Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML13333A406
Person / Time
Site: San Onofre 
Issue date: 08/10/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: James Drake
SOUTHERN CALIFORNIA EDISON CO.
References
TAC-48143, NUDOCS 7909270710
Download: ML13333A406 (2)


Text

DISTRIBUTION NRC PDR Local PDR ORB #2 Reading NRR Reading Docket No. 50-206 DLZiemann HSmith ABurger WRussell TVWambach Mr. James H. Drake OELD Vice President OI&E (3)

Southern California Edison Company GLainas AUG 2244 Wfalnut Grove Avenue RFerguson Post Office Box 300 JRBuchanan Rosemead, California 91770 TERA

Dear Mr. Drake:

ACRS (16)

DCrutchfield In May 19-76, w-e issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 -

Fire Protection.

Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with tne NRC guidelines.

In late 1976, we set October 1980 as the date for completing the imple mentation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon -as practical, with due consideration of the nature of the modifications.

For example, minor modifications, adoption of administrative controls and additional portable equip ment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to.

maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urgje you to apply your best efforts to improve your schedules for completion of as many of the fire protection modifications at your facility as possible prior to October 1980 and to submit on an expedited b)asis any information that is still outstanding with regard to open items and required design details.

DOR' AD/SEP DOR:

Sincerely, R

mer DG t

Orig Si/79

/79 R..

ORB...R...........

. 1 v.......

.ng..D. rpertor........

T Wam a ivisio,of Operating Reactors iemann SURNMEOT..

  • jmbach.c (f

.NucTh.a Reji.i.f rn A.

./

/79

/

/79 NRC FORM 318 (9-76) NRCM 0240

  • U.S. GOVERNMENT PRINTING OPFICE' 1978 - 2065 - 77 909270 7/0

,t

Mr. James UG1 0 1979 cc Charles R. Kocher, Assistant General Counsel Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Samuel B. Casey Chickering & Gregory Three Embarcadero Center Twenty-Third Floor San Francisco, California 94111 Jack E. Thomas Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 U. S. Nuclear Regulatory Commission ATTN:

Robert J. Pate P. 0. Box 4167 San Clemente, California 92672 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676