Other: 05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired, ML13308A644, ML13308A646, ML13317A193, ML13317A236, ML13317A408, ML13317A411, ML13317A726, ML13317A797, ML13322A549, ML13326A530, ML13326A551, ML13326A553, ML13330A121, ML13330A157, ML13330A207, ML13330A251, ML13330A253, ML13333A308, ML13333A315, ML13333A322, ML13333A323, ML13333A326, ML13333A338, ML13333A348, ML13333A367, ML13333A406, ML13333A423, ML13333A476, ML13333A524, ML13333A762, ML14100A289, ML14119A353, ML19282B877, ML19318H957, ML19318H978, ML19318H981, ML19340D243, ML20136H076
|
MONTHYEAR05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired1978-03-28028 March 1978 /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired Project stage: Other ML19318H9571978-05-19019 May 1978 Submits Results of Review of Fire Protection Program for Conformance W/Nrc Guidelines, Nuclear Plant Fire Protection Functional Responsibilities, Admin Controls & QA, Per 770819 Request Project stage: Other ML19318H9781978-07-0303 July 1978 Discusses V Stello Forwarding Manpower Requirements for Operating Reactors. Util Still Maintains That Min Fire Brigade of Three Persons Sufficient.Basis for Position Included in Util Project stage: Other ML19318H9811978-07-0808 July 1978 Forwards Suppl 1 to Fire Protection Program Review..., Providing Addl Info Requested in Encl 1 to NRC & Responses to NRC Positions Identified in Same Ltr Project stage: Other ML13309A5711978-10-18018 October 1978 Forwards Amend 12 to Fsar. Amend Contains Responses to NRC 780726 & 0818 Questions & Includes Corrections & Additions to FSAR Info Project stage: Request ML13333A3081978-10-18018 October 1978 Forwards Info Re Mod to 4,160-volt Switchgear Room for Fire Zone 8 & Mod to Lube Oil Reservoir & Conditioner Area in Fire Zone 9A as Part of Fire Protection Program Project stage: Other ML13333A3141978-10-30030 October 1978 Repts Insertion of Containment Spray Sys Nozzle Insp Requirement in Section 4.2 of Tech Specs, Safety Injection & Containment Spray Sys Periodic Testing Project stage: Request ML13333A3151978-10-30030 October 1978 Advises That Casualty Procedure Re Air Supply for Lube Oil Reservoir & Conditioner Area & Station walk-through Will Be Performed in Response to NRC 781018 Request Re Fire Protection Project stage: Other IR 05000361/19780161978-11-17017 November 1978 IE Inspec Rept 50-361/78-16 on 781030-1103 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Reactor Internals & Miscellaneous Open Items from Previous Inspecs Project stage: Request ML13333A3221978-11-22022 November 1978 Submits Proposed Mods to Air Supply Sys of Subj Facil.Mods Will Ensure Availability of Air Supply to Req Equip After Loss of Main Air Header Due to Fire in Lube Oil Reservoir & Conditioner Area Project stage: Other ML13333A3231978-11-28028 November 1978 States Util Is Unable to Submit Response to Fire Protec Review Questions by 781127.Will Submit by 781201 Project stage: Other ML13333A3261978-12-0101 December 1978 Responds to NRC Staff Positions Forwarded in 781117 NRC Ltr Re Fire Protec Prog Review.Staff Positions Responded to incl:PF-27A,Cable Spreading Area & PF-51,Containment Project stage: Other ML13333A3381979-01-15015 January 1979 Forwards Conceptual Plan for Safe Unit Shutdown Following Fire in 4160v Switchgear Room or Lube Oil Reserve Area.Also Forwards Related Plant Mod Plan & Implementation Schedule Project stage: Other ML19282B8771979-01-31031 January 1979 Fire Protection in Operating Nuclear Power Stations Project stage: Other ML13326A5301979-01-31031 January 1979 Suggests Mods to Fire Protection Plan,Re Electrical Valve Supervision & Portable Smoke Venting Equipment Project stage: Other IR 05000361/19790011979-01-31031 January 1979 IE Insp Repts 50-361/79-01 & 50-362/79-01 on 790108-11. Noncompliance Noted:Discrepancies Noted in Governing Record Used as Calibr Control Project stage: Request ML13333A3481979-03-0101 March 1979 Requests Extension to 790330 in Which to Submit Evaluation, Originally Due 790215,re Effects of Fire in H-seal Unit on Structured Steel of Turbine Bldg Project stage: Other ML13322A5491979-04-13013 April 1979 Requests Licensee Provide Design Mods Which Will Assure Safe Shutdown Can Be Achieved & Maintained Using Onsite Power Source Project stage: Other ML13333A3671979-05-15015 May 1979 Updates Status of Commitments Re Operating Functions & Plant Mods of Fire Protection Program.Discusses Safe Shutdown Casualty Procedure,Spurious Valve Actuation & Hydrogen Seal Oil Area Fire Project stage: Other ML13326A5511979-07-19019 July 1979 Amend 44 to License DPR-13,incorporating Tech Spec Changes Re Fire Protection Sys Operability & Surveillance & Fire Protection Program Responsibility Project stage: Other ML13326A5531979-07-19019 July 1979 Notice of Issuance & Availability of Amend 44 to License DPR-13 Project stage: Other ML13326A5491979-07-19019 July 1979 Forwards Amend 44 to License DPR-13,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML13326A5521979-07-19019 July 1979 Safety Evaluation Supporting Amend 44 to License DPR-13 Project stage: Approval ML13333A4061979-08-10010 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML13333A4131979-08-27027 August 1979 Forwards 790413 Request for Addl Info Re Safe Shutdown of Facility Project stage: RAI ML14100A2891979-09-14014 September 1979 NRC Position on Safe Shutdown Capability Project stage: Other ML13333A4181979-09-14014 September 1979 Forwards NRC Position on Safe Shutdown Capability,To Help Licensee Prepare Response to Safety Evaluation for Fire Protection.Requests Schedule for Submittal of Revised Safe Shutdown Plan within 30 Days Project stage: Approval ML13333A4231979-10-23023 October 1979 Forwards Addl Design Info Re Fire Protection Program Review in Response to NRC .Revised Plan for Safe Shutdown Following Fire Deferred Pending Completion of Integrated Assessment of SEP Mods Project stage: Other ML13333A4591979-12-26026 December 1979 Forwards Rept Re Analysis Methods to Determine That Fire in Hydrogen Seal Oil Unit Would Not Substantially Impact Structural Integrity of Steel in South End of Turbine Bldg Project stage: Request ML13333A4761980-01-23023 January 1980 Forwards Addl Design Info & Drawings Re Fire Protection Mods to Be Implemented During Next Refueling Outage.Drawings Available in Central Files Only Project stage: Other ML13311B0361980-01-23023 January 1980 Requests Denial of Petitions Under 10CFR2.206.Petitions Fail to Particularize Factual Basis for Conclusions,Fail to Raise Unreviewed Health or Safety Issues & Fail to Seek Proper Reconsideration of Resolved Issues Project stage: Request ML13333A5241980-03-0606 March 1980 Informs NRC That in Situ Testing of Fire Detection Sys Will Be Deferred Until Acceptable Method Is Developed to Ensure That Station Will Not Be Adversely Affected.Util Will Proceed W/Inplace Sensitivity & Loop Voltage Tests Project stage: Other IR 05000206/19800091980-04-16016 April 1980 IE Insp Rept 50-206/80-09 on 800301-0404.Noncompliance Noted:Failure to Follow Emergency Procedure & Operation Outside Limiting Condition for Operation Project stage: Request ML13308A6441980-04-16016 April 1980 Forwards Revision to BNL Re Items 3.1.1(5),3.1.2 (b),3.1.5(d),3.1.6,3.1.7(a),3.1.7(b),3.1.15(b) & 3.2.3. for Fire Protection Review Project stage: Other ML13308A6461980-05-13013 May 1980 Forwards Fire Protection Review Responding to Items 3,7 & 10 & Licensee .Automatic Power Backup Should Be Supplied for Fire Alarm Sys Project stage: Other ML13330A1211980-09-26026 September 1980 Forwards Response to Comments & Recommendations Re BNL Review of Fire Protection Program.Response Includes New Design Change Commitments.Oversize Drawings,Hydraulic Design Info & Calculation Sheets Available in Central Files Project stage: Other IR 05000206/19800251980-09-26026 September 1980 IE Insp Rept 50-206/80-25 on 800811-29.No Noncompliance Noted.Major Areas Inspected:Plant Operations During long-term Outage,Monthly Maint & Surveillance Observations & Review of LERs Project stage: Request ML13330A1571980-11-0606 November 1980 Informs of Recently Approved Revised 10CFR50.48 Containing Schedules for Completion of All Fire Protection Mods.No Present Implementation Required as Necessary Addl Info Has Not Yet Been Approved Project stage: Other ML19340D2431980-11-24024 November 1980 Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl Project stage: Other ML13302A8701980-11-24024 November 1980 Summary of 801020 Meeting W/Fema in Los Angeles,Ca Re Emergency Planning Project stage: Request ML20136H0761981-02-0404 February 1981 Marked-up Sser 1 Supporting Fire Protection Project stage: Other ML13302A1651981-02-0404 February 1981 LOCA, Emergency Operating Instruction Project stage: Request ML13330A2191981-02-0404 February 1981 Forwards Suppl 1 to 790719 Fire Protection Safety Evaluation Rept.Items Reviewed:Control Room Fire Detection Sys,Smoke Detectors in Lube Oil Area,Fire Pump Test Features & Turbine Bldg Structure Project stage: Approval ML13330A2071981-02-10010 February 1981 Requests Extension to 811117 for Completion of Fire Protection Features Re Water Suppression Sys,Fire Barriers, Fire Dampers,Fire Barrier Penetrations & Water Damage Protection Project stage: Other ML13330A2531981-02-13013 February 1981 Notice of Extension of Completion Dates of Fire Protection Mods from 800719 to 811117 Project stage: Other ML13330A2511981-02-13013 February 1981 Forwards Fr Notice Re Extension of Time for Completion of Fire Protection Mods from 800719 to 811117.Description of Mods Encl Project stage: Other ML14119A3531981-03-19019 March 1981 Provides Info Required by New Fire Protection Regulations 10CFR50.48.Installation of Smoke Detectors,Emergency Lighting,Reactor Coolant Pump Lube Oil Collection Sys & Provision of Safe Shutdown Capability Discussed Project stage: Other ML13330A9081981-11-0404 November 1981 Application for Exemption from Deadline to Install Certain Fire Safety Measures Project stage: Request ML13330A9121981-11-0404 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Submit Fire Safety Plans & Schedules.Proof of Svc by Mail Encl Project stage: Request ML13330A9101981-11-0505 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Install Certain Fire Safety Measures.Proof of Svc by Mail Encl Project stage: Request 1979-05-15
[Table View] |
Text
REGULATORY DOCKET FILE COP'f Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K.
P. BASKIN TELEPHONE MANAGE A GENERATION ENGINEERING December 1, 1978 213-572-1401 Director, Office of Nuclear Reactor Regulation Attn: Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Subject:
Docket No. 50-206, Provisional Operating License No. DPR-13 Fire Protection Program Review San Onofre Nuclear Generating Station Unit 1 As indicated in our letter of November 28, 1978, we committed to respond to the NRC Staff Positions PF-27A, "Cable Spreading Area", and PF-51, "Containment", which were forwarded to us as Enclosure 2 to your letter of November 17, 1978. The following response is supplied in order to satisfy that commitment.
PF-27A Cable Spreading Area Staff Position:
Passive measures should be taken to prevent a major electrical cable fire in the cable spreading areas. These measures should consist of the appli cation of a flame retardant coating to electrical cables or the combination of fire stops in cable trays and the use of suitable fire barriers to prevent fire propagation between adjacent cable trays.
Response
The fire zone of concern is the 4160V switchgear room. A fire in this area results in considerable difficulties with respect to the capability of achieving a safe shutdown of the plant.
For this reason, a substantial effort has been directed at providing a viable means of detecting and suppressing a fire in this area in order to limit the associated fire damage.
The results of this effort have been the proposed final modifications identified in our letter of October 18, 1978, which is included as Enclosure 1 of this letter.
812001P
Mr. D. L. Ziemann.
December 1, 1978 Furthermore, in the event that a fire in this area results in the total loss of the 4160V electrical systems (and associated equipment), it is our intent to provide a means to ensure safe shutdown of the station in a manner which considers the criteria identified in NRC staff position PF-50A "Shutdown Capability", which is included as Enclosure 2 of this letter.
Based on the combination of the above identified fire protection measures with the capability for safe shutdown of the station independent of any fire, adequate measures exist to satisfy the expressed NRC staff concerns. Therefore, passive measures such as a flame retardant coating and/or fire stops for electrical cables in the 4160V switchgear room are not needed to ensure safe shutdown of the station.
PF-51 Containment Staff Position:
Fire stops should be provided in cable trays to prevent fire propagation between redundant divisions of cable trays (inside containment).
Response
Passive measures as indicated in this staff position will be con sidered as part of the Systematic Evaluation Program in the same manner as the other interfacing and related fire protection modifications which have been deferred as agreed upon at the NRC/SCE meeting of August 29, 1978.
If you have any questions or desire additional information, please contact me.
Very truly yours, Enclosures Final Modifications to 4160-volt Switchgear Room (Fire Zone 8)
- 1. Automatic Halon System (Double Shot)
- 2. Fire Detectors
- 3. Fire/Smoke Dampers
- 4. Drainage Modifications
.5. Hose Reel at Southeast Door
- 6. Penetration Seals for Leak Tightness*
- 7. Spray Splash Shields for Switchgear Note:
The above described modifications are in addition to the interim modifica tions which have been installed during the last refueling outage. These modifica tions include a 3-hour self-closing fire door at the southwest door and the addition of a sealing around the southeast door.
- Seals will have a fire rating of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
W Fire Protection Program Review NRC Staff Position on Safe Shutdown PF-50A Shutdown Capability Staff Position:
An alternate means should be provided to ensure safe shutdown with either onsite or offsite power independent of systems which could be damaged by a fire in the 4160 volt switchgear room. It is recommended that consideration be given to a dedicated shutdown system which could resolve this concern and any concerns resulting from the Systematic Evaluation Program. The alternate shutdown means should meet the following criterion:
- 1. Following any fire, the plant should be capable of achieving hot shutdown conditions using equipment and systems that are free of fire damage.
- 2. The plant should be capable of maintaining hot shutdown conditions for an extended time period significantly longer than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
This capa bility should include the use of a charging pump and be accomplished from a minimum of remote locations.*
- 3. Fire damage to systems necessary to achieve and maintain cold shutdown conditions should be limited so that repairs can be made and cold shutdown conditions achieved within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- 4. Repair procedures for cold shutdown systems should be prepared and material needed for such repairs should be on the site.
- 5. The hot shutdown condition must be achievable with power from the offsite power system, and upon its loss, with power from the onsite power system.
A dedicated power supply may be substituted for the onsite power system.
- 6. The power needed to achieve the cold shutdown condition may be obtained from any one of the offsite power, onsite power, or dedicated power systems.
- 7. The adequacy of these minimum systems should be verified by a thorough evaluation of:
- a. Systems required for hot shutdown;
- b. Systems required for cold shutdown;
- c. Fire damage to power distribution systems; and
- d. Interactions caused by fire damage to power and water supply systems and to supporting systems.