Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
Results
Other: 05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired, ML13308A644, ML13308A646, ML13317A193, ML13317A236, ML13317A408, ML13317A411, ML13317A726, ML13317A797, ML13322A549, ML13326A530, ML13326A551, ML13326A553, ML13330A121, ML13330A157, ML13330A207, ML13330A251, ML13330A253, ML13333A308, ML13333A315, ML13333A322, ML13333A323, ML13333A326, ML13333A338, ML13333A348, ML13333A367, ML13333A406, ML13333A423, ML13333A476, ML13333A524, ML13333A762, ML14100A289, ML14119A353, ML19282B877, ML19318H957, ML19318H978, ML19318H981, ML19340D243, ML20136H076
|
MONTHYEAR05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired1978-03-28028 March 1978 /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired Project stage: Other ML19318H9571978-05-19019 May 1978 Submits Results of Review of Fire Protection Program for Conformance W/Nrc Guidelines, Nuclear Plant Fire Protection Functional Responsibilities, Admin Controls & QA, Per 770819 Request Project stage: Other ML19318H9781978-07-0303 July 1978 Discusses V Stello Forwarding Manpower Requirements for Operating Reactors. Util Still Maintains That Min Fire Brigade of Three Persons Sufficient.Basis for Position Included in Util Project stage: Other ML19318H9811978-07-0808 July 1978 Forwards Suppl 1 to Fire Protection Program Review..., Providing Addl Info Requested in Encl 1 to NRC & Responses to NRC Positions Identified in Same Ltr Project stage: Other ML13309A5711978-10-18018 October 1978 Forwards Amend 12 to Fsar. Amend Contains Responses to NRC 780726 & 0818 Questions & Includes Corrections & Additions to FSAR Info Project stage: Request ML13333A3081978-10-18018 October 1978 Forwards Info Re Mod to 4,160-volt Switchgear Room for Fire Zone 8 & Mod to Lube Oil Reservoir & Conditioner Area in Fire Zone 9A as Part of Fire Protection Program Project stage: Other ML13333A3141978-10-30030 October 1978 Repts Insertion of Containment Spray Sys Nozzle Insp Requirement in Section 4.2 of Tech Specs, Safety Injection & Containment Spray Sys Periodic Testing Project stage: Request ML13333A3151978-10-30030 October 1978 Advises That Casualty Procedure Re Air Supply for Lube Oil Reservoir & Conditioner Area & Station walk-through Will Be Performed in Response to NRC 781018 Request Re Fire Protection Project stage: Other IR 05000361/19780161978-11-17017 November 1978 IE Inspec Rept 50-361/78-16 on 781030-1103 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Reactor Internals & Miscellaneous Open Items from Previous Inspecs Project stage: Request ML13333A3221978-11-22022 November 1978 Submits Proposed Mods to Air Supply Sys of Subj Facil.Mods Will Ensure Availability of Air Supply to Req Equip After Loss of Main Air Header Due to Fire in Lube Oil Reservoir & Conditioner Area Project stage: Other ML13333A3231978-11-28028 November 1978 States Util Is Unable to Submit Response to Fire Protec Review Questions by 781127.Will Submit by 781201 Project stage: Other ML13333A3261978-12-0101 December 1978 Responds to NRC Staff Positions Forwarded in 781117 NRC Ltr Re Fire Protec Prog Review.Staff Positions Responded to incl:PF-27A,Cable Spreading Area & PF-51,Containment Project stage: Other ML13333A3381979-01-15015 January 1979 Forwards Conceptual Plan for Safe Unit Shutdown Following Fire in 4160v Switchgear Room or Lube Oil Reserve Area.Also Forwards Related Plant Mod Plan & Implementation Schedule Project stage: Other ML19282B8771979-01-31031 January 1979 Fire Protection in Operating Nuclear Power Stations Project stage: Other ML13326A5301979-01-31031 January 1979 Suggests Mods to Fire Protection Plan,Re Electrical Valve Supervision & Portable Smoke Venting Equipment Project stage: Other IR 05000361/19790011979-01-31031 January 1979 IE Insp Repts 50-361/79-01 & 50-362/79-01 on 790108-11. Noncompliance Noted:Discrepancies Noted in Governing Record Used as Calibr Control Project stage: Request ML13333A3481979-03-0101 March 1979 Requests Extension to 790330 in Which to Submit Evaluation, Originally Due 790215,re Effects of Fire in H-seal Unit on Structured Steel of Turbine Bldg Project stage: Other ML13322A5491979-04-13013 April 1979 Requests Licensee Provide Design Mods Which Will Assure Safe Shutdown Can Be Achieved & Maintained Using Onsite Power Source Project stage: Other ML13333A3671979-05-15015 May 1979 Updates Status of Commitments Re Operating Functions & Plant Mods of Fire Protection Program.Discusses Safe Shutdown Casualty Procedure,Spurious Valve Actuation & Hydrogen Seal Oil Area Fire Project stage: Other ML13326A5511979-07-19019 July 1979 Amend 44 to License DPR-13,incorporating Tech Spec Changes Re Fire Protection Sys Operability & Surveillance & Fire Protection Program Responsibility Project stage: Other ML13326A5531979-07-19019 July 1979 Notice of Issuance & Availability of Amend 44 to License DPR-13 Project stage: Other ML13326A5491979-07-19019 July 1979 Forwards Amend 44 to License DPR-13,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML13326A5521979-07-19019 July 1979 Safety Evaluation Supporting Amend 44 to License DPR-13 Project stage: Approval ML13333A4061979-08-10010 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML13333A4131979-08-27027 August 1979 Forwards 790413 Request for Addl Info Re Safe Shutdown of Facility Project stage: RAI ML14100A2891979-09-14014 September 1979 NRC Position on Safe Shutdown Capability Project stage: Other ML13333A4181979-09-14014 September 1979 Forwards NRC Position on Safe Shutdown Capability,To Help Licensee Prepare Response to Safety Evaluation for Fire Protection.Requests Schedule for Submittal of Revised Safe Shutdown Plan within 30 Days Project stage: Approval ML13333A4231979-10-23023 October 1979 Forwards Addl Design Info Re Fire Protection Program Review in Response to NRC .Revised Plan for Safe Shutdown Following Fire Deferred Pending Completion of Integrated Assessment of SEP Mods Project stage: Other ML13333A4591979-12-26026 December 1979 Forwards Rept Re Analysis Methods to Determine That Fire in Hydrogen Seal Oil Unit Would Not Substantially Impact Structural Integrity of Steel in South End of Turbine Bldg Project stage: Request ML13333A4761980-01-23023 January 1980 Forwards Addl Design Info & Drawings Re Fire Protection Mods to Be Implemented During Next Refueling Outage.Drawings Available in Central Files Only Project stage: Other ML13311B0361980-01-23023 January 1980 Requests Denial of Petitions Under 10CFR2.206.Petitions Fail to Particularize Factual Basis for Conclusions,Fail to Raise Unreviewed Health or Safety Issues & Fail to Seek Proper Reconsideration of Resolved Issues Project stage: Request ML13333A5241980-03-0606 March 1980 Informs NRC That in Situ Testing of Fire Detection Sys Will Be Deferred Until Acceptable Method Is Developed to Ensure That Station Will Not Be Adversely Affected.Util Will Proceed W/Inplace Sensitivity & Loop Voltage Tests Project stage: Other IR 05000206/19800091980-04-16016 April 1980 IE Insp Rept 50-206/80-09 on 800301-0404.Noncompliance Noted:Failure to Follow Emergency Procedure & Operation Outside Limiting Condition for Operation Project stage: Request ML13308A6441980-04-16016 April 1980 Forwards Revision to BNL Re Items 3.1.1(5),3.1.2 (b),3.1.5(d),3.1.6,3.1.7(a),3.1.7(b),3.1.15(b) & 3.2.3. for Fire Protection Review Project stage: Other ML13308A6461980-05-13013 May 1980 Forwards Fire Protection Review Responding to Items 3,7 & 10 & Licensee .Automatic Power Backup Should Be Supplied for Fire Alarm Sys Project stage: Other ML13330A1211980-09-26026 September 1980 Forwards Response to Comments & Recommendations Re BNL Review of Fire Protection Program.Response Includes New Design Change Commitments.Oversize Drawings,Hydraulic Design Info & Calculation Sheets Available in Central Files Project stage: Other IR 05000206/19800251980-09-26026 September 1980 IE Insp Rept 50-206/80-25 on 800811-29.No Noncompliance Noted.Major Areas Inspected:Plant Operations During long-term Outage,Monthly Maint & Surveillance Observations & Review of LERs Project stage: Request ML13330A1571980-11-0606 November 1980 Informs of Recently Approved Revised 10CFR50.48 Containing Schedules for Completion of All Fire Protection Mods.No Present Implementation Required as Necessary Addl Info Has Not Yet Been Approved Project stage: Other ML19340D2431980-11-24024 November 1980 Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl Project stage: Other ML13302A8701980-11-24024 November 1980 Summary of 801020 Meeting W/Fema in Los Angeles,Ca Re Emergency Planning Project stage: Request ML20136H0761981-02-0404 February 1981 Marked-up Sser 1 Supporting Fire Protection Project stage: Other ML13302A1651981-02-0404 February 1981 LOCA, Emergency Operating Instruction Project stage: Request ML13330A2191981-02-0404 February 1981 Forwards Suppl 1 to 790719 Fire Protection Safety Evaluation Rept.Items Reviewed:Control Room Fire Detection Sys,Smoke Detectors in Lube Oil Area,Fire Pump Test Features & Turbine Bldg Structure Project stage: Approval ML13330A2071981-02-10010 February 1981 Requests Extension to 811117 for Completion of Fire Protection Features Re Water Suppression Sys,Fire Barriers, Fire Dampers,Fire Barrier Penetrations & Water Damage Protection Project stage: Other ML13330A2531981-02-13013 February 1981 Notice of Extension of Completion Dates of Fire Protection Mods from 800719 to 811117 Project stage: Other ML13330A2511981-02-13013 February 1981 Forwards Fr Notice Re Extension of Time for Completion of Fire Protection Mods from 800719 to 811117.Description of Mods Encl Project stage: Other ML14119A3531981-03-19019 March 1981 Provides Info Required by New Fire Protection Regulations 10CFR50.48.Installation of Smoke Detectors,Emergency Lighting,Reactor Coolant Pump Lube Oil Collection Sys & Provision of Safe Shutdown Capability Discussed Project stage: Other ML13330A9081981-11-0404 November 1981 Application for Exemption from Deadline to Install Certain Fire Safety Measures Project stage: Request ML13330A9121981-11-0404 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Submit Fire Safety Plans & Schedules.Proof of Svc by Mail Encl Project stage: Request ML13330A9101981-11-0505 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Install Certain Fire Safety Measures.Proof of Svc by Mail Encl Project stage: Request 1979-05-15
[Table View] |
Text
"DISTRI ON FOR AMEND #12 FSAR" REGULATORY NFORMATION DISTRIBUTION OTEM DOCKET NBR: 050-361/362 SAN ONOFRE-2/3 DOC DATE:
781018 REo.PIENT:
BAER, R.L.
ACCESSION NBR:781026R15 GRIGINATOR: DRAKE, J.H.
COPIES RECEIVED:
COMPANY NAME-S CA EDISON LTR 3
ENCL 60
SUBJECT:
SIZE: 1+400 Forwards amend 12 to FSAR oper lic appl. Amend contains responses to NRC questions dtd 780726 & 0818.
Includes corrections & additions to FSAR info..-.,w
- Ae 4vW/a IFI NOTARIZED L
DIST0TRUTION COOE B001 DISTRTRUTION TITLEl PSAR/FSAR AMOTS AND RELATED CfRESPONDENCE NAME ENCL?
FOR ACTION ASST r
LTR ONLY
- VASSALLO gP CHTFF LTR ONLY
- LWR#3 BC pRo JrR w;'/ENCL
- ROOD L,C:A -=T LTQ ONLY T.W 4 9 T.A 2-~~:~
w/ENCL N:P-P A/ENCL I & E
'4/2 ENCL OELD LTR nNLY OPERATOR LIC HQ
/ENCL EmEPGFNICY PLAH 3R w/ENCL QAS3 w/ENCL DIRECTOR NRP LTP ONLY MIPC LTR ONLY AD FOp ENr, LTQ ONLY MECH FNG SR
/ENCL STRUCTURAL ENG 8R vJ/ENCL MATERTAL ENG RR w./2 ENCL AD FOP REAC SFTY LTP ONLY OCT W
NOTES:
- 1. SEND ALL FSAR & ER AMENDS TO L. CHANDLER
- 2. DISTRIBUTION FOR DRWGS FOR TABLE 1.8-2:
REG FILES, NRC PDR, I & E(1)., AUXILIARY SYS BR, LPDR.
7 9
REGULATOP 9 INFORMATION DISTRIBUTION *STEM DOCKET NBR:
DOC DATE:
RECIPIENT:
ACCESSION NBR:
ORIGINATOR:
COPIES RECEIVED:
LTR ENCL
SUBJECT:
SIZE:
FOR ACTION REACTnrP SYSTEm8 BR W/ENCL ANALYSTS RR V/ENCL CORE FFnRMANCE BR W/ENCL AD FOR PLANT SYSTEMS LTR ONLY AUXILTAPY SYS BR w/ENCL CONTATNMENT SYSTEMS W/ENCL I & C SYSTEMS RR 4/ENCL POwER SYS R
W/ENCL AD FOP SITE TECH W/5 ENCL AD FOR SITE ANLYS LTR flNLY ACCIDFNT ANALYSIS
/ENCL EFFLUENT TREAT SYS W/ENCL RAD AIsESSMENT HR W/ENCL KIRKwnOD
/ENCL GEOSCIENCES BR W/ENCL LPDP W/ENCL TERA W/ENCL NSIC W/ENCL ACRS W/16 ENCL TOTAL NUMBER OF COPIES REQUIREDs LTR 58 E CL 48 NOTES:
Southern California Edison Company gCE
. 0. BOX 800 2244 WALNUT GROVE AVENUE J. H. DRAKE ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT 213-572-2258 October 18, 1978 Director of Nuclear Reactor Regulation Attention: Mr. Robert L. Baer, Chief LWR Branch 2, DPM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station
-Units 2 and 3 Enclosed are sixty-three copies of Amendment No. 12 to the Final Safety Analysis Report (FSAR) for the San Onofre Nuclear Generating Station, Units 2 and 3, operating license applications. This amendment contains responses to several of the questions forwarded by the NRC's letters of July 26 and August 18, 1978 and also provides information to satisfy several of the commitments made in the FSAR in Docket Nos.
50-361 and 50-362.
In.addition, Amendment No. 12 contains miscellaneous corrections, clarifications, and additions to FSAR information.
Direct distribution of the amendment will be made in accordance with the revised service.list provided by SCE's letter of February 23, 1978 to the Commission. An affidavit attesting to the fact that distribution has been completed will be provided within ten days of amendment docketing.
If you have any questions or comments concerning the information contained in this amendment, please contact me.
Sincerely, Eco/s Enclosures/
Southern California Edison Company
...CE P. 0. BOX 800 2244 WALNUT GROVE AVENUE J. H. DRAKE ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT 213-572-2258 October 18, 1978 Director of Nuclear Reactor Regulation Attention:
Mr. Robert L. Baer, Chief LWR Branch 2, DPM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2 and 3 Enclosed are sixty-three copies of Amendment No. 12 to the Final Safety Analysis Report (FSAR) for the San Onofre Nuclear Generating Station, Units 2 and 3, operating license applications. This amendment contains responses to several of the questions forwarded by the NRC's letters of July 26 and August 18, 1978 and also provides information to satisfy several of the commitments made in theFSAR in Docket Nos.
50-361 and 50-362.
In addition, Amendment No. 12 contains miscellaneous corrections, clarifications, and additiods to FSAR information.
Direct distribution of the amendment will be made in accordance with the revised servide,list provided by SCE's letter of February 23, 1978 to the Commission. An affidavit 'attesting to the fact that distribution has been completed will be provided within ten days of amendment docketing.
If you have any questions or comments concerning the information contained in this amendment, please contact me.
Sincerely, Enclosures E-4 0A
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 EMORANDUM FOR:
TERA Corp.
FROM:
US NRC/TIDC/Distribution Services Branch
SUBJECT:
Special Document Handling Requirements Please use the following special distribution list for the attached document.
p
.1___
beys frov1 i.
- 2. The attached document requires the following special considerations:
Do not send oversize enclosure to the NRC PDR.
Only one oversize enclosure was received -
please return for Regulatory File storage.
Proprietary information -
send affidavit only to the NRC PDR Other: (specify) cc: DSB Files TIDC/DSB Authorized Signa ure
)* *"DISTRIJ TON FOR AMEND #12 FSAR" REGULATORINFORMATION DISTRIBUTION*STEM DOCKET NBR: 050-361/362 SAN ONOFRE-2/3 DOC DATE:
781018 RECIPIENT:
BAER, R.L.
ACCESSION NBR: 781026115 ORIGINATOR: DRAKE, J.H.
COPIES RECEIVED:
COMPANY NAME-S CA EDISON LTR 3
ENCL 60
SUBJECT:
SIZE: 1+400 Forwards amend 12 to FSAR oper lic appl.
Amend contains responses to NRC questions dtd 780726 & 0818.
Includes corrections & additions to FSAR info.
NOTARIZED___
DISTPTRUTTON CODE:
BO01 DISTRTRUTION TITLEI PSAR/FSAR AMDTS AND RELATED CORESPONDENCE NAME ENCL?
FOR ACTION ASST rDIR LTR ONLY
- VASSALLO BR CHTEF LTR ONLY
- T.WRA T.A REG FILE w/ENCL NRC PR W/ENCL I & E W/2 ENCL OELD LTR ONLY OPERATOR LIC HR w/ENCL EMERGFNJCY PLAN BR W/ENCL QAB W/ENCL DIRECTOR NRP LTP ONLY MIPC LTR ONLY AD FOP ENr LTR ONLY MECH pNiG BR W/ENCL STRUCTURAL ENG BR W/ENCL MATERTAL ENG PR w/2 ENCL AD FOR REAC SFTY LTP ONLY NOTES:
- 1. SEND ALL FSAR & ER AMENDS TO L. CHANDLER
- 2.
DISTRIBUTION FOR DRWGS FOR TABLE 1.8-2:
REG FILES, NRC PDR, I & E(1), AUXILIARY SYS BR, LPDR.
Al-e REGULATORINFORMATION DISTRIBUTION STEM DOCKET NBR:
__DOC DATE:
RECIPIENT:
__ACCESSION NBR:
ORIGINATOR:
COPIES RECEIVED:
LTR ENCL
SUBJECT:
SIZE:
FOR ACTION REACTIP SYSTEmS BR W/ENCL I
ANALYSTS RR W/ENCL CORE PEPFORMANCE BR W/ENCL AD FOP PLANT SYSTEMS LTR ONLY AUXILTARY SYS BR W/ENCL CONTATNMENT SYSTEMS W/ENCL I & C SYSTEMS BR W/ENCL POwER sYS R
W/ENCL AD FOP SITE TECH W/5 ENCL AD FOR SITE ANLYS LTR W1NLY ACCIDENT ANALYSIS W/ENCL EFFLUENT TREAT SYS W/ENCL RAD ASsESSMENT BR W/ENCL KIRKwnnD W/ENCL GEOSCIENCES 3R
.W/ENCL LPDP W/ENCL TERA W/ENCL NSIC W/ENCL ACRS W116 ENCL TOTAL NUMBER OF COPIES REQUIREDI LTR 58 E CL 48 NOTES:
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS &
ELECTRIC COMPANY for a Class 103
)
DOCKET NO. 50-361 UNIT 2 License to Acquire, Possess, and Use
)
AMENDMENT NO. 12 Two Utilization Facilities and Related Licenses in Connection with
)
DOCKET NO. 50-362 UNIT 3 Units No. 2 and 3 of the San Onofre
)
AMENDMENT NO. 12 Nuclear Generating Station of SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS &
ELECTRIC COMPANY hereby amend the above-numbered Application by submitting herewith.Amendment No. 12 to Final Safety Analysis Report (FSAR).
This Amendment consists of (1) information submitted in response to several of the questions contained in the request for additional information in the Commission's letters dated July 26 and August 18, 1978, (2) information provided to satisfy several of the commitments made in the FSAR in Docket Nos. 50-361 and 50-362; and (3) miscellaneous corrections, clarifications and additions to the FSAR information.
In the event of a conflict, the information in this Amendment No. 12 supersedes the information previously submitted.
Uj
Subscribed on this y
day of
&d;O-f
/97 Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By Vice Presidpnt David N. Barry James A. Beoletto Attorneys for Southern California Edison Company By Subscribed and sworn to before me this O ffCIAL SEZ a
o AGNES CRABTREE L7 day of 7,fFe /97.
NOTARY PUBLIC CALIFORNIA PRINCIPAL OFFICE IN LOS ANGELES COUNTY My Commission Exp. Aug,27, 1982 Notar Public in and for the County of Los Angeles, State of California
SAN DIEGO GAS & ELECTRIC COMPANY By 1
D. W. Gilman Senior Vice President David R. Pigott Frank S. Bayley, III Samuel B. Casey Chickering & Gregory Attorneys for San Diego Gas & Electric Company By David R. Pigo t Subscribed and sworn to before me this 18th day of October OFFICIAL SEAL LEE BLANAS
~
Notary Public in and for the City and NOTAvPUBuC-CAuRIA County.of San Diego, California Principai Office, San Diego Coo Califo My Commission Exp. Nov. 16, 1980