Other: 05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired, ML13308A644, ML13308A646, ML13317A193, ML13317A236, ML13317A408, ML13317A411, ML13317A726, ML13317A797, ML13322A549, ML13326A530, ML13326A551, ML13326A553, ML13330A121, ML13330A157, ML13330A207, ML13330A251, ML13330A253, ML13333A308, ML13333A315, ML13333A322, ML13333A323, ML13333A326, ML13333A338, ML13333A348, ML13333A367, ML13333A406, ML13333A423, ML13333A476, ML13333A524, ML13333A762, ML14100A289, ML14119A353, ML19282B877, ML19318H957, ML19318H978, ML19318H981, ML19340D243, ML20136H076
|
MONTHYEAR05000206/LER-1978-003-01, /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired1978-03-28028 March 1978 /01T-0:on 780315,inverters Tripped Causing Loss of Power to Containment Spray Actuation Sys Logic Train & Pressure Sensors.Caused by Failure of Capacitor.One Inverter Reset & One Inverter Removed & Repaired Project stage: Other ML19318H9571978-05-19019 May 1978 Submits Results of Review of Fire Protection Program for Conformance W/Nrc Guidelines, Nuclear Plant Fire Protection Functional Responsibilities, Admin Controls & QA, Per 770819 Request Project stage: Other ML19318H9781978-07-0303 July 1978 Discusses V Stello Forwarding Manpower Requirements for Operating Reactors. Util Still Maintains That Min Fire Brigade of Three Persons Sufficient.Basis for Position Included in Util Project stage: Other ML19318H9811978-07-0808 July 1978 Forwards Suppl 1 to Fire Protection Program Review..., Providing Addl Info Requested in Encl 1 to NRC & Responses to NRC Positions Identified in Same Ltr Project stage: Other ML13309A5711978-10-18018 October 1978 Forwards Amend 12 to Fsar. Amend Contains Responses to NRC 780726 & 0818 Questions & Includes Corrections & Additions to FSAR Info Project stage: Request ML13333A3081978-10-18018 October 1978 Forwards Info Re Mod to 4,160-volt Switchgear Room for Fire Zone 8 & Mod to Lube Oil Reservoir & Conditioner Area in Fire Zone 9A as Part of Fire Protection Program Project stage: Other ML13333A3141978-10-30030 October 1978 Repts Insertion of Containment Spray Sys Nozzle Insp Requirement in Section 4.2 of Tech Specs, Safety Injection & Containment Spray Sys Periodic Testing Project stage: Request ML13333A3151978-10-30030 October 1978 Advises That Casualty Procedure Re Air Supply for Lube Oil Reservoir & Conditioner Area & Station walk-through Will Be Performed in Response to NRC 781018 Request Re Fire Protection Project stage: Other IR 05000361/19780161978-11-17017 November 1978 IE Inspec Rept 50-361/78-16 on 781030-1103 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Reactor Internals & Miscellaneous Open Items from Previous Inspecs Project stage: Request ML13333A3221978-11-22022 November 1978 Submits Proposed Mods to Air Supply Sys of Subj Facil.Mods Will Ensure Availability of Air Supply to Req Equip After Loss of Main Air Header Due to Fire in Lube Oil Reservoir & Conditioner Area Project stage: Other ML13333A3231978-11-28028 November 1978 States Util Is Unable to Submit Response to Fire Protec Review Questions by 781127.Will Submit by 781201 Project stage: Other ML13333A3261978-12-0101 December 1978 Responds to NRC Staff Positions Forwarded in 781117 NRC Ltr Re Fire Protec Prog Review.Staff Positions Responded to incl:PF-27A,Cable Spreading Area & PF-51,Containment Project stage: Other ML13333A3381979-01-15015 January 1979 Forwards Conceptual Plan for Safe Unit Shutdown Following Fire in 4160v Switchgear Room or Lube Oil Reserve Area.Also Forwards Related Plant Mod Plan & Implementation Schedule Project stage: Other ML19282B8771979-01-31031 January 1979 Fire Protection in Operating Nuclear Power Stations Project stage: Other ML13326A5301979-01-31031 January 1979 Suggests Mods to Fire Protection Plan,Re Electrical Valve Supervision & Portable Smoke Venting Equipment Project stage: Other IR 05000361/19790011979-01-31031 January 1979 IE Insp Repts 50-361/79-01 & 50-362/79-01 on 790108-11. Noncompliance Noted:Discrepancies Noted in Governing Record Used as Calibr Control Project stage: Request ML13333A3481979-03-0101 March 1979 Requests Extension to 790330 in Which to Submit Evaluation, Originally Due 790215,re Effects of Fire in H-seal Unit on Structured Steel of Turbine Bldg Project stage: Other ML13322A5491979-04-13013 April 1979 Requests Licensee Provide Design Mods Which Will Assure Safe Shutdown Can Be Achieved & Maintained Using Onsite Power Source Project stage: Other ML13333A3671979-05-15015 May 1979 Updates Status of Commitments Re Operating Functions & Plant Mods of Fire Protection Program.Discusses Safe Shutdown Casualty Procedure,Spurious Valve Actuation & Hydrogen Seal Oil Area Fire Project stage: Other ML13326A5511979-07-19019 July 1979 Amend 44 to License DPR-13,incorporating Tech Spec Changes Re Fire Protection Sys Operability & Surveillance & Fire Protection Program Responsibility Project stage: Other ML13326A5531979-07-19019 July 1979 Notice of Issuance & Availability of Amend 44 to License DPR-13 Project stage: Other ML13326A5491979-07-19019 July 1979 Forwards Amend 44 to License DPR-13,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML13326A5521979-07-19019 July 1979 Safety Evaluation Supporting Amend 44 to License DPR-13 Project stage: Approval ML13333A4061979-08-10010 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML13333A4131979-08-27027 August 1979 Forwards 790413 Request for Addl Info Re Safe Shutdown of Facility Project stage: RAI ML14100A2891979-09-14014 September 1979 NRC Position on Safe Shutdown Capability Project stage: Other ML13333A4181979-09-14014 September 1979 Forwards NRC Position on Safe Shutdown Capability,To Help Licensee Prepare Response to Safety Evaluation for Fire Protection.Requests Schedule for Submittal of Revised Safe Shutdown Plan within 30 Days Project stage: Approval ML13333A4231979-10-23023 October 1979 Forwards Addl Design Info Re Fire Protection Program Review in Response to NRC .Revised Plan for Safe Shutdown Following Fire Deferred Pending Completion of Integrated Assessment of SEP Mods Project stage: Other ML13333A4591979-12-26026 December 1979 Forwards Rept Re Analysis Methods to Determine That Fire in Hydrogen Seal Oil Unit Would Not Substantially Impact Structural Integrity of Steel in South End of Turbine Bldg Project stage: Request ML13333A4761980-01-23023 January 1980 Forwards Addl Design Info & Drawings Re Fire Protection Mods to Be Implemented During Next Refueling Outage.Drawings Available in Central Files Only Project stage: Other ML13311B0361980-01-23023 January 1980 Requests Denial of Petitions Under 10CFR2.206.Petitions Fail to Particularize Factual Basis for Conclusions,Fail to Raise Unreviewed Health or Safety Issues & Fail to Seek Proper Reconsideration of Resolved Issues Project stage: Request ML13333A5241980-03-0606 March 1980 Informs NRC That in Situ Testing of Fire Detection Sys Will Be Deferred Until Acceptable Method Is Developed to Ensure That Station Will Not Be Adversely Affected.Util Will Proceed W/Inplace Sensitivity & Loop Voltage Tests Project stage: Other IR 05000206/19800091980-04-16016 April 1980 IE Insp Rept 50-206/80-09 on 800301-0404.Noncompliance Noted:Failure to Follow Emergency Procedure & Operation Outside Limiting Condition for Operation Project stage: Request ML13308A6441980-04-16016 April 1980 Forwards Revision to BNL Re Items 3.1.1(5),3.1.2 (b),3.1.5(d),3.1.6,3.1.7(a),3.1.7(b),3.1.15(b) & 3.2.3. for Fire Protection Review Project stage: Other ML13308A6461980-05-13013 May 1980 Forwards Fire Protection Review Responding to Items 3,7 & 10 & Licensee .Automatic Power Backup Should Be Supplied for Fire Alarm Sys Project stage: Other ML13330A1211980-09-26026 September 1980 Forwards Response to Comments & Recommendations Re BNL Review of Fire Protection Program.Response Includes New Design Change Commitments.Oversize Drawings,Hydraulic Design Info & Calculation Sheets Available in Central Files Project stage: Other IR 05000206/19800251980-09-26026 September 1980 IE Insp Rept 50-206/80-25 on 800811-29.No Noncompliance Noted.Major Areas Inspected:Plant Operations During long-term Outage,Monthly Maint & Surveillance Observations & Review of LERs Project stage: Request ML13330A1571980-11-0606 November 1980 Informs of Recently Approved Revised 10CFR50.48 Containing Schedules for Completion of All Fire Protection Mods.No Present Implementation Required as Necessary Addl Info Has Not Yet Been Approved Project stage: Other ML19340D2431980-11-24024 November 1980 Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl Project stage: Other ML13302A8701980-11-24024 November 1980 Summary of 801020 Meeting W/Fema in Los Angeles,Ca Re Emergency Planning Project stage: Request ML20136H0761981-02-0404 February 1981 Marked-up Sser 1 Supporting Fire Protection Project stage: Other ML13302A1651981-02-0404 February 1981 LOCA, Emergency Operating Instruction Project stage: Request ML13330A2191981-02-0404 February 1981 Forwards Suppl 1 to 790719 Fire Protection Safety Evaluation Rept.Items Reviewed:Control Room Fire Detection Sys,Smoke Detectors in Lube Oil Area,Fire Pump Test Features & Turbine Bldg Structure Project stage: Approval ML13330A2071981-02-10010 February 1981 Requests Extension to 811117 for Completion of Fire Protection Features Re Water Suppression Sys,Fire Barriers, Fire Dampers,Fire Barrier Penetrations & Water Damage Protection Project stage: Other ML13330A2531981-02-13013 February 1981 Notice of Extension of Completion Dates of Fire Protection Mods from 800719 to 811117 Project stage: Other ML13330A2511981-02-13013 February 1981 Forwards Fr Notice Re Extension of Time for Completion of Fire Protection Mods from 800719 to 811117.Description of Mods Encl Project stage: Other ML14119A3531981-03-19019 March 1981 Provides Info Required by New Fire Protection Regulations 10CFR50.48.Installation of Smoke Detectors,Emergency Lighting,Reactor Coolant Pump Lube Oil Collection Sys & Provision of Safe Shutdown Capability Discussed Project stage: Other ML13330A9081981-11-0404 November 1981 Application for Exemption from Deadline to Install Certain Fire Safety Measures Project stage: Request ML13330A9121981-11-0404 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Submit Fire Safety Plans & Schedules.Proof of Svc by Mail Encl Project stage: Request ML13330A9101981-11-0505 November 1981 Affidavit Re Support of Application for Exemption from Deadline to Install Certain Fire Safety Measures.Proof of Svc by Mail Encl Project stage: Request 1979-05-15
[Table View] |
Text
March 5, 1982 DISTRIBUTION:
Docket No. 50-206 Docket Tlppolito ECase LS05 03-034, NRC PDR HSmith LPDR WPaulson NSIC QELD ORB #5 RF OI&E Mr. R. Dietch, Vice President ainas ACRS (10)
Nuclear Engineering and Operatio Southern California Edison Conpa iles Roiggs 2244 Walnut Grove Avenue N
Post Office Box 800 4
Rosemead, California 91770 9, Fe v5 u~s *
Dear Mr. Dietch:
SUBJECT:
EXEMPTION - FIRE PROTECTION (APPENDIX R), INSTALLATION OF BATTERY POWERED EMERGENCY LIGHTING INSIDE CONTAINMENT RE:
San Onofre Unit 1 By application dated December 22, 1981, you requested an exemption from Section IlI.J of Appendix R to 10 CFR Part 50 to the extent that it requi.res the installation of battery powered emergency lighting within containment.
Based on our review of your submittal, the Commission has determined that pursuant to 10CFR 50.12, an exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. Accordingly, the exemption has been granted (enclosed).
A copy of the Exemption is being filed with the Office of the Federal Register for publication.
Your request dated November 4, 1981, for an exemption from the schedul-ar requirements of 10 CER 50.48(c)(5) for the submission of plans and schedules for a safe shutdown capability at San Onofre Unit 1 to approximately six months after completion of Systematic Evaluation Program (SEP) is currently under review.
Sincerely, OriRgihl signed by Dennis D. Crutchfield, Chief Operating-Reactors Branch #5 Division of Licensing
Enclosure:
Exemption cc w/enclosure:
NRR See next page opein OFFICE FPL;.QQ...............MI.;
4 -.
I Base on ou iWPaulson: r*
sbCr ield h
th pursunt to030.
10CF..
12 ad.........
mtoisatozdblwan
.A;',PDR ADOCK 050002086SP:18-3-8 NRC',f, PDR O
rFFICIAL RECORD COPY SP:1835-6
Mr. R. Dietch 2 -
March 5, 1982 CC w/enclosure:
Charles R. Kocher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 6600 Montgomery Street San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U. S. NRC P. 0. Box 4329 San Clemente, California 92672 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente SSan Clemente, California 92672 Chairman Board-of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:
Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 U. S. Environmental Protection Agency Region IX Office ATTN:
Regional Radiation Representative 215 Freemont Street San Francisco, California 94111 Robert H. Engelken, Regional Administrator Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane Walnut Creek, California 94596