Category:Graphics incl Charts and Tables
MONTHYEARML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 ML1019004182010-06-28028 June 2010 Quick View Chart ML1005413692010-01-0505 January 2010 TS Pages from Licensee ML0930200982009-10-29029 October 2009 Summary of Meeting with STP Nuclear Operating Company, Licensee for South Texas Project, Units 1 and 2, to Discuss Experience with Implementation of Risk-Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report ML0426502472004-09-13013 September 2004 One Page from 033004 Open Items Table Riv Fire Protection ML0426100732004-09-13013 September 2004 One Page from the Open Items Table CY-02-012, Project Response to AIF Generator Survey2002-02-28028 February 2002 Project Response to AIF Generator Survey 2022-02-02
[Table view] Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant NOC-AE-04001763, Inservice Inspection Summary Report for Welds and Component Supports - 2RE102004-07-22022 July 2004 Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 2023-08-09
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
i Nuclear Operating Company ax28,9 Wdwvith, Teas 77483 South Taws Poed Eletri Gewnraing Station PO January 19, 2006 NOC-AE-06001960 File No: G25, T07.03 10CFR50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Unit 2 Docket No. STN 50-499 2RE1 1 Inservice Inspection Summary Report Enclosed are four copies of the South Texas Project Unit 2 inservice inspection summary report for activities performed prior to and during the eleventh refueling outage (2RE1 1) completed in October 2005. This summary report satisfies the reporting requirements of ASME Section XI, Article IWA-6230.
There are no commitments contained in this report.
If there are any questions, please contact either Philip Walker at (361) 972-8392 or me at (361) 972-7030.
Michael J. Berg Manager, Testing/Programs Engineering PLW
Enclosures:
Examination Plan/Summary Report for the 2RE1 1 Inservice Inspection STI#: 31971523
NOC-AE-06001 960 Page 2 of 2 cc:
(paper copy) (electronic copy)
Bruce S. Mallelt A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Mohan Thadani Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Richard A. Ratliff Jack A. Fusco Bureau of Radiation Control Michael A. Reed Texas Department of Health Texas Genco, LP 1100 West 49th Street Austin, TX 78756-3189 C. Kirksey City of Austin Jeffrey Cruz Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady J. J. Nesrsta City of Austin R. K. Temple Electric Utility Department E. Alarcon 721 Barton Springs Road City of San Antonio Austin, TX 78704 One Copy per recipient
EXAMINATION PLAN/
SUMMARY
REPORT for the 2RE1 1 INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION COMPONENT SUPPORT, CONTAINMENT METAL LINER (IWE),
REPAIR/REPLACEMENT, STEAM GENERATOR TUBING, SYSTEM PRESSSURE TESTING, AND WELD INSPECTION PROGRAMS OUTH TEXAS PROJE, T
-LECTRIC' CGENERATIl IG STAT 01 1 STP NUCLEAR OPERATING COMPANY November 2005
COVER SHEET 2REll INSERVICE INSPECTION
SUMMARY
REPORT FOR COMPONENT SUPPORTS, CONTAINMENT METAL LINER (IWE), REPAIR AND REPLACEMENT, SYSTEM PRESSURE TESTING AND WELD INSPECTION PROGRAMS SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19,1989 Prepared by: \ £ Jw E. Starber, Engineer Reviewed by:d Jenewein, Supervising Engineer
NOC-AE-06001960 Page 1 of 7 SCOPE COMPONENT SUPPORT, REPAIR AND REPLACEMENT, SYSTEM PRESSURE TESTING, AND WELD INSPECTION PROGRAMS The examinations summarized in this report were performed in accordance with the 1989 Edition with no Addenda of the ASME Code, Section Xi which is applicable to the South Texas Project, Unit 2, second ten-year interval (10/19/2000-10/18/2010), second period (10/19/2003-10/1 8/2007). This report covers selected ASME Code Class 1, 2, and 3 Systems/Components.
This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-1.
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components, and IWD-2412 for ASME Code Class 3 Systems/Components.
The ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with Table 2500-1 of Code Case N-491-2.
CONTAINMENT METAL LINER (IWE/IWL)
The Containment Metal Liner examinations summarized in this report were performed in accordance with the 1992 Edition 1992 Addenda of the ASME Code, Section Xl, which is applicable to the South Texas Project, Unit 2, first ten-year interval (09/09/1998-09/08/2008),
third period (09/09/2005-09/08/2008). This report covers selected ASME Code Class CC liner and MC Components. This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-1.
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWE-2412 for ASME Code Class CC liner and MC Components. The Containment Metal Liner Components were examined in accordance with Table IWE-2500-1, Examination Categories.
FORM OAR-I OWNER'S ACTIVITY REPORT (Code Case N-532-1)
Report Number OAR-2REI I Owner STP Nuclear Operating Company, P. 0. Box 289. Wadsworth. TX 77483 (Name and Address of Owner)
Plant South Texas Project Electric Generating Station P.O. Box 289. Wadsworth. TX 77483
- (Name and Address of Plant)
Unit No. 2 Commercial service date June 19,1989 Refueling outage no. 2REI I (if applicable)
Current inspection interval IWB. IWC. IWD. IWF - 2nd: IWE -1" (lI, 2"A, P,4 , other)
Current inspection period IW13. TWQ. TWD. IWF - 2"d : IWE -3d (V,2-',3-)
Edition and Addenda of Section XI applicable to the l0 year inspection plan: 1989 Edition/ No Addenda (IWE-1992 Edition 1992 Addenda)
Date and revision of 10 year inspection plan September 13. 2005. Revision 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan N/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XM.
Certificate of Authorization No. - N/A Expiration Date_ I N/A (if applicable)
Signed J. Stauber < ENGINEER Date I1/ / Z / 0* 0l Owner's Designee, Title)
CERTIFICATE OF INSERVICE INSPECTION L the undersigned, holding a valid commission issued by the National Board of Boiler and pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Group Inc -o- f Houston. Texas have inspected the items described in this Owner's Activity Report, during the period _0/l9/2003_to 10/18/2007 for Component Supports, Repair And Replacement, System Pressure Tests and Weld Inspection program, and during the period 9/9/2005 to -9/8/208 for Containment Metal Liner program, and state that to the best ofmy knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations, and corrective measures described this report Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from the connected with this ector's Signature National.Board, State, Province, and Endorsements Robert liemarm Date .&,8 §/-E
NOC-AE-06001 960 Page 3 of 7 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Interval 2 Period 2 2RE11 October 2005 COMPONENT SUPPORTS AND WELD INSPECTIONS, per WINISI Computerized Inservice Inspection Database Total Total Total Total Ex tion Examinations Examinations Examinations Examinations Re k Ex nation Required for Credited for Credited (%) Credited (%) emarks Category the Interval the Period for the Period to Date for the Interval B-A 1 0 0.00 100.00 B-B 5 2 40.00 60.00 B-D 20 8 40.00 60.00 B-G-2 38 13 34.21 42.11*
B-H 9 4 44.44 66.67 B-M-2 15 6 40.00 40.00*
B-N-1 3 0 0.00 33.33*
C-A 4 1 25.00 50.00 C-B 5 2 40.00 60.00 C-C 25 10 40.00 56.00*
C-G 16 7 43.75 62.50 F-A 272 101 37.13 56.99*
R-A-1 59 19 32.20 49.15* B-F & B-J **
R-A-2 7 0 0 28.57* C-F-1 & C-F-2 NOTES: Period 2 = 2RE10, 2RE1 1 & 2RE12
- = need completion of scheduled Period inspections/tests during 2RE12
- = Categories combined for Class 1 Risk Informed piping welds
- = Categories combined for Class 2 Risk Informed piping welds
NOC-AE-06001960 Page 4 of 7 TABLE 1A ABSTRACT OF EXAMINATIONS AND TESTS Interval 2 Period 2 2RE1I October 2005 SYSTEM PRESSURE TESTING INSPECTIONS, per WINISI Computerized Inservice Inspection Database Total Total Total Total Examination Examinations Examinations Examinations Examinations Remarks Category Required for Credited for Credited (%) Credited (%)
the Interval the Period for the Period To Date for the Interval B-E 28 8 28.57 57.14*
B-P 42 12 28.57 57.14*
C-H 132 32 24.24 57.58*
D-A 12 0 0.00 33.33*
D-B 12 1 8.33 41.67*
D-C 3 1 33.33 66.67 NOTES: Period 2 = 2RE10, 2RE1 1 & 2RE12
- - need completion of scheduled Period inspections/tests during 2RE12
= Categories combined for Class 1 Risk Informed piping welds
= Categories combined for Class 2 Risk Informed piping welds TABLE 1B ABSTRACT OF EXAMINATIONS AND TESTS Interval 1 Period 3 2RE1 1 October 2005 CONTAINMENT METAL LINER (IWE)
Total Total Total Total Examination Examinations Examinations Examinations Examinations Remarks Category Required for Credited for Credited (%) Credited (%)
the Interval the Period for the Period To Date for The Interval E-D 3 1 33.33 100.00 E-G 128 42 32.81 59.38*
- = need completion of scheduled Period inspections/tests during 2RE12 NOTES: Period 3 = 2RE11, 2RE12
NOC-AE-06001 960 Page 5 of 7 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE 2RE1 1 October 2005 Flaw or Relevant Examination Item Item Flaw Condition Found Category Number Description Characterization During Scheduled (WA-3300)Section Xi Examination or Test (Yes or No)
See Note 1 NOTES:
- 1. No items found with flaws or relevant conditions that required evaluation for continued service.
- 2. Surveillance procedure OPSP1 1-RC-0015, ASME Section Xi Inservice Inspection, documents Inservice Inspection activities during 2RE1 1.
NOC-AE-06001 960 Page 6 of 7 TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE 2RE11 October 2005 Repair, Flaw or Relevant Code Replacement, Item Description of Work Condition Found Date Repair/Replacement Class or Corrective Description During Scheduled Completed Plan Number Measure Section Xi ExaminationCoped PlnNm r or Test (Yes/No) 2 Replacement Valve Replaced valve disc No 11/14/05 02-97-52 2 Replacement Valve Replaced valve disc No 11/14/05 02-97-57 2 Replacement Valve Replaced valve disc No 11/14/05 02-97-66 2 Replacement Valve Replaced valve disc No 11/14/05 02-99-39 3 Replacement Valve Replaced valve disc No 10/20/05 02-01 -25 2 Repair Valve Drill and tap valve body for No 10/20/05 02-03-29 Furmanite fitting 2 Replacement Valve Valve poppet & pilot poppet No 10/29/05 02-03-40 3 Replacement Valve Replaced valve No 10/24/05 02-03-44 3 Replacement Pump Replaced casing capscrews No 10/20/05 02-03-55 3 Replacement Pump Replaced casing capscrews No 10/20/05 02-03-56 3 Replacement Pump Replaced casing capscrews No 10/20/05 02-03-57 3 Replacement Piping Replaced flange nuts & bolts No 10/29/05 02-04-38 3 Replacement Pipinq Replaced flange nuts & bolts No 10/29/05 02-04-39 3 Replacement Piping Replaced flange nuts & bolts No 10/21/05 02-04-41 3 Replacement Piping Replaced flange nuts & bolts No 10/22/05 02-04-42 3 Replacement Valve Replaced valve disc No 10/24/05 02-04-43 3 Replacement Valve Replaced valve disc No 10/24/05 02-04-44 2 Repair Valve Bonnet seal weld No 10/22/05 02-04-47 3 Replacement Valve Replaced valve disc No 10/22/05 02-04-49 3 Replacement Valve Replaced valve disc No 10/24/05 02-04-50 3 Replacement Pipe support Replaced U strap No 10/24/05 02-04-52 3 Replacement Valve Replaced bonnet bolts No 10/20/05 02-04-54 3 Replacement Valve Replaced bonnet bolts No 10/24/05 02-04-57
NOC-AE-06001 960 Page 7 of 7 3 Replacement Valve Replaced bonnet bolts No 10/20/05 02-04-58 1 Repair Valve Welded in valve disc guides No 10/20/05 02-04-59 1 Replacement Valve Replaced studs & nuts No 10/20/05 02-04-60 1 Replacement Valve Replaced valve plug No 11/09/05 02-04-61 3 Replacement Valve Replaced valve No 11/14/05 02-04-62 2 Replacement Valve Replaced valve boltin No 10/20/05 02-04-64 2 Replacement Valve Replaced valve bolting No 10/20/05 02-04-65 1 Replacement Valve Replaced valve studs & nuts No 11/15/05 02-05-7 2 Replacement Valve Replaced valve ball No 10/29/05 02-05-16 2 Repair Valve Seal Weld of leak off line No 11/10/05 02-05-18 1 Replacement Pipe Support Replace spring can No 11/10/05 02-05-019 2 Repair Valve Bonnet seal weld No 11/08/05 02-05-20 2 Repair Valve Bonnet seal weld No 11/08/05 02-05-21 2 Replacement Valve Replaced valve plug No 11/10/05 02-05-22 1 Replacement Valve Replaced valve No 11/14/05 02-05-26 1 Replacement Valve Replaced valve No 11/14/05 02-05-27 1 Replacement Valve Replaced valve No 11/14/05 02-05-28 3 Replacement Piping Replaced pipe, flange, bolting No 10/21/05 02-05-30 3 Replacement Piping Replaced pipe & flange No 10/20/05 02-05-35 3 Repair Piping Repaired/Replaced pipe, flange No 10/29/05 02-05-36 1 Repair Valve, Piping Replaced valve, piping No 11/14/05 02-05-37 1 Repair Valve, Piping Replaced valve, piping No 11/15/05 02-05-38 3 Replacement Valve Replaced valve No 10/24/05 02-05-41 2 Replacement Valve Replaced valve disc, studs, nuts No 11/10/05 02-05-42 2 Replacement Valve Replaced valve disc No 11/10/05 02-05-43 2 Replacement Snubber Replaced snubber No 10/18/05 02-05-47 1 Repair Pipe Support Repair of spring can No 11/10/05 02-05-48 3 Repair Valve Bonnet seal weld No 11/08/05 02-05-49 3 Repair Valve Bonnet seal weld No 11/15/05 02-05-50 2 Replacement Valve Replaced valve plug No 11/14/05 02-05-52 1 Replacement Pipe Support Replaced sway strut paddles No 11/14/05 02-05-54