NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) | 14 December 2023 | Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) | Time of Discovery License Renewal |
ML23229A499 | 17 August 2023 | Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) | Time of Discovery License Renewal |
NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) | 23 September 2021 | Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) | Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure Boundary Leakage |
ML21266A426 | 23 September 2021 | Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) | Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure Boundary Leakage |
ML16302A015 | 20 October 2016 | South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Coatings Operating Basis Earthquake Surveillance Frequency Control Program Large early release frequency Exemption Request Maintenance Rule Program Fuel cladding |
NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. | 31 March 2016 | LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. | Safe Shutdown Earthquake Hydrostatic Earthquake Dissimilar Metal Weld Coast down |
NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. | 31 August 2014 | Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. | |
ML14260A438 | 31 August 2014 | Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. | |
NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 | 11 March 2014 | Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 | Large early release frequency |
ML14072A087 | 24 February 2014 | CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 | Boric Acid |
ML14072A086 | 24 February 2014 | CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 | Boric Acid Coatings Scaffolding |
ML14072A080 | 24 February 2014 | CHLE-006, STP Material Calculations, Revision 2 | Coatings Scaffolding |
ML14072A083 | 24 February 2014 | CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 | Boric Acid Grab sample |
ML14072A082 | 23 February 2014 | CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 | Boric Acid Grab sample |
ML14072A079 | 22 February 2014 | CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 | Boric Acid Coatings Scaffolding |
ML14072A085 | 22 February 2014 | CHLE-014, T2 LBLOCA Test Report, Revision 3 | Boric Acid Scaffolding |
ML14072A088 | 22 February 2014 | CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 | Boric Acid |
ML14072A077 | 18 February 2014 | CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 | Boric Acid |
ML14072A084 | 18 February 2014 | CHLE-012, T1 Mbloca Test Report, Revision 4 | Boric Acid Scaffolding |
ML14149A435 | 14 February 2014 | Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 | Probabilistic Risk Assessment |
ML14072A081 | 13 February 2014 | CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 | Boric Acid |
ML13339A736 | 29 January 2014 | Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown Boric Acid High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Severe Accident Management Guideline Frazil ice Battery sizing Earthquake GOTHIC |
ML13354B833 | 23 January 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 | Safe Shutdown Boric Acid High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Severe Accident Management Guideline Frazil ice Battery sizing Earthquake GOTHIC |
NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application | 23 December 2013 | Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application | |
ML13323B209 | 4 October 2013 | Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). | Boric Acid Coatings Scaffolding |
ML13323B208 | 23 September 2013 | Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) | Boric Acid |
ML13323B207 | 16 September 2013 | Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. | Boric Acid |
ML13175A212 | 18 June 2013 | Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary | Boric Acid High winds Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Grab sample Probabilistic Risk Assessment Coatings Large early release frequency Control of Heavy Loads Fuel cladding |
ML13175A240 | 6 June 2013 | Project, Units 1 and 2, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 1 of 260 Through Page 160 of 260 | Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Large early release frequency Fuel cladding |
NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End | 6 June 2013 | Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End | Boric Acid Grab sample Hydrostatic Coatings |
NOC-AE-13002975, Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-46 | 31 March 2013 | Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-46 | Safe Shutdown Ultimate heat sink Hydrostatic Fukushima Dai-Ichi Earthquake |
ML13079A808 | 11 March 2013 | Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End | Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Earthquake |
ML13323B201 | 22 January 2013 | Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. | Boric Acid Scaffolding |
ML13323B204 | 22 January 2013 | Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. | Boric Acid |
ML13323B202 | 15 January 2013 | Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. | Boric Acid Coatings Scaffolding |
ML13323B200 | 9 January 2013 | Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End | Scaffolding |
ML13323B199 | 9 January 2013 | Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 | Boric Acid Scaffolding |
ML12335A184 | 26 November 2012 | Licensee Documents for December 12, 2012 Public Meeting | Boric Acid |
ML12335A190 | 26 November 2012 | Licensee Documents for December 12, 2012 Public Meeting | Boric Acid Coatings Scaffolding |
ML13025A138 | 31 October 2012 | STP GSI-191 Bypass Sensitivity Report - Water Conductivity Added | Boric Acid |
ML12243A474 | 30 August 2012 | Email - Risk-Informed Approach to GSI-191, STP Cfd Data Analysis Report - Bypass Test Protocol | Grab sample Coatings |
ML13323B198 | 19 August 2012 | Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. | Boric Acid Grab sample |
ML13323B191 | 14 August 2012 | Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. | Coatings Scaffolding |
NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. | 13 August 2012 | Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. | Boric Acid |
ML13323B194 | 11 August 2012 | Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. | Boric Acid |
ML13323B196 | 12 June 2012 | Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. | Boric Acid Grab sample |
ML120610068 | 28 February 2012 | Southtexas Project, Units 1 and 2 - Test Plan for STP High Temperature Vertical Loops Testing | |
ML120540816 | 23 February 2012 | Experimental Setup for Chle Test Equipment | Coatings |
ML120540667 | 22 February 2012 | Casa Grande Summary | High winds Mission time Probabilistic Risk Assessment Coatings Large early release frequency |
ML120540727 | 9 February 2012 | Actions Taken to Resolved Pirt Items | Coatings Fuel cladding |