Letter Sequence Meeting |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML120540570, ML120540610, ML120540667, ML120540727, ML120540816, ML120610068, ML120610074, ML120610102, ML12145A438, ML12145A466, ML12243A474, ML12335A174, ML12335A177
|
MONTHYEARML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company Project stage: Meeting ML1204400602012-01-26026 January 2012 Summary of January 12, 2012 Chemical Effects Meeting Project stage: Request ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U Project stage: Meeting ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company Project stage: Meeting ML1204400612012-02-0808 February 2012 Email Licensee Slides for 2/9/12 Public Meeting Via Conference Call Project stage: Meeting ML1204400652012-02-0909 February 2012 Licensee Slides for 2/9/12 Meeting Regarding GSI-191 Project stage: Meeting ML1205407272012-02-0909 February 2012 Actions Taken to Resolved PIRT Items Project stage: Other ML1205406942012-02-22022 February 2012 Email Additional Meeting Materials for the 3/01/12 Meeting to Discuss GSI- 191 Project stage: Meeting ML1205406672012-02-22022 February 2012 Casa Grande Summary Project stage: Other ML1205406102012-02-22022 February 2012 Email Casa Grande Summary Project stage: Other ML1205405572012-02-22022 February 2012 Licensee Slides for 03/1/12 Meeting with STP Nuclear Operating Company Meeting to Discuss GSI-191 Project stage: Meeting ML1205405092012-02-22022 February 2012 Email Meeting Materials for March 1, 2012 Conference Call Project stage: Meeting ML1205407582012-02-22022 February 2012 STP Summary of January Meeting Project stage: Meeting ML1205406042012-02-22022 February 2012 Meeting Materials for 3/1/12 Conference Call Project stage: Meeting ML1205405702012-02-22022 February 2012 Uncertainty Modeling of LOCA Frequencies and Break Size Distributions for the STP GSI-191 Resolution Project stage: Other ML1205407842012-02-23023 February 2012 Email Documents Transmitted for March 1, 2012 Meeting Project stage: Meeting ML1205408162012-02-23023 February 2012 Experimental Setup for Chle Test Equipment Project stage: Other ML1206100682012-02-28028 February 2012 Southtexas Project, Units 1 and 2 - Test Plan for STP High Temperature Vertical Loops Testing Project stage: Other ML1206100742012-02-29029 February 2012 Corrosion Head Loss Experiments Test Program Project stage: Other ML1206100632012-02-29029 February 2012 Intro for March 8, 2012 Public Meeting to Discuss GSI-191 Project stage: Meeting ML1206101022012-02-29029 February 2012 Proposed STP Strainer Fiber Bypass Test Protocol Project stage: Other ML1206205412012-03-0606 March 2012 2/9/12 Summary of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un Project stage: Meeting ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 Project stage: Meeting ML1208300862012-03-29029 March 2012 Summary of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 Project stage: Meeting ML1208301032012-03-30030 March 2012 3/1/12 Summary of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un Project stage: Meeting ML1210800062012-05-0404 May 2012 Staff Comments and Questions Related to Review of STP Nuclear Operating Companys Report Entitled, Risk-Informed Resolution of GSI-191 at South Texas Project, Discussed at Public Meeting on 3/1/12 (TAC ME7735-36) Project stage: Meeting ML12145A4382012-05-18018 May 2012 Licensee Handout on Calibration and Benchmarking of Single and Two-Phase Jet Cfd Models Project stage: Other ML12145A3122012-05-18018 May 2012 E-mail Documents for Public Meeting on LOCA Frequency and Jet Formation Project stage: Meeting ML12145A4662012-05-18018 May 2012 Loca-Hybrid-Final Project stage: Other ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit Project stage: Meeting ML1213805222012-05-31031 May 2012 3/29/12 Summary of Conference Call Meeting with STP Nuclear Operating Company, Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units Project stage: Meeting ML12187A0812012-07-11011 July 2012 Summary of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni Project stage: Meeting ML12234A6042012-08-21021 August 2012 Email - Documents for NRC Public Meeting on Corrosion Head Loss Experiments (Chle) Part 1 and 2 Project stage: Meeting ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni Project stage: Meeting ML12243A4742012-08-30030 August 2012 Email - Risk-Informed Approach to GSI-191, STP Cfd Data Analysis Report - Bypass Test Protocol Project stage: Other ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach Project stage: Meeting ML12270A0552012-10-0404 October 2012 9/6/2012 Summary of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un Project stage: Meeting ML12300A2972012-11-0808 November 2012 Summary of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and Project stage: Meeting ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit Project stage: Meeting ML12335A1842012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting Project stage: Meeting ML12335A1772012-11-26026 November 2012
- Licensee Documents ALION-CAL-STP for 12-10-12 Public Telecon GSI-191
Project stage: Other ML12335A1902012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting Project stage: Meeting ML12335A1742012-11-26026 November 2012 Email Licensee Documents for 12-10-12 Public Telecon GSI-191 Project stage: Other ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 Project stage: Meeting ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and Project stage: Meeting ML12341A1702012-12-20020 December 2012 12/3/12 Summary of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni Project stage: Meeting ML13004A4012013-01-31031 January 2013 Summary of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & Project stage: Meeting 2012-02-08
[Table View] |
Text
From:
Kee, Ernie [keeej@STPEGS.COM]
Sent:
Thursday, February 23, 2012 8:41 AM To:
Singal, Balwant Cc:
Kerry Howe; Zigler, Gilbert
Subject:
RE: Documents transmitted for 1 March 2012 LOCA Frequency Meeting Attachments:
Experimental Setup for CHLE Test Equipment 2-8-2012.pdf
- Balwant, We intended to go over the CHLE facility design in the 9 February meeting (that was one of the main purpose of that meeting). I believe the attached document is the one you are referring to.
Please bear in mind the attached document is significantly out of date. We have continued on and we now are creating the revised version to be ready for the 8 March meeting. Recall we are discussing Chemical Effects Experiments as well as the head loss and bypass experiments on 8 March (Chemical Effects were added to the 8 March due to the document confusion surrounding the 9 February meeting).
Ernie Kee STPNOC Risk Management PO Box 289 Wadsworth, TX 77483 c 979.479.2312 w 361.972.8907 http://erniestinyworld.com From: Singal, Balwant [1]
Sent: Thursday, February 23, 2012 6:55 AM To: Kee, Ernie
Subject:
RE: Documents transmitted for 1 March 2012 LOCA Frequency Meeting Ernie:
Someone from STP in the last meeting on Feb 9 stated that document related to picture or illustration of the test facility has already been transmitted to me via e-mail, but not provided to the NRC staff. I do not remember receiving this document. Can you please send me another copy of this document? I may not have the proper description of the document.
Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222
From: Kee, Ernie [2]
Sent: Wednesday, February 22, 2012 6:08 PM To: Singal, Balwant Cc: Bailey, Stewart; Harrison, Albon; Blossom, Steven; Dyer, Linda
Subject:
Documents transmitted for 1 March 2012 LOCA Frequency Meeting
- Balwant, I just want to confirm that you have received from Linda Dyer at STP six files that we hope can be included in the 1 March 2012 NRC Public Meeting on LOCA Frequency.
Three of the files, are directly related to the meeting:
- 1) An article entitled: Uncertainty modeling of LOCA frequencies and break size distributions for the STP GSI-191 resolution.
- 2) A power Point Presentation: Uncertainty modeling of LOCA frequencies and break size distributions for the STP GSI-191 resolution (same name as the article - Item 1).
- 3) A PDF slide presentation entitled: Introduction NRC Public Meeting on Risk-Informed Resolution of GSI-191 Topic: LOCA Frequency.
Three other files were sent for additional staff background information as part of the overall GSI-191 Pilot Project progress:
- 4) A PDF file that has a description of the CASA Grande software entitled: Risk-Informed Resolution of GSI-191 at South Texas Project.
- 5) An STP summary of the previous meeting on 1/26-1/27 for Chemical Effects entitled: STP Post-meeting Notes for January 26-27, 2012 Public Meeting.
- 6) A write up with proposed PIRT resolutions entitled: Resolution of Outstanding Chemical Effects PIRT Issues.
Ernie Kee STPNOC Risk Management PO Box 289 Wadsworth, TX 77483 c 979.479.2312 w 361.972.8907 http://erniestinyworld.com