Letter Sequence Request |
---|
|
|
MONTHYEARML11251A0022011-09-26026 September 2011 Request for Withholding Information from Public Disclosure by Letters Dated June 30, 2011, and July 11, 2011 Project stage: Withholding Request Acceptance ML1200903212012-01-0505 January 2012 Email Request for Additional Information Regarding the Steam Generator License Amendment Request Dated June 30, 2011, to Revise Technical Specification for Permanent Alternate Repair Criteria Project stage: RAI ML11347A3292012-01-12012 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed Nshcd≪ and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI (TAC Me 6670 and ME6671) Project stage: Other ML11347A3232012-01-19019 January 2012 Transmittal Letter for Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Project stage: Other ML12038A1732012-02-0101 February 2012 Proposed Tech Specs Amendment TS 3.4.13, TS 5.5.9, TS 5.6.8, License Amendment Request to Revise TS for Permanent Alternate Repair Criteria Project stage: Request ML1205801222012-02-27027 February 2012 Request for Withholding Information from Public Disclosure by Letter Dated January 12, 2012 Project stage: Withholding Request Acceptance ML12054A6922012-03-12012 March 2012 Issuance of Amendment Nos. 267 and 263, Revise Technical Specifications for Permanent Alternate Repair Criteria for Steam Generator Tubes Project stage: Approval 2012-01-05
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RA-18-0156, Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability2019-09-0404 September 2019 Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2019-07-0101 July 2019 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-10-29029 October 2018 (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2018-10-0808 October 2018 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time2017-09-14014 September 2017 License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time ML17165A4412017-07-21021 July 2017 Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-269-A, Revision 2 (CAC Nos. MF8983 and MF8984). 08/10/2017 RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17122A1162017-05-0202 May 2017 Catawba and McGuire - License Amendment Request Proposing Changes to Technical Specification 3.8.1, AC Sources - Operating. RA-16-0028, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2016-12-15015 December 2016 Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process CNS-16-030, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ...2016-06-15015 June 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ... RA-16-0021, License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems2016-05-26026 May 2016 License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems CNS-16-014, License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And.2016-03-23023 March 2016 License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And. CNS-16-015, Technical Specification Bases Changes2016-02-18018 February 2016 Technical Specification Bases Changes CNS-16-001, License Amendment Request (LAR) to Revise Technical Specifications (TS) Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-01-18018 January 2016 License Amendment Request (LAR) to Revise Technical Specifications (TS) Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies CNS-15-101, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-12-11011 December 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants RA-15-0020, License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding2015-08-20020 August 2015 License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot2015-07-15015 July 2015 Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112015-07-15015 July 2015 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4392015-06-24024 June 2015 Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 CNS-15-058, Proposed Technical Specifications (TS) Amendments, TS 3.4.1, Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits2015-06-12012 June 2015 Proposed Technical Specifications (TS) Amendments, TS 3.4.1, Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML15125A1352015-04-30030 April 2015 License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors, Dated November 2012 CNS-14-128, License Amendment Request for Changes to Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation and TS 3.3.5, Loss of Power Diesel Generator Start Instrumentation Resolution of Operable.2014-11-24024 November 2014 License Amendment Request for Changes to Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation and TS 3.3.5, Loss of Power Diesel Generator Start Instrumentation Resolution of Operable. RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-06-23023 June 2014 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate CNS-14-026, Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System.2014-02-17017 February 2014 Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System. CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology2013-11-14014 November 2013 License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML13032A0332013-01-21021 January 2013 License Amendment Request for Technical Specification (TS) 3.6.14, Divider Barrier Integrity. ML1207600792012-06-25025 June 2012 Issuance of Amendment Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML12038A1732012-02-0101 February 2012 Proposed Tech Specs Amendment TS 3.4.13, TS 5.5.9, TS 5.6.8, License Amendment Request to Revise TS for Permanent Alternate Repair Criteria 2023-07-07
[Table view] Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22263A0432022-09-0707 September 2022 Editorial Change to SLC 16.10-5 ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16124A6942016-06-0202 June 2016 Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16081A3332016-04-29029 April 2016 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16082A0382016-04-18018 April 2016 Issuance of License Amendment Regarding Emergency Action Level Scheme Change ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements ML16007A1762016-01-12012 January 2016 Issuance of Amendments Regarding Non-Conservative Technical Specification Allowable Value ML15320A3332015-12-18018 December 2015 Issuance of Amendments Regarding Non-Conservative Technical Specifications Allowable Value ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-06-23023 June 2014 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate ML14056A2172014-02-27027 February 2014 Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC MF3473&74) ML12194A2182012-07-0909 July 2012 Response to NRC Request for Additional Information on Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML12038A1732012-02-0101 February 2012 Proposed Tech Specs Amendment TS 3.4.13, TS 5.5.9, TS 5.6.8, License Amendment Request to Revise TS for Permanent Alternate Repair Criteria ML1106705362011-03-29029 March 2011 Issuance of Amendments Regarding Revision of the Technical Specifications to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using a Risk-Informed Justification ML1032700112010-12-20020 December 2010 Issuance of Amendments Regarding Revision of Technical Specification (TS) 3.8.4 DC Sources - Operating ML1026405372010-09-27027 September 2010 Issuance of Amendment Regarding the Steam Generator Program. ML1025601442010-09-0909 September 2010 Proposed Technical Specifications (TS) Amendment TS 5.5.9, Steam Generator (SG) Program TS 5.6.8, Steam Generator (SG) Tube Inspection Report License Amendment Request to Revise TS for Alternate Repair Criteria ML1021605622010-08-0202 August 2010 Notice of Enforcement Discretion Request, Technical Specification 3.8.1, AC Sources - Operating, TS 3.78, Nuclear Service Water System, TS 3.7.5, Auxiliary Feedwater System, TS 3.6.6, Containment Spray System. ML0925300882010-06-28028 June 2010 License Amendment, Issuance of Amendments Regarding Technical Specification Change to Allow Manual Operation of the Containment Spray System (TAC Nos. MD9752 and MD9753) ML1017303882010-04-28028 April 2010 Proposed Technical Specifications Amendment TS 5.5.9, Steam Generator Program, TS 5.6.8, Steam Generator Tube Inspection Report, License Amendment Request to Revise TS for Alternate Repair Criteria ML1009201602010-03-31031 March 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML0935600772009-12-15015 December 2009 Technical Specifications Revision Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0923805882009-10-30030 October 2009 License Amendment, Implement Technical Specification Task Force (TSTF) Changes Travelers TSTF-479, Revision 0, Changes to Reflect Revision (Title 10 of the Code of Federal Regulations, Part 50, Section 50.55a) 10 CFR 50.55a,.. ML0924003112009-09-21021 September 2009 Issuance of Amendments Regarding Proposed Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Ts. 5.2.2 to Support Compliance with 10 CFR Part 26. Catawba Units 1& 2, McGuire, Units 1 & 2, Oconee, Units 1, 2, & ML0919503552009-07-0101 July 2009 License Amendment Request to Support Plant Modifications to the Nuclear Instrumentation System ML0914102832009-05-18018 May 2009 License Amendment Request to Revise the Definition of Shutdown Margin (SDM) ML0905402522009-02-19019 February 2009 Proposed Technical Specifications Amendment TS 5.5.9, Steam Generator Program, TS 5.6-8, Steam Generator Tube Inspection Report. ML0835704702008-12-18018 December 2008 Units 1 &2 - Proposed Technical Specification Amendment to Relax Completion Times and Surveillance Intervals for the Reactor Trip System Instrumentation TS 3.3.1, Engineered Safety Feature Actuation System Instrumentation. ML0828800982008-10-0808 October 2008 Proposed Technical Specifications and Bases Amendment, TS and Bases Administrative Changes ML0819803572008-07-15015 July 2008 Technical Specifications, Issuance of Emergency Amendment Regarding One-Time Extension of the Auxiliary Feedwater System and the Containment Spray System Allowed Outage Time ML0817700602008-06-23023 June 2008 Proposed Technical Specifications (TS) and Bases Amendment, TS and Bases 3.7.8, Nuclear Service Water System, Response to Request for Additional Information ML0806304962008-03-28028 March 2008 Technical Specifications, Issuance of Amendments Regarding a Change in Corporate Name of License & Oconee Independent Spent Fuel Storage Installation (TAC Nos. MD5156 - MD5162) ML0731803132007-11-0808 November 2007 Tech Spec Pages for Amendments 238 and 234 Regarding Emergency Core Cooling System Strainer Modification ML0730904132007-10-31031 October 2007 Technical Specifications, Issuance of Amendment Regarding Technical Specification 5.5.9 Steam Generator Tube Surveillance Program ML0730604052007-10-31031 October 2007 Tech Spec Pages for Amendment 237 Regarding Extension of Time Limit to Complete Emergency Core Cooling Systems Sump Modification ML0717703102007-06-25025 June 2007 Issuance of Amendments Regarding Emergency Diesel Generator Testing (TAC Nos. MD3217 and MD3218) - Technical Specifications ML0707903972007-03-19019 March 2007 Tech Spec Pages for Amendments 235 and 231 Regarding Snubbers, TSTF-372, Rev. 4 ML0635303422006-12-0707 December 2006 Proposed Technical Specifications (TS) Amendments TS 3.7.10 (Catawba)/Ts 3.7.9 (McGuire) - Control Room Area Ventilation System (Cravs) TS 3.7.11 (Catawba)/Ts 3.7.10 (McGuire) - Control Room Area Chilled Water System (Cracws) ML0629003532006-09-30030 September 2006 Tech Spec Pages for Amendments 234 and 230, Revising Reactor Coolant Systems Leakage Detection Instrumentation ML0627105962006-09-27027 September 2006 Tech Spec Pages for Amendments 233 and 229 Revised Storage Criteria for Low-enriched Uranium Fuel ML0626901142006-09-25025 September 2006 Technical Specifications Revision of Temperature Limits for the Standby Nuclear Service Water Pond ML0626901122006-09-25025 September 2006 Tech Spec Pages for Amendments 231 and 227 Regarding Updated Final Safety Analysis Report and Emergency Operating Procedures 2023-08-29
[Table view] |
Text
SEnergy Duke JAMES R.MORRIS Vice President Duke Energy Catawba Nuclear Station 4800 Concord Road York, SC 29745 803-701-4251 803-701-3221 fax February 1, 2012 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 Proposed Technical Specifications (TS) Amendment TS 3.4.13, "RCS Operational LEAKAGE" TS 5.5.9, "Steam Generator (SG) Program" TS 5.6.8, "Steam Generator (SG) Tube Inspection Report" License Amendment Request to Revise TS for Permanent Alternate Repair Criteria
Reference:
Letters from Duke Energy to NRC, same subject, dated June 30, 2011, July 11, 2011, and January 12, 2012 The reference letters comprise Duke Energy's request for an amendment to Catawba Facility Operating Licenses NPF-35 and NPF-52 and the subject TS. The proposed amendment constitutes a redefinition of the SG tube primary to secondary pressure boundary for Unit 2 and defines the safety significant portion of the tube that must be inspected or plugged. The technical justification for the amendment request is based in part on Westinghouse WCAP-17330-P, Rev. 1, "H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5)".
On January 26, 2012, a telephone conference call was held among representatives of Duke Energy and the NRC. The purpose of this call was to discuss the need for the continuation of regulatory commitments associated with previous one-cycle amendments. As a result of this call, Duke Energy is making the following two regulatory commitments associated with the permanent amendment request:
Regulatory Commitment 1: For Unit 2, Catawba commits to monitor for tube slippage as part of the SG tube inspection program required by TS 5.5.9. The results of this monitoring will be included in the report required by TS 5.6.8j.
Regulatory Commitment 2: For Unit 2, for the Condition Monitoring (CM) assessment, the component of operational leakage from the prior cycle from below the H* distance will be multiplied by a factor of 3.27 and added to the total accident leakage from any other source and compared to the allowable accident induced leakage limit. For the www. duke-energy com
U.S. Nuclear Regulatory Commission Page 2 February 1, 2012 Operational Assessment (OA), the difference between the allowable accident induced leakage and the accident induced leakage from sources other than the tubesheet expansion region will be divided by 3.27 and compared to the observed operational leakage. An administrative operational leakage limit will be established to not exceed the calculated value in the event that TS 3.4.13 is no longer bounding.
Also included with this letter is a copy of the reprinted TS and Bases pages associated with this amendment request (refer to the attachment).
The original regulatory evaluation provided in support of the proposed amendment is unchanged as a result of this supplement.
In accordance with 10 CFR 50.91, Duke Energy is notifying the State of South Carolina of this license amendment request supplement by transmitting a copy of this letter and its attachment to the designated state official.
Should you have any questions concerning this information, please contact L.J. Rudy at (803) 701-3084.
Very truly yours, Morris LJR/s Attachment
U.S. Nuclear Regulatory Commission Page 3 February 1, 2012 James R. Morris affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
Jaml4 R. Morris, Vice President Subscribed and sworn to me:
Date Notrylubic My commission expires: 7 -o - 2_
Date SEAL
U.S, Nuclear Regulatory Commission Page 4 February 1, 2012 xc (with attachment):
V.M. McCree Regional Administrator U.S, Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, III Senior Resident Inspector (CNS)
U.S, Nuclear Regulatory Commission Catawba Nuclear Station J.H. Thompson (addressee only)
NRC Project Manager (CNS)
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management
-Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.
Columbia, SC 29201
ATTACHMENT Reprinted TS and Bases Pages
RCS Operational LEAKAGE 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:
- a. No pressure boundary LEAKAGE;
- b. 1 gpm unidentified LEAKAGE;
- c. 10 gpm identified LEAKAGE; and
- d. 150 gallons per day (Unit 1) and 45 gallons per day (Unit 2) primary to secondary LEAKAGE through any one steam generator (SG).
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS operational A.1 Reduce LEAKAGE to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> LEAKAGE not within within limits.
limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.
B. Required Action and B. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Pressure boundary LEAKAGE exists.
OR Primary to secondary LEAKAGE not within limit.
Catawba Units 1 and 2 3.4.13-1 Amendment Nos.
RCS Operational LEAKAGE 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 NOTES ------------------
NOTE ------
- 1. Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after Only required to establishment of steady state operation. be performed during steady
- 2. Not applicable to primary to secondary LEAKAGE. state operation Verify RCS Operational LEAKAGE within limits by In accordance with performance of RCS water inventory balance. the Surveillance Frequency Control Program
+
SR 3.4.13.2 -NOTE ---------------- NOTE --------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after Only required to establishment of steady state operation. be performed
during steady state operation Verify primary to secondary LEAKAGE is < 150 gallons In accordance with per day (Unit 1) and < 45 gallons per day (Unit 2) through the Surveillance any one SG. Frequency Control Program Catawba Units 1 and 2 3.4.13-2 Amendment Nos.
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Proqram (continued)
The following SG tube alternate repair criteria shall be applied as an alternative to the 40% depth based criteria:
- 1. For Unit 2 only, tubes with service-induced flaws located greater than 14.01 inches below the top of the tubesheet do not require plugging. Tubes with service-induced flaws located in the portion of the tube from the top of the tubesheet to 14.01 inches below the top of the tubesheet shall be plugged upon detection.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. For Unit 1, the number and portions of the tubes inspected and method of inspection shall be performed with the objective of detecting flaws of any type (for example, volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. For Unit 2, the number and portions of the tubes inspected and method of inspection shall be performed with the objective of detecting flaws of any type (for example, volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from 14.01 inches below the top of the tubesheet on the hot leg side to 14.01 inches below the top of the tubesheet on the cold leg side, and that may satisfy the applicable tube repair criteria. In addition to meeting requirements d.1, d.2, d.3, and d.4 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
(continued)
Catawba Units 1 and 2 5.5-7a Amendment No.
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Pro-gram (continued)
- 1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
- 2. For Unit 1, inspect 100% of the tubes at sequential periods of 144, 108, 72, and, thereafter, 60 Effective Full Power Months (EFPM). The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 72 EFPM or three refueling outages (whichever is less) without being inspected.
- 3. For Unit 2, inspect 100% of the tubes at sequential periods of 120, 90, and, thereafter, 60 EFPM. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50%
by the refueling outage nearest the end of the period. No SG shall operate for more than 48 EFPM or two refueling outages (whichever is less) without being inspected.
- 4. For Unit 1, if crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 EFPM or one refueling outage (whichever is less). For Unit 2, if crack indications are found in any SG tube from 14.01 inches below the top of the tubesheet on the hot leg side to 14.01 inches below the top of the tubesheet on the cold leg side, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 EFPM or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with crack(s), then the indication need (continued)
Catawba Units 1 and 2 5.5-8 Amendment Nos.
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.8 Steam Generator (SG) Tube Inspection Report (continued)
- h. For Unit 2, the primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign leakage to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle preceding the inspection which is the subject of the report, For Unit 2, the calculated accident leakage rate from the portion of the tubes below 14.01 inches from the top of the tubesheet for the most limiting accident in the most limiting SG. In addition, if the calculated accident leakage rate from the most limiting accident is less than 3.27 times the maximum primary to secondary LEAKAGE rate, the report shall describe how it was determined, and
- j. For Unit 2, the results of monitoring for tube axial displacement (slippage). If slippage is discovered, the implications of the discovery and corrective action shall be provided..
Catawba Units 1 and 2 5.6-6 Amendment Nos.
RCS Operational LEAKAGE B 3.4.13 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.13 RCS Operational LEAKAGE BASES BACKGROUND Components that contain or transport the coolant to or from the reactor core make up the RCS. Component joints are made by welding, bolting, rolling, or pressure loading, and valves isolate connecting systems from the RCS.
During plant life, the joint and valve interfaces can produce varying amounts of reactor coolant LEAKAGE, through either normal operational wear or mechanical deterioration. The purpose of the RCS Operational LEAKAGE LCO is to limit system operation in the presence of LEAKAGE from these sources to amounts that do not compromise safety. This LCO specifies the types and amounts of LEAKAGE.
10 CFR 50, Appendix A, GDC 30 (Ref. 1), requires means for detecting and, to the extent practical, identifying the source of reactor coolant LEAKAGE. Regulatory Guide 1.45 (Ref. 2) describes acceptable methods for selecting leakage detection systems.
The safety significance of RCS LEAKAGE varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring reactor coolant LEAKAGE into the containment area is necessary. Quickly separating the identified LEAKAGE from the unidentified LEAKAGE is necessary to provide quantitative information to the operators, allowing them to take corrective action should a leak occur that is detrimental to the safety of the facility and the public.
A limited amount of leakage inside containment is expected from auxiliary systems that cannot be made 100% leaktight. Leakage from these systems should be detected, located, and isolated from the containment atmosphere, if possible, to not interfere with RCS leakage detection.
This LCO deals with protection of the reactor coolant pressure boundary (RCPB) from degradation and the core from inadequate cooling, in addition to preventing the accident analyses radiation release assumptions from being exceeded. The consequences of violating this LCO include the possibility of a loss of coolant accident (LOCA).
APPLICABLE Except for primary to secondary LEAKAGE, the safety analyses do not SAFETY ANALYSES address operational LEAKAGE. However, other operational LEAKAGE is related to the safety analyses for LOCA; the amount of leakage can affect the probability of such an event.
Catawba Units 1 and 2 B 3.4.13-1 Revision No. 7
RCS Operational LEAKAGE B 3.4.13 BASES APPLICABLE SAFETY ANALYSES (continued)
The safety analysis (Ref. 3) for an event resulting in steam discharge to the atmosphere assumes that primary to secondary LEAKAGE from each steam generator (SG) is 150 gallons per day. Any event in which the reactor coolant system will continue to leak water inventory to the secondary side, and in which there will be a postulated source term associated with the accident, utilizes this leakage value as an input in the analysis. These accidents include the rod ejection accident, locked rotor accident, main steam line break, steam generator tube rupture and uncontrolled rod withdrawal accident. The rod ejection accident, locked rotor accident and uncontrolled rod withdrawal accident yield a source term due to postulated fuel failure as a result of the accident. The main steam line break and the steam generator tube rupture yield a source term due to perforations in fuel pins causing an iodine spike. Primary to secondary side leakage may escape the secondary side due to flashing or atomization of the coolant, or it may mix with the secondary side SG water inventory and be released due to steaming of the SGs. The rod ejection accident is limiting compared to the remainder of the accidents with respect to dose results. The dose results for each of the accidents delineated above are below the 10 CFR 50.67 limits (Ref. 9) and the limits in Regulatory Guide 1.183 (Ref. 10) for these accidents.
The RCS operational LEAKAGE satisfies Criterion 2 of 10 CFR 50.36 (Ref. 4).
LCO RCS operational LEAKAGE shall be limited to:
- a. Pressure Boundary LEAKAGE No pressure boundary LEAKAGE is allowed, being indicative of material deterioration. LEAKAGE of this type is unacceptable as the leak itself could cause further deterioration, resulting in higher LEAKAGE.
Violation of this LCO could result in continued degradation of the RCPB. LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE.
- b. Unidentified LEAKAGE One gallon per minute (gpm) of unidentified LEAKAGE is allowed as a reasonable minimum detectable amount that the containment air monitoring and containment sump level monitoring equipment Catawba Units 1 and 2 B 3.4.13-2 Revision No. 7
RCS Operational LEAKAGE B 3.4.13 BASES LCO (continued) can detect within a reasonable time period. Violation of this LCO could result in continued degradation of the RCPB, if the LEAKAGE is from the pressure boundary.
- c. Identified LEAKAGE Up to 10 gpm of identified LEAKAGE is considered allowable because LEAKAGE is from known sources that do not interfere with detection of unidentified or total LEAKAGE and is well within the capability of the RCS Makeup System. Identified LEAKAGE includes LEAKAGE captured by the pressurizer relief tank and reactor coolant drain tank, as well as quantified LEAKAGE to the containment from specifically known and located sources, but does not include pressure boundary LEAKAGE or controlled reactor coolant pump (RCP) seal leakoff (a normal function not considered LEAKAGE). Violation of this LCO could result in continued degradation of a component or system.
- d. Primary to Secondary LEAKAGE through Any One SG The limit of 150 gallons per day (Unit 1) and 45 gallons per day (Unit 2) per SG is based on the operational LEAKAGE performance criterion in NEI 97-06, "Steam Generator Program Guidelines" (Ref.
6). The Steam Generator Program operational LEAKAGE performance criterion in NEI 97-06 states: "The RCS operational primary to secondary leakage through any one SG shall be limited to 150 gallons per day." The limit for Unit 2 has been permanently reduced as a result of the SG tube alternate repair criteria that has been implemented for this unit.
The primary to secondary LEAKAGE measurement is based on the methodology described in Ref. 5.
The operational LEAKAGE rate limit applies to LEAKAGE in any one SG. If it is not practical to assign the LEAKAGE to an individual SG, all the LEAKAGE should be conservatively assumed to be from one SG.
The limit in this criterion is based on operating experience gained from SG tube degradation mechanisms that result in tube LEAKAGE. The operational LEAKAGE rate criterion in conjunction with implementation of the Steam Generator Program is an effective measure for minimizing the frequency of SG tube ruptures.
Catawba Units 1 and 2 B 3.4.13-3 Revision No. 7
RCS Operational LEAKAGE B.3.4.13 BASES APPLICABILITY In MODES 1, 2, 3, and 4, the potential for RCPB LEAKAGE is greatest when the RCS is pressurized.
In MODES 5 and 6, LEAKAGE limits are not required because the reactor coolant pressure is far lower, resulting in lower stresses and reduced potentials for LEAKAGE.
LCO 3.4.14, "RCS Pressure Isolation Valve (PIV) Leakage," measures leakage through each individual PIV and can impact this LCO. Of the two PIVs in series in each isolated line, leakage measured through one PIV does not result in RCS LEAKAGE when the other is leak tight. If both valves leak and result in a loss of mass from the RCS, the loss must be included in the allowable unidentified LEAKAGE.
ACTIONS A.1 Unidentified LEAKAGE or identified LEAKAGE in excess of the LCO limits must be reduced to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. This Completion Time allows time to verify leakage rates and either identify unidentified LEAKAGE or reduce LEAKAGE to within limits before the reactor must be shut down. This action is necessary to prevent further deterioration of the RCPB.
B.1 and B.2 If any pressure boundary LEAKAGE exists, or if primary to secondary LEAKAGE is not within limit, or if unidentified LEAKAGE or identified LEAKAGE cannot be reduced to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the reactor must be brought to lower pressure conditions to reduce the severity of the LEAKAGE and its potential consequences. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE.
The reactor must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. This action reduces the LEAKAGE and also reduces the factors that tend to degrade the pressure boundary.
The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. In MODE 5, the pressure stresses acting on the RCPB are much lower, and further deterioration is much less likely.
Catawba Units 1 and 2 B 3.4.13-4 Revision No. 7
RCS Operational LEAKAGE B 3.4.13 BASES SURVEILLANCE SR 3.4.13.1 REQUIREMENTS Verifying RCS LEAKAGE to be within the LCO limits ensures the integrity of the RCPB is maintained. Pressure boundary LEAKAGE would at first appear as unidentified LEAKAGE and can only be positively identified by inspection. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE. Unidentified LEAKAGE and identified LEAKAGE are determined by performance of an RCS water inventory balance. For this SR, the volumetric calculation of unidentified LEAKAGE and identified LEAKAGE is based on a density at room temperature of 77 degrees F.
The Surveillance is modified by two Notes. The RCS water inventory balance must be performed with the reactor at steady state operating conditions and near operating pressure. Therefore, Note 1 indicates that this SR is not required to be completed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state operation near operating pressure have been established.
Steady state operation is required to perform a proper inventory balance; calculations during maneuvering are not useful and Note 1 requires the Surveillance to be met when steady state is established. For RCS operational LEAKAGE determination by water inventory balance, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows.
Note 2 states that this SR is not applicable to primary to secondary LEAKAGE because LEAKAGE of 150 gallons per day or lower cannot be measured accurately by an RCS water inventory balance.
An early warning of pressure boundary LEAKAGE or unidentified LEAKAGE is provided by the automatic systems that monitor the containment atmosphere radioactivity and the containment sump level. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE. These leakage detection systems are specified in LCO 3.4.15, "RCS Leakage Detection Instrumentation."
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. A Note under the Frequency column states that this SR is only required to be performed during steady state operation.
Catawba Units 1 and 2 B 3.4.13-5 Revision No. 7
RCS Operational LEAKAGE B 3.4.13 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.4.13.2 This SR verifies that primary to secondary LEAKAGE is less than or equal to 150 gallons per day (Unit 1) and less than or equal to 45 gallons per day (Unit 2) through any one SG. Satisfying the primary to secondary LEAKAGE limit ensures that the operational LEAKAGE performance criterion in the Steam Generator Program is met. If this SR is not met, compliance with LCO 3.4.18, "Steam Generator (SG) Tube Integrity,"
should be evaluated. The 150 gallons per day (Unit 1) and 45 gallons per day (Unit 2) limit is based on measurements taken at room temperature.
The primary to secondary leak rate assumed in the safety analyses is taken also at room temperature.
The Surveillance is modified by a Note which states that this SR is not required to be completed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state operation near operating pressure have been established. During normal operation the primary to secondary LEAKAGE is determined using continuous process radiation monitors or radiochemical grab sampling.
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. A Note under the Frequency column states that this SR is only required to be performed during steady state operation.
REFERENCES 1. 10 CFR 50, Appendix A, GDC 30.
- 2. Regulatory Guide 1.45, May 1973.
- 3. UFSAR, Section 15.
- 4. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 5. EPRI TR-104788-R2, "PWR Primary-to-Secondary Leak Guidelines," Revision 2.
- 6. NEI 97-06, "Steam Generator Program Guidelines."
- 7. UFSAR, Section 18, Table 18-1.
- 8. Catawba License Renewal Commitments, CNS-1274.00-00-0016, Section 4.27.
- 9. 10 CFR 50.67.
Catawba Units 1 and 2 B 3.4.13-6 Revision No. 7
RCS Operational LEAKAGE B 3.4.13 BASES REFERENCES (continued)
- 10. Regulatory Guide 1.183, July 2000.
Catawba Units 1 and 2 B 3.4.13-7 Revision No. 7