Issuance of Amendments Regarding Emergency Diesel Generator Testing (TAC Nos. MD3217 and MD3218) - Technical Specifications
ML071770310
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/25/2007
From: Stang J
NRC/NRR/ADRO/DORL/LPLII-1
To: Morris J
Duke Power Co
Stang J, NRR/DORL, 415-1345
Shared Package
ML071520320 List:
References
TAC MD3217, TAC MD3218
Download: ML071770310 (3)


Text

(2) Tedmchnc Soeacerctions The Technical So9ialn contained InAppencrix A.as revised "uuh Amendment No 236 which ame attached hefeto, are hereby Incorporated into thi reviewed operating license. Duke Power Company LLC shall operate the facWE Inacirdaknce with the Technical Speclficallons.

(3) WM ivlSft wýl;M The Updated Final Safety Aralysis Report supplement submitted FurMan to 10 CFR 54.21(d), as revised on December 16,2002 dsrZ e certhlnfuture activtis to be completed before Ihe period of extended operaftio Duke shall conplete thee activities no later than December 6, 2024, and sAd idl~y Mhe NRC Inwriting when Inplementation of these actiites Iscomplete anid can be verified by NRC hispectior The Updated Final Safety Analysis Report aupplement as revised on December 16.,2002 described above, shall be included Inthe netd scheuled update to the Updated Final Sfety Analysis Report fecuqued by 10OCFR 50.71(e%4) folwing isuance of this renewed operating license. MIn Mtha update Iscomplete. Duke may make changes to fme programs; desoWe Inaudi supplement wltout prior Commirssion approval, provided Ihat Duke evaluates each such change pursuant to the criteria set fbrt fIn 10 CFR 50.59 and otherwise comptles with the requirements Inthat section.

(4) Adto MA Duke Power C~ompany LLC: shall compty with the antitrust conditions delineated InAppendix C to thi renewed operafti license.

(5) Fire Pr tection Probram (Section 9.5.1, SER, SSER #2,SSER #M.SSER#94, SSER #s DukeO Power CoMpany LLC shall hIplemnent and maintain Ineffect ad provision of the approved fire protection program as descdmbd Inthe Updated Final.Saet Analysis Report, as amnended, for the faclty and as approved Inthe SER through Supplemennt 5% subject to the folowing provision:

The licensee nay mnake changes to the approved fire prof.Won program wlAJut prior appova of toe Commisslion only 9 those ftngesvioud rnot adversety affect the abilit to achieve and maintain safe shM=ow Inthe event of a fir.

  • The parenthetical notation following the titl of thi renewed operatin license conditin denotes the section of the Safety Evaluaton Report mndAkr Its supplement wherein tIs reneuwed limens condition is discused.

Renewed License Nlo. NPF-35 Amendment No. .236

(2) Tvchnical SpsEcifcaton The Technical Snadffications contafred fIn Appendix A. as revisd through Amendment tc 232 whIch are afttaed hereto, ame hereby kicrporated into this renewed operating licnse. Duke Power Comany LLC shall operate tMe facliy Inaccrdance with the Technca Specificatons.

(3) U"Wte Final Safet Analysis R-ewor he Updated Fknal Safety Analysis Report supplment sutnilAtd puruait to 10 CFR 54.21(d) as revised an Decemnber 16,20M2, describes-certaln futlure acdvvtes to be completed before the period of extended qxemthLn Dula shall cotilete these activtles; no later than Februury 24,2=2, and shall notfy the NRC Inwriting when knplmentation of these actiites Iscomplete and can be verified by NRC Inspection.

The Updated Final Safety Analysis Report supplement as revised an Decemnber 16,*2002 described above. shal be Induded Inthe next scheduled updates lo 1he Updte Fina Safety Arall~ls Report requite by 10 CFR 60.71 (eX4), following Issuance of Othi renevad operating license. Unti att update Iscomplete, Duke rnay make changes to the programs desat~ed fIn such supplement wilhout prior Commidsson approval. prcovided W~ Duke evakiates eadh such change pursuant b the criteria set forth InlO0 CFR 50.5 mid otherwise complies with the requiremnents Inthat section.

Duke Power Company LLC shall cmply with the antitrust cranduions delineated

  • inAp~pendlx C lo this renewed operating license.

(5) Fire Protection ProaraM (Section 0.&~1, SER, SSER #2,SSER #3.SSER #4.

SSER#5)'

Duke Power Comnpany LLC shagl Imp~lement and rnantahi Ineffect a!l provisions of tOe approved fire protecWon program as describd hIn On Updated Final Safety Anabois ReporL as amendled, for toe facflty and as approved lh-the MER-through Supplement 5, sitbject to the folowig provilsorc The Ucensee may make chaniges to the approved fire protecton program without prio apprval of Owe Commnission only Ifthose changes would nout adversely affect the abflty to achiev end rmerfhit sae uwdo in Inthe Vevet of a rem.

'm1e parentlietical notation fokfloin the tMl of Othi renewed operatig license,condltbn denotes the sedwionfc the Safety Evaluatin Repart andlor its supplementsvwde~n this renewed license conditon Isdiscussed.

Renewed License No. NPF-62 Amendlment No. 232

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) _______

SURVEILLANCE FREQUENCY SR 3.8.1.13 Verify each DG's non-emergency automatic trips are 18 months I bypassed on actual or simulated loss of voltage signal on the emergency bus concurrent with an actual or simulated ESF actuation signal.

SR 3.8.1.14-------------------------- NOTE -----------------------

Momentary transients outside the load and power factor ranges do not invalidate this test.

Verify each DG operating at a power factor < 0.9 18 months operates for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> loaded > 5600 kW and

< 57150 kW.

(continued)

Catawba Units 1 and 2 3.8.1-11 Cataba nits1 ad 2 .8.-11Amendment Nos. 236, 232