Letter Sequence Other |
---|
|
|
MONTHYEARML0730604052007-10-31031 October 2007 Tech Spec Pages for Amendment 237 Regarding Extension of Time Limit to Complete Emergency Core Cooling Systems Sump Modification Project stage: Other ML0727400622007-10-31031 October 2007 Issuance of License Amendment 237 Regarding Extension of Time Limit to Complete Emergency Core Cooling Systems Sump Modification Project stage: Approval 2007-10-31
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22263A0432022-09-0707 September 2022 Editorial Change to SLC 16.10-5 ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16124A6942016-06-0202 June 2016 Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16081A3332016-04-29029 April 2016 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16082A0382016-04-18018 April 2016 Issuance of License Amendment Regarding Emergency Action Level Scheme Change ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements ML16007A1762016-01-12012 January 2016 Issuance of Amendments Regarding Non-Conservative Technical Specification Allowable Value ML15320A3332015-12-18018 December 2015 Issuance of Amendments Regarding Non-Conservative Technical Specifications Allowable Value ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-06-23023 June 2014 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate ML14056A2172014-02-27027 February 2014 Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC MF3473&74) ML12194A2182012-07-0909 July 2012 Response to NRC Request for Additional Information on Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML12038A1732012-02-0101 February 2012 Proposed Tech Specs Amendment TS 3.4.13, TS 5.5.9, TS 5.6.8, License Amendment Request to Revise TS for Permanent Alternate Repair Criteria ML1106705362011-03-29029 March 2011 Issuance of Amendments Regarding Revision of the Technical Specifications to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using a Risk-Informed Justification ML1032700112010-12-20020 December 2010 Issuance of Amendments Regarding Revision of Technical Specification (TS) 3.8.4 DC Sources - Operating ML1026405372010-09-27027 September 2010 Issuance of Amendment Regarding the Steam Generator Program. ML1025601442010-09-0909 September 2010 Proposed Technical Specifications (TS) Amendment TS 5.5.9, Steam Generator (SG) Program TS 5.6.8, Steam Generator (SG) Tube Inspection Report License Amendment Request to Revise TS for Alternate Repair Criteria ML1021605622010-08-0202 August 2010 Notice of Enforcement Discretion Request, Technical Specification 3.8.1, AC Sources - Operating, TS 3.78, Nuclear Service Water System, TS 3.7.5, Auxiliary Feedwater System, TS 3.6.6, Containment Spray System. ML0925300882010-06-28028 June 2010 License Amendment, Issuance of Amendments Regarding Technical Specification Change to Allow Manual Operation of the Containment Spray System (TAC Nos. MD9752 and MD9753) ML1017303882010-04-28028 April 2010 Proposed Technical Specifications Amendment TS 5.5.9, Steam Generator Program, TS 5.6.8, Steam Generator Tube Inspection Report, License Amendment Request to Revise TS for Alternate Repair Criteria ML1009201602010-03-31031 March 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML0935600772009-12-15015 December 2009 Technical Specifications Revision Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0923805882009-10-30030 October 2009 License Amendment, Implement Technical Specification Task Force (TSTF) Changes Travelers TSTF-479, Revision 0, Changes to Reflect Revision (Title 10 of the Code of Federal Regulations, Part 50, Section 50.55a) 10 CFR 50.55a,.. ML0924003112009-09-21021 September 2009 Issuance of Amendments Regarding Proposed Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Ts. 5.2.2 to Support Compliance with 10 CFR Part 26. Catawba Units 1& 2, McGuire, Units 1 & 2, Oconee, Units 1, 2, & ML0919503552009-07-0101 July 2009 License Amendment Request to Support Plant Modifications to the Nuclear Instrumentation System ML0914102832009-05-18018 May 2009 License Amendment Request to Revise the Definition of Shutdown Margin (SDM) ML0905402522009-02-19019 February 2009 Proposed Technical Specifications Amendment TS 5.5.9, Steam Generator Program, TS 5.6-8, Steam Generator Tube Inspection Report. ML0835704702008-12-18018 December 2008 Units 1 &2 - Proposed Technical Specification Amendment to Relax Completion Times and Surveillance Intervals for the Reactor Trip System Instrumentation TS 3.3.1, Engineered Safety Feature Actuation System Instrumentation. ML0828800982008-10-0808 October 2008 Proposed Technical Specifications and Bases Amendment, TS and Bases Administrative Changes ML0819803572008-07-15015 July 2008 Technical Specifications, Issuance of Emergency Amendment Regarding One-Time Extension of the Auxiliary Feedwater System and the Containment Spray System Allowed Outage Time ML0817700602008-06-23023 June 2008 Proposed Technical Specifications (TS) and Bases Amendment, TS and Bases 3.7.8, Nuclear Service Water System, Response to Request for Additional Information ML0806304962008-03-28028 March 2008 Technical Specifications, Issuance of Amendments Regarding a Change in Corporate Name of License & Oconee Independent Spent Fuel Storage Installation (TAC Nos. MD5156 - MD5162) ML0731803132007-11-0808 November 2007 Tech Spec Pages for Amendments 238 and 234 Regarding Emergency Core Cooling System Strainer Modification ML0730904132007-10-31031 October 2007 Technical Specifications, Issuance of Amendment Regarding Technical Specification 5.5.9 Steam Generator Tube Surveillance Program ML0730604052007-10-31031 October 2007 Tech Spec Pages for Amendment 237 Regarding Extension of Time Limit to Complete Emergency Core Cooling Systems Sump Modification ML0717703102007-06-25025 June 2007 Issuance of Amendments Regarding Emergency Diesel Generator Testing (TAC Nos. MD3217 and MD3218) - Technical Specifications ML0707903972007-03-19019 March 2007 Tech Spec Pages for Amendments 235 and 231 Regarding Snubbers, TSTF-372, Rev. 4 ML0635303422006-12-0707 December 2006 Proposed Technical Specifications (TS) Amendments TS 3.7.10 (Catawba)/Ts 3.7.9 (McGuire) - Control Room Area Ventilation System (Cravs) TS 3.7.11 (Catawba)/Ts 3.7.10 (McGuire) - Control Room Area Chilled Water System (Cracws) ML0629003532006-09-30030 September 2006 Tech Spec Pages for Amendments 234 and 230, Revising Reactor Coolant Systems Leakage Detection Instrumentation ML0627105962006-09-27027 September 2006 Tech Spec Pages for Amendments 233 and 229 Revised Storage Criteria for Low-enriched Uranium Fuel ML0626901142006-09-25025 September 2006 Technical Specifications Revision of Temperature Limits for the Standby Nuclear Service Water Pond ML0626901122006-09-25025 September 2006 Tech Spec Pages for Amendments 231 and 227 Regarding Updated Final Safety Analysis Report and Emergency Operating Procedures 2023-08-29
[Table view] |
Text
(2) Teclcal Sv t The Tedhical Sc*weficzaions conftlned inAppendix A, as revised tgh Amendment No 2 3 7whch am attached hereto, are hereby Incoprated W Iisrernwd operating Ecen-. Duke Power Comp-ny LLC hd op*ea the fabdly Ine *rdance with the TechnlCS Spedflcerlon.
TMe Updt~ Final Safet Analysi Report uqplment submlted "M M*aiito 10 CFR 6421(d)j as revised on Decomber 16, 2002. descrbea certanfuture activities to be completed before the peaod of extended %eato Dn. shell coaptete Ilee actvilles no leter than December 6, 2024, and Au no* IhD NRC hInwrf when rIplementaton of these acIvltesis complde nd can be verified by NRM inspeco.
The Updated Final Safety Analysi Report supplement as revised on.
December 16,2002, described above, dhal be Included Intie nerd sheduled update-to fe Updated Final Safety Analysis Report iequked by 10CFR 50.71(eX4), folowing issuance of Oh renewed operating icense. UrM thlt update is complete. Duke may make chanres to the progrms desct)ed In such supplermnt withou prior Comnrruon approval, provided tt Duke evakates, each such change pwuuant to the alteuE set forth In10 CFR 50.M and otherwise complfes wIth the requirements Inthat sectLon.
(4) Ant n d k Duke Power Company LLC shellcomply with lie antlinist condktins defineated ini Appendix C to this renewed qxerth license.
(5) Fire Pmtecdon Pmbnmim (SectIon 9.5.1, SER, SSER #2, SSER #3. SSER#4,
$SER #6')
Dula Power C=ompny LLC sius hnpernnt and manahtain Ineffect d provisons of the approved ftre protection program as desatbed inthe Updated FRa Safety Ana1ylsi Report as urnended. or the facri and as approved inMe SER tro Supplerent 5. su*e*t b fobwing pmwvon The Eenre naay mlk dhangs to the approved fire prtecon program wWht prior aproaMl cc to Conmmssion only Wthese d woiesiM rot adversely affect the aby to achieve end maintaln safe shutMin Inthe event of a frei.
- The parenthetical notation fowloing the i of this renewed operatg Icense condilm denotes the section of the Safety Evalution Repot andforIt supplement whereh hIs eneud license cordItIon is dbi sed.
Renewed Lim=s Nu. NPF35.
Amnendment.o.. 237
(6) Mitigation Strategies Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders (7) Additional Conditions The Additional Conditions contained in Appendix B, as revised through.
Amendment No. 23 7, are hereby incorporated into this renewed operating license. Duke Power Company LLC shall operate the facility in accordance with the Additional Conditions.
D. The facility requires exemptions from certain requirements of Appendix J to 10 CFR Part 50, as delineated below and pursuant to evaluations contained in the referenced SER and SSERs. These include, (a) partial exemption from the requirement of paragraph III.D.2(b)(ii) of Appendix J, the testing of containment airlocks at times when the containment integrity is not required (Section 6.2.6 of the SER, and SSERs
- 3 and #4), (b) exemption from the requirement of paragraph III.A.(d) of Appendix J, insofar as it requires the venting and draining of lines for type A tests (Section 6.2.6 of SSER #3), and (c) partial exemption from the requirements of paragraph III.B of Appendix J, as it relates to bellows testing (Section 6.2.6 of the SER and SSER #3).
These exemptions are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and are consistent with certain special circumstances as discussed in the referenced SER and SSERs. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
Renewed License No. NPF-35 Amendment No. 237
Amendment Implementation Number Additional Condition Date 173 The schedule for the performance of new and By January 31, 1999 revised surveillance requirements shall be as follows:
For surveillance requirements (SRs) that are new in Amendment No. 173 the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment No. 173. For SRs that existing prior to Amendment No. 173, including SRs with modified acceptance criteria and SRs who intervals of performance are being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of amendment No. 173. For SRs that existed prior to Amendment No. 173, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon
,y-,ý9 Pý 0Q, completion of the first surveillance performed after implementation of Amendment No. 173
,ko 4-I The maximum rod average burnup for any rod Within 30 days of shall be limited to 60 GWd/mtU until the date of amendment.
completion of an NRC environmental assessment supporting an increased limit.
In association with the ECCS sump strainer Within 30 days of modification and Generic Safety Issue (GSI)- date of amendment 191 requirements: and no later than December 31, 2007
- 1. Unit 1 shall enter Mode 5 for the outage to install the sump strainer modification no later than May 19, 2008 and
- 2. The Unit 1 sump strainer modification shall be completed prior to entry into Mode 4 after May 19. 2008.
Amendment No. 237