Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6
ML15175A442
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Brunswick, McGuire  Duke energy icon.png
Issue date: 06/24/2015
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of New Reactors
Shared Package
ML15175A438 List:
References
Download: ML15175A442 (50)


Text

{{#Wiki_filter:Brunswick Unit 2 INSERT Bases SR 3.4.8.2 SR 3.4.8.2 AHA Shutdown Cooling System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the AHA shutdown cooling subsystems and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of AHA Shutdown Cooling System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The AHA Shutdown Cooling System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the AHA Shutdown Cooling System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. Gas accumulation in the AHA shutdown cooling (SOC) suction flow path is satisfactorily addressed by procedures which fill the system prior to placing SDC in service. Since the non-safety shutdown cooling mode of AHA is manually initiated at a low reactor pressure, sufficient time is available to ensure fill and warm-up of the flow path have been performed prior to starting an AHA pump, thereby avoiding any unacceptable pressure transients on the system. AHA Shutdown Cooling System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the AHA Shutdown Cooling System piping and the procedural controls governing system operation.

ECCS-Operating B 3.5.1 BASES LCO Each ECCS injection/spray subsystem and six of seven ADS valves are required to be OPERABLE. The ECCS injection/spray subsystems are defined as the two CS subsystems, the two LPCI subsystems, and one HPCI System. The low pressure ECCS injection/spray subsystems are defined as the two CS subsystems and the two LPCJ subsystems. With Jess than the required number of ECCS subsystems OPERABLE, the potential exists that during a limiting design basis LOCA concurrent with the worst case single failure, the limits specified in Reference 9 could be exceeded. All ECCS subsystems must therefore be OPERABLE to satisfy the single failure criterion required by Reference 9. LPCI subsystems may be considered OPERABLE during alignment and operation for decay heat removal when below the actual RHR shutdown cooling isolation pressure in MODE 3, if they are capable of being manually realigned (remote or local) to the LPCI mode and not otherwise inoperable. Alignment and operation for decay heat removal includes the period when the required RHR pump is not operating and the period when the system is being realigned to or from the RHR shutdown cooling mode. At these low pressures and decay heat levels, a reduced complement of ECCS subsystems should provide the required core cooling, thereby allowing operation of RHR shutdown cooling when necessary. APPLICABILITY All ECCS subsystems are required to be OPERABLE during MODES 1, 2, and 3, when there is considerable energy in the reactor core and core cooling would be required to prevent fuel damage in the event of a break in the primary system piping. In MODES 2 and 3, when reactor steam dome pressure is ~ 150 psig, ADS and HPCI are not required to be OPERABLE because the low pressure ECCS subsystems can provide sufficient flow below this pressure. ECCS requirements for MODES 4 and 5 are specified in LCO 3.5.2, "ECCS-Shutdown." (continued) _M,.,:J~¥-VIf at: ja ~ Vo j Lc IO /;:., ro~f.-A-t- -/., E c., c.. S ~~ j c.. c., -It ~tV /5f.rA- s J, s 7 ~~.-yt.., oPt1-.lri>IL' 1'1, Brunswick Unit 2 B 3.5.1-5 Revision No. 62

ECCS-Operating B 3.5.1 BASES ACTIONS 4.1 (continued) When multiple ECCS subsystems are inoperable, as stated in Condition J, the plant is in a condition outside of the accident analyses. Therefore, LCO 3.0.3 must be entered immediately. SURVEILLANCE SR 3.5.1.1 REQUIREMENTS ~~~~~~~~~~~~~~~~~~~~- The flow path piping of each ECCS has the potential to dev voids and pockets of entrained air. Maintaining the pump disc e lines of the HPCI System, CS subsystems, and LPCI sub ems full of water ensures that the ECCS will perform pr y, injecting its full capacity into

       -----+'7'1 the RCS upon demand. This S             o prevents water hammer in the piping following an ECC
  • 1ation signal. One acceptable method of ensuring that the
  • are full is to vent at the high points. The 31 day Frequenc
  • ased on the gradual nature of void buildup in the ECCS pi * , e procedural controls governing system operation, and operatin x erience.

SR 3.5.1.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these are verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an initiation signal is allowed to be in a nonaccident position provided the valve will automatically reposition to the accident position in the proper stroke time. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of potentially being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. For the HPCI System, this SR also includes the steam flow path for the turbine and the flow controller position. (continued) Brunswick Unit 2 B 3.5.1-10 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SA 3.5.1.1 The ECCS injection/spray subsystem flow path piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the ECCS injection/spray subsystems and may also prevent a water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of ECCS injection/spray subsystem locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The ECCS injection/spray subsystem is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the ECCS injection/spray subsystems are not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. ECCS injection/spray subsystem locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 92 day Frequency is based on the gradual nature of void buildup in the ECCS injection/spray subsystem piping, the procedural controls governing system operation, and operating experience.

ECCS-Operating B 3.5.1 BASES SURVEILLANCE SR 3.5.1.2 (continued) REQUIREMENTS The 31 day Frequency of this SR was derived from the lnservice Testing Program requirements for performing valve testing at least once every 92 days. The Frequency of 31 days is further justified because the valves are operated under procedural control and because improper valve position typically only affects a single subsystem. This Frequency has been shown to be acceptable through operating experience. In MODE 3 with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure, the RHR System may be required to operate in the shutdown cooling mode to remove decay heat and sensible heat from the reactor. Therefore, this SR is modified by a Note that allows LPCI subsystems to be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned (remote or local) to the LPCI mode and not otherwise inoperable. Alignment and operation for decay heat removal includes the period when the required RHR pump is not operating and the period when the system is being realigned to or from the RHR shutdown cooling mode. At low reactor pressure and with a low decay heat load associated with operation in MODE 3 with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure, a reduced complement of low pressure ECCS subsystems should provide the required core cooling in the unlikely event of a LOCA, thereby, allowing operation of the shutdown cooling mode of the RHR System, when necessary. SR 3.5.1.3 Verification every 31 days that ADS pneumatic supply header pressure is

                ~ 95 psig ensures adequate pneumatic pressure for reliable ADS operation. The accumulator on each ADS valve provides pneumatic pressure for valve actuation. The design pneumatic supply pressure requirements for the accumulator are such that, following a failure of the pneumatic supply to the accumulator, at least three valve actuations can occur with the drywell at 70% of design pressure. The ECCS safety analysis assumes only one actuation to achieve the depressurization required for operation of the low pressure ECCS. This minimum required pressure of ~ 95 psig is provided by the non-interruptible Reactor (continued)

Brunswick Unit 2 B3.5.1-11 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SR 3.5.1.2 The Surveillance is modified by a second Note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

ECCS-Shutdown B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM B 3.5.2 ECCS-Shutdown BASES BACKGROUND A description of the Core Spray (CS) System and the low pressure coolant injection (LPCI) mode of the Residual Heat Removal (RHR) System is provided in the Bases for LCO 3.5.1, "ECCS-Operating." APPLICABLE The ECCS performance is evaluated for the entire spectrum of break SAFETY ANALYSES sizes for a postulated loss of coolant accident (LOCA). The long term cooling analysis following a design basis LOCA (Ref. 1) demonstrates that only one low pressure ECCS injection/spray subsystem is required, post LOCA, to maintain adequate reactor vessel water level in the event of an inadvertent vessel draindown. It is reasonable to assume, based on engineering judgement, that while in MODES 4 and 5, one low pressure ECCS injection/spray subsystem can maintain adequate reactor vessel water level. To provide redundancy, a minimum of two low pressure ECCS injection/spray subsystems are required to be OPERABLE in MODES 4 and 5. The low pressure ECCS subsystems satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii) (Ref. 2). LCO Two low pressure ECCS injection/spray subsystems are required to be OPERABLE. A low pressure ECCS injection/spray subsystem consists of a CS subsystem or a LPCI subsystem. Each CS subsystem consists of one motor driven pump, piping, and valves to transfer water from the suppression pool or condensate storage tank (CST) to the reactor pressure vessel (RPV). Each LPCI subsystem consists of one motor driven pump, piping, and valves to transfer water from the suppression pool to the RPV. The necessary portions of the Service Water System are required to provide appropriate cooling to the required low pressure ECCS injection/spray subsystems. Only a single LPCI pump is required per LPCI subsystem because of the larger injection capacity in relation to a CS subsystem. In MODES 4 and 5, the RHR System cross tie valve is not required to be closed. (continued) j1) -r~'~"j ~ #>..VIT ,-{- J tt .I vo 1 ~!.s ,; ,_;,/u " +",t- ..f-o ~~--~c_fw-vvj.sf ""'7 sui,s(s-1,./)AI.. tJ/t::-JJti>!Ltrf, Brunswick Unit 2 B 3.5.2-1 Revision No. 30 I

ECCS-Shutdown B 3.5.2 BASES SURVEILLANCE SR 3.5.2.4 (continued) REQUIREMENTS to be in a nonaccident position provided the valve will automatically reposition to the accident position in the proper stroke time. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of potentially being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. The 31 day Frequency is appropriate because the valves are operated under procedural control and the probability of their being mispositioned during this time period is low. In MODES 4 and 5, the RHR System may be required to operate in the shutdown cooling mode to remove decay heat and sensible heat from the reactor. Therefore, this SR is modified by a Note that allows one LPCI subsystem to be considered OPERABLE if it is capable of being manually realigned (remote or local) to the LPCI mode and not otherwise inoperable. Alignment and operation for decay heat removal includes the period when the required RHR pump is not operating and the period when the system is being realigned to or from the RHR shutdown cooling mode. Because of the low pressure and low temperature conditions in MODES 4 and 5, sufficient time is available to manually align and initiate LPCI subsystem operation to provide core cooling prior to postulated fuel uncovery. This will ensure adequate core cooling if an inadvertent RPV draindown should occur. REFERENCES 1. NED0-20566A; General Electric Company Analytical Model for Loss-of-Coolant Analysis in Accordance with 10 CFR 50 Appendix K, Vols. 1, 2, and 3; September 1986.

2. 10 CFR 50.36(c)(2)(ii).

Brunswick Unit 2 B 3.5.2-6 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SR 3.5.2.4 The Surveillance is modified by a second Note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

RCIC System B 3.5.3 BASES BACKGROUND The RCIC pump is provided with a minimum flow bypass line, which (continued) discharges to the suppression pool. The valve in this line automatically opens to prevent pump damage due to overheating when other discharge line valves are closed. To ensure rapid delivery of water to the RPV and to minimize water hammer effects, the RCIC System discharge piping is maintained full of water using a "keep fill" system. APPLICABLE The function of the RCIC System is to respond to transient events by SAFETY ANALYSES providing makeup coolant to the reactor. The RCIC System is not an Engineered Safety Feature System and no credit is taken in the safety analyses for RCIC System operation. Based on its contribution to the reduction of overall plant risk, however, the system satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii) (Ref. 3) and is therefore included in the Technical Specifications. LCO The OPERABILITY of the RCIC System provides adequate core cooling such that actuation of any of the low pressure ECCS subsystems is not required in the event of RPV isolation accompanied by a loss of feedwater flow. The RCIC System has sufficie t a

  • m int * *n RP
                 ~nve tory during an isolation even .M ""'~J e """<-"~ t #-- J a-1 vo i I.S ;,Nt or     /I t-    ~(_ I(.. S s'-41V"'- OfEMB/LiiY.

APPLICABILITY The RCIC System is required to be OPERABLE during MODE 1, and MODES 2 and 3 with reactor steam dome pressure > 150 psig, since RCIC is the primary non-ECCS water source for core cooling when the reactor is isolated and pressurized. In MODES 2 and 3 with reactor steam dome pressure $ 150 psig, and in MODES 4 and 5, RCIC is not required to be OPERABLE since the low pressure ECCS injection/spray subsystems can provide sufficient flow to the RPV. ACTIONS A Note prohibits the application of LCO 3.0.4.b to an inoperable RCIC system. There is an increased risk associated with entering a MODE or other specified condition in the Applicability with an inoperable RCIC system and the provisions of LCO 3.0.4.b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance. A.1 and A.2 If the RCIC System is inoperable during MODE 1, or MODE 2 or 3 with reactor steam dome pressure > 150 psig, and the HPCI System is verified immediately to be OPERABLE, the RCIC System must be restored to (continued) Brunswick Unit 2 B 3.5.3-2 Revision No. 39 I

RCIC System B 3.5.3 BASES (continued) SURVEILLANCE SR 3.5.3.1 REQUIREMENTS The flow path piping has the potential to develop voids and po s of entrained air. Maintaining the pump discharge line oft IC System full of water ensures that the system will perfor operly, injecting its ful

 ~------t:?l capacity into the reactor vessel upon               nd. This SR will also prevent water hammer in the piping foil
  • g an initiation signal. One acceptable method of ensuring the
  • s full is to vent at the high points. The 31 day Frequency is b on the gradual nature of void buildup in the RCIC System *
  • g, the procedural controls governing system operation, and o mg experience.

SR 3.5.3.2 Verifying the correct alignment for manual, power operated, and automatic valves in the RCIC flow path provides assurance that the proper flow path exists for RCIC System operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these valves are verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an initiation signal is allowed to be in a nonaccident position provided the valve will automatically reposition to the accident position in the proper stroke time. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of potentially being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. This SR also includes the steam flow path for the turbine and the flow controller position. The 31 day Frequency of this SR was derived from the lnservice Testing Program requirements for performing valve testing at least once every 92 days. The Frequency of 31 days is further justified because the valves are operated under procedural control and because improper valve position typically affects only the RCIC System. This Frequency has been shown to be acceptable through operating experience. Brunswick Unit 2 B 3.5.3-4 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SR 3.5.3.1 The RCIC System flow path piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RCIC System and may also prevent a water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of RCIC System locations susceptible to gas accumulation is based on a self-assessment of the piping configuration to identify where gases may accumulate and remain even after the system is filled and vented, and to identify vulnerable potential degassing flow paths. The review is supplemented by verification that installed high-point vents are actually at the system high points, including field verification to ensure pipe shapes and construction tolerances have not inadvertently created additional high points. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RCIC System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RCIC Systems are not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RCIC System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 92 day Frequency is based on the gradual nature of void buildup in the RCIC piping, the procedural controls governing system operation, and operating experience.

Brunswick Unit 2 INSERT Bases SA 3.5.3.2 The Surveillance is modified by a Note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

RHR Suppression Pool Cooling B 3.6.2.3 BASES (continued) APPLICABLE References 1 and 2 contain the results of analyses used to predict SAFETY ANALYSES primary containment pressure and temperature following large and small break LOCAs. The intent of the analyses is to demonstrate that the heat removal capacity of the RHR Suppression Pool Cooling System is adequate to maintain the primary containment conditions within design limits. The suppression pool temperature is calculated to remain below the design limit. The RHR Suppression Pool Cooling System satisfies Criterion 3 of 10 CFR 50.36(c)(2)(ii) (Ref. 3). LCO During a DBA, a minimum of one RHR suppression pool cooling subsystem is required to maintain the primary containment peak pressure and temperature below design limits (Refs. 1 and 2). To ensure that these requirements are met, two independent RHR suppression pool cooling subsystems must be OPERABLE with power from two safety related independent power supplies. Therefore, in the event of an accident, at least one subsystem is OPERABLE assuming the worst case single active failure. An RHR suppression pool cooling subsystem is OPERABLE when two pumps, the heat exchanger, and. associated pi in

  • e t ti~n, and controls ~re OPERABLE. ~"fi"..J~ tJf-J.,.s PAT +o r-..HLSi.fjlr-tiStt.*/1 Pool 4d"" S. .s.J.r./"Wl. OfJb'"'MBtLtrY, APPLICABILITY In MODES 1, 2, and 3, a DBA could cause both a release of radioactive material to the primary containment and a heatup and pressurization of primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations in these MODES. Therefore, the RHR Suppression Pool Cooling System is not required to be OPERABLE in MODE4 or5.

ACTIONS A.1 With one RHR suppression pool cooling subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status within 7 days. In this Condition, the remaining RHR suppression pool cooling subsystem is adequate to perform the primary containment cooling function. However, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced primary containment cooling capability. The 7 day Completion Time is acceptable in light of the redundant RHR suppression pool cooling capabilities afforded by the OPERABLE subsystem and the low probability of a DBA occurring during this period. (continued) Brunswick Unit 2 B 3.6.2.3-2 Revision No. 39

RHR Suppression Pool Cooling B 3.6.2.3 BASES SURVEILLANCE SR 3.6.2.3.2 REQUIREMENTS (continued) Verifying that each RHR pump develops a flow rate 2: 7700 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that the primary containment pressure and temperature can be maintained below the design limits during a DBA (Ref. 2). The normal test of centrifugal pump performance required by ASME OM Code (Ref. 4) is covered by the requirements of LCO 3.5.1, "ECCS-Operating." This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such tests confirm component OPERABILITY, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is 92 days. REFERENCES 1. UFSAR, Section 6.2.1.1.3.2.

2. NEDC-32466P, Power Uprate Safety Analysis Report for Brunswick Steam Electric Plant Units 1 and 2, September 1995.
3. 10 CFR 50.36(c)(2)(ii).
4. ASME Code for Operation and Maintenance of Nuclear Power Plants.

Brunswick Unit 2 B 3.6.2.3-4 Revision No./ I

Brunswick Unit 2 INSERT Bases SR 3.6.2.3.3 SR 3.6.2.3.3 RHR Suppression Pool Cooling System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR suppression pool cooling subsystems and may also prevent water hammer and pump cavitation. Selection of RHR Suppression Pool Cooling System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR Suppression Pool Cooling System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR Suppression Pool Cooling System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RHR Suppression Pool Cooling System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 92 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR Suppression Pool Cooling System piping and the procedural controls governing system operation.

RHR-High Water Level B 3.9.7 BASES LCO with respect to the corresponding specified water level above the reactor (continued) pressure vessel flange. Only one subsystem is required because the volume of water above the RPV flange provides backup decay heat removal capability. An OPERABLE RHR shutdown cooling subsystem consists of an RHR pump, a heat exchanger, one RHR Service Water Pump capable of providing cooling to the heat exchanger, valves, piping, instruments, and controls to ensure an OPERABLE flow path. In MODE 5, the RHR cross tie valve is not required to be closed; thus, the valve may be opened to allow pumps in one RHR loop to discharge through the opposite RHR and recirculation loops to make a complete subsystem. Additionally, each RHR shutdown cooling subsystem is considered OPERABLE if it can be manually aligned (remote or local) in the shutdown cooling mode for removal of decay heat. Operation (either continuous or intermittent) of one subsystem can maintain and reduce the reactor coolant temperature as required. However, to ensure adequate core flow to allow for accurate average reactor coolant temperature monitoring, nearly continuous operation is required. A Note is provided to allow a 2 hour exception to shutdown the operating subsystem every 8 hours. APPLICABILITY One RHR shutdown cooling subsystem must be OPERABLE and in operation in MODE 5, with irradiated fuel in the reactor pressure vessel and with the water level~ 21 feet 10 inches above the top of the RPV flange, to provide decay heat removal. RHR shutdown cooling subsystem requirements in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS). RHR shutdown cooling subsystem requirements in MODE 5 with irradiated fuel in the RPV and with the water level< 21 feet 10 inches above the RPV flange are given in LCO 3.9.8, "Residual Heat Removal (RHR)-Low Water Level." ACTIONS A.1 With no RHR shutdown cooling subsystem OPERABLE, an alternate method of decay heat removal must be established within 1 hour. In this condition, the volume of water above the RPV flange provides adequate capability to remove decay heat from the reactor core. However, the overall reliability is reduced because loss of water level could result in (continued) M"' ::r" ""-t .J J . . J _ vo

  • J..r N tM / o.r--1-v,.,f

{l..l-4-l- Sitv.Jr:Lwrv [vc/J Sf~ oPt::'A Mllr t7Y-Brunswick Unit 2 B 3.9.7-2 Revision No. 30 I

RHR-High Water Level B 3.9.7 BASES ACTIONS B.1. B.2. B.3. and B.4 (continued) examining logs or other information to determine whether the components are out of service for maintenance or other reasons. It is not necessary to perform the Surveillances needed to demonstrate the OPERABILITY of the components. If, however, any required component is inoperable, then it must be restored to OPERABLE status. In this case, a Surveillance may need to be performed to restore the component to OPERABLE status. Actions must continue until all required components are OPERABLE. C.1 and C.2 If no RHR shutdown cooling subsystem is in operation, an alternate method of coolant circulation is required to be established within 1 hour. The Completion Time is modified such that the 1 hour is applicable separately for each occurrence involving a loss of coolant circulation. Furthermore, verification of reactor coolant circulation must be reconfirmed every 12 hours thereafter. This will ensure reactor coolant circulation is maintained. During the period when the reactor coolant is being circulated by an alternate method (other than by the required RHR shutdown cooling subsystem), the reactor coolant temperature must be periodically monitored to ensure proper functioning of the alternate method. The once per hour Completion Time is deemed appropriate. SURVEILLANCE SR 3.9.7.1 REQUIREMENTS This Surveillance demonstrates that the required RHR shutdown cooling subsystem is in operation and circulating reactor coolant. The required flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability. The Frequency of 12 hours is sufficient in view of other visual and audible indications available to the operator for monitoring the RHR shutdown cooling subsystem in the control room. REFERENCES 1. 10 CFR 50.36(c)(2)(ii). Brunswick Unit 2 B 3.9.7-4 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SR 3.9.7.2 SR 3.9.7.2 RHR Shutdown Cooling System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the required RHR shutdown cooling subsystem(s) and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of RHR Shutdown Cooling System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR Shutdown Cooling System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR Shutdown Cooling System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. Gas accumulation in the RHR shutdown cooling (SOC) suction flow path is satisfactorily addressed by procedures which fill the system prior to placing SOC in service. Since the non-safety shutdown cooling mode of RHR is manually initiated at a low reactor pressure, sufficient time is available to ensure fill and warm-up of the flow path have been performed prior to starting an RHR pump, thereby avoiding any unacceptable pressure transients on the system. RHR Shutdown Cooling System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR Shutdown Cooling System piping and the procedural controls governing system operation.

RHR-Low Water Level B3.9.8 BASES LCO pumps in one loop or one RHR pump in each of the two loops must be (continued) OPERABLE. If the LCO is met using two RHR pumps in one loop, then two RHR Service Water pumps must be capable of providing cooling to the associated heat exchanger. In MODE 5, the RHR cross tie valve is not required to be closed; thus, the valve may be opened to allow pumps in one RHR loop to discharge through the opposite RHR and recirculation loops to make a complete subsystem. 4J Additionally, eac s u own cooling subsystem is considered OPERABLE if it can be manually aligned (remote or local) in the shutdown cooling mode for removal of decay heat. Operation (either continuous or intermittent) of one subsystem can maintain and reduce the reactor coolant temperature as required. However, to ensure adequate core flow to allow for accurate average reactor coolant temperature monitoring, nearly continuous operation is required. A Note is provided to allow a 2 hour exception to shutdown the operating subsystem every 8 hours. APPLICABILITY Two RHR shutdown cooling subsystems are required to be OPERABLE, and one must be in operation in MODE 5, with irradiated fuel in the RPV and with the water level < 21 feet 10 inches above the top of the RPV flange, to provide decay heat removal. RHR shutdown cooling subsystem requirements in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS). RHR shutdown cooling subsystem requirements in MODE 5 with irradiated fuel in the RPV and with the water level~ 21 feet 10 inches above the RPV flange are given in LCO 3.9.7, "Residual Heat Removal (RHR)-High Water Level." ACTIONS A.1 With one of the two required RHR shutdown cooling subsystems inoperable, the remaining subsystem is capable of providing the required decay heat removal. However, the overall reliability is reduced. Therefore, an alternate method of decay heat removal must be provided. With both required RHR shutdown cooling subsystems inoperable, an alternate method of decay heat removal must be provided in addition to that provided for the initial RHR shutdown cooling subsystem inoperability. This re-establishes backup decay heat removal capabilities, (continued) f() / +"'1"1-t- *-1-u I- t-1/L .Mevt'j~V?+- a!- jet .s vo I d.S I.S ;.;;., Si1cl+~/t ~ol;~ Sl.s.-hNV o ft:-AA /l.IL-1/ 'I, Brunswick Unit 2 B 3.9.8-2 Revision No. 30 I

RHR-Low Water Level B 3.9.8 BASES ACTIONS B.1. B.2. and B.3 (continued) If, however, any required component is inoperable, then it must be restored to OPERABLE status. In this case, the surveillance may need to be performed to restore the component to OPERABLE status. Actions must continue until all required components are OPERABLE. C.1 and C.2 If no RHR shutdown cooling subsystem is in operation, an alternate method of coolant circulation is required to be established within 1 hour. The Completion Time is modified such that the 1 hour is applicable separately for each occurrence involving a loss of coolant circulation. Furthermore, verification of reactor coolant circulation must be reconfirmed every 12 hours thereafter. This will ensure reactor coolant circulation is maintained. During the period when the reactor coolant is being circulated by an alternate method (other than by the required RHR shutdown cooling subsystem), the reactor coolant temperature must be periodically monitored to ensure proper functioning of the alternate method. The once per hour Completion Time is deemed appropriate. SURVEILLANCE SR 3.9.8.1 REQUIREMENTS This Surveillance demonstrates that one RHR shutdown cooling subsystem is in operation and circulating reactor coolant. The required flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability. The Frequency of 12 hours is sufficient in view of other visual and audible indications available to the operator for monitoring the RHR shutdown


f>

cooling subsystems in the control room. REFERENCES 1. 10 CFR 50.36(c)(2)(ii). Brunswick Unit 2 B 3.9.8-4 Revision No. 30 I

Brunswick Unit 2 INSERT Bases SR 3.9.8.2 SR 3.9.8.2 RHR Shutdown Cooling System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR shutdown cooling subsystems and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of RHR Shutdown Cooling System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR Shutdown Cooling System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR Shutdown Cooling System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. Gas accumulation in the RHR shutdown cooling (SOC) suction flow path is satisfactorily addressed by procedures which fill the system prior to placing SOC in service. Since the non-safety shutdown cooling mode of RHR is manually initiated at a low reactor pressure, sufficient time is available to ensure fill and warm-up of the flow path have been performed prior to starting an RHR pump, thereby avoiding any unacceptable pressure transients on the system. RHR Shutdown Cooling System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR Shutdown Cooling System piping and the procedural controls governing system operation.

3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION The plant is designed to operate with all reactor coolant loops in operation and maintain DNBR above the design DNBR value during all normal operations and anticipated transients. In MODES 1 and 2 with one reactor coolant looQ not in operation this specification requires that the plant be in at least HOT STANDBY within 6 hours. In MODE 3. two reactor coolant loops provide sufficient heat removal capability for removing core decay heat even in the event of a bank withdrawal accident: however. a s1ngle reactor coolant loop provides sufficient heat removal capacity if a bank withdrawal accident can be prevented. i.e .. by opening the Reactor Trip System breakers. Single failure considerations require that two loops be OPERABLE at all times. In MODE 4. and in MODE 5 with reactor coolant loops filled. a single reactor coolant loop or RHR loop provides sufficient heat removal capabil1ty for removing decay heat: but single failure considerations require that at least two loops (either RHR or RCSJ be OPERABLE. Surveillance Requirements for MODES 3. 4. and 5 with reactor coolant loops filled require verification of steam generator (SG) OPERABILITY. Verification of adequate level in the applicable steam generator ensures an adequate heat sink for the removal of decay heat. If the SG tubes become uncovered. the associated loop may not be capable of providing the heat sink for the removal of the decay heat. The level values include allowances for channel uncertainty and process measurement effects and may not be simultaneously j indicated by the respective instrumentation. The 12 hour frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of SG level. In MODE 5 with reactor coolant loops not filled. a single RHR loop provides sufficient heat removal capability for removing decay heat: but single failure considerations. and the unavailability of the steam generators as a heat removing component. require that at least two RHR loops be OPERABLE. The operation of one reactor coolant pump (RCP) or one RHR pump provides adequate flow to ensure mixing. prevent stratification and produce gradual reactivity changes during boron concentration reductions in the Reactor Coolant System. The reactivity change rate associated with boron reduction will. therefore. be within the capabllity of operator recognition and control. The restrictions on starting an RCP with one or more RCS cold legs less than or equal to 325°F are provided to prevent RCS pressure transients. caused by energy additions from the Secondary Coolant System. which could exceed the limits of Appendix G to 10 CFR Part 50. The RCS will be protected against overpressure transients and will not exceed the limits of Appendix G by restricting starting of the RCPs to when the secondary water temperature of each steam generator is less than 50°F above each of the RCS cold leg temperatures. 3/4.4.2 SAFETY VALVES The pressurizer Code safety valves operate to prevent the RCS from being pres-surized above its Safety Limit of 2735 psig. Each safety valve is designed to relieve 380.000 lbs per hour of saturated steam at the valve Setpoint. The rel

  • f capacity of a single safet valve is adequate to relieve any 4- , , i {a-~ c ~ J )

SHEARON HARRIS - UNIT 1 8 3/4 4-1 Amendment No. 116

Shearon Harris Unit 1 INSERT Bases 3/4.4.1 Management of gas voids is important to RHR System OPERABILITY. RHR System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the required RHR loop(s) and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Surveillance Requirements verify that required RHR loop locations susceptible to gas accumulation are sufficiently filled with water. Selection of RHR System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. Surveillance Requirement 4.4.1.3.4 is modified by a Note that states the SR is not required to be performed until12 hours after entering MODE 4. In a rapid shutdown, there may be insufficient time to verify all susceptible locations prior to entering MODE 4.

  ~4.5     EMERGENCY CORE COOLING SYSTEMS BASES ECCS SUBSYSTEMS (Continued)

With the RCS temperature below 350oF, one OPERABLE ECCS subsystem is acceptable without single failure consideration on the basis of the stable . reactivity condition of the reactor and the limited core cooling requirements. The limitation for a maximum of one charging/safety injection pump to be OPERABLE and the Surveillance Requirement to verify one charging/safety injection pump OPERABLE below 325oF provides assurance that a mass addition pressure transient can be relieved by the operation of a single PORV. SHEARON HARRIS - UNIT 1 B 3/4 5-la Amendment No. 86 I

Shearon Harris Unit 1 INSERT Bases 3/4.5.2A Management of gas voids is important to ECCS OPERABILITY. ECCS piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the ECCS and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. A Surveillance Requirement verifies that required ECCS locations susceptible to gas accumulation are sufficiently filled with water. Selection of ECCS locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The ECCS is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the ECCS is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. ECCS locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.

EMERGENCY CORE COOLING SYSTEMS G:;!j_t:J!-;::_Jj~. r ~~J)) ECCS SUBSYSTEMS (Continued.) The Surveillance Requirements provided to ensure OPERABILITY of each component ensures that at a minimum. the assumptions used in the safety analyses are met and that subsystem OPERABILITY is maintained. Surveillance Requirements for throttle valve position and flow balance testing provide assurance that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the ~iping system to each injection point is necessary to: (1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration. (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses. and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECCS-LOCA analyses.

~/4.5.4   REFUELING WATER STORAGE TANK The OPERABILITY of the refueling water storage tan~ CRWST) as part of the ECCS ensures that a sufficient supply of borated water is available for injection into the core by the ECCS. This borated water is used as cooling water for the core in the event of a LOCA and provides sufficient negative reactivity to adequately counteract any positive increase in reactivity caused by RCS cooldown. RCS cooldown can be caused by inadvertant depressurization. a LOCA.

or a steam line rupture. The limits on RWST minimum volume and boron concentration assure that: (1) sufficient water is available within containment to permit recirculation cooling flow to the core and (2) the reactor will remain subcritical in the cold condition following mixing of the RWST and the RCS water volumes with all shutdown and control rods inserted except for the most reactive control assembly. These limits are consistent with the assumption of the LOCA and steam line brea~ analyses. The contained water volume limit includes an allowance for water not usable because of tank discharge line location or other physical characteristics. The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.0 and 11.0 for the solution recirculated within 1 containment after a LOCA. This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components. An RWST allowed outage time of 12 hours is penmitted during perfonmance of Technical Specification surveillance 4.4.6.2.2 with a dedicated attendant stationed at valve 1CT-22 in communication with the Control Room. The dedicated attendant is to remain within the RWST compartment whenever valve ICT-22 is open during the surveillance. The dedicated attendant can manually close valve 1CT-22 within 30 minutes in case of a line break caused by a seismic event. Due to the piping configuration. a break in the non-seismic portion of piping during this surveillance could result in draining the RWST below the minimum analyzed volume. SHEARON HARRIS - UNIT 1 B3/4 5-2 Amendment No. 134

Shearon Harris Unit 1 The Surveillance Requirement provided to verify the correct position of valves in the flow path is modified by a note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM (Continued) gross leakage failures could develop. The 0.60 La leakage limit of Specification 3.6.1.2b. shall not be exceeded when the leakage rates determined by the leakage integrity tests of these valves are added to the previously determined total for all valves and penetrations subject to Type B and C tests. 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4.6.2.1 CONTAINMENT SPRAY SYSTEM The OPERABILITY of the Containment Spray System ensures that containment depressurization and cooling capability will be available in the event of a LOCA or steam line break. The pressure reduction and resultant lower containment leakage rate are consistent with the assumptions used in the safety analyses. The Containment Spray System and the Containment Fan Coolers are redundant to each other in providing post-accident cooling of the containment atmosphere. However. the Containment Spray System also provides a mechanism for removing iodine from the containment atmosphere and therefore the time requirements for restoring an inoperable spray system to OPERABLE status have been maintained consistent with that assigned other inoperable ESF equipment. 3/4.6.2.2 SPRAY ADDITIVE SYSTEM The OPERABILITY of the Spray Additive System ensures that sufficient NaOH is added to the containment spray in the event of a LOCA. The limits on NaOH volume and concentration ensure a pH value of between 7.0 and 11.0 for the solution recirculated within containment after a LOCA. This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components. The contained solution volume limit includes an allowance for solution not usable because of tank discharge line location or other physical characteristics. These assumptions are consistent with the iodine removal efficiency assumed in the safety analyses. The maximum and minimum volumes for the Spray Additive Tank are based on the analytical limits. The specified indicated levels used for surveillance include instrument uncertainties and unusable tank volume. 3/4.6.2.3 CONTAINMENT COOLING SYSTEM The OPERABILITY of the Containment Fan Coolers ensures that adequate heat re-moval capacity is available when operated in conjunction with the Containment Spray Systems during post-LOCA conditions. ESW flowrate to the Containment Fan Coolers will vary based on reservoir level. Acceptable ESW flowrate is dependent on the number of heat exchanger tubes in service. Surveillance test acceptance criteria should be adjusted for these factors. SHEARON HARRIS - UNIT 1 B 3/4 6-3 Amendment No. 134

Shearon Harris Unit 1 INSERT Bases 3/4.6.2.1 Management of gas voids is important to Containment Spray System OPERABILITY. Containment Spray System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the containment spray trains and may also prevent water hammer and pump cavitation. A Surveillance Requirement verifies that required Containment Spray System locations susceptible to gas accumulation are sufficiently filled with water. Selection of Containment Spray System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The Containment Spray System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the Containment Spray System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. Containment Spray System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The Surveillance Requirement provided to verify the correct position of valves in the flow path is modified by a note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

BASES CONTAINMENT BUILDING PENETRATIONS (Continued) The allowance to have containment penetration (including the airlock doors and equipment hatch) flow paths with direct access from the containment atmosphere to the outside atmosphere to be unisolated during fuel movement and CORE ALTERATIONS is based on (1) confirmatory dose calculations as approved by the NRC staff which indicate acceptable radiological consequences and (2) commitments from the licensee to implement acceptable administrative procedures that ensure in the event of a refueling accident that the airlock or equipment hatch can and will be promptly closed following containment evacuation (even though the containment fission product control function is not required to meet acceptable dose consequences) and that the open penetration(s) can and will be promptly closed. The time to close such penetrations or combination of penetrations shall be included in the confirmatory dose calculations. Containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated. or capable of isolation via administrative controls. on at least one side of containment. Isolation may be achieved b~ an OPERABLE automatic isolation valve. or by a manual isolation valve. blind flange. or equivalent. Equivalent isolation methods include use of a material that can provide a temporary. atmospheric pressure. ventilation barrier for the other containment penetrations during fuel movement. 3/4.9.5 COMMUNICATIONS - DELETED 3/4.9.6 REFUELING MACHINE - DELETED 3/4.9.7 CRANE TRAVEL - FUEL HANDLING BUILDING -DELETED 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION The requirement that at least one residual heat removal CRHR> loop be in operation ensures that: (1) sufficient cooling capacity is available to remove decay heat and maintain the water in the reactor vessel below 140°F as required during the REFUELING MODE. and (2) sufficient coolant circulation is maintained through the core to minimize the effect of a boron dilution incident and prevent boron stratification. The requirement to have two RHR loops OPERABLE when there is less than 23 feet of water above the reactor vessel flange ensures that a single failure of the operating RHR loop will not result in a complete loss of residual heat removal capability. With the reactor vessel head removed and at least 23 feet of water above the reactor pressure vessel flange. a large heat sink is available for core cooling. Thus. in the event of a failure of the operating RHR loop. adequate time is provided to initiate emergency procedures to cool the core. The minimum RHR flow requirement is reduced to 900 gpm when the reactor water level is below the reactor vessel flange. The 900 gpm limit reduces the possibility of cavitation during operation of the RRR pumps and ensures sufficient mixing in the event of a MODE 6 boron dilution incident. ~--t::>'P 314.9.9 CONTAINMENT VENTILATION ISOLATION SYSTEM The OPERABILITY of this system ensures that the containment purge makeup and exhaust penetrations will be automatically isolated upon detect1on of high radiation levels within the containment . The OPERABILITY of this system is required to restrict the release of radioactive material from the containment atmosphere to the environment. SHEARON HARRIS - UNIT 1 8 3/4 9-2 Amendment No . 104 1

Shearon Harris Unit 1 INSERT Bases 3/4.9.8 Management of gas voids is important to RHR System OPERABILITY. RHR System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR loops and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Surveillance Requirements verify that required RHR loop locations susceptible to gas accumulation are sufficiently filled with water. Selection of RHR System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.

RCS Loops- MODE 4 B 3.4.6 BASES LCO (continued) performed during the startup testing program is the validation of rod drop times during cold conditions, both with and without flow. The no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits the de-energizing of the pumps in order to perform this test and validate the assumed analysis values. If changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values must be revalidated by conducting the test again. The 1 hour time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow. Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by initial startup test procedures:

a. No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentrations less than required to meet SDM of LCO 3.1.1 and maintain ke11 < 0.99, therefore maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM and maintain ke11 < 0.99 is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and
b. Core outlet temperature is maintained at least 10°F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Note 2 requires that the secondary side water temperature of each SG be

s; 50°F above each of the RCS cold leg temperatures before the start of an RCP with any RCS cold leg temperature :s; 21 0°F. This restraint is to prevent a low temperature overpressure event due to a thermal transient when an RCP is started.

An OPERABLE RCS loop comprises an OPERABLE RCP and an OPERABLE SG, which has the minimum water level specified in SR 3.4.6.2. The water level is maintained by an OPERABLE AFW train in accordance with LCO 3.7.5, "Auxiliary Feedwater System." Catawba Units 1 and 2 B 3.4.6-2 Revision No. 4

RCS Loops- MODE 4 B 3.4.6 BASES SURVEILLANCE REQUIREMENTS (continued) SA 3.4.6.3 Verification that the required pump is OPERABLE ensures that an additional RCS or AHA pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pump. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.


~~

REFERENCES 1. 10 CFR 50.36, Technical Specifications, (c)(2)(ii). Catawba Units 1 and 2 B 3.4.6-5 Revision No. 4

Catawba Units 1 and 2 INSERT Bases SR 3.4.6.4 SR 3.4.6.4 RHR System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the required RHR loop(s) and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of RHR System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. This SR is modified by a Note that states the SR is not required to be performed until 12 hours after entering MODE 4. In a rapid shutdown, there may be insufficient time to verify all susceptible locations prior to entering MODE 4. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO (continued) reactor coolant pump (RCP) with an RCS cold leg temperature::; 21 0°F. This restriction is to prevent a low temperature overpressure event due to a thermal transient when an RCP is started. Note 4 provides for an orderly transition from MODE 5 to MODE 4 during a planned heatup by permitting removal of RHR loops from operation when at least one RCS loop is in operation . This Note provides for the transition to MODE 4 where an RCS loop is permitted to be in operation and replaces the RCS circulation function provided by the RHR loops. An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. An OPERABLE SG can perform as a heat sink when it has an adequate water level. APPLICABILITY In MODE 5 with RCS loops filled, this LCO requires forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. One loop of RHR provides sufficient circulation for these purposes. However, one additional RHR loop is required to be OPERABLE, or the secondary side narrow range water level of at least two SGs is required to be ~ 12%. Operation in other MODES is covered by: LCO 3.4.4, "RCS Loops-MODES 1 and 2"; LCO 3.4.5, "RCS Loops-MODE 3"; LCO 3.4.6, "RCS Loops-MODE 4"; LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled"; LCO 3.4.17 "RCS Loops-Test Exceptions"; LCO 3.9.4, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6). D/fMJIL17~ Catawba Units 1 and 2 B 3.4.7-3 Revision No. 5

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES SURVEILLANCE REQUIREMENTS (continued) SR 3.4.7.3 Verification that a second RHR pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the RHR pump. If secondary side narrow range water level is ;;::: 12% in at least two SGs, this Surveillance is not needed. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. REFERENCES 1. 10 CFR 50.36, Technical Specifications, (c)(2)(ii). Catawba Units 1 and 2 B 3.4.7-5 Revision No. 5

Catawba Units 1 and 2 INSERT Bases SA 3.4.7.4 SA 3.4.7.4 AHA System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the required AHA loop(s) and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of AHA System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The AHA System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the AHA System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. AHA System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

RCS Loops- MODE 5, Loops Not Filled B 3.4.8 BASES LCO (continued) Note 2 allows one RHR loop to be inoperable for a period of s; 2 hours, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible. An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service. APPLICABILITY In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System. Operation in other MODES is covered by: LCO 3.4.4, "RCS Loops-MODES 1 and 2"; LCO 3.4.5, "RCS Loops-MODE 3"; LCO 3.4.6, "RCS Loops-MODE 4"; LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled"; LCO 3.4.17, "RCS Loops-Test Exceptions"; LCO 3.9.4, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6). ACTIONS If only one RHR loop is OPERABLE and in operation, redundancy for RHR is lost. Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal. B.1 and B.2 If no required RHR loops are OPERABLE or in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet

       '-'----~S~DM of LCO 3.1.1 must be suspended and action must be initiated
.t\1 ~ Ill t1 f 'lUll+ o..J.. P .s v o7J.s ~     1~    ar.frut+  .J..o f-. 1-J* ~ S .s-f.u~w. 0 fJE~/t {)I L l r Y, Catawba Units 1 and 2                            B 3.4.8-2                                          Revision No. 3

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES ACTIONS (continued) immediately to restore an RHR loop to OPERABLE status and operation. RCP seal injection flow is not considered to be an operation involving a reduction in RCS boron concentration. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality. The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must continue until one loop is restored to OPERABLE status and operation. SURVEILLANCE SR 3.4.8.1 REQUIREMENTS This SR requires verification that one loop is in operation. Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. SR 3.4.8.2 Verification that the required number of pumps are OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pumps. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.


~~

REFERENCES 1. 10 CFR 50.36, Technical Specifications, (c)(2)(ii). Catawba Units 1 and 2 B 3.4.8-3 Revision No. 3

Catawba Units 1 and 2 INSERT Bases SR 3.4.8.3 SR 3.4.8.3 RHR System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR loops and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of RHR System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The RHR System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

ECCS - Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued) It also ensures that the centrifugal charging and Sl pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling . The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5). LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents. In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an Sl subsystem, and an AHA subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an Sl signal and automatically transferring suction to the containment sump. During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains. APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The Sl pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 .,---------~and MODE 3 requirements are bounded b the MODE 1 analysis. jal vu', J.s  ;~ 1M ur-h*;rf- ~ ECCS. ~PfM/)ILIT'(, Catawba Units 1 and 2 B 3.5.2-5 Revision No. 3

ECCS - Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Fre u nc Control Program. ifVJEPt f!:HlJ.l_/"3 , 5,1 iL (VLMd ~ ~'ftr){"*'+treiJud) SR 3.5.2.3 With the exception of the operating centrifugal charging pump, the EC pumps are normally in a standby, nonoperating mode. As such, path piping has the potential to develop voids and pockets of e

  • ed gases.

ECCS piping is verified to be water filled by venting t move gas from accessible locations susceptible to gas accu 1on. Alternative means may be used to verify water filled conditi (e.g., ultrasonic testing or high point sight glass observation}. aintaining the piping from the ECCS pumps to the RCS full ater ensures that the system will perform properly, injecti 1ts full capacity into the RCS upon demand. This will also preve ater hammer, pump cavitation, and pumping of noncondensib as (e.g., air, nitrogen, or hydrogen) into the reactor vessel fol mg an Sl signal or during shutdown cooling. The Surv

  • ance Frequency is based on operating experience, equipment r 'ability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the lnservice Testing Program, the ASME Code. The ASME Code provides the activities and Frequencies necessary to satisfy the requirements. Catawba Units 1 and 2 B 3.5.2-8 Revision No. 3

Catawba Units 1 and 2 INSERT Bases SR 3.5.2.2 The Surveillance is modified by a Note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed. INSERT Bases SR 3.5.2.3 ECCS piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the ECCS and may also prevent water hammer, pump cavitation, and pumping of noncondensible gas into the reactor vessel. Selection of ECCS locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The ECCS is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the ECCS is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. ECCS locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

ECCS - Shutdown B 3.5.3 BASES LCO (continued) APPLICABILITY In MODES 1, 2, and 3, the OPERABILITY requirements for ECCS are covered by LCO 3.5.2. In MODE 4 with RCS temperature below 350°F, one OPERABLE ECCS train is acceptable without single failure consideration, on the basis of the stable reactivity of the reactor and the limited core cooling requirements. In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.4, "Residual Heat Removal (AHA) and Coolant Circulation-High Water Level," and LCO 3.9.5, "Residual Heat Removal (AHA) and Coolant Circulation-Low Water Level." ACTIONS A Note prohibits the application of LCO 3.0.4.b to an inoperable ECCS centrifugal charging subsystem when entering MODE 4. There is an increased risk associated with entering MODE 4 from MODE 5 with an inoperable ECCS centrifugal charging subsystem and the provisions of LCO 3.0.4.b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance. With no ECCS AHA subsystem OPERABLE, the plant is not prepared to respond to a loss of coolant accident or to continue a cooldown using the AHA pumps and heat exchangers. The Completion Time of immediately to initiate actions that would restore at least one ECCS AHA subsystem to OPERABLE status ensures that prompt action is taken to restore the required cooling capacity. Normally, in MODE 4, reactor decay heat is removed from the RCS by an AHA loop. If no RHR loop is OPERABLE for this function, reactor decay heat must be removed by some alternate method, such as use of the steam generators. The alternate means of Catawba Units 1 and 2 B 3.5.3-2 Revision No. 1

Containment Spray System B 3.6.6 BASES LCO During a DBA, one train of Containment Spray System is required to provide the heat removal capability assumed in the safety analyses. To ensure that this requirement is met, two containment spray trains must be OPERABLE with power from two safety related, independent power supplies. Therefore, in the event of an accident, at least one train operates. Each Containment Spray System includes a spray pump, headers, valves, heat exchangers, nozzles, piping, instruments, and controls to ensure an OPERABLE flow path capable of being manually initiated to take suction from the containment sump and delivering it to the containment spray rings. APPLICABILITY In MODES 1, 2, 3, and 4, a DBA could cause a release of radioactive material to containment and an increase in containment pressure and temperature requiring the operation of the Containment Spray System. In MODES 5 and 6, the probability and consequences of these events are reduced because of the pressure and temperature limitations of these MODES. Thus, the Containment Spray System is not required to be OPERABLE in MODE 5 or 6. ACTIONS With one containment spray train inoperable, the affected train must be restored to OPERABLE status within 72 hours. The components in this degraded condition are capable of providing 100% of the heat removal after an accident. The 72 hour Completion Time was developed taking into account the redundant heat removal and iodine removal capabilities afforded by the OPERABLE train and the low probability of a DBA occurring during this period.

    ;t1 Ml :J-e ,-NA  of &{- j    t.L1  V6;   Jl      I.S.  ,;..,,Vr--h,/1+ 4 c~ 'I+~ ,-f)M.A/1 + .sf '"7 5 7 .5~          /YYl Of~j..A:Bt LIT'"(,

Catawba Units 1 and 2 B 3.6.6-4 Revision No. 6

Containment Spray System B 3.6.6 BASES ACTIONS (continued) B.1 and B.2 If the affected containment spray train cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours and to MODE 5 within 84 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. The extended interval to reach MODE 5 allows additional time and is reasonable when considering that the driving force for a release of radioactive material from the Reactor Coolant System is reduced in MODE3. SURVEILLANCE SR 3.6.6.1 REQUIREMENTS Verifying the correct alignment of manual and power operated valves, excluding check valves, in the Containment Spray System provides assurance that the proper flow path exists for Containment Spray System operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since they were verified in the correct position prior to being secured. This SR does not require any testing or valve manipulation. Rather, it involves verification, through a system walkdown or computer status indication, that those valves outside containment and capable of potentially being mispositioned, are in the correct position. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

                    ~~=s~ 3 ?,~-~~f;ifJ;V Verifying that each containment spray pump's developed head at the flow test point is greater than or equal to the required developed head ensures that spray pump performance has not degraded during the cycle.

Flow and differential head are normal tests of centrifugal pump performance required by the ASME Code (Ref. 6). Since the containment spray pumps cannot be tested with flow through the spray headers, they are tested on bypass flow. This test confirms one point on the pump design curve and is indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SA is in accordance with the lnservice Testing Program. Catawba Units 1 and 2 B 3.6.6-5 Revision No. 6

Catawba Units 1 and 2 INSERT Bases SR 3.6.6.1 The Surveillance is modified by a Note which exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent flow path if directed.

Containment Spray System B 3.6.6 BASES SURVEILLANCE REQUIREMENTS (continued) SR 3.6.6.3 and SR 3.6.6.4 Not used. SR 3.6.6.5 and SR 3.6.6.6 These SRs require verification of proper interaction between the CPCS system and the Containment Spray System. SR 3.6.6.5 deals solely with the containment spray pumps. It must be shown through testing that: (1) the containment spray pumps are prevented from starting in the absence of a CPCS permissive, (2) the containment spray pumps can be manually started when given a CPCS permissive, and (3) when running, the containment spray pumps stop when the CPCS permissive is removed. The "inhibit", "permit", and "terminate" parts of the CPCS interface with the containment spray pumps are verified by testing in this fashion.

 *~
 *-.S                SR 3.6.6.6 deals solely with containment spray header containment isolation valves NS12B, NS15B, NS29A, and NS32A. It must be shown M

through testing that: (1) each valve closes when the CPCS permissive is

   ~                removed, OR (2) each valve is prevented from opening in the absence of V)                a CPCS permissive. In addition to one of the above, it must also be shown that each valve can be manually opened when given a CPCS
   ~                permissive.
   ~

The Surveillance Frequency is based on operating experience,

 ~

equipment reliability, and plant risk and is controlled under the t- Surveillance Frequency Control Program.

 ~\-J               SR 3.6.6.7 With the containment spray inlet valves closed and the spray header drained of any solution, low pressure air or smoke can be blown through test connections. The spray nozzles can also be tested using a vacuum blower to induce air flow through each nozzle to verify unobstructed flow.

This SR requires verification that each spray nozzle is unobstructed following activities that could cause nozzle blockage. Normal plant operation and activities are not expected to initiate this SR. However, activities such as inadvertent spray actuation that causes fluid flow through the nozzles, major configuration change, or a loss of foreign material control when working within the respective system boundary may require Surveillance performance. Catawba Units 1 and 2 B 3.6.6-6 Revision No. 6

Catawba Units 1 and 2 INSERT Bases SR 3.6.6.8 SR 3.6.6.8 Containment Spray System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the containment spray trains and may also prevent water hammer and pump cavitation. Selection of Containment Spray System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions. The Containment Spray System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the Containment Spray System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met. Accumulated gas should be eliminated or brought within the acceptance criteria limits. If the accumulated gas is eliminated or brought within the acceptance criteria limits as part of the Surveillance performance, the Surveillance is considered met and the system is OPERABLE. Past operability is then evaluated under the Corrective Action program. If it is suspected that a gas intrusion event is occurring, then this is evaluated under the Operability Determination Process. Containment Spray System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY. The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.}}