10/05-07/2010-Summary of Site Audit Related to the Review of the License Renewal Application for Seabrook Station, Unit 1
ML102950271
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/10/2010
From: Susco J
Division of License Renewal
To:
NextEra Energy Seabrook
SUSCO, J NRR/DLR 415-2927
References
TAC ME3959
Download: ML102950271 (15)


Text

REGU UNITED STATES

~r 01'.-. NUCLEAR REGULATORY COMMISSION g WASHINGTON, D.C. 20555-0001

~ ~

I November 10, 2010

"'o? ~o

        • i<

LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR SEABROOK STATION, UNIT 1 (TAC NO.

ME3959)

From October 5-7,2010, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and contractors from Argonne National Laboratory (ANL) participated in a site audit at Seabrook Station related to the environmental review of the Seabrook Station license renewal application. The primary goal of the site visit was to review documentation , gather information to ensure that the environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) were met, and to interface with officials in Federal, State, and local government agencies to obtain related information . En closure 1 is a list of representatives from NRC, ANL, New Hampshire (NH) State agencies, other Federal agencies, and NextEra Energy Seabrook, LLC (NextEra) who participated in the site audit.

The audit began on October 5, 2010, with a kickoff meeting to introduce participants and to discuss logistics of the audit. Following the kickoff meeting, the environmental review team participated in a general site tour of Seabrook Station with NextEra staff. The general site tour provided an ecological overview of the site and focused on areas relevant to the environmental review.

During the remainder of the site audit, the environmental review team examined data used by NextEra in preparation of the Environmental Report and met in smaller groups with NextEra representatives with corresponding environmental expertise. These groups participated in various activities, including tours of onsite National Pollutant Discharge Elimination System-permitted outfalls; circulating water systems; in-scope transm ission line rights-of-way; radioactive waste processing and storage areas; meteorological towers and monitoring equipment; and Title V-permitted air emission points.

The environmental review team also met onsite with officials from the National Oceanic and Atmospheric Administration Fisheries Division, the NH Department of Environmental Services, the NH Division of Historical Resources, the NH Division of Public Health, the NH Fish and Game Department, and the NH Natural Heritage Bureau . Information gathered through participation of these agencies will assist the environmental review team in its evaluation.

In addition , the team reviewed NextEra's process for identifying new and significant information (information that would challenge the generic conclusions reached in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437). NextEra cited no new and significant information, and the team's independent review during the course of the site audit did not identify any either.

At the conclusion of the site audit, the environmental review team summarized the status of the review with NextEra representatives. Most of the team 's questions were answered through the conduct of the audit. Those that were not will be answered by NextEra, as it responds to the team's request for additional information (RAI) letter (ADAMS accession number ML102861217). Enclosure 2 is a table of documents requested by the team during the site audit and provided by NextEra to assist the team in its review. These documents will be made publically available in the NRC's Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's Public Document Room staff at 800-397-4209 (or 301-415-4737) or bye-mail at pdr.resource@nrc.gov.

While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any add itional information necessary to support the review would be formally requested .

Jeremy Susco, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosures:

As stated cc w/encls: Distribution via Listserv

LIST OF PARTICIPANTS SEABROOK STATION LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL SITE AUDIT October 5-7 , 2010 NAME ORGANIZATION Briana Balsam U.S. Nuclear Regulatory CommisSion (NRC)

April BeBault NRC Paula Cooper NRC Kevin Folk NRC Andy Imboden NRC Stephen Klem entowicz NRC Dennis Logan NRC Michelle Moser NRC Bill Rautzen NRC Jeffrey Rikhoff NRC Jeremy Susco NRC Allison Travers NRC Brooke Traynham NRC Young-Soo Chang Argonne National Laboratory (ANL)

Ron Kolpa ANL Bill Metz ANL Dan O'Rourke ANL John Quinn ANL Sarah Burnum NextEra Energy Seabrook, LLC (NextEra)

Ed Carle NextEra Tom Casey NextEra Rick Cliche NextEra Sarah Cloutman Gebo NextEra Mike Collins NextEra Paul Freeman NextEra AI Legendre NextEra Ed Metcalf NextEra Bill Meyer NextEra Mike O'Keefe NextEra Marty Peters NextEra David Robinson NextEra Peter Tutinas NextEra Paul Willoughby NextEra Herb Giorgio NextEra Energy Duane Arnold , LLC Steven Dort FirstEnergy Jenna Flynn National Ocean ic and Atmospheric Administration ,

Fisheries ENCLOSURE 1

Brian Valimont New England Archaeology Christian Williams New Hampshire Department of Environmental Services Tanya Krajcik New Hampshire Division of Historical Resources Dennis O'Dowd New Hampshire Division of Public Health Services Bruce Smith New Hampshire Fish and Game Department Melissa Coppola New Hampshire Natural Heritage Bureau Tim Cooper Northeast Utilities Fred Polaski Polaski Consulting , LLC Laura Games Public Service of New Hampshire (PSNH)

Kurt Nelson PSNH W illiam Temple PSNH Kathleen Yhip Southern California Edison Kristi Hagood TetraTech NUS Phi lip Moore TetraTech NUS Karen Patterson TetraTech NUS

References Requested for Submittal at the Seabrook Station Environmental Site Audit October 5-7,2010 Meteorology and Air Quality Seabrook Station, Design Basis Document, Meteorological Monitoring System , DBD-MET -01 ,

Revision 2, January 7, 2010.

FPL Company - New England Division, 345 kV Seabrook Transmission Substation SF6 Emissions Reduction Partnership for Electric Power Systems, Annual Reports for 2005-2009.

NHDES, Stage 1111 Gasoline Vapor Recovery System, Certificate of Compliance, March 20, 2008.

NHDES, Title V Operating Permit, TV-OP-017, Issued June 5, 2006.

NHDES, Issuance of General State Permit: GSP-EG-225, Issued July 2, 2008.

Letter of Deficiency for the Title V air permit issued by New Hampshire Department of Environmental Services in 2010 and any subsequent related correspondence Aquatic Ecology ARCADIS et. al. (ARCADIS , Normandeau Associates Inc., Wayne C. Micheletti , Inc., and Harris Group, Inc.). 2008. Cooling Water Intake Structure information Document. Prepared for FPL Energy Seabrook, LLC. July 2008.

(Note that Appendix F is privileged and confidential. If the NextEra feels it is appropriate, you can request that this appendix be non-public by filling out an affidavit under 10 CFR 2.390.)

Florida Power and Light (FPL). 2006. Seabrook Station NPDES Permit NH0020338 Renewal Application. September 2006.

(Please include cover letter and Clean Water Act Section 316(a) and (b) certifications.)

NAI (Normandeau Associates , Inc.). 1988. Seabrook Environmental Studies, 1987. A Characterization of Baseline in the Hampton-Seabrook Area, 1975-1987. A preoperational study for Seabrook Station Technical Report XIX-II. Prepared for NH Yankee Division Public Service Comr:>any of New Hampshire. November 1988.

NAI (Normandeau Associates Inc.). 1991. Seabrook Station 1990 Environmental Studies in the Hampton - Seabrook Area : A Characterization of Environmental Conditions.

NAI (Normandeau Associates Inc.). 1994. Seabrook Station 1993 Environmental Studies in the Hampton - Seabrook Area : A Characterization of Environmental Conditions. Prepared for North Atlantic Energy Service Corporation.

NAI (Normandeau Associates Inc.). 1995. Seabrook Station 1994 Environmental Monitoring in the Hampton - Seabrook Area: A Characterization of Environmental Conditions. Prepared for North Atlantic Energy Service Corporation.

NAI (Normandeau Associates , Inc.). 1997. Seabrook Station 1996 Environmental Monitoring in the Hampton-Seabrook Area: A Characterization of Environmental Conditions.

NAI (Normandeau Associates Inc.). 2001. Seabrook Station Essential Fish Habitat Assessment. R-18900 .009. Prepared for North Atlantic Energy Service Corporation.

NAI (Normandeau Associates, Inc.). 2008. Seabrook Station 2007 Environmental Monitoring in the Hampton-Seabrook Area: A Characterization of Environmental Conditions. Prepared for FPL Energy Seabrook Station.

NAI (Normandeau Associates, Inc.). 2010. Seabrook Station 2009 Environmental Monitoring in the Hampton-Seabrook Area: A Characterization of Environmental Conditions. Prepared for FPL Energy Seabrook Station.

NAI (Normandeau Associates, Inc.). 2010. Seabrook Station 2010 Environmental Monitoring Program Mid-Year Report.

NAI and ARCADIS . (Normandeau Associates, Inc. and ARCADIS) . 2008. Seabrook Nuclear Power Station EPA 316(b) Phase II Rule Project, Revised Proposal for Information Collection .

ENCLOSURE 2

Section 7.0. Prepared for FPL Energy Seabrook Station. June 2008.

NAI (Normandeau Associates, Inc.) and BBL (Blasland Bouck and Lee). 2006. Seabrook Nuclear Power Station EPA 316(b) Phase II Rule Project Proposal for Information Collection .

Prepared for FPL Energy Seabrook Station. Bedford, New Hampshire, Normandeau Associates. May 2006.

(Please also include associated letter to EPA dated May 4, 2006.)

NMFS (National Marine Fisheries Service). 2004. Letter From L. Allen, Office of Protected Resources to A. Legendre , FPL Energy Seabrook Station Regarding Withdrawal of Application for Incidental Take Authorization . May 7, 2004.

Padmanabhan M and Hecker GE. 1991. Comparative evaluation of hydraulic model and field thermal plume data Seabrook Nuclear Station . Alden Research Laboratory, Inc. Sponsored by New Hampshire Yankee Division of Public Service Company of New Hampshire.

Seabrook Station. 2010. Bivalve Larvae Entrainment Sampling. ZN1120.02, Rev.OO , Chg. 03.

Regulatory Compliance Procedure.

Seabrook Station. 2010. Icthyoplankton Entrainment Sampling . ZN 1120.01, Rev.01 , Chg . 03 .

Regulatory Compliance Procedure.

Hydrology Seabrook, 2010, Environmental Reclamation of 32 Acres behind General Office Building , Rev.

1, March 23 Radiation Safety & Control Services , Inc. (RSCS) , 2009a , Site Conceptual Ground Water Model for Seabrook Station , Rev. 01, TSD #09-019, June 9 Radiation Safety & Control Services , Inc. (RSCS) , 2009b, Tritium Distribution and Ground Water Flow at Seabrook Station, Rev. 00, TSD #09-039, August 31 NextEra Energy Seabrook, LLC, 2009, Stormwater Pollution Prevention Plan for NextEra Energy Seabrook, Rev. 41, July 1 NHDES, 2010 , NPDES Compliance Evaluation Inspection for NPDES Permit No. NH0020338, letter from P. Heirtzler, Wastewater Engineering Bureau , to A. Legendre , NextEra Energy Seabrook LLC, July 20 NHDES, 2010, NPDES Compliance Evaluation Inspection for NPDES Permit No. NH0020338, letter from P. Heirtzler, Wastewater Engineering Bureau, to A. Legendre, NextEra Energy Seabrook LLC , June 15 NextEra Energy Seabrook, 2010, Response to Letter of Deficiency - NPDES Compliance Evaluation Inspection , letter from M. O'Keefe, Licensing Manager, to State of New Hampshire, Department of Environmental Services, July 15 Well completion data and elevation data for wells TW-1 , TW-2, and TW-3 and the recent SW-series wells (circa 2009 and 2010)

Current illustrations of tritium data (plume) and groundwater elevation contours in surficial and bedrock aquifers , September 2010 (prepared by RSCS)

USEPA letter regarding timely and complete NPDES permit renewal application (circa 2006)

Discharge Monitoring Reports (DMRs) for the last 12 months, as submitted to the USEPA per NPDES Permit #NH0101303 Archaeological and Cultural Resources Seabrook Station Program Manual , Environmental Compliance Manual, Rev. 4 1 (NAEC) excludi~g_ the appendices Draft Cultural Resources Protection Plan (and fina l when available)

Cultural Resources Management Plan, Seabrook Nuclear Power Plant, Seabrook and Hampton Falls, New Hampshire, May 2010 by Brian Valimont, New England Archaeology Co. , LLC Socioeconomics Visitor center attendance for the last three years Emergency preparedness fees for the last three years

Mill rates and education takes for the last three ears raisal value of Seabrook Station for the last three ears

ML102950271 OFFICE PM:RPB1 :DLR LADLR BC:RPB1 :DLR PM:RPB1 :DLR NAME JSusco IKing BPham JSusco DATE 101 110 10/27/10 11/5110 11/10/10

Memorandum from J. Susco to Seabrook Station dated November 10, 2010

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR SEABROOK STATION , UNIT 1 (TAC NO. ME3959)

DISTRIBUTION:

HARDCOPY:

DLR Reading File E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource JSusco RPlasse BPham DWrona EMiller MWentzel Almboden DBeissel KFoik MMoser DLogan ATravers BBalsam MMoser ABeBault SKlementowicz WRautzen JRikhoff ICouret,OPA EDacus,OCA MSpencer, OGC WRaymond, RI DTifft, RI NMcNamara, RI NSheehan, RI DScrenci, RI JJohnson, RI ABurritt, RI Ronal Kolpa (rlkolpa@anl.gov)