ML110100113

From kanterella
Jump to navigation Jump to search

Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Nextera Energy Seabrook, LLC for Renewal of the Operating License for Seabrook Station
ML110100113
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/01/2011
From: Bo Pham
License Renewal Projects Branch 1
To: Freeman P
NextEra Energy Seabrook
Wentzel, Michael J. NRR/DLR, 415-6459
References
TAC ME3959
Download: ML110100113 (168)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 1, 2011 Mr. Paul Freeman Site Vice President clo Mr. Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

ISSUANCE OF ENVIRONMENTAL SCOPING

SUMMARY

REPORT ASSOCIATED WITH THE STAFF'S REVIEW OF THE APPLICATION BY NEXTERA ENERGY SEABROOK, LLC FOR RENEWAL OF THE OPERATING LICENSE FOR SEABROOK STATION (TAC NUMBER ME3959)

Dear Mr. Freeman,

The U.S. Nuclear Regulatory Commission (NRC or the staff) conducted a scoping process and solicited public comments from July 20 to September 21,2010, to determine the scope of the staff's environmental review of the application for renewal of the operating license for Seabrook Station (Seabrook). The scoping process is the first step in the development of a plant-specific supplement to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS), for Seabrook.

As part of the scoping process, the staff held two public environmental scoping meetings in Hampton, New Hampshire on August 19, 2010, to solicit public input regarding the scope of the review. The staff also received written comments by letter and e-mail. At the conclusion of the scoping process, the staff prepared the enclosed environmental scoping summary report identifying comments received during the scoping period. In accordance with Section 51.29(b) of title 10 of the Code of Federal Regulations (10 CFR), the staff will send a copy of the scoping summary report to all participants in the scoping process.

The transcripts of the public scoping meetings are available for public inspection in the NRC public document room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html. The transcripts for the afternoon and evening meetings are listed under accession numbers ML102520183 and ML102520207, respectively.

If you encounter problems accessing documents in ADAMS should contact the NRC's PDR reference staff by telephone at 1-800-397-4209 or 301-415-4737 or bye-mail at pdr.resource@nrc.gov.

P. Freeman

-2 The draft supplement to the GElS is scheduled to be issued in mid 2011. A notice of the availability of the draft document and the procedures for providing comments will be published in the Federal Register. If you have any questions concerning the staff's environmental review of this license renewal application, please contact Mr. Michael Wentzel, Project Manager, at (301) 415-6459 or bye-mail at michael.wentzel@nrc.gov.

Bo M. Pham, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

As stated cc w/encl: Distribution via Listserv

P. Freeman

-2 The draft supplement to the GElS is scheduled to be issued in mid 2011. A notice of the availability of the draft document and the procedures for providing comments will be published in the Federal Register. If you have any questions concerning the staff's environmental review of this license renewal application. please contact Mr. Michael Wentzel, Project Manager, at (301) 415-6459 or bye-mail at michael.wentzel@nrc.gov.

Sincerely, IRA!

Bo M. Pham, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession Number: ML110100113

. OFFICE LADLR PM:DLR/RPB1 OGC (NLO)

BC:DLR/RPB1 D:DLR i NAME IKing MWentzel MSpencer BPham BHolian DATE 01/19/2011 01/19/2011 01/31/2011 02/08/2011 02/17/2011 OFFICE PM:DLR/RPB1 BC:DLR/RERB BC:DLR/RPB1 NAME MWentzel Almboden BPham DATE 03/01/2011 03/01/2011 03/01/2011 OFFICIAL RECORD COpy

Letter to Paul Freeman from Bo M. Pham dated March 1, 2011

SUBJECT:

ISSUANCE OF ENVIRONMENTAL SCOPING

SUMMARY

REPORT ASSOCIATED WITH THE STAFFS REVIEW OF THE APPLICATION BY NEXTERA ENERGY SEABROOK, LLC FOR RENEWAL OF THE OPERATING LICENSE FOR SEABROOK STATION (TAC NUMBER ME3959)

DISTRIBUTION:

HARD COPY:

DLR RF John Parker John Fleming Joyce Kemp Andrew Port E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RPlasse ICouret, OPA MWentzel EDacus, OCA BPham MSpencer, OGC DWrona WRaymond, RI AImboden DTifft, RI EMiller NMcNamara, RI RGallucci NSheehan, RI DHarrison DScrenci, RI JJohnson, RI ABurritt, RI Tim Noonis Joe Casey Paul Gunter Joseph Fahey Janet Guen William Harris Maggie Hassan Peter Somssich Rob McDowell Skip Medford Debbie Grinnell Gil Brown Paul Blanch Michael Schidlovsky Doug Bogen Robin Read Dennis Wagner Mary Lampert Bob Backus

ENCLOSURE Environmental Impact Statement Scoping Process Summary Report Seabrook Station Seabrook, New Hampshire March 2011 U.S. Nuclear Regulatory Commission Rockville, Maryland Introduction The U.S. Nuclear Regulatory Commission (NRC) received an application from NextEra Energy Seabrook, LLC (NextEra), dated May 25, 2010, for renewal of the operating license for Seabrook Station (Seabrook). Seabrook is located in Seabrook, New Hampshire. The purpose of this report is to provide a concise summary of the determinations and conclusions reached, including the significant issues identified, as a result of the scoping process in the NRCs environmental review of this license renewal application.

As part of the application, NextEra submitted an environmental report (ER) (NextEra, 2010) prepared in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 51 which contains the NRC requirements for implementing the National Environmental Policy Act of 1969 (NEPA). The requirements for preparation and submittal of ERs to the NRC are outlined in 10 CFR 51.53(c)(3).

The requirements in Section 51.33(c)(3) were based on the findings documented in NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) (NRC, 1996), (NRC, 1999). In the GEIS, the staff identified and evaluated the environmental impacts associated with license renewal. After issuing a draft version of the GEIS, the staff received and considered input from Federal and State agencies, public organizations, and private citizens before developing the final document. As a result of the assessments in the GEIS, a number of impacts were determined to be small and generic to all nuclear power plants. These were designated as Category 1 impacts. An applicant for license renewal may adopt the conclusions contained in the GEIS for Category 1 impacts unless there is new and significant information that may cause the conclusions to differ from those of the GEIS. Other impacts that are plant-specific were designated as Category 2 impacts and are required to be evaluated in the applicants ER. The Commission determined that the NRC does not have a role in energy-planning decision-making for existing plants. Therefore, an applicant for license renewal need not provide an analysis of the need for power or the economic costs and benefits of the proposed action. Additionally, as stated in 10 CFR 51.23(b), the Commission determined that the ER need not discuss any aspect of storage of spent fuel for the facility that is within the scope of the generic determination in 10 CFR 51.23(a). This determination was based on the Nuclear Waste Policy Act of 1982 and the NRCs Waste Confidence Rule, 10 CFR 51.23.

On July 20, 2010, the NRC initiated the scoping process by issuing a Federal Register notice (75 FR 42168). This notified the public of the staffs intent to prepare a plant-specific supplement to the GEIS regarding the application for renewal of the Seabrook operating license.

The plant-specific supplement to the GEIS will be prepared in accordance with 10 CFR Part 51.

The scoping process provides an opportunity for public participation to identify issues to be addressed in the plant-specific supplement to the GEIS.

The notice of intent identified the following objectives of the scoping process:

Define the proposed action Determine the scope of the supplement to the GEIS and identify significant issues to be analyzed in depth Identify and eliminate peripheral issues Identify any environmental assessments and other environmental impact statements being prepared that are related to the supplement to the GEIS Identify other environmental review and consultation requirements Indicate the schedule for preparation of the supplement to the GEIS Identify any cooperating agencies Describe how the supplement to the GEIS will be prepared The NRCs proposed action is whether to renew the Seabrook Station operating license for an additional 20 years.

The scope of the Supplemental Environmental Impact Statement (SEIS) includes an evaluation of the environmental impacts of Seabrook license renewal and reasonable alternatives to license renewal. The Scoping Comments and Responses section of this report includes specific issues identified by the comments. The subsequent NRC responses explain if the issues will be addressed in the SEIS and, if so, where in the report they will likely be addressed.

Several environmental issues related to license renewal are site-specific. These include:

threatened or endangered species, impingement and entrainment of fish and shellfish, historic and archaeological resources, housing impacts, public services (public utilities and transportation), offsite land use (license renewal term), severe accidents, and environmental justice. During the scoping process, the Staff noted the change in status of the Atlantic sturgeon. On October 6, 2010, the National Marine Fisheries Service (NMFS) proposed listing the Gulf of Maine distinct population segment of the Atlantic sturgeon as a threatened species under the Endangered Species Act (NOAA, 2010). This change of status is currently in the rulemaking process.

Throughout the scoping process, the NRC staff identified and eliminated peripheral (i.e., out-of-scope) issues for the environmental review. This report provides responses to comments that were determined to be out of the scope of the environmental review. For in-scope comments, the staff will consider the comments in the development of the SEIS. A detailed response to in-scope comments will be provided, if necessary, in Appendix A of the SEIS.

In order to meet the requirements of the Magnuson-Stevens Fisheries Conservation and Management Act and Section 7 of the Endangered Species Act, the NRC staff is required to consult with the National Marine Fisheries Service to evaluate the potential impacts of continued operation on Atlantic sturgeon, and the essential fish habitat. In order to fulfill its obligations under the National Historic Preservation Act, the NRC additionally initiated consultation with the Advisory Council on Historic Preservation, the New Hampshire State Historic Preservation Officer, and the Massachusetts State Historic Preservation Officer.

The NRC staff expects to publish the draft SEIS in mid 2011. The NRC staff did not identify any cooperating agencies for this review. The SEIS will be prepared by NRC staff with contract support from Argonne and Pacific Northwest National Laboratories.

The NRC invited the applicant; Federal, State and local government agencies; Indian tribal governments; local organizations; and individuals to participate in the scoping process by providing oral comments at the scheduled public meetings or by submitting written comments before the end of the scoping comment period on September 21, 2010. The scoping process included two public meetings which were held on August 19, 2010, at the Galley Hatch Conference Center, 815 Lafayette Road, Hampton, New Hampshire 03842. The NRC issued press releases, purchased newspaper advertisements, and distributed flyers locally to advertise these meetings. Approximately 82 people attended the meetings. Each session began with NRC staff members providing a brief overview of the license renewal process and the NEPA environmental review process. Following the NRCs prepared statements, the floor was opened for public comments. Twenty-two attendees provided oral comments that were recorded and transcribed by a certified court reporter. The transcripts of the comments from these meetings are included at the end of this report. The NRC issued a summary of the scoping meetings on September 20, 2010 (NRC, 2010a).

Additionally, on October 15, 2010, the NRC contacted representatives from four Indian tribes to solicit input to the scoping process (NRC, 2010c). The four tribes were the Wampanoag Tribe of Gay Head-Aquinnah, Abenaki Nation of New Hampshire, Cowasuck Band of Pennacook-Abenaki People, and the Abenaki Nation of Missisquoi. No responses were received from these tribes.

All documents associated with this scoping process are available for public inspection in the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRCs Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html. Persons who encounter problems in accessing documents in ADAMS should contact the NRCs PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737 or by e-mail at pdr.resource@nrc.gov. The ADAMS accession number for each document is listed below in Table 1.

In addition to the comments received at the meetings, the NRC also received three letters and five e-mails with comments about the review. At the conclusion of the scoping period, the staff reviewed the transcripts, meeting notes, and all written material received in order to identify individual comments. Each comment was marked with a unique identifier including the Commenter ID (specified in Table 1) and a comment number, allowing each comment to be traced back to the transcript, letter, or e-mail in which the comment was submitted. Comments were consolidated and categorized according to the topic within the proposed supplement to the GEIS or according to the general topic if outside the scope of the GEIS. Once comments were grouped according to subject area, the staff determined the appropriate action for the comment.

The action or resolution for each comment is described in the staffs responses in this report.

Table 1 identifies the individuals providing comments and the assigned Commenter ID.

Individuals are listed alphabetically by last name, however, the corresponding Commenter ID was assigned in the order in which they spoke at the public meeting. Accession numbers identify the source document of the comment in ADAMS.

TABLE 1. Individuals Providing Comments During The Scoping Comment Period Commenter Affiliation (If Stated) Comment Source Commenter ID ADAMS Accession Number Backus, Robert Afternoon Scoping Meeting I

ML102520183 Bamberger, Paul Evening Scoping Meeting P

ML102520207 Blanch, Paul Afternoon Scoping Meeting Evening Scoping Meeting K

ML102520183 ML102520207 Bogen, Doug Seacoast Anti-Pollution League Afternoon Scoping Meeting www.regulations

.gov E

ML102520183 ML102670048 Brown, Gilbert Evening Scoping Meeting V

ML102520207 Casey, Joe New Hampshire Building and Construction Trades Council Afternoon Scoping Meeting G

ML102520183 Fahey, Joseph Town of Amesbury, Office of Community and Economic Development Letter X

ML102650486 Fleming, Kevin Afternoon Scoping Meeting M

ML102520183 Grinnell, Debbie C-10 Research and Education Foundation Evening Scoping Meeting R

ML102520207 Guen, Janet United Way of the Greater Seacoast Afternoon Scoping Meeting F

ML102520183 Commenter Affiliation (If Stated) Comment Source Commenter ID ADAMS Accession Number Gunter, Paul Beyond Nuclear Afternoon Scoping Meeting Evening Scoping Meeting D

ML102520183 ML102520207 Harris, William Evening Scoping Meeting E-mails T

ML102520207 ML102500271 ML102420043 Hassan, Maggie New Hampshire State Senator, District 23 Evening Scoping Meeting Letter N

ML102520207 ML102420037 Kemp, Joyce www.regulations

.gov Z

ML102640371 Lampert, Mary Speaking for C-10 Research and Education Foundation Afternoon Scoping Meeting Evening Scoping Meeting A

ML102520183 ML102520207 McDowell, Robert Afternoon Scoping Meeting C

ML102520183 Medford, Scott Evening Scoping Meeting U

ML102520207 Noonis, Tim Hampton Area Chamber of Commerce Afternoon Scoping Meeting Evening Scoping Meeting H

ML102520183 ML102520207 Nord, Chris Evening Scoping Meeting O

ML102520207 Commenter Affiliation (If Stated) Comment Source Commenter ID ADAMS Accession Number Port, Andrew City of Newburyport, Office of Planning and Development Letter W

ML102660331 Read, Robin New Hampshire House of Representatives, District 16 Afternoon Scoping Meeting B

ML102520183 Schidlovsky, Michael Exeter Area Chamber of Commerce Afternoon Scoping Meeting J

ML102520183 Somssich, Peter Evening Scoping Meeting and Submittal Q

ML102520207 Vining, Geordie www.regulations

.gov Y

ML102450525 Wagner, Dennis Afternoon Scoping Meeting L

ML102520183 Wolff, Cathy Evening Scoping Meeting S

ML102520207 The comments and suggestions received as part of the scoping process are documented in this section and the disposition of each comment is discussed. The formatting of the comment in the source document is not necessarily preserved. The meeting transcripts and written comments are included in their original form at the end of this report.

Comments have been grouped into general categories.

In-scope comments:

1. Comments in Support of NextEra, Nuclear Power and License Renewal (PRO)
2. Comments Concerning Alternatives to License Renewal (ALT)
3. Comments Concerning the Socioeconomic Impacts of Seabrook (SOC)
4. Comments Concerning Aquatic Ecology (ECO)
5. Comments Concerning the Effects of Climate Change (CLI)
6. Comments Concerning Severe Accident Mitigation Analysis (SAMA)
7. Comments Concerning Radioactive Releases to the Environment (RAD)
8. Comments Concerning Hydrology/Groundwater (HYD)

Out-of-scope comments:

9. Comments Concerning Long-term Radioactive Waste Storage (WST)
10. Comments Concerning Plant Security and Emergency Planning (SEC)
11. Comments Concerning Safety Issues and Aging Management of Plant Systems (SAF)
12. Comments Concerning License Renewal and Related Processes (LIC)

In those cases where no new environmental information was provided by the commenter, only a brief response has been provided to the comment and no further evaluation will be performed.

The preparation of the plant-specific supplement to the GEIS (also referred to as the Supplemental Environmental Impact Statement or SEIS) will take into account all the relevant issues raised during the scoping process. The SEIS will address both Category 1 and 2 issues, along with any new information identified as a result of the scoping process. The SEIS will rely on conclusions supported by information in the GEIS for Category 1 issues and will include analysis of Category 2 issues and any new and significant information. The NRC will issue a draft SEIS for public comment. The comment period will offer the next opportunity for the applicant, interested Federal, State, and local government agencies, Indian tribal governments, local organizations, and other members of the public to provide input to the NRCs environmental review process. The comments received on the draft SEIS will be considered in the preparation of the final SEIS. The final SEIS, along with the staffs safety evaluation report (SER), will provide much of the basis for the NRCs decision on the NextEra application to renew the license of Seabrook.

Summary of Seabrook Station Public Scoping Comments and Responses In-Scope Comments

1. Comments in Support of NextEra, Nuclear Power and License Renewal (PRO)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: C-01-PRO, G-01-PRO, H-01-PRO, H-02-PRO, J-01-PRO, L-01-PRO, N-01-PRO, N-03-PRO, U-01-PRO, T-09-PRO, and V-01-PRO Response: These comments are general in nature and express support for nuclear power, NextEra, or license renewal of Seabrook. These comments provide no new and significant information and will not be evaluated further in the development of the SEIS.

2. Comments Concerning Alternatives to License Renewal (ALT)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: B-01-ALT, E-04-ALT, E-08-ALT, T-04-ALT, and T-07-ALT Response: These comments refer to the alternatives to license renewal of Seabrook, including the alternative of not renewing the operating license, also known as the no-action alternative.

The staff will evaluate all reasonable alternatives in Chapter 8 of the SEIS. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

3. Comments Concerning the Socioeconomic Impacts of Seabrook (SOC)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: F-01-SOC, and U-02-SOC Response: These comments address the socioeconomic benefits of Seabrook on local/regional communities and economy, including related issues such as employment, taxes, and philanthropy. The staff will address the socioeconomic impact of renewing the Seabrook operating license in Chapter 2 and 4 of the SEIS. In addition, the socioeconomic impact of not renewing the Seabrook operating license will be discussed in Chapter 8. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

4. Comments Concerning Aquatic Ecology (ECO)

The comment in this category can be found at the back of this report and is labeled with the following identifier: I-03-ECO Response: This comment relates to the impact on aquatic ecology associated with Seabrooks once-through cooling systems. The impacts of impingement and entrainment from Seabrooks once-through cooling system will be discussed in Chapters 2 and 4 of the SEIS. Appendix A of the draft SEIS will include an expanded response to this comment as well as the other comments that are within the scope of the NRCs environmental review.

5. Comments Concerning the Effects of Climate Change (CLI)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: E-02-CLI, and E-07-CLI Response: These comments relate to the impact of climate change on the environmental characteristics of the Seabrook site. The effects of climate change on the Seabrook site will be discussed in Chapter 4 of the SEIS. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

6. Comments Concerning Severe Accident Mitigation Analysis (SAMA)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: A-01-SAMA, and A-03-SAMA Response: These comments relate to the adequacy of the applicants SAMA, focusing mainly on the adequacy of the MELCOR Accident Consequence Code System, version 2 (MAACS2) code and the validity of the models chosen by the applicant to perform the analysis. The staffs evaluation of the applicants SAMA analysis will be discussed in Chapter 5 and Appendix F of the SEIS. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

7. Comments Concerning Radioactive Releases to the Environment (RAD)

The comments in this category can be found at the back of this report and are labeled with the following identifiers: E-01-RAD, E-06-RAD, and O-03-RAD Response: These comments relate to the radioactive effluents, including tritium, which may occur during the operation of Seabrook. The effects on public health and the environment due to effluents from Seabrook will be evaluated in Chapter 4 of the SEIS. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

These comments also deal with aging management of plant systems as they relate to radioactive releases caused by degrading plant components. In so much as these comments deal with aging management, those portions of the comments are considered out of scope for the environmental review and will not be evaluated further in the development of the SEIS.

Aging management of plant systems will, however, be evaluated as part of the Seabrook license renewal application safety review. The results of that evaluation will be documented in the staffs Safety Evaluation Report.

8. Comments Concerning Hydrology/Groundwater (HYD)

The comment in this category can be found at the back of this report and is labeled with the following identifier: A-02-HYD This comment relates to the methodology utilized to select monitoring well locations used to track releases from Seabrook. Groundwater quality issues related to the operation of the Seabrook will be evaluated in Chapter 4 of the SEIS. Appendix A of the draft SEIS will include expanded responses to these comments as well as the other comments that are within the scope of the NRCs environmental review.

This comment also concerns aging management of plant systems as they relate to radioactive releases caused by degrading plant components. In so much as this comment deals with aging management, those portions of the comment are considered out of scope for the environmental review and will not be evaluated further in the development of the SEIS. Aging management of plant systems will, however, be evaluated as part of the Seabrook license renewal application safety review and this comment has been provided to the NRC staff conducting the safety review for further consideration. The results of the staffs safety review of the license renewal application will be documented in the staffs Safety Evaluation Report.

Out-of-Scope Comments

9. Comments Concerning Long-term Radioactive Waste Storage (WST)

Comment E-03-WST: When we're talking about the nuclear waste, those of us who have been following this issue for some years, we know that that waste is not going to be hauled out of there the day the plant closes. It needs to cool off. It's got to be transported. There are many, many issues.

That means we are going to be dealing with that waste on that site for many decades after that, and that is a scary prospect with the ocean roaring in with storms and increased sea level. We need to be addressing these issues in this environmental impact study.

Comment I-04-WST: We know the plant has routine releases, and as somebody mentioned, I think Mr. Bogen mentioned, we know that there's been some tritium releases which was certainly not intended. We need to look at that. I was going to mention the sea level rise, but that was well-discussed by Mr. Bogen. I won't go into that.

Lastly, of course, I know that these licensing proceedings and these individual plant proceedings, we're shuffled off with many of the important things are shuffled off as a generic issue to how those are handled on a big national basis. A quintessential example of that is of course nuclear waste disposal.

But we think that this needs to be dealt with in this specific context of this plant. If we're going to license this plant for 20 more years, we're going to have a lot more spent fuel. That means a lot of very much greater level of high level waste disposal. We think that the environmental impacts of that have to be considered in regard to the particular characteristics of this site, where there's, as we say, a spent fuel pool which is pretty close to the ambient sea level and the concerns that that raises.

Comment O-01-WST: So, for high-level waste -- as was asked earlier -- where is the high-level waste to go? We have 20-times the radioactive activity of the Chernobyl accident's release contained here at Seabrook in far less than adequate a storage system -- far less than adequate. It's going to be here for the foreseeable future, which might mean many decades because Yucca Mountain is not going to open. That was the plan -- the plan was no good.

Why isn't going off to some permanent disposal site on Indian land somewhere a good idea?

Well, the state of Nevada doesn't want it. In fact, everyone feels like we would feel -- the state of New Hampshire it turned out didn't want the DOE to take over seven towns by eminent domain. Nobody's going to want that. So, all over the United States, plants just like ours -- the people in those regions live in sacrifice zones where the radioactive inventory, 20-times the size of Chernobyl's release, is left right on site. That's what we're left with. Why is our homegrown dumpsite not adequate? First of all, it's here in Seabrook, which is one of the fastest-growing summer populations in the -- well, fastest-growing populations in the United States. One of the most populous beach populations in the United States during the summertime.

So, we have a lot of people moving in.

Secondly, an above ground closely housed unhardened dry-cask bunker constitutes one of the most vulnerable terrorist targets on U.S. soil. Which is a huge worry. Should be a huge worry for our elected officials, but we don't seem to be getting traction in the state of New Hampshire with that issue. Yet, Florida Power and Light's bunker was rushed to construction years after whole agencies of the federal government were established to protect the American public from fiascos such as this. We have a roadmap for better technologies than the [NUHOMS] system that was implemented quickly by Florida Power and Light just as Florida Power and Light is quickly trying to implement this relicensing process. The process should be slowed down so that the proper technologies could be used to adequately protect the public.

The disposition of Seabrook's reactors high-level waste should be included within the scope of any license extension process. Sufficient time should be devoted to finding the state-of-the-art storage technologies for all U.S. commercial and military high-level waste now because so-called temporary storage must suffice to keep us safe for perhaps many decades. I want to point out for the technicians in this room that believe that this is not within the scope of these upcoming hearings -- the Generic Environmental Impact Statement, Section 5, allows for review of high-level waste storage in terms of consequence. In this case, it could be the consequence of a severe accident, for instance, due to terrorist attack. Which is just how the issue was raised in California and the Ninth Circuit Court of Appeals upheld the contentions of those that brought that litigation to court. So, this is a totally permissible arena for high-level waste to be considered within the scope.

Comment P-01-WST: Recently I read a quote from an official from Seabrook who said -- We can handle the nuclear waste for the next 20-years and beyond. Well, beyonds [sic] faith --

there's no information. When people answer serious questions with words like `beyond` it really scares me. And he also did it tonight to me. He said -- Well, it's safe until the year 2080. But it's been decades now that you had a chance to prepare for 2081 and I heard you say nothing about 2081. It's another non-answer to a very serious question. And you get this all the time.

You have to be very careful with the way they use the language.

Comment T-02-WST: We have some setbacks in long-term high-level waste management, but I think the Yucca Mountain thing is not entirely over. It may depend on elections this year and later. There's also an issue of alternative dry-cask storage as a technology that might be considered for mitigation in lieu of on-site swimming pool storage of waste from this plant. And another major change since 1990 -- and this is the primary field I work with. I used to plan and draft arms-control treaties on leave working for the State Department -- The Arms Control and Disarmament Agency -- the United States through this Nunn-Lugar Program has bought and repossessed by various means both high-level waste and low-level waste and nuclear fuel rods from other countries, which are important for our non-proliferation efforts. So, I believe it is a positive factor that needs to be considered that since the United States has now accumulated much more nuclear material -- from other nations and has decommissioned a substantial number of nuclear weapons -- that the recycling of this material in low-level enriched fuel assemblies is a much safer alternative for those fuels than to leave them abroad in a Kazakhstan or any other number of other places. So, these are major changes that need to be considered in the relicensing. Though I also find it troubling that the relicensing is done so far ahead. I believe there's some opportunities that ought to be included in the design of the Environmental Review.

Response: To the extent the comments suggest a need to analyze the environmental impacts associated with onsite waste storage during the 20 year renewal term, Part 51 designates the environmental impacts pertaining to on-site spent fuel storage a Category 1 issue. See 10 CFR Part 51, subpart A, Appendix B, Table B-1. The GEIS generally addresses onsite storage of spent fuel during a renewal period of up to 20 years. Chapter 6 of the GEIS addresses environmental impacts associated with the uranium fuel cycle as they apply to license renewal, and the environmental impacts associated with the management of radiological and nonradiological wastes during the license renewal term. Chapter 6 of the GEIS concludes that continued storage of existing spent fuel and storage of spent fuel generated during the license renewal term can be accomplished safely and without significant environmental impacts.

Chapter 6 further concludes without qualification or exception that mitigation alternatives have been considered and existing regulatory requirements provide adequate mitigation for on-site spent fuel storage.

To the extent the comments suggest site-specific analysis of the safety and environmental effects of long-term storage of spent fuel onsite, this issue has been assessed by the NRC, and, as set forth in its Waste Confidence Decision (codified at 10 CFR 51.23), the Commission has generically determined that such storage can be accomplished without significant environmental impact. In the Waste Confidence Decision, the Commission determined that spent fuel can be stored onsite for at least 30 years beyond the license operating life, which may include the term of a renewed license. At or before the end of that period, the fuel would be removed to a permanent repository. In its Statement of Consideration for the 1990 update of the Waste Confidence Decision (55 FR 38472), the Commission addressed the impacts of both license renewal and potential new reactors. In its December 6, 1999, review of the Waste Confidence Decision (64 FR 68005), the Commission reaffirmed the findings in the rule. In addition to the conclusion regarding safe onsite storage of spent fuel, the Commission states in the rule that there is reasonable assurance that at least one geologic repository will be available within the first quarter of the 21st century, and sufficient repository capacity for the spent fuel will be available within 30 years beyond the licensed life for operation of any reactor. On October 9, 2008, the Commission issued a proposed revision of the Waste Confidence Decision in the Federal Register (73 FR 59551) for comment. This revision provided the basis for extending the time for sufficient repository capacity for spent fuel to be available from within 30 years beyond the licensed life for operation of any reactor to within 50 to 60 years. The proposed revision also provides reasonable assurance that spent fuel can be stored without significant environmental impacts for at least 60 years beyond the licensed life for reactor operation assuming storage of spent fuel in either a spent fuel storage basin or onsite or offsite independent spent fuel storage installation. On December 23, 2010, the Commission issued a final revision to the agencys Waste Confidence findings and regulation (75 FR 81037),

expressing the Commissions confidence that the nations spent nuclear fuel can be safely stored for at least 60 years beyond the licensed life of any reactor and that sufficient repository capacity will be available when necessary. In addition, the Commission directed the NRC staff to conduct additional analysis for longer-term storage to ensure that the NRC remains fully informed by current circumstances and scientific knowledge relating to spent fuel storage and disposal (NRC, 2010b). In February 2011, the states of New York, Vermont, and Connecticut filed a petition for judicial review of the Commissions December 23, 2010 waste confidence decision by the United States Court of Appeals for the District of Columbia Circuit.

To the extent the comments reference the Ninth Circuit Court of Appeals in San Luis Obispo Mothers for Peace, v. NRC, 449 F.3d 1016 (9th Cir. 2006), the court upheld the Commission's decision on the Atomic Energy Act issues, but, as to the NEPA issues, concluded that "the NRC's determination that NEPA does not require a consideration of the environmental impact of terrorist attacks does not satisfy reasonableness review," and held that "the EA prepared in reliance on that determination is inadequate and fails to comply with NEPA's mandate." Id. at 1035. The Supreme Court did not review a petition to review this matter. However, refusal to take review does not imply agreement with the Circuit Courts decision. In a Memorandum and Order concerning the renewal of the operating license for the Oyster Creek Nuclear Generating Station, AmerGen Energy Company, LLC (License Renewal for Oyster Creek Nuclear Generating Station), CLI-07-8, 65 NRC 124 (February 26, 2007), ADAMS Accession No. ML070570511), the Commission reaffirmed its long-standing position that NEPA does not require inquiry into the consequences of a hypothetical terrorist attack. The Commission stated that it respectfully... disagrees" with the Ninth Circuit Court of Appeals decision, and will follow the decision of the court as applicable to the Diablo Canyon matter and any other matters within the jurisdiction of the Ninth Circuit. But, as to other proceedings, the Commission continues to believe that such inquiry is not required. In the Oyster Creek Memorandum and Order, the Commission also reached the following conclusions: First, terrorist issues are unrelated to the detrimental effects of aging and are beyond the scope of license renewal.

Second, the environmental effect caused by terrorists is simply too far removed from the natural or expected consequences of agency action to require a study under NEPA. Third, a NEPA-driven review of the risks of terrorism would not be necessary because the NRC has undertaken extensive efforts to enhance security at nuclear facilities. These ongoing post-9/11 enhancements provide the best vehicle for protecting the public. Fourth, substantial practical difficulties impede meaningful NEPA-terrorism review, while the problem of protecting sensitive security information in the quintessentially public NEPA and adjudicatory process presents additional obstacles. Finally, the GEIS documents a discretionary analysis of terrorist acts in connection with license renewal, and concluded that the core damage and radiological release from such acts would be no worse than the damage and release to be expected from internally initiated events. The Commissions decision in Oyster Creek was affirmed by the Third Circuit.

New Jersey Department of Environmental Protection v. NRC, 561 F.3d 132 (3rd Cir.2009). The Commission recently reiterated its position that the NRC conduct environmental analyses of terrorist scenarios only for facilities in the Ninth Circuit in Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-14, 71 NRC __, __

(slip op. at 37-28) (June 17, 2010) (ADAMS Accession No. ML101680369).

Accordingly, as discussed above and as specified by 10 CFR 51.23(b), and 10 CFR Part 51, subpart A, Appendix B, Table B-1, no site-specific discussion of any environmental impact of spent fuel storage in reactor facility storage pools or ISFSIs during the renewal term or thereafter is required in an environmental impact statement associated with license renewal.

These comments do not provide new and significant information and will not be evaluated further in development of the SEIS.

10. Comments Concerning Plant Security and Emergency Planning (SEC)

Comment M-01-SEC: Does the evacuation plan and the accuracy of the evacuation plan figure into the process of license renewal? That's my question. I'm sorry if that's something I could have found online or, you know, other documents. But with that, at the same time, with this license renewal then being considered, then could evacuation be considered further, such as the 2000 census data or does it go to a 2010? Is there a requirement for updating?

And then particularly we're talking about the evacuation of special, "special needs," whether it be school children, retirement communities, retirement homes, nursing homes, elderly, of whatever or special needs people of any sort. So that's all. My question coming here today is really to ask if evacuation updating is required, and if it's not, then could it be given consideration at this point?

Comment O-02-SEC: Evacuation Planning was a snow job here 20-years ago. The reason --

the reason that so many rules got changed -- the field got changed 20-years ago -- was because the evacuation plans 20-years ago were not sufficient. So, someone came up here earlier and said we're dealing with it in the moment -- in the here and now. Well, in the here and now, these evacuation plans are unworkable. They've been unworkable for 20-years. Take a look. The Federal Emergency Management Agency 20-years ago -- the Region One director, Ed Thomas, said it's no good. And because of that, we have to stop the license. The Reagan administration pulled him, installed a new Region One director and they rubber-stamped the evacuation plans. That's not an adequate evacuation plan. We have twice as many people living in the seacoast region than we did 20-years ago. So, how is that going to work? That has to be included within the scope of relicensing.

Comment T-01-SEC: I'd like to address mainly issues relating to the scope of the Environmental Review. First, what has changed significantly since the licensing hearing that ended with the license in 1990 for the Seabrook plant? Several significant changes have occurred. We have a significant population increase -- both in southern New Hampshire and in northern Massachusetts. You'll get the 2010 census data during your review for this license.

We have increased mobility of people. So, during the summer, we have much more peaking of beach traffic. We have a great infusion of population at the beaches, which raises a challenge for evacuation planning.

Comment T-03-SEC: My first concern has to do with emergency evacuation planning and recovery operations. Not only did FEMA have trouble with the original evacuation planning, but the governor of Massachusetts, then Governor Dukakis, could not approve in 1990 the evacuation plan. We already had traffic saturation troubles then.

I've been working on mitigation for the Whittier Bridge Project, which is I-95 crossing the Merrimack River. We're going from 6 to 10-lanes -- 8-lanes and two emergency lanes.

There've been significant studies mainly from Florida since hurricane Andrew -- many important reports from the National Research Council on contraflow evacuation opportunities and so ultimately we will have more flow-capacity -- we'll have a significant, about a two thirds increase, in flow south in the event of an emergency at Seabrook. But we're getting saturation on I-95.

We have not yet had the adequate modeling of connectors between say Route 110 going east/west between I-95 and 495. So, we really don't have the flow-capability to handle evacuations in a major emergency, especially in the summer when we have beach traffic.

Now, a most significant change since 1990 that I think needs to be considered in the Environmental Review and I think also in the Safety Review -- has to do unfortunately with the development of volitional actors -- terrorists -- who would like to take out high-value targets that can cause great harm.

We have two important de-classified findings that are pertinent to the Seabrook relicensing.

First we have the 9/11 Commission, which in its official release indicated that those who planned the World Trade Center bombings had actually had Seabrook as a priority target just before that. That's all online in the 9/11 Commission report.

Then more recently Curt Weldon, the Congressman from Pennsylvania who served on the Armed Services Committee of the House, released information that a group of mainly Pakistani citizens in Canada with 19 arrests were considering an attack on Seabrook after 9/11. So, I think as we're planning for the operation of this plant past 2030 -- even in the next decade -- we need now to take a re-look as part of the environmental mitigation and risk assessment for this relicensing, the consequences of having actors who are malevolent rather than just the risk that come from nature and from failures of technology that are inadvertent.

I believe the C-10 Coalition -- I am not a member. I am not opposed to nuclear power -- but I believe they've done some important work to model weather patterns from Seabrook. It may have made sense for the 1990 assessment to look at prevailing winds. Prevailing winds mainly go west to east. Unfortunately, when you are dealing with malevolent actors, you will not get an attack when the prevailing winds go from west to east. You may get it when they go north/south because that would pick up a much larger population north of Boston that would be exposed in the event of a terrorist attack.

So, I suggest that there are opportunities if you take the weather modeling that was done by the C-10 organization and other studies and get the assistance from the Defense Threat Reduction Agency -- they have the nation's best models. They have a declassifiable version that can do the plume analysis when the winds are blowing in any number of directions, but you should include as the greatest threat a north/south wind pattern and then you should probably include the prevailing wind patterns and you should include summer beach times -- our summer traffic on I-95 peaks between May and October. The main peaks are July/August to Labor Day. You have major peaks in congestion on weekends. If you do that -- I believe if you did that analysis and the U.S. Department of Transportation now has excellent models -- their Office of Emergency Evacuation -- they have excellent software models. NRC has a group of excellent software models on emergency evacuation.

If you get the help of the Defense Threat Reduction Agency, which has a colonel in this region who would do the modeling for you, I believe you would be able to develop much better mitigation planning. So, you do not evacuate everybody in a major emergency. You only evacuate the people who are at high risks of radiation or other threats. That would be essential to do.

You should also include consideration of what's been developed by the U.S. Department of Transportation for contraflow traffic where they provide in their contracting that all contractors working on interstates are responsible to remove their construction equipment in an emergency because during hurricane evacuations in Florida and elsewhere, we've had problems with contraflow traffic when equipment is left on these interstates. So, I believe that this is at least one advantage of this early relicensing application, which is we have an inadequate set of emergency plans to evacuate people. We have good software in the federal government in different parts. And an excellent plume analysis done by the Defense Threat Reduction Agency that's available to NRC. I hope that as part of this relicensing, you consider mitigation measures that would be important for both evacuation and recovery operations in the event of a terrorist attack or just an accident at the plant.

I also hope you'll consider dry-cask storage options, so that you can get the spent-fuel assemblies that are now on site at Seabrook off that site. That could also reduce a target of attack and radiological harm.

Comment T-05-SEC: It is, I believe, in the national interest that the scoping review for this re-licensing application be broader than is the usual scope for a re-licensing application. The Nuclear Regulatory Commission has an opportunity to improve significantly, and at relatively low cost, both the consequences assessments and the emergency evacuation capabilities for Seabrook Station and the potentially impacted communities within NRC's Region I area.

I note that it is the usual practice for NRC not to consider emergency evacuation capabilities for a licensed nuclear plant when that license is re-considered with an application for license extension. This would be a huge and potentially fateful omission for both the Nuclear Regulatory Commission and the nation, if the NRC were not to include options for emergency evacuation planning and mitigation as a part of the Seabrook Station No. 1 license renewal.

When Seabrook Station No. 1 was licensed the primary risks were of an accidental nature,.

Evidence from the 9/11 Commission and other official sources indicate that Seabrook is now primarily at risk from intention attack by malevolent adversaries. This energy facility is situated near a major population center and summer-surging beach traffic; it is accessible from low flying aircraft passing over the Atlantic Ocean; it is now less well protected by Air Defense capabilities following closure of Pease Air Force Base nearby; and it has a containment system designed before the era of terrorist hijackings of wide bodied jets. These are fundamental changes of circumstances and assumptions since this plant was licensed in year 1990.

On the one hand, if NRC decides to exclude consideration of options to improve planning, modeling and procedures for emergency evacuation and re-licenses without these mitigation measures, and this facility then suffers either a terrorist attack or an accident involving significant radiation dispersal, this would be a tragedy not only for the region surrounding Seabrook Station but also for the entire civil electric nuclear industry. And indirectly for both national energy policy and an evolving effort to reduce greenhouse gases (GHGs) as part of a global environmental commitment of the U.S. government.

On the other hand, if NRC seizes a significant opportunity to improve at relatively low cost the planning, modeling, regional sensor network, and evacuation planning for Seabrook-related emergencies, the outcome would be to assure that, if a radiation release of significance occurs, whether by accident or by terrorist initiative, loss of life, harm to public health and safety, and regional economic disruptions are minimized responsibly.

These proactive initiatives would provide essential reassurance, not only for the re-licensing of the Seabrook Station No. 1, but for potential follow-on licenses for additional nuclear energy facilities at a preexisting nuclear energy complex with ready access to cooling ocean waters. It is notable that the Seabrook energy complex was initially designed and planned for at least two reactors. A broad scope for environmental risk assessment and mitigation planning for the Seabrook No. 1 station, could be confidence building, hence create opportunities for follow-on licensed facilities at this same energy complex.

Broad based environmental assessment should include, within mitigation strategies, initiatives that can: improve emergency planning; monitor in near-real-time radiation dispersals; design and implement phased, zonal, evacuation strategies; and build in, as field data indicate, in situ no-evacuation options for those in subzones not at risk.

Technologies to incorporate within consequences assessments and evacuation strategies, should include: plume modeling linked to near-real-time meteorological data; embedded software override capabilities within traffic signalization & traffic synchronization systems for evacuation arteries; contraflow traffic designs based on lessons learned from hurricane evacuations across interstate highway systems; backup batteries or renewable signal systems, designed for operability during electric grid outages; encryption capabilities to defeat unauthorized "capture" of light signal evacuation algorithms; and regional coordination among transportation and law enforcement entities within the affected region.

Opportunities to improve emergency planning, modeling, regional radiation sensor networks and evacuation management are now present, with capabilities far greater than were available when Seabrook Station was licensed in year 1990:

In 1990 the main risks related to component and system failures through natural occurring accidents, based on WASH-1400 and other fault-tree modeling; Over the past two decades, models for nuclear-related emergencies have developed greater capabilities to project risks of volitional attacks -- such as declassified information indicates to have been under consideration specifically for the Seabrook No. 1 station before 9/11/2001 and since that tragedy.

In particular, the Defense Threat Reduction Agency has significantly improved its plume

& dispersal modeling capabilities for radioactive clouds and related meteorological projections; and Upon request of NRC, the Defense Threat Reduction Agency would be capable and willing to model radiation-plume dispersals and hazards as a function of (a) seasonal weather patterns, and (b) terrorist optimization to place at risk maximal regional populations when attacking the Seabrook reactor itself, or (c) attacks on spent fuel assemblies stored in on-site swimming pools.

Of great potential to minimize loss of life, harm to public health and safety, and economic productivity in the region, a non-profit group operating in northern Massachusetts, the C-10 Foundation, now operates a near-real-time network of eighteen (18) regional radiation-monitoring stations throughout northern Massachusetts. The Commonwealth of Massachusetts funds these sensor stations, which constitute significant regional resources in event of radiation release(s).

Of critical importance for an Incident Commander (whether based in the Department of Homeland Security, or the Nuclear Regulatory Commission, or under more dire circumstances, within STRATCOM) (under military auspices) would be the enlargement of the regional radiation sensor network to include communities in southern New Hampshire, presently not included in the C-10 Foundation radiation sensor network.

A total of about 50 radiation sensors, a low cost investment for the re-licensing and potential expansion of nuclear reactors at the Seabrook facility, would provide an Incident Commander the capability to stage evacuations (and in situ population holds) by zones assigned, with DTRA near-real time plume analysis, by levels of radiation intensity, and traffic evacuation capability modeling.

A primary goal should be to reduce expected loss of life and harm to public health and safety, and not the total clearance of human populations from the entire region within a specified period of time. Under many circumstances, total clearance of region populations would be counterproductive to protection of life, public health and safety, and the regional economy.

Without a regional radiation sensor network available to an Incident Commander, excessive evacuations would be likely to expose potential evacuees in stalled motor vehicles with less protection than within their homes or businesses, needlessly aggravating loss of life, cancer incidents, etc.

Without a regional sensor network, and without any evacuation orders, the communities around Three Mile Island (1979) self-evacuated without any cohesive planning. This resulted in massive transport congestion. Had there been significant radioactive dispersal, which was not present, loss of life would have been needlessly aggravated.

In contrast, the failure of prompt notification and coordinated evacuations in the region surrounding Chernobyl (in the Ukraine, 1986) resulted in epidemiological estimates of radiation-related losses of approximately 92,000 lives -- most resulting from failures to design orderly, zonal evacuations.

The 18 existing C-10 Foundation sensor sites in northeastern Massachusetts presently lack long-life backup batteries, and redundant telecommunications channels, so a (federal) Incident Commander could be reliably informed despite the potential (likely) loss of regional power across the regional electric grid. The cost of these network improvements (backup batteries, dual telecomm channels) is so minimal, relative to potential for life saving and potential to improve public confidence supporting additional plant licensing, that this mitigation measure should be considered essential to any emergency plan and to mitigation measures to enhance emergency evacuation capabilities.

The extension of this regional sensor network to Southern New Hampshire might be facilitated by a grant or grants from the Department of Homeland Security to regional communities or a non-profit Foundation operating within the State of New Hampshire. It is essential that southern New Hampshire communities be included in near-real-time radiation monitoring and reporting to assure a cost-effective emergency evacuation (and non-evacuation) system is developed as part of the re-licensing process for Seabrook Station No. 1.

Since the licensing of the Seabrook plant in year 1990, NOAA has developed weather modeling capabilities that could be utilized for regional emergency/consequences assessment/evacuation planning and mitigation plans.

It is my understanding that the C-10 Foundation commissioned a study of seasonal weather patterns in the region of Seabrook Station by a trained meteorologist. These localized studies should be combined with NOAA databases to develop threat scenarios that account for potential terrorist initiatives designed to maximize population at risk, as with timing an incident while winds flow from north to south over densely populated land areas.

The Emergency Transportation Operations staff within the U.S. Department of Transportation has developed modeling capabilities to optimize contraflow evacuations; these models have utilized empirical data from Florida, Louisiana, Texas and other hurricane episodes, and might assist NRC in developing a 21st century emergency evacuation and management model, thence a regional emergency plan for Seabrook Station.

The National Research Council (Transportation) has a variety of findings for emergency evacuation management on its websites. These include design into construction contracts for Interstate highways and other arterial evacuation routes of positive incentives to clear construction equipment from all operable lanes of highways in advance of contraflow traffic implementation. There need to be financial bonuses for compliance, and significant contract penalties for noncompliance, so contraflow traffic is not impeded by leftover construction equipment as has happened during all too many recent hurricanes.

The "Intelligent Transportation" program of the U.S. Department of Transportation has developed traffic signalization / signalization synchronization that can automate traffic signals for major evacuation arteries, and on-ramps/off-ramps with (reversed) contraflow evacuations. These capabilities can be designed to accept, with encryption protection, wireless signals to implement evacuation software algorithms.

Even if some of the "best practices" emergency evacuation capabilities are beyond the responsibility of the NRC license applicant, or of the NRC itself, NRC's environmental scope for mitigation planning should be broad-based in identifying cost-effective mitigation measures, some fundable by the U.S. Department of Transportation, or by the Department of Homeland Security, or by state governments.

Comment W-01-SEC: It is our understanding that the scope of this initial review is to determine what environmental and safety issues will be the subject of a supplement to your boilerplate Generic Environmental Impact Statement (GElS) which is typical for licenses and renewals on all Nuclear Power Plants. It is our understanding that these GEIS and supplemental environmental and safety issues will be analyzed in greater depth over the next year and a half, prior to granting a License Renewal for Nextera Energy Seabrook LLC for their operation of the Seabrook No. 1 Unit from year 2030 to year 2050.

While we understand that safety considerations were taken into account for the Seabrook No. 1 Unit during the initial licensing process in 1999, and that the plant has been operational without major incident for the first twenty (20) years, we believe that substantial public benefits should be associated with a potentially premature renewal to the current license which will not presently expire for another twenty (20) years. If the NRC is expected to extend the license commitment until 2050, several decades into the future, mitigation for this private benefit (and public risk) should be provided with some additional consideration for risk assessment and emergency evacuation capabilities within the potentially impacted communities. Newburyport, MA falls within ten (10) miles of the Seabrook Nuclear Power Plant.

While it may not be usual practice for the NRC to consider emergency evacuation planning and mitigation for a license renewal extension, this would be a mistake for both the Nuclear Regulatory Commission and the nation. It is in both the national and regional interest that the scope of review for this re-licensing application be broader than is the usual scope for a re-licensing application. The Nuclear Regulatory Commission has an opportunity to improve the emergency evacuation capabilities for Seabrook Station and the potentially impacted communities, including Newburyport, MA.

The following relevant comments were previously submitted by Newburyport resident William Harris:

When Seabrook Station No. 1 was licensed the primary risks were of an accidental nature. Evidence from the 9/11 Commission and other official sources indicate that Seabrook is now primarily at risk from intentional attack by malevolent adversaries.

This energy facility is situated near a major population center and summer-surging beach traffic; it is accessible from low flying aircraft passing over the Atlantic Ocean; it is now less well protected by Air Defense capabilities following closure of Pease Air Force Base nearby; and it has a containment system designed before the era of terrorist hijackings of wide bodied jets. These are fundamental changes of circumstances and assumptions since this plant was licensed in year 1990.

The NRC should utilize this opportunity to improve (at relatively low cost) the planning, modeling, regional sensor network, and evacuation planning for Seabrook-related emergencies.

In return for granting such a large extension to the current license term, Nextera Energy Seabrook LLC should be required to assure that, if a radiation release occurs, (whether by accident or by terrorist attack) loss of life, harm to public health and safety are minimized.

In order to provide for coordinated evacuations in the event of a Seabrook-related emergency, we request that the NRC require the following mitigation, within the Seabrook region, as essential elements of review under the GElS supplement:

1) Design and installation of plume modeling systems linked to near-real-time meteorological data;
2) Design and installation of software overrides within existing traffic signalization & traffic synchronization systems for key evacuation arteries (such signal-synchronization software could provide the added ongoing benefit of reducing vehicle congestion stops, fuel usage, air pollution, and economic losses due to regional transportation congestion);
3) Modeling and preparations (installation of signage, signalization, control systems, etc.) for contraflow traffic designs based on lessons learned from hurricane evacuations across interstate highway systems;
4) Installation of backup batteries or renewable signal systems, designed for operability during electric grid outages; and
5) Funding for regional emergency preparedness coordination among municipal, transportation, law enforcement and emergency response entities.

Comment X-01-SEC: As you are well aware, MassDOT is preparing to replace the Whittier Bridge which crosses the Merrimack River between Amesbury and Newburyport, MA along Interstate 1-95. The Whittier Bridge represents a key bottleneck and vulnerability point between the two communities and the estimated 75,000 vehicle trips per day that move between New Hampshire and Massachusetts. As part of the licensing requirements in 1990 when the Plant was originally permitted, evacuation capabilities for the resident population largely depend upon Route 110 in Amesbury and Salisbury as well as 1-95 southbound across the Whittier Bridge.

As such, recent advances in the US DOT "intelligent transportation" technologies provide significant opportunities for automated traffic signal synchronization -- using remotely signaled algorithms for contra flow evacuations, and for changes in red/green ratios for other highway connectors.

Thus, there are opportunities to now model arterial vehicular networks, and identify and eliminate bottlenecks for evacuation.

Given the significant traffic flows and transportation-related improvements being designed for the arterial backbone of Seabrook's evacuation plan we are requesting that the re-Iicensing hearing consider new environmental and safety impacts. This is first real opportunity for federal reevaluation of Evacuation Plans for communities within 10 miles of the Plant since 1990, When Massachusetts Governor Dukakis refused to accept the evacuation plan because it was inadequate and impractical. Beach populations in summer are roughly double what they were in year 1990. As a result, we are requesting that the regional communities participate in a Demonstration Program, sponsored by USDOT, that would:

Incorporate emergency traffic modeling on a regional basis. Some of these modeling and traffic signalization capabilities have the added benefit of improving regional traffic flow during summer peaking and weekend peaking demand for vehicular travel in the region while also improving emergency management; Our region has near-saturation of coastal roadways, and at times total saturation during "beach" visitation surges. See the Whittier Bridge traffic projections, increasing from about 77,000 trips per day in coming decades. MassDOTs draft EIR is pending for this.

project which will provide additional baseline data for modeling; Incorporate improved near-real-time "plume analysis" for radiation contingencies as considered generically in NUREG-1555,Section V (pp 513 - 547);

Harness improved, declassified plume modeling techniques of the Defense Threat Reduction Agency, which that agency would make available to the NRC or the Department of Homeland Security in an emergency, for selection of evacuation zones by stages and non-evacuation zones under an Incident Commander; Augment the existing 18 (Geiger Counter) sensor and reporting system in northeastern Massachusetts communities, including the Town of Amesbury. Supplement the 18 existing sites with about 32 additional sites, mainly in southern New Hampshire, thereby improving near-real-time radiation monitoring and most likely reducing the zones requiring evacuation, making the evacuation plan more realistic and less likely to expose evacuees in stalled vehicles to radiation without building protection for occupants; Improve the reliability of regional radiation monitoring capabilities by identifying low-cost redundant capabilities (e.g. backup batteries for each of the 18 existing sensor sites) and redundant data links so an incident commander could obtain near-real-time radiation monitoring reports even if Seabrook produces no net electrical power and if the regional electric grid is temporarily inoperable; Improve emergency coordination between Northern Massachusetts and Southern New Hampshire, both at the state-to-state level and through a Demonstration Program involving the local municipalities in the region of the Seabrook station. Utilize the U.S. Dept of Transportation Modeling Capabilities (Office of Emergency Operations in US DOT) and use the "lessons learned" from Hurricane contra flow operations; and Supporting Regional planning whereby utilizing expansion of I-95 from 3 to 4 lanes to the New Hampshire border (8 or 9 lanes of contra flow compared to 5 or 6 now) will induce further growth pressures and traffic congestion. The study should harness the existing technologies for synchronized traffic signalization for all Merrimack River crossings, for Highways 110 and 286, and ramp improvements for 1-95 and 1-495 at the Highway 110 connectors now under modernization. The same technologies -- using solar panel rechargeable LED signals with remotely re-programmable software -- could assure more effective contra flow evacuation and save lives of law enforcement personnel -- who need not be exposed to direct traffic that can be done by synchronized signals in most hot spots along the corridor. Signal synchronization software also reduces vehicle congestion stops, fuel usage, air pollution, and economic losses due to regional transportation congestion.

In closing, we are seeking to layout a proposal that will meet the federal "requirements" for relicensing and we are providing a foundation for Regional Traffic Congestion & Emergency Evacuation Grant opportunities for our community and the surrounding region. In designating our Region a "Model Evacuation Demonstration Grant Area", we are seeking U.S. DOT support to use state-of-the-art traffic management support, build upon our regional planning capabilities, and fund this regional transportation mitigation and management effort.

Response: The Commission considered the need for a review of emergency planning issues in the context of license renewal during its rulemaking proceeding on 10 CFR Part 54, which included public notice and comment. As discussed in the Statement of Considerations for rulemaking (56 FR 64966), the programs for emergency preparedness at nuclear plants apply to all nuclear power plant licensees and afford protection for each licensee regardless of plant design, construction, or license date. Requirements related to emergency planning are set forth in the regulations at 10 CFR 50.47 and Appendix E to 10 CFR Part 50. These requirements apply to all operating licenses and will continue to apply to plants with renewed licenses.

Emergency Plans are evaluated by the NRC and coordinated with the Federal Emergency Management Agency (FEMA) and local authorities for implementation. Drills and exercises are conducted periodically to verify the adequacy of the plans. Issues identified during such exercises are resolved within the context of the current operating license and are not reevaluated as part of license renewal. These comments will be provided to the appropriate NRC staff for consideration in their assessments of emergency preparedness; however, the comments are considered out of scope in accordance with the regulations governing license renewal and will not be evaluated further in development of the SEIS.

Comment Q-03-SEC: Safety and Security Concerns. The safety record of many U.S. nuclear power plants over the past 30-years has been better than was expected by the critics.

However, the strong scrutiny brought to bear by both environmental groups and government agencies must be credited with most of this outcome, since otherwise profits would have been the main focus. It is, however, also important to point out that Seabrook's initial license was conditioned by the requirement that a final destination point for its nuclear waste be determined prior to initial operation. This never happened because the federal government never provided such a location. If Seabrook had told the public at the time that the final destination of the waste was in fact on the property of Seabrook Station, perhaps that license would never have been issued. Regardless of the disposal issue, this power plant must be considered a possible terrorist target and the level of security needed for adequate protection must be very high.

However, undisclosed visits by government teams testing such security at nuclear power plants have concluded that the current security measures are not enough. This means that there will be added additional expense for all nuclear power plants in the near future.

Materials for Nuclear Weapons Proliferation. Not only is a nuclear power plant a potential terrorist threat, but it must also be viewed as a target for groups attempting to procure nuclear fuel materials to enable the production of nuclear weapons. With increasing storage of nuclear waste on-site, as is the current case currently at most nuclear sites, without the full protection against theft that a centralized facility could provide, the attraction for both terrorists and nuclear weapons brokers will only increase.

Comment T-06-SEC: A separate component of mitigation planning, within the scope of environmental review, should include the Applicant's participation, whether voluntary or mandatory, in critical infrastructure control system monitoring programs, such as the recently announced "PERFECT CITIZEN" research program of the National Security Agency. ["Sensors deployed in computer networks for critical infrastructure" will be utilized in cooperative research with energy utility companies. See "U.S. Plans Cyber Shield for Utilities, Companies," Wall Street Journal, July 8, 2010.] Older NRC-licensed nuclear plants are likely to have "legacy" information technology systems connected to the internet; loss of service (LOS) attacks can result in harm to public safety if electric power disruptions are controlled by a hostile adversary and not by utility management. Mitigation measures to monitor, prevent, and contain cyber attacks on nuclear-electric systems subject to NRC licensure should be an essential component of any re-licensing review and mitigation for the Seabrook facilities.

Comment T-08-SEC: As a reference document that could be relevant to the scoping of environmental review for relicensing of the Seabrook Station No. 1 facility, please consider the attached full report of the Congressionally-mandated Commission to Assess the Threat of High Altitude Electromagnetic Pulse (EMP), completed in April 2008.

The entire report has a relevancy to critical infrastructure protection requirements. Chapter 2 provides an overview of the electric power industry, its infrastructure, particular system components, and overall vulnerability to EMP attack. If you have not considered this chapter before, please do so in the future.

Of particular interest, the Commission observed that protection of energy system components from prompt (E1), intermediate (E2) and longer phased (E3) energy pulse phenomena would be most cost-effective when combined with parallel efforts to improve cyber security -- relevant to the current initiatives of the National Security Agency to sponsor joint research programs with the electric power industry.

This Commission Report (the Graham Commission) notes the long-lead time to acquire transmission, transformer, and other specialized equipment under market conditions in which China and India and other emerging states have a substantial backlog of equipment orders.

The risks of long-term electric power outages and shortages, because of back-orders for essential replacement equipment, are substantial.

One overall consequence of the risks of EMP attack (low probability/high consequence) and cyber attack on electric system infrastructure (higher probability/high consequence), with a National Electric Reliability Council (NERC) excess capacity that is closer to 10 percent compared to historic reserve capacity of 20 percent is the following:

Taking into account a reduced reserve of electric power generation capability in future years for the nation and for the Northeast (US-Canada) region within which Seabrook operates, the relicensing of existing baseline electric generation capabilities, if sufficiently safe, contributes positively to a capacity buffer that could significantly protect the public health and safety and economy of the United States and of the North American continent, and of specific regions of the nation.

ISO New England currently projects (May 2010) net installed capacity (in MWe) of 32,127 for the year 2013-2014, with peak load capacity of 28,570 (MWe) in that same year. Projected peak load (demand) as a percentage of projected net regional capacity (which includes hydroelectric imports from Canada) is about 88.9%. Hence, there is a reserve of about 11 percent of net projected capacity as of the year 2013-2014.

Seabrook Station, with about 1,248 MWe of online capacity produces about 4.4 percent of the New England ISO demand projected for year 2013-2014. This is about one fourth of the nuclear generation in this region. The total loss of Seabrook Station No. 1 would significantly reduce the reserve margin of installed (and under contract hydroelectric import) capacity for the six state New England ISO region.

Response: The NRC and other Federal agencies have heightened vigilance and implemented initiatives to evaluate and respond to possible threats posed by terrorists, including the use of aircraft against commercial nuclear power facilities and spent fuel storage installations.

Malevolent acts remain speculative and beyond the scope of a NEPA review. The NRC routinely assesses threats and other information provided by other Federal agencies and sources. The NRC also ensures that licensees meet appropriate security-level requirements.

The NRC will continue to focus on prevention of terrorist acts for all nuclear facilities, rather than site-specific evaluations of speculative environmental impacts resulting from terrorist acts.

While these are legitimate matters of concern, they will continue to be addressed through the ongoing regulatory process as a current and generic regulatory issue that affects all nuclear facilities and many of the activities conducted at nuclear facilities. The issue of security and risk from malevolent acts at nuclear power facilities is not unique to facilities that have requested a renewal to their licenses because these issues are being addressed on an ongoing basis for all nuclear facilities. These comments are not within the scope of this environmental review and will not be evaluated further in development of the SEIS.

11. Comments Concerning Safety Issues and Aging Management of Plant Systems (SAF)

Comment I-02-SAF: Just a couple of other points I'd like to make. As part of your review, I would hope that you would determine that this plant is in full compliance with its current design basis in all regards, and how will we find that out? How will we know what the design basis is and whether the plant is in compliance with it?

This plant, like so many of them, went through any number of changes as a way of sort of being designed as it was being built in some respects. So how will we know that? It seems to me that that will have to be demonstrated.

Comment K-02-SAF: Seabrook, and I don't think I missed it, but I've been wrong in the past, there are no drawings that identify the buried pipes that are part of the buried pipe inspection program. So I don't think there could be any meaningful intervention contentions filed by the present deadline, and for the NRC to accept this application that is so extremely deficient in reality and from an engineering standpoint, borders on irresponsibility.

I have a few examples, and by the way, I have taken a few hours to go through, I believe it was somewhere around a 1,800 page document of the license renewal. I would just like to point out some of the technical shortcomings, and again my expertise is not on severe accident management. It's more on systems, systems interaction, mechanical systems, electrical systems, cabling, requirements for cabling and so on and so forth.

Let me -- and by the way, just for informational purposes and this may be informational also for the Nuclear Regulatory Commission, that Congressman Markey and I believe Congressman Hodes might be involved with it.

But Congressman Hall from New York, a few other Congressmen from New York, Congressman Peter Welch from Vermont have requested the GAO, which is General Accountability Office, to investigate the adequacy of the NRC's program for buried pipe inspection program.

And I have been working very, very closely with the General Accounting Office in identifying shortcomings of the proposed programs that the NRC accepts and considers adequate for buried pipe inspection. And working with the GAO, we found, and even though I've been working with this for three or four years, we find new stuff.

It's interesting. It's repeated in the Seabrook license renewal application. If we look at the Seabrook's application, for instance, for buried pipe, very interesting in the fact that buried is not even defined within the regulation. Nobody knows what "buried" means. We saw the confusion up at Vermont Yankee, where they said we didn't have buried pipes.

Well, that resulted in some criminal investigation against some people. Unfortunately, some of them are friends of mine who I used to work with. But buried is not defined. Does "buried" mean in contact with the soil? Yes, it does mean that among other things. Does it mean that if it's in a pipe trench, a concrete trench that's located 14 feet underground, is that considered buried? We don't know.

Buried pipe does not necessarily include piping that contains highly radioactive material. Buried pipe only covers those items that are listed within the scope of the license renewal, which I believe is 10 C.F.R. 54.4. So buried pipes containing radioactive material are not necessarily covered by the license renewal application, and that is reinforced by the license renewal application.

Another example, and again this is something that I just found out recently, that the buried pipe and tank inspection program only covers carbon steel and stainless steel. It does not cover other materials such as titanium, bronze, copper, nickel, aluminum and other exotic materials that are used in vital systems at the Seabrook plant.

So Seabrook conveniently says, and NRC buys it, that it only covers steel or ferrous material including cast iron. But it's not going to cover any fiberglass pipe or any of the other exotic metallic materials that are used in safety-related systems.

Now we've seen a lot of recent information on cables that are, and it's interesting how when we go to piping, they use the term "buried." But when we go to cables, they use the term "inaccessible." Well, I think we need some consistency here between piping and cables.

Really, the intent to protect the public health and safety is it should be inaccessible piping and not buried piping. There's a lot of inaccessible piping.

But let me just move on to show and demonstrate how the NRC can ignore protecting the health and safety of the general public. By the way, I'm not here to close Seabrook or to stop its license. My only intention is to assure that Seabrook operates safely for as long as it continues to operate.

But I've recently identified a shortcoming with respect to vital cables contained within these nuclear power plants. We have many vital cables that go out to supply motor operated valves, vital motors and many pieces of vital equipment.

The NRC has recently acknowledged that some of these vital cables are running conduits that are underground, and many of these conduits, and in fact I've heard from the NRC 95 percent of the plants, including Seabrook, these cables are submerged. May be submerged under water, and at Seabrook it's even worse, because that water contains high salinity levels because it's right on the ocean.

This is a clear violation of NRC requirements that are specifically stated in 10 C.F.R. 50, Appendix B. So the NRC says well, Vermont Yankee, where it was originally identified -- well not originally identified, but recently identified in an inspection report. The NRC says "It's okay to violate the regulations. You can continue to operate because we consider the risk to be low."

The NRC does not have the authority within the regulations to say you can violate those regulations without going through the exemption process, which is under 50.12, to allow a plant to continue to operate outside of the regulations of 10 C.F.R. 50, Appendix B.

Comment K-03-SAF: Now, let's contrast that to Seabrook. Seabrook is violating the regulations. They're emitting hazardous substances -- tritium and possibly other -- which are unmonitored that are a health hazard.

So, what does the NRC Office of Enforcement do? They clearly identify it's a violation of regulations. Same as with cable. And they issue them a severe non-cited Green violation, but they don't make them put out the cigarette. That thing is still leaking tritium. In the same respect, we have the cable issues, which Mrs. Grinnell just talked about, and we have cables that are clearly outside their capability to operate per 10 CFR 50 Appendix B, Criterion I think is 15 and 16, Design/Control/Inspection. The NRC knowingly allows these plants to operate outside of its design basis. We know that the cables must be qualified in order to determine whether that plant could safely operate and its emergency equipment will properly operate.

I've just got so many examples -- the buried pipe inspection program -- we just found out and again working with the General Accountability Office that the buried pipe inspection program only covers steel pipes. Well, they've got every other kind of material pipes and then the real shocking thing that came up in the GAO investigation is the buried pipe inspection program only looks for external corrosion. So Seabrook says -- We'll look at external corrosion when the thing fails -- is basically what they say. It just goes on and on and on. We need a regulatory agency that will actually look at their regulations, enforce their regulations and if the plant is not compliant with those regulations change the regulations or shut down the plant until the plant can operate.

Again, with this license renewal application -- it's just a license to continue to operate outside of the regulations. The NRC accepts, as Mrs. Grinnell said, Seabrook's program and other programs like Vermont Yankee who have observed water in manholes. They accept -- We'll look at the manholes once every two-years to see whether there's any water in. If there's any water in there, we'll pump them out. Use a little engineering common sense. When you have manholes connected by conduits that contain cables and if I have water in each end of the conduit or the manholes and I pump it out and it's good for another two-years -- how do we ever, ever know that those cables are dry? We don't.

Take a look at the Brookhaven report, which is sponsored by NRC research. They say -- You must take a look and determine if these cables are submerged. Nothing is being done presently or for the next 40-years other than Seabrook says -- We'll look at them every once in awhile and see if they're dry. If not, we'll pump them dry and we'll continue to generate those mega-dollars everyday.

I can go on and on on the shortcomings of this application. The fact that insufficient information is provided in there for anyone to determine whether this plant is safe -- whether it is in compliance with the regulations. I think that the NRC needs to give a hard look at how they take enforcement action and they cannot just turn a blind eye to clear regulations, whether it be environmental qualifications or whether it be 10 CFR 50, 55(a) for piping inspections and leaky terminations, structural integrity of pipes. There is no assurance. I was in the Navy, as Mr. Bo Pham was in the Navy. Those nuclear power plants -- we slept less than 100 feet away from them. Those were safe. They were regulated properly. They were operated properly. When I got out of the Navy and I saw how these power plants were built and not regulated -- I was totally shocked. This is a different world from the Navy program. It's my belief that unless this regulatory agency can really do its job -- enforce its regulation -- that these plants should not continue to operate as they are right now with unqualified cables and pipes in unknown conditions leaking God knows what. Thank you.

Comment K-05-SAF: Will the NRC provide these drawings [referenced on page 2.1-6 of the LRA] for our experts review?

Our experts also need all drawings of all inaccessible cable runs to determine if the cables are properly addressed in the LRA.

The NRC uses the term inaccessible for cables and buried for pipes. Why the distinction?

Why is the buried pipe inspection program limited only to steel and stainless steel (including cast iron)?

How does the NRC define buried vs underground, in enclosed trenches, encased in concrete, etc.?

Are there other tanks within the scope of 10 CFR 54.4 constructed from non-steel materials?

Are there other materials used for buried pipes?

Why does the NRC not require inspection of internal corrosion of buried pipes?

Which tanks are covered under this program?

How does the NRC assure the structural and physical integrity of these buried pipes?

How can the public be assured that all vital cables within the scope of 10 CFR 54.4 are qualified for long term operation when submerged or exposed to moisture.

How can the NRC justify not inspecting more than an estimated 90% of the vital cables that are most susceptible to submergence and failure?

How can Seabrook justify violating NRC requirements (10 CFR 50 Appendix B)?

How does the NRC rationalize not inspecting more than an estimated 95% of vital instrument cables?

How can the NRC permit these cables to operate in violation of NRC regulations for up to two years?

Even if the manholes are drained, what assurance does the public have that other low points are free of water?

Comment R-01-SAF: When Seabrook submitted their application 20-years in advance of their license expiration -- which would bring the plant to 2050 -- we were very aware that the parts and the underlining underpinning construction foundation of this plant has parts from the 1970s.

We looked over some recent inspection reports to look at how NextEra was managing their component systems and parts. What was immediately brought to our attention after the last refueling and inspection report was that NextEra was cited for submerged electrical cables in two-vaults that were underwater -- underwater, which is saline, which is highly corrosive.

So, what we're looking at here is inaccessible electric cables that are in water that is known to cause early failure. So, we thought what's the most responsible thing to do here? We looked into some recent research. We looked into what the NRC was doing and the NRC had actually contracted/sponsored a study with the Brookhaven National Labs and asked them to assess the early cable failures before the 40-year license expiration and to analyze which cables, how many -- but they didn't actually do that because they were a research institute and what the generic letter requested was not to find/locate on the schematics every buried/submerged underground pipe and electrical cable -- it was to identify the ones that are already failed.

So, what we needed to know up-front was how many have failed, where are they, what manufacturers are most responsible. What were the years of the greatest failure? 1970s. We still don't know what manufacturer manufactured and what usage NextEra has. What we do know is that none of the cables that are submerged at Seabrook were qualified for submersion.

They are not marine cables. They are not qualified, which means that the plant is now operating outside of its design basis and in violation of Federal Regs. The NRC has done a very minor citation. There is no fine. They were asked to pump out the water and come up with a long-term solution. What hasn't happened in this industry -- we haven't identified where all the cables are. How many there are? How many are submerged? And what condition they're in.

The reason we can't do that is because the only way this can be done is visually. The Brookhaven National report reported that the surveillance testing, the in-service program, the maintenance rule, the aging program -- does not identify the cables before failure. It is impossible to do. So, short of instituting -- which has not been done by the NRC -- a responsible program that is based on a regulation that would enforce the industry to actually:

know where all the cables are, the condition of them. We cannot go forward with this.

Response: The commenters raise several concerns regarding safe operation of Seabrook and their aging management programs. The NRC's environmental review is confined to environmental impacts associated with the extended period of operation for Seabrook. These comments provide no specific information about environmental issues or the environmental review. Operational safety issues, including current compliance with NRC requirements, are addressed as part of the ongoing regulatory process, and are outside the scope of 10 CFR Part

51. Issues related to the aging of structures and components are evaluated as part of the license renewal safety review process, and are also outside the scope of 10 CFR Part 51. The comments provide no new information within the scope of the environmental review and, therefore, will not be evaluated further in the context of the environmental review.
12. Comments Concerning License Renewal and Related Processes (LIC)

Comment D-01-LIC: I'm a former resident of New Hampshire for 23 years, and also I was one of the petitioners that filed with the U.S. Nuclear Regulatory Commission yesterday under the provision for petition for rulemaking, in a request that the agency change the current rule under 10 C.F.R. 5417(c), from 20 years in advance of the expiration date to ten years in advance.

And one of the key reasons that we've requested this petition for rulemaking is precisely because a premature application will do nothing but provide meaningless data for this agency's consideration.

This application is the equivalent of green fruit. It's not ripe. It needs more time. It needs more time to consider a whole host of issues, ranging from system structures and components at this plant that you're required to look at, in the context of aging.

But more particularly, I would like to just say a few words about the due process issue. One of the key concerns that we have here with an application that's coming 20 years in advance of the expiration date is that it excludes a whole generation of citizens, commercial interests from participating in this process.

I mean people who should be here are in grade school right now, particularly when you're talking about a federal action that will not occur until 2030. So it's alarming that -- well first of all, the slide that you had up earlier with regard to why 20 years, I've participated in many of these license renewal proceedings.

We've been an intervener before, and that's the first time I've ever seen this slide. It was not reassuring that the basic message of the slide was because we say so. What you've addressed here is that -- I mean you've determined that 20 years of operational and regulatory experience provides an applicant with substantial amounts of information.

But I would refer you to the National Environmental Policy Act, the reason we're here in the first place, provides that at Section 1501(b), it says NEPA procedures must ensure that environmental information is available to public officials and citizens before decisions are made and before actions are taken.

The information must be of high quality. Accurate scientific analysis, expert agency comments, public scrutiny are essential to implementing NEPA.

Most important, NEPA documents must concentrate on issues that are truly significant to the action in question, rather than amassing needless detail. What you have before you in this application, now 20 years before the time of expiration, it basically constitutes nothing but nonsense, an amassing of needless, meaningless detail.

Let's look just in, you know, a license renewal application for a nuclear power plant submitted 20 years in advance of its expiration date cannot, according to Section 1500.2 of the same Act -- provide to the fullest extent possible is the requirement of NEPA -- accurately and reliably evaluate what's foreseeable, particularly for the renewable energy alternatives that the representative from New Hampshire has already addressed as a tremendous resource.

I mean essentially what this application currently puts forth in its claim that the contribution of wind and solar to the consideration of alternatives under NEPA, they fix it -- the nonsensical comparison is much like saying the Model T is going to be what we have for the next 20-40 years.

It casts aside any kind of consideration for advancement. But in fact, it's not just -- we're not just pulling this out of the air. The Department of Energy's own National Renewable Energy Laboratory, in its assessment, particularly of offshore wind, is that the contribution for the region of interest that we're discussing here under NEPA is -- ranges from good to superb.

This basically still -- this all contradicts what the applicant has put forward for your consideration. They don't even mention that the potential here, as rated by the Department of Energy, is that this offshore wind resource is superb.

But, you know, it remains a concern that you have -- you've got an application here that's before you, and now it's your duty under NEPA to rigorously explore and objectively evaluate all reasonable alternatives and for the alternatives that are to be eliminated by the detailed study that you have before you, you have to discuss the reasons that they have been eliminated.

Frankly, that's why you've got green fruit on your hands right now. There's really no rational, reasonable way to assess a resource 20 years out from the time that you're talking about this federal action to be considered, to be in effect.

So I urge you, as we have petitioned the agency, to essentially reject this application as premature, as simply -- in many sections of it, simply an amassing of needless detail, and let's come back to this issue when the time is right, as the petition has suggested, in 2020.

Comment D-02-LIC: First of all, it is beyond the scope of this proceeding in its Environmental Review to address the issue of there's no management for the nuclear waste that would be generated in that 20-year cycle -- beginning in 2030/2050. So, we have an unmanaged issue and it is beyond the scope.

We are also not allowed to address the issue within the licensing process about security, even though we know and I think it's been referenced by an expert here today -- but clearly it was already a public document by one of the federal labs -- I believe it was Oak Ridge. No, I'm sorry, it was Argon National Lab -- that the reactor design for Seabrook was never designed nor constructed nor evaluated for fire and explosion from a direct impact from an aircraft. Matter of public record. That public record disappeared for a while after 9/11, but it is now back a part of the NRC public document room.

Now, again, we have what appears to be an unmanaged problem that's beyond the scope of being addressed within the context of extending this reactor's operation another 20-years. Also, you've heard comment and concern with regard to an evacuation plan that's proved to be a very prickly problem -- a lot of uncertainties. That too is now beyond the scope of this proceeding.

And we can go on. There are several that present this unmanaged problem for the NRC and I think that it begins to suggest that we have an obsolete and antiquated review process that has to be challenged. I think that you're getting some of that challenge tonight.

As one of the petitioners to change the rule that facilitates Florida Power and Light submitting an application 20-years in advance of the expiration date -- I suggest to you that this is yet another one of these streamlining of a very problematic issue that does not serve to benefit public health and safety and security nor does it offer adequate protection to the environment necessarily.

But it provides and facilitates a conveyor belt for this licensing process. As a consequence, that has to be challenged today. We have, as of yesterday, formally challenged the 10 CFR 54 Part 17(c), which says you can do that. But, I just want the Agency, the public, the various experts on both sides to see that there appears to be a pattern here that facilitates this process, but not necessarily to the benefit that is mandated by Congress or presented to us publicly.

I'll just close my remarks by pointing out one other piece here. I'm just going to read into the record one of the aspects of this 10 CFR 54 Part 17(c) that presents a problem for those of us who would like a fair airing of a relicensing process -- filing for license renewal midterm of the current license finds the licensee at a place in this system/structure/and component service-life where the industry experiences few failures that are observed and generally those that are observed are episodic or anomalous in nature and thus cannot be readily plotted as a trend for prediction purposes. The time of an elevated rate of failures due to design/manufacturing/construction defects has passed. That's what we call early component failure in what is traditionally called a bathtub curve. I'm sure Dr. Brown is quite familiar with the bathtub curve.

In that early failure rate, it's largely irrelevant to aging management in the proposed extended period of operation. The anticipated end-of-design-life and aging issues have barely, if at all, begun to emerge. We're basically at the bottom of this bathtub curve where you have a high incidence early on as you work the bugs out -- whether it's a nuclear power plant or an electric toaster or an early model of a car -- there are these early failures. But now we're at the bottom of that bathtub curve that has been described to us as a highly efficient period of operation of any facility.

So, little or no specific information on how a given plant will age is available to be trended, provide lessons or otherwise illuminate the path forward. It is generally observed that for many system structures and components, such information flow rates increase rapidly in the fourth quarter and toward the end of the license. This system/structure/component reliability progression is well known and often illustrated in the so-called bathtub curve.

Additionally, corrosion risk is a function of time. For example, the Beaver Valley Nuclear Power containment was discovered to have been rusting from the outside of an inner liner that was inaccessible for inspection. So, the evidence of this through-wall corrosion on the containment component surfaced when a bubble appeared in the paint on the inside of the containment. So, it was a outside/in corrosion process that escaped inspection and maintenance until it was discovered by a bubble in the paint on the inside.

Now, similarly -- I was very involved in the Seabrook controversy. It was well known to us that the pores in that concrete were facilitated by such things as cutting of rebar that -- there were a whole host of issues that raised concerns about the integrity of both the construction and the documentation of quality control in that facility -- a whole host of systems and structures and components. And I submit to you that our concern that this review process now is coming at the bottom of this bathtub where things are relatively stable, but the Agency is proposing to give its approval for the latter life -- escaping the operational experience of the latter life of this plant for the next 20-years, we believe is to be responsible, both in terms of how this application is being presented and how it's being reviewed.

We strongly urge you to again -- we are asking the Agency both formally and in its review process to reject this application. It's premature. It doesn't provide the staff with enough information to give a fair assessment of how this plant can be or if it can be well-managed in this period of 2030/22050.

Comment E-05-LIC: So just to sum up, I don't want to take too much time. But just for the record, we do recommend no action at this point. I know that is one of the options you have.

We do feel this whole license renewal process to be highly premature.

It cannot possibly take into account all the many key factors affecting plant maintenance, reliability and safety from the deterioration of vital plant systems and infrastructure, to climate change and future power needs as I've described over the next 40 years.

So that's why we are also petitioning the NRC to suspend the process now in the public interest.

We need to keep in mind we are talking about decisions now that will affect future generations, people that aren't even born yet, our children and grandchildren. Most of us here won't even be alive when this plant is still chugging away under this proposal.

So we need to be thinking very carefully about what the impacts will be for their benefit, not just for a current corporate interest that clearly has some financial benefit or they wouldn't be here advocating for this at this time.

Comment I-01-LIC: My questions and I guess there are two NRC lawyers here. I particularly address this to them. How can you base your reasonable assurance on merely substantial information? When you fill out an application for college or practically anything else, you're asked for complete information, not substantial information.

Well, the answer's obvious. You can't have substantial -- you can't have complete information, because we're trying to relicense this plant 20 years before that license will become effective.

One of the key questions, as many have said here, is what's going to happen to age-related degradation on systems and components and structures over the next 20 years?

We can't know that. So again, I want to support those who have said that this application is extremely premature. I don't know how you came up with a rule that said you could apply 20 years in advance, you know. Can I apply 20 years in advance for my next motor vehicle license need? I don't think the State Department of Motor Vehicles would permit that.

And we know that as time goes on, as radiation takes its effect and other wear and tear occurs, we are going to have age degradation of important structures and components. We know the Yankee Road plant had an embrittled reactor vessel which led to its shutdown. But would we have been able to detect that if we were licensing it 20 years before that became known? I mean how long did it take that to develop?

So I have a real grave concern of whether you can meet the requirements you have to have for reasonable reassurance lining, just on the basis of accepting substantial information rather than complete and accurate information.

Obviously starting at this point, in 2010, 30 years, 20 years before the license is to be renewed, you can't possibly have that. So I think this is extremely premature.

The other reason you give for starting 20 years ahead is that it takes maybe that long for it to come up with alternative supplies. Well, you've heard others speak about that, and there's going to be technological progress. There's going to be developments in many areas, whether it be solar or wind or other things that we can't foresee now.

We're really way out ahead of ourselves, and I think being highly irresponsible in undertaking this license review here in 2010, when the license will not be renewed for another 20 years. I was interested to hear you say there are a couple of other plants that have applied early. But I didn't hear anybody has applied as early as this one. So I think that's a real problem.

Comment Q-01-LIC: What is the hurry? I am sure that I'm not the only member of the public who was surprised to see a request for an extension of a license that is still valid for another 20-years. To apply for an extension 5-years before the expiration date would not surprise me, but 20-years -- that is strange. The only logical explanation I can think of is that this is an insurance policy against possible problems with the plant in the next 40-years and/or that the owners of the plant see what all outside experts already know, that in fact nuclear power is too expensive and will not be able to compete with other sources of power in the future, even as recently as the next 10-years.

Comment S-01-LIC: Then, in the last few years the industry, as you well know I'm sure, launched a new political offensive to help assure its comeback would not be derailed again by public opinion. It sought even larger tax subsidies with a lot of help from the last administration.

A streamlined licensing process that gives an even shorter shrift to public input than existed previously. And they moved quickly to extend the lifetime of existing plants. I believe there have been 50, so far, that have applied for and received operating license extensions.

Ironically, those extensions will only increase the chances of a serious accident. An accident that could be a PR nightmare for the nuclear industry -- not to mention what it might do to the people who live nearby.

There were reasons that your predecessors set a lifetime of 40-years before a plant should be decommissioned. It wasn't whim. Do any other power generating plants -- oil, coal -- have decommissioning dates set by law? I haven't been able to find out, but I don't think they do. It's nice to see that manners -- and I'm mentioning this mainly because that's the way it felt this afternoon, not necessarily at the beginning of this evening's session -- or perhaps maybe just improved PR device -- although after the beginning of this evening's session, I doubt that -- has creeped into the NRC's public hearing process since the 1970s, but I would hope that's not all that's changed. I would hope that you -- you NCR [sic] representatives -- will go back to Washington and please don't just review the issues raised here -- which you have to admit, at least this afternoon and beginning already this evening, are substantial and thought-provoking.

You may not be able to stop nuclear companies from applying for absurdly premature license renewals -- although let's hope that a rule change will -- but you certainly don't have to smooth the way for their approval. You can, with diligent study, recommend -- Hey, wait 10-years, try it then. Please consider as you deliberate that you have not heard -- at least not this afternoon and not so far this evening -- a single argument today directly related to why an operating license should be extended 20-years before it expires. Not a single argument. Even the handout from the company that I picked up out there that's seeking the extension does not make a lot of sense. So they can plan ahead, they argue. Well, does that mean that without an extension they plan to let things fall into dangerous disrepair? In fact, your very own PowerPoint fails to provide even a substantial -- a word that got bantered around earlier today - reason much less a complete one.

The fact that the folks at Seabrook provide jobs, give money to the United Way and are generally good guys and good community members does not address the issue. I am sure that 10-years from now they will still be good guys and loyal Chamber of Commerce members both in Exeter and Hampton.

The only final thing I have to say is in your PowerPoint, you have on page 21 or slide 21 -- the Final Agency Decision -- the Commission considers Safety Evaluation, Environmental Impact, NRC inspections, recommendations from the ACRS -- how about also considering public input?

Comment Z-01-LIC: I am opposed to extending the license for Seabrook for 20 more years, especially since, there are 20 years still remaining on the current license and many questions remain unaddressed. In particular:

This process highly premature, given no one can reasonably predict what condition plant infrastructure will be in 20-40 years in advance, let alone future energy policy planning.

Ongoing problems like emergency generator malfunctions and potential future ones like inaccessible submerged electrical cables need to be addressed before re-licensing the plant.

Neighboring residents should not be exposed to another 20 years or routine radioactive emissions, let alone the risk of catastrophic accident, when cheaper, safer and sustainable power sources will likely be available (and necessary!) in coming decades.

We should not be committing to generate another 20 years of high-level radioactive waste, when there is NO viable plan for long-term storage of existing wastes, and the plant's waste dump (as well as the reactor!) is dangerously close to a increasingly rising sea level and violent storm potential.

I believe that over the3 next 20 years, we will have other more sustainable and safer alternatives available to us for energy. These must be considered. The current plant must face deteriorating structures with plans to test and replace WHETHER THE LICENSE IS EXTENDED OR NOT!

Please do not extend the license now, and continue to ensure that the owners take responsibility for addressing the above concerns.

Response: These comments deal with the timing of Seabrook license renewal request.

Section 54.17(c) of Title 10 of the Code of Federal Regulations (10 CFR 54.17(c)) allows licensees to submit license renewal applications up to 20 years before the expiration of the current license. The Commission established the earliest date for submission of license renewal applications after soliciting and considering comments. Power Plant License Renewal, Final Rule, 56 Fed. Reg. 65943, 64963 (Dec. 13, 1991). In the 1991 statements of consideration for section 54.17(c), the Commission rejected the suggestion that 20 years of operational and regulatory experience with a particular plant was an insufficient period in which to accumulate information on plant performance. The Commission rejected suggestions that new information about plant systems and components as well as age-related degradation concerns discovered after the renewed license is issued would not be considered or would not be factored into a plants programs. The Commission stated that the licensing basis of a plant will continue to evolve throughout the term of the renewed license to address the effects of age-related degradation as well as any other operational concern that arises. Further, licensees are required to continue to ensure that the plant is being operated safely and in conformance with its licensing basis. The NRC verifies such safe operation through its on-going regulatory oversight process.

In the 1991 statements of consideration for 54.17(c), the Commission also rejected suggestions that a 5-year or even a 15-year time limit for filing renewal applications would be adequate. The Commission stated that in establishing the earliest date for license renewal applications, it considered the time necessary for utilities to plan for replacement of retired nuclear plants. The Commission found that the lead time for building new electric generation facilities is 10-14 years depending on the technology.

When the license renewal rule was revised, the Commission again solicited comments on the earliest date for filing license renewal applications. After considering the comments, the Commission concluded that there was no new information warranting a change in the earliest date for license renewal applications, either to make it earlier or later. Nuclear Power Plant License Renewal; Revisions, Final Rule, 60 Fed. Reg. 22461 22487-88 (May 8, 1995).

Currently, a petition for rulemaking requesting that the Commission amend 10 CFR 54.17(c) to establish a ten year time limit for filing license renewal applications is pending before the Commission. The Commission published a notice of receipt and docketing of this petition on September 27, 2010 (75 Fed. Reg. 59158).

These comments are not within the scope of the license renewal environmental review and will not be evaluated further in development of the SEIS.

Comment N-02-LIC: On the flip side of that -- this is an enormously fragile ecosystem. There are just 18-miles of the New Hampshire shoreline that we hold very, very dear. There is the Great Bay Estuary that is really at a tipping point in terms of its environmental quality. So, we would ask that the NRC and its environmental and safety experts listen with great care to the concerns that will be raised throughout this process about the impact on this extraordinary part of our state and our country.

I think more than anything else, people in my district want to know that the plant is well-run and that the people there hold as dear as my constituents do, this part of our state and our country.

They also want to know that the NRC is doing its job. I can't stress enough as an elected official how concerned people are right now that government is capable of doing what the citizens trust it to do. I can't think of a more important example of a nuclear power plant sitting so close-by to so many levels of our ecosystem and human life.

So, with that I just thank you all for being here. I look forward in any way I can assist from the state government point of view in making sure that this process is as complete and informative for all of you as I can. I would be happy to do that and I know my other legislatures and the Governor's office feel the same way. To my constituents who are in the room -- I hope that you will bring forward not only to the NRC, but again if the Senate or the House or the Governor's office can be helpful in facilitating conversation, as that may need to happen, I look forward to doing that as well. More than anything, we just want to know that we are keeping New Hampshire beautiful and safe. Thank you.

Response: The commenter is encouraging the public participation process during the Seabrook license renewal process. Public involvement is a very important part of the environmental evaluation process for license renewal. Although public participation and comments are invited and encouraged throughout the environmental review process, the public is specifically invited and encouraged to provide input at two critical stages in the environmental review: during the scoping period and following the publication of the draft SEIS. The scoping period for the Seabrook environmental review occurred from July 20 to September 21, 2010.

Comments received during the scoping period that have been determined to be in-scope for the environmental review will be discussed further in Appendix A of the draft SEIS.

Following publication of the draft SEIS, the public will have an opportunity to review the findings and provide feedback. The NRC staff places a notice in the Federal Register and on the NRC website that the draft SEIS has been issued with instructions for the public and other interested parties on how to obtain copies. Copies of the notice and the draft SEIS are also sent to those people that requested a copy during the scoping process.

Two public meetings will be held during the public comment period near Seabrook to provide an overview of the draft SEIS and to accept additional public comments on the document.

Comments received will be reviewed and, if appropriate, incorporated into the final document.

All of the comments on the draft SEIS will be listed in Appendix A of the final SEIS, and addressed, as appropriate.

This comment provides no new and significant information and will not be evaluated further in the development of the SEIS.

Comment Q-02-LIC: Financial viability. What independent energy experts except those who are employed by nuclear power industry already agree is that nuclear power is currently not able to compete with other energy options on a free-market basis, were it not for the federal government, which is providing it with large low-risk loans and insurance protection against liability. This type of power is already the most expensive kind available and will not improve significantly in the near term future, if at all. That is why private investors have rejected even very generous options to build a new power plant over the last 30-years. This energy is not renewable and therefore not sustainable and all indications are that at least in the United States and most of the rest of the world, it will stay that way.

Comment Q-04-LIC: Finally, an alternative suggestion. As many of you present today already know, most European countries have already turned their backs on nuclear power for many of the reasons already mentioned above. However, in Germany, which is phasing out its nuclear energy industry, a number of environmental groups have supported the extension of nuclear power licenses, if they are safe enough to operate, in exchange for the payment into a renewable energy fund of some portion of the windfall profits that operators and owners will reap as the result of a license extension. Since most nuclear power plants are built for a specific number of years in operation and have been budgeted and paid for during these years, a license extension provides extra operating years and extra revenue. It would seem only a fair deal to ask for some of that windfall profit, say 50%, to be invested in a fund for truly renewable energy projects should an extension be granted.

Response: The decision to seek a license renewal rests entirely with nuclear power facility owners and typically is based on the facilitys economic viability and the investment necessary to continue to meet the NRC safety and environmental. The NRC makes its decision to grant or deny a license based on the determination of whether or not the applicant meets the environmental and safety requirements in the NRCs regulations.

These comments are not within the scope of the environmental review and will not be evaluated further in the development of the SEIS.

Comment K-01-LIC: My concerns are the adequacy of maintaining this plant in a safe condition for the next 20 years, and if the license renewal is granted, which the NRC has never even hinted at not granting one, I want to assure that that plant is operated safely.

Now it was said earlier by some of the NRC representatives that their objective is to protect the public health and safety, and I agree that is their mission. Their mandate by Congress is to protect the health and safety of the general public.

After working in this industry on the inside, on the outside, as a consultant, as an expert witness, I've come to the belief that the NRC is not fulfilling their Congressional mandate of protecting the health and safety of the public.

I'd like to provide a few examples, and again it's very, very bothersome to me that I see September 20th as a deadline date for formal intervention to oppose this license. Believe me, it costs millions of dollars to effectively intervene in opposing a license renewal application. The purpose of this whole license renewal application, as was stated earlier by the NRC personnel, is to assure that the CLB, which is the current licensing basis, which is defined in 10 C.F.R. 54.3.

The current licensing basis includes all the applicable regulations, and the public needs to and I believe the NRC needs to, in order to protect the public health and safety, assure the public that this current licensing basis is maintained for the next 20 years, and if the license renewal is granted, for the 20 years following that.

Again, I mentioned I was an expert, am an expert named in Indian Point litigation related to buried pipes and vital cables, and other electrical devices including transformers. The current licensing basis is not available. In contrast to what Jeremy said, the current licensing basis includes, and he said these documents were available, it includes all regulations.

All the regulations of 10 C.F.R. Part 2, Part 20, Part 26, Part 50, Part 54, Part 72 and all the other regulations that are applicable to Seabrook. The current licensing basis also includes such items as the final safety analysis report, orders and anyone can look under 10 C.F.R. 54.3 and find the definition.

What is really strange about the current licensing basis, Mr. Pham is here and a few years ago, I wrote Mr. Pham a letter. Could you please identify for Indian Point's Unit II and III what the current licensing basis was, and what regulations are applicable to Indian Point's Unit II and III.

His response, and again these responses are public information, can be found on ADAMS. Mr.

Pham's response, Mr. Pham is sitting right in front of me, was one can find the current licensing basis if you go into ADAMS. That is not an accurate statement. One cannot find the current licensing basis in ADAMS.

There are certain portions of the current licensing basis that are not in ADAMS. The FSAR, part of the current licensing basis, is not in ADAMS.

In the Indian Point application, a license renewal application and I'd like to make a comment right here, and I have reviewed various applications for license renewal, that this particular one for Seabrook is the most deficient application I have reviewed so far.

Let me just provide just some contrast between this application at Seabrook and Indian Point, and I don't consider Entergy to be one of the more superior operating companies in the country.

But at least their application identified things that an intervener who's concerned about safety would want to know about before it was able to file a meaningful contention.

For instance, in the Indian Point license renewal application, all the drawings that identified the buried pipe that are within scope of the buried pipe and tank inspection program were supplied.

In fact, there were about, and don't hold me to this number, somewhere between 50 and 100 detailed drawings of Indian Point systems, and this is not only mechanical systems, but also included the electrical systems that were within the scope of license renewal.

Comment K-04-LIC: Is it possible that a member of the public can obtain a copy of the CLB to assure it is not being changed by the License renewal process?

How can we obtain a copy of the most recent FSAR, Technical Specifications and docketed licensing correspondence?

How can we obtain a copy of the regulations which address inspection for inaccessible pipes as referenced by 10 CFR 50.55?

Response: These comments deal with the availability of the current licensing basis (CLB) for Seabrook. Defined in 10 CFR 54.3, the CLB is the set of plant-specific information required by the NRC to ensure that the operating plant shows compliance with and operates within the NRC requirements and plant-specific design basis. The CLB includes all applicable regulations, orders, license conditions, exemptions, technical specifications, and the most recent update to the plants final safety analysis report (FSAR). Publicly available portions of the CLB can be accessed electronically from the NRCs Agencywide Documents Access and Management System (ADAMS). Publicly available portions of the CLB, particularly documents docketed before 1999, are available through the NRCs Public Document Room (PDR) located at O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852-2738. Examples of documents that are considered non-publicly available include those containing proprietary information, and those containing plant-specific security information. The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html. Persons who encounter problems in accessing documents in ADAMS should contact the NRCs PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737 or by e-mail at pdr.resource@nrc.gov. PDR staff can also assist members of the public in locating pre-1999 documents. Additionally, copies of NRC regulations and guidance can be accessed by visiting the Document Collection page of the NRC website. The Document Collection page is accessible at http://www.nrc.gov/reading-rm/doc-collections/.

Copies of the American Society of Mechanical Engineers (ASME) Codes referenced in 10 CFR 50.55a can be purchased from the American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016, or by visiting their website at http://www.asme.org/Codes/.

Copies of the ASME Codes may also be inspected at the NRC Technical Library, Two White Flint North, Rockville, MD 20852-2738.

Drawings associated with Seabrooks license renewal application are available at ADAMS Accession Numbers ML101620331, ML101620333, ML101620334, ML101620337, and ML101620329.

The staff notes that license renewal applicants are not required to compile their CLBs for purposes of license renewal. The Commission considered requiring license renewal applicants to compile their CLBs for license renewal, but concluded that such a requirement was unnecessary to identify the systems, structures, and components, important to license renewal.

Nuclear Power Plant License Renewal, Final Rule, 56 Fed. Reg. 64943, 64952 (Dec. 13, 1991).

The Commission reaffirmed this conclusion in the statements for consideration for the 1995 amendments to the license renewal rule: After considering all comments concerning compilation of the CLB, the Commission has reconfirmed its conclusion made for the previous rule that it is not necessary to complete, review, and submit a list of documents that comprise the CLB in order to perform a license renewal review. Nuclear Power Plant License Renewal; Revisions, Final Rule, 60 Fed. Reg. 22461, 22474 (May 8, 1995).

These comments are not within the scope of the environmental review and will not be evaluated further in the development of the SEIS.

References 10 CFR 50. Code of Federal Regulations, Title 10, Energy, Part 50, Domestic Licensing of Production and Utilization Facilities.

10 CFR 51. Code of Federal Regulations, Title 10, Energy, Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions.

10 CFR 54. Code of Federal Regulations, Title 10, Energy, Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.

National Environmental Policy Act of 1969 (NEPA). 42 U.S.C. 4321, et seq.

National Oceanic and Atmospheric Administration (NOAA). 2010. Endangered and Threatened Wildlife and Plants; Proposed Listing Determinations for Three Distinct Population Segments of Atlantic Sturgeon in the Northeast Region, Federal Register, Vol. 75, No. 193, pp. 61872-61904, October 6, 2010.

NextEra Energy Seabrook, LLC (NextEra). 2010. License Renewal Application, Seabrook Station, Appendix E, Applicants Environmental Report, Operating License Renewal Stage, ADAMS Accession Nos. ML101590092 and ML101590089 U.S. Nuclear Regulatory Commission (NRC). 1990. Waste Confidence Decision, Federal Register, Vol. 55, p. 38472, September 18, 1990.

U.S. Nuclear Regulatory Commission (NRC). 1996. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Volumes 1 and 2, Washington, D.C.,

ADAMS Accession Nos. ML040690705 and ML040690738.

U.S. Nuclear Regulatory Commission (NRC). 1999. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Main Report, Section 6.3 - Transportation, Table 9.1, Summary of Findings on NEPA Issues for License Renewal of Nuclear Power Plants, Final Report, NUREG-1437, Volume 1, Addendum 1, Washington, D.C., ADAMS Accession No. ML040690720.

U.S. Nuclear Regulatory Commission (NRC). 1999a. Waste Confidence Decision Review:

Status, Federal Register, Vol. 64, No. 233, pp. 68005-68007, December 6, 1999.

U.S. Nuclear Regulatory Commission (NRC). 2008. Waste Confidence Decision Update, Federal Register, Vol. 73, No. 197, pp. 59551-59570, October 9, 2008.

U.S. Nuclear Regulatory Commission (NRC). 2010. Nextera Energy Seabrook; Notice of Intent to Prepare an Environmental Impact Statement and Conduct the Scoping Process for Seabrook Station, Unit 1, Federal Register, Vol. 75, No. 138, pp. 42168-42170, July 20, 2010.

U.S. Nuclear Regulatory Commission (NRC). 2010a. Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Seabrook Station License Renewal Application (TAC Nos. ME3959 and ME4028), ADAMS Accession No. ML102520222.

U.S. Nuclear Regulatory Commission (NRC). 2010b. Memorandum, Staff Requirements - Affirmation Session, 8:45 a.m., Wednesday, September 15, 2010, Commissioners Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance), ADAMS Accession No. ML102580229.

U.S. Nuclear Regulatory Commission (NRC). 2010c. Request for Scoping Comments Concerning the Seabrook Station License Renewal Application Review, ADAMS Accession No. ML102730657.

U.S. Nuclear Regulatory Commission (NRC). 2010d. Waste Confidence Decision Update, Federal Register, Vol. 75, No. 246, pp. 81037-81076, December 23, 2010.

Meeting Transcripts and Comment Letters The following pages contain the comments, identified by commenter designation and comment number, from the public scoping meeting transcripts, and written comment letters.

MS. BOWDEN-BERRY: Okay. With that, we'll go 1

on to the second part of the meeting, and we'll take your 2

comments. The first speaker that I have is Mary Lampert.

3 MS. LAMPERT: Hello. I'm Mary Lampert. I am 4

Director of Pilgrim Watch, but I am not here in that 5

capacity. I'm here to provide technical advice for C-10.

6 Impacts, environmental impacts can be both from normal 7

operations and also from accidents, design-based accidents 8

and severe accidents.

9 I'd like to direct my questions and comments 10 solely to severe accidents. There is a requirement of the 11 applicant to do a severe accident mitigation analysis. It 12 can be found in their application. In reading it, it's akin 13 to reading a fairy tale. There is absolutely nothing in it 14 that has a commonality of what one would expect of a severe 15 accident from a nuclear reactor.

16 It is NRC's job in the SEIS to not just 17 describe what the applicant did, and summarize it in a 18 chapter, as has been done at other licensees. It is rather 19 to do, and we expect a detailed analysis of this issue. A 20 SAMA, that's the shorthand, they're required to analyze.

21 It's a cost-benefit analysis, the consequences of off-site of 22 an accident, and then weigh that against costs for mitigative 23 measures that would help reduce risk.

24 So this is very, very important. The applicant 25 used a computer code called the MAC code, MAC-S2. My 26 A-01-SAMA question is I think it's necessary to justify the use of that 1

code. First, it is not -- it was not held to the same 2

quality assurance requirements of the American Society of 3

Mechanical Engineering QA Program, requirements for nuclear 4

facilities.

5 So therefore there is a

very important 6

question. It was designed solely for research. There is a 7

paper on this by the author of the code. It was not designed 8

for licensing. So therefore the question is why is it being 9

used?

10 Also in the code, if you read it, go through 11 it, there's no explanation of exactly how it works, which is 12 a problem and your responsibility to explain to the public.

13 The problem, there are many problems with this code, and it's 14 not appropriate for use.

15 As it was used by Seabrook in this application 16 to determine off-site consequences. Why? It's important, 17 when you're looking at consequences, to understand 18 atmospheric dispersion and deposition. The code has embedded 19 in it a module called ATMOS, and relevant for you, that uses 20 the straight-line Gaussian plume model, which assumes that 21 wind blows like a beam of a flashlight.

22 NRC, DOE, the public, the world, meteorologists 23 know that is not how the wind blows in a coastal location.

24 Therefore, it is very important when you are doing your 25 A-01-SAMA cont review, that you do site-specific analysis, analyses of plume 1

distribution, meteorology in this area.

2 There have been numerous studies ignored by the 3

applicant, but they cannot be ignored by NRC, of how the 4

meteorology is on the coast of Massachusetts, New Hampshire 5

and Maine, specifically discussing the sea breeze effect, 6

which occurs here, increases deposition, number one, and also 7

when it looks like the wind's blowing offshore, it's brought 8

in sometimes 20 to 40 miles. Very significant, ignored by 9

the applicants in their application.

10 Also ignored is the fact of how plumes travel 11 over water, where they because of lack of turbulence, they 12 remain concentrated, and as a result you can find, when there 13 are northeast winds, deposition blowing down to the dense 14 urban areas, such as a Boston, where you'd expect to find hot 15 spots, or conversely up the New Hampshire coast, to densely 16 populated areas such as Portsmouth and Portland.

17 This is ignored by the licensee. It cannot be 18 ignored. Nor can it be ignored that they got their 19 meteorological data from one

source, the on-site 20 meteorological tower, which simply will tell how wind is 21 blowing on site, but not what happens to it off site.

22 So the data they used is essentially worthless.

23 We expect and demand NRC to do more. The economic costs were 24 also grossly underestimated, particularly the cleanup costs.

25 The MAC-S2 models bases its assumptions on clean up, on WASH 26 A-01-SAMA cont 1400. Therefore, the DF factor, decommissioning factor, 1

decontamination rather factor, is 15.

2 We want you to look at that. What is the DF 3

factor that Seabrook has assumed? More importantly, what 4

level of cleanup? They never talk about the level of 5

cleanup. Would it be required to go EPA, 15 millirem a year?

6 Are we going to 25? Are we going to 50? Are we going to 7

500? Because what is allowable greatly affects the cost of 8

cleanup.

9 A GOE report has reported that in fact there's 10 no agreement between EPA and NRC. The public here wants to 11 know. The public wants to know some other factors that were 12 ignored. Where's the waste going to go? How much waste?

13 What is the volume that is expected in a severe accident?

14 While you're looking for a place, how is it 15 going to be safeguarded? That's a cost that's not accounted 16 for. Are they going to put lead blankets over it? How is 17 resuspension going to be covered? What about workers?

18 Whereas WASH 1400 and the MAC-S2 code that they use for their 19 cost calculations assume and was based on a weapons event, 20 cleaning up; it was during the Cold War, of a weapons event.

21 That is the fundamental underpinning of the 22 code, cleanup cost factors. However, there is a vast 23 difference between cleaning up on a weapons event than 24 cleaning up from a reactor event. A weapons event has larger 25 particles, larger mass loading. They assumed, as the MAC-S2 26 A-01-SAMA cont code assumes, the buildings will be hosed down and fueled to 1

be plowed under.

2 This will not be allowed by the public, by 3

CERCLA, by EPA. So let's get some real cost here, real cost.

4 You don't have real cost.

5 Also underestimated are the health costs. Look 6

at, and we want to know. This has to be site-specific. We 7

cannot have the health costs that are assumed in the code, 8

that go back to understandings of the 1960's, at best early 9

70's. We've had BEIR-7. BEIR-7 is not conservative enough, 10 because it does not include the Techna River studies. It 11 does not include the studies by Cardis, which show far 12 greater damage from lower doses than BEIR-7.

13 So therefore the health costs. Health itself 14 is taken off the table as a Category 1 issue. But the costs 15 of health belong in the SAMA.

16 Next, and I'm almost finished, what is missing 17 is consideration of a spent fuel pool accident. I think 18 obviously this is important, because there's far more 19 radioactivity in a spent fuel pool, and you can have 20 migration from a reactor accident to a spent fuel pool 21 accident, so you get a double whammy, or it can move the 22 other way.

23 The argument for not considering this holds no 24 water. They go to the GEIS and look at Section 6, which 25 takes spent fuel and low level waste for that matter off the 26 A-01-SAMA cont table for adjudication, but the first paragraph says "Normal 1

operations."

2 Section 5 of the GEIS, which this process is 3

under, describes and gives a definition of severe accidents, 4

and it defines it in terms of consequence, not in terms of 5

the origin of the accident. Therefore, consideration of the 6

spent fuel pool accident in a severe accident mitigation 7

analysis, must be considered.

8 Last in the application, they talk about 9

evacuation time estimates, which are required, because how 10 long it takes and how many people will get out of dodge will 11 affect -- in time will affect health costs.

12 However, when you read the application, the 13 only reference is to Seabrook's radiological emergency plan.

14 There is no reference, no information of evacuation time 15 estimates, no provision if they used KLD, whether these time 16 estimates were performed during peak commuter hours, during 17 bad weather in peak commuter hours, during holidays, during 18 high beach season. There's no information whatsoever.

19 Just a mere "other" reference to new Reg 1150, 20 which has absolutely nothing to do with this, that was an 21 analysis of consequence at five reactors, not Seabrook 22 included in 1991. So it is really irrelevant. So that has 23 to be updated. Last, they do a sensitivity analysis to show 24 that we put in more numbers to make a severe accident look a 25 little worse, and see it didn't make enough of a difference.

26 A-01-SAMA cont But what they did was use the same code, the 1

same assumptions, the same processes, so repeating the same 2

mistake one, two, three, four times, that never will give you 3

the right answer. And so these are the questions. We will 4

send these questions to the NRC, because we will not accept, 5

and nor will you -- we're sure you would like to do a good 6

job -- simply to read what they did and then briefly describe 7

it in Reader's Digest form.

8 We expect analyses, and we're very willing to 9

help you with this process.

10 MS. BOWDEN-BERRY: Mary, thank you very much 11 for your comment. We're going to go to Representative Read 12 next, and then Dr. McDowell. Could you spell your name when 13 you get up to the mic please?

14 MR. READ: My name is Robin Read, R-E-A-D. I'm 15 a member of the New Hampshire House of Representatives from 16 Portsmouth, which as you all know is within the evacuation 17 zone. I was also a member of the House in the 1980's when we 18 went through the financial struggles related to the plant and 19 would like to say that I think the new owners have done a 20 better job of communicating with the public and letting us 21 know what's going on than the previous owners.

22 You're going to hear -- you've heard a lot 23 about the evacuation issue, and you're going to be hearing 24 I'm sure more about the problems that we really should be 25 B-01-ALT A-01-SAMA cont looking at, including waste, the issue of nuclear waste in 1

the review.

2 But I'd like to talk just for a minute on the 3

reasonable alternatives appropriate for the area. I was at a 4

conference of legislators from all over the Northeast in 5

Maine on Monday, where Gordon Van Welie, who's the ISO -- the 6

president of ISO New England, which runs the grid in New 7

England, said that there are 3,000 megawatts of wind power 8

currently in the pipeline in New England. 12,000 megawatts 9

is available.

10 Maine in 2008 passed the Maine Wind Energy Act, 11 which calls on Maine to produce 3,000 megawatts of wind by 12 2020. New Hampshire, we now have renewable portfolio 13 standard, which calls on the state to have 25 percent of its 14 energy produced from renewable sources by 2025.

15 I seriously question the need for Seabrook, and 16 I still don't understand how we can be doing this process, 17 looking at what the environmental and renewable energy 18 situation and energy efficiency improvements 20 years and 40 19 years down the road.

20 I think it's way premature to be doing this 21 process now. I agree with the petitioners, who say that ten 22 years would be a much better time period to look at. There 23 have been huge advances in renewable energy and energy 24 efficiency. There have been huge advantages in storing 25 alternative energy through battery technology.

26 B-01-ALT cont There was a recent article in the New York 1

Times about storing wind power. I think that this is just 2

way premature, and I think that the NRC should look seriously 3

at the petitioners' proposal, and look at the alternatives 4

seriously.

5 MS. BOWDEN-BERRY: Thank you, Representative 6

Read. Now we'll have Dr. McDowell.

7 DR. McDOWELL: I'm Robin McDowell. I'm a 8

professor of Oceanography and Environmental Science, American 9

Military University. You've heard a lot of negatives and 10 cons in Seabrook. I think you need to hear the positive 11 side. Right now, there are something like 131 nuclear power 12 plants being constructed around the world, and they're not 13 all in Iran, by the way.

14 I worked at Los Alamos for 18 months, and I 15 still have all my hair, and as far as I know, I don't have 16 leukemia. I live in Portsmouth, down wind from the Schiller 17 and Newington fossil fuel plants. When the air's humid 18 there, Portsmouth smells like Pittsburgh used to, yet 19 nobody's protesting that one.

20 Nuclear is a proven technology. Seabrook, as 21 far as I know, has never had an incident or a problem. I see 22 no good reason to deny a license, although you guys ought to 23 work on the fuel disposal problem, and we spent a little 24 money out in Yucca Mountain. We ought to do something with 25 it.

26 C-01-PRO B-01-ALT cont Other than that, there is no, unless we want to start 1

turning lights off and shutting off air conditioners and 2

other facilities around here, wind and solar are nice. But 3

look out that window. There's not enough wind going out 4

there right now to fly a decent-sized kite. So unless you 5

want to start turning switches off, we need Seabrook, like it 6

or not.

7 It hasn't had a problem, you know, I see. But 8

I assure you guys when you get back to Rockville Pike will do 9

a very thorough job, as you usually do, in looking at things.

10 Thank you.

11 MS. BOWDEN-BERRY: Thank you. We'd like to 12 have Paul Gunter. Please spell your name and indicate where 13 you're from. Thank you.

14 MR. GUNTER: Thank you. My name's Paul Gunter.

15 That's G-U-N-T-E-R, and I'm Director of the Reactor Oversight 16 Project at Beyond Nuclear, and we're based out of Takoma 17 Park, Maryland, just outside of Washington, D.C. I'm a 18 former resident of New Hampshire for 23 years, and also I was 19 one of the petitioners that filed with the U.S. Nuclear 20 Regulatory Commission yesterday under the provision for 21 petition for rulemaking, in a request that the agency change 22 the current rule under 10 C.F.R. 5417(c), from 20 years in 23 advance of the expiration date to ten years in advance.

24 And one of the key reasons that we've requested 25 this petition for rulemaking is precisely because a premature 26 D-01-LIC C-01-PRO cont application will do nothing but provide meaningless data for 1

this agency's consideration.

2 This application is the equivalent of green 3

fruit. It's not ripe. It needs more time. It needs more 4

time to consider a whole host of issues, ranging from system 5

structures and components at this plant that you're required 6

to look at, in the context of aging.

7 But more particularly, I would like to just say 8

a few words about the due process issue. One of the key 9

concerns that we have here with an application that's coming 10 20 years in advance of the expiration date is that it 11 excludes a whole generation of citizens, commercial interests 12 from participating in this process.

13 I mean people who should be here are in grade 14 school right now, particularly when you're talking about a 15 federal action that will not occur until 2030. So it's 16 alarming that -- well first of all, the slide that you had up 17 earlier with regard to why 20 years, I've participated in 18 many of these license renewal proceedings.

19 We've been an intervener before, and that's the 20 first time I've ever seen this slide. It was not reassuring 21 that the basic message of the slide was because we say so.

22 What you've addressed here is that -- I mean you've 23 determined that 20 years of operational and regulatory 24 experience provides an applicant with substantial amounts of 25 information.

26 D-01-LIC cont But I

would refer you to the National 1

Environmental Policy Act, the reason we're here in the first 2

place, provides that at Section 1501(b), it says NEPA 3

procedures must ensure that environmental information is 4

available to public officials and citizens before decisions 5

are made and before actions are taken.

6 The information must be of high quality.

7 Accurate scientific analysis, expert agency comments, public 8

scrutiny are essential to implementing NEPA.

9 Most important, NEPA documents must concentrate 10 on issues that are truly significant to the action in 11 question, rather than amassing needless detail. What you 12 have before you in this application, now 20 years before the 13 time of expiration, it basically constitutes nothing but 14 nonsense, an amassing of needless, meaningless detail.

15 Let's look just in, you know, a license renewal 16 application for a nuclear power plant submitted 20 years in 17 advance of its expiration date cannot, according to Section 18 1500.2 of the same Act -- provide to the fullest extent 19 possible is the requirement of NEPA -- accurately and 20 reliably evaluate what's foreseeable, particularly for the 21 renewable energy alternatives that the representative from 22 New Hampshire has already addressed as a tremendous resource.

23 I

mean essentially what this application 24 currently puts forth in its claim that the contribution of 25 wind and solar to the consideration of alternatives under 26 D-01-LIC cont NEPA, they fix it -- the nonsensical comparison is much like 1

saying the Model T is going to be what we have for the next 2

20-40 years.

3 It casts aside any kind of consideration for 4

advancement. But in fact, it's not just -- we're not just 5

pulling this out of the air. The Department of Energy's own 6

National Renewable Energy Laboratory, in its assessment, 7

particularly of offshore wind, is that the contribution for 8

the region of interest that we're discussing here under NEPA 9

is -- ranges from good to superb.

10 This basically still -- this all contradicts 11 what the applicant has put forward for your consideration.

12 They don't even mention that the potential here, as rated by 13 the Department of Energy, is that this offshore wind resource 14 is superb.

15 But, you know, it remains a concern that you 16 have -- you've got an application here that's before you, and 17 now it's your duty under NEPA to rigorously explore and 18 objectively evaluate all reasonable alternatives and for the 19 alternatives that are to be eliminated by the detailed study 20 that you have before you, you have to discuss the reasons 21 that they have been eliminated.

22 Frankly, that's why you've got green fruit on 23 your hands right now. There's really no rational, reasonable 24 way to assess a resource 20 years out from the time that 25 D-01-LIC cont you're talking about this federal action to be considered, to 1

be in effect.

2 So I urge you, as we have petitioned the 3

agency, to essentially reject this application as premature, 4

as simply -- in many sections of it, simply an amassing of 5

needless detail, and let's come back to this issue when the 6

time is right, as the petition has suggested, in 2020. Thank 7

you.

8 MS. BOWDEN-BERRY: Thank you for your comment.

9 We'll have Doug Bogen. Can you spell your name, and indicate 10 where you're from please when you get to the mic? Thank you.

11 MR. BOGEN: Good afternoon. My name is Doug 12 Bogen. That's B-O-G-E-N, and I'm the executive director for 13 the Seacoast Antipollution League. I'm also a 25-year 14 resident of the seacoast New Hampshire region. Seacoast 15 Antipollution League was founded in 1969, and has been 16 engaged since the inception of the Seabrook nuclear plant and 17 the original licensing, as well as in watch dogging the 18 operation and the regulatory process since its start-up.

19 We are very concerned about the ongoing air and 20 water emissions from these plants. You've heard some from 21 others and probably will hear more on that.

22 One in particular that hasn't been mentioned is 23 the radioactive water, otherwise known as tritium, which we 24 have seen leakage from the plant already, and is a problem 25 E-01-RAD D-01-LIC cont throughout the industry. We've most recently heard about the 1

problems at Vermont Yankee.

2 We're just amazed that in all these years and 3

all the time we've known about the security and leakage 4

problem, that the NRC does not require the power plant owners 5

to have a maintenance plan to report that information. It's 6

a voluntary program.

7 I just find this appalling that for all this 8

time we've known about this problem, and for all the problems 9

it's caused in particular with the relicensing of Vermont 10 Yankee, that this is still an issue, and that we do not have 11 public access to this information. It just isn't available.

12 Now I recognize that the purpose of this 13 meeting is to identify environmental impacts of this plant.

14 But we're more concerned actually right now I'd like to talk 15 about the plant impacts from the environment. We know now 16 that our environment is changing.

17 I think most everybody and certainly the 18 science is in on this, and to others it should be obvious 19 from recent calamities occurring across the globe as well as 20 in the region, that the climate is changing, that we know now 21 the environmental parameters we have today are not going to 22 be in effect 20, 40, 50, 100 years from now.

23 Just look at a few of these, sea level in 24 particular. Sea level is going up. It has been going up for 25 decades. But it's going to accelerate. We know this. The 26 E-02-CLI E-01-RAD cont question is how quickly will it accelerate? How many meters 1

higher will it be in 50 or 100 years?

2 The current best estimate, without dramatic 3

reductions in carbon emissions, which we certainly aren't 4

seeing in our country, according to recent events, that 5

estimate is that by the end of this century, sea level will 6

rise upwards of a meter. That will affect the, obviously the 7

coastline, the ground water levels, the salinity of the 8

ground water. It will have dramatic effects on our sea coast 9

environment.

10 Now another organization that I've worked with 11 in the past, Clean Air Cool Planet out of Portsmouth, has put 12 together a map of what the Hampton-Seabrook Harbor will look 13 like with a one meter sea level rise.

14 I'm sorry, I don't have a blow-up of this. I 15 just pulled it out of my files this morning. But if you can 16 see the area in blue, it's essentially all the salt marsh and 17 much of the low-lying coastal area will be under water with a 18 one meter sea level rise.

19 The Seabrook plant is on this little peninsula 20 right in the middle here. It will be almost surrounded by 21 water. Most of the routes out of the plant, out of Seabrook 22 and Hampton will be under water. Route 1, Route 1A, Route 23 101, they will not be accessible if this sea level rise 24 continues, as is predicted now.

25 E-02-CLI cont We have to take this into account. We'll have 1

a much better picture 10 or 20 years from now. But we 2

certainly can't say right now that everything's going to be 3

fine and that the current water regime is going to be the 4

same.

5 Now looking at groundwater, this is a very 6

important concern. I've mentioned the issues with tritium, 7

but we're also concerned about all the underground 8

infrastructure specifically at this plant, and what effects 9

this groundwater change will have on that, on those systems.

10 The salinity increases certainly will affect 11 the corrosion levels, the amount of damage going on to these 12 critical infrastructure, and it will affect the coastal area 13 in many other ways. There are studies that have already been 14 done.

15 The United States Geological Survey did a 16 report on sea coast water resources. They have determined 17 that there will be much greater reliance on groundwater, more 18 extraction of groundwater in our seacoast area in coming 19 decades, and that will also affect the salinity levels of 20 groundwater.

21 We know this on the sea coast. When you pump 22 water out of the ground, you draw in more of the ocean water, 23 the saline water and certainly with sea level rising, that 24 makes it all the much worse. One other key issue we've heard 25 E-02-CLI cont a little bit about, especially down in the Gulf Coast, is 1

violent storms.

2 We haven't had a significant hurricane up on 3

this region, a really big one since, I think, 1938. But it 4

is predicted that there will be much more and more frequent 5

violent storms in this area. Again, looking at this map 6

here, one of the things that it shows with the one meter sea 7

level rise is that Hampton Beach will be largely under water.

8 Seabrook Beach will be under water.

9 Those are the barrier beaches that we rely on 10 to protect our salt marsh area and our inland coastal areas.

11 And with those barrier beaches gone, it's much more likely 12 that you're going to see damage. I don't know exactly how 13 high Seabrook plant is above sea level or the spent fuel 14 pools or the dry cast storage area. But I know it's not that 15 high. I know with the 20 foot sea level rise, the whole 16 place will be under water.

17 So I do hope that you will be, if you don't 18 have on staff, you'll be hiring a climatologist to look at 19 the latest research on this, and a hydrogeologist to look at 20 the impacts on ground water and the impacts of a changing 21 water regime, because we need to know this information.

22 This could be vitally important to the 23 integrity of the plant in coming decades. But again, the 24 bottom line is that we don't have all the information. This 25 is highly premature to be assuming that we have any idea 26 E-02-CLI cont what's going to be happening in 40, 50, 60 years down the 1

road.

2 When we're talking about the nuclear waste, 3

those of us who have been following this issue for some 4

years, we know that that waste is not going to be hauled out 5

of there the day the plant closes. It needs to cool off.

6 It's got to be transported. There are many, many issues.

7 That means we are going to be dealing with that 8

waste on that site for many decades after that, and that is a 9

scary prospect with the ocean roaring in with storms and 10 increased sea level. We need to be addressing these issues 11 in this environmental impact study.

12 It has been mentioned about alternative 13 resources. I think it's very important that we be looking at 14 the other options, particularly if you're saying that, you 15 know, utilities need to plan for the future. I do wonder, 16 though, how this plant as a merchant plant, it's not like 17 they have, you know, a specific clientele that they have to 18 service. It's not Public Service of New Hampshire anymore.

19 We are still paying for it, by the time. I 20 resent every month I have to pay a little fee to help pay the 21 stranded costs of this plant from the expenses of decades 22 ago. But we don't get any direct benefit. My understanding 23 is that Public Service of New Hampshire does not directly get 24 power from Seabrook. It's just bought through the wholesale 25 market.

26 E-03-WST E-04-ALT So this idea that somehow if the plant was to 1

close in 2030, that would somehow, you know, really disrupt 2

the current utilities. It boggles my mind.

3 I mean I think that we really need to be 4

looking more broadly and look at, you know, really the 5

current and future power systems and power policy in the 6

Northeast, and right now New Hampshire has, I think, 3,500 7

megawatts of capacity. That's like three times our stage 8

usage of power. We are essentially an energy colony for the 9

rest of the Northeast.

10 Now that's okay. Obviously some areas are 11 going to be better at producing power, you know, and we fully 12 expect other states will jump in and be major power 13 producers. It was mentioned, I think earlier, the offshore 14 potential for wind power.

15 The state of Maine in particular has looked 16 into this. They did a report. It came out last December, 17 which said that there was the potential of large scale 18 offshore wind power to produce 149 gigawatts of power.

19 That's about 120 Seabrooks just off the coast of Maine.

20 I'm sure some of you have seen this map, but 21 this is the Department of Energy map that Mr. Gunter referred 22 to later. In this map, the color code is bright red there.

23 That's not "warning, get out of here"; that is the highest 24 potential, excellent potential, outstanding is the word they 25 E-04-ALT cont use, the Department of Energy, and that's off the coast of 1

Maine, off the coast of New Hampshire and on down the coast.

2 We need to be looking very carefully at these 3

alternative power sources, and also the economic impact of 4

that. I mean just think of all the many thousands of jobs 5

that would be created if we were to convert some of our 6

coastal facilities to the production of wind power.

7 I think of the Portsmouth Naval Shipyard, the 8

Bath Armworks. All up and down the coast we have facilities 9

that could be producing very useful technology for the future 10 of our energy system in this region, and we need to be 11 looking at the potential huge public benefit of developing 12 those resources, instead of relying on old, obsolete, 13 potentially unsafe resources like the Seabrook reactor.

14 So just to sum up, I don't want to take too 15 much time. But just for the record, we do recommend no 16 action at this point. I know that is one of the options you 17 have. We do feel this whole license renewal process to be 18 highly premature.

19 It cannot possibly take into account all the 20 many key factors affecting plant maintenance, reliability and 21 safety from the deterioration of vital plant systems and 22 infrastructure, to climate change and future power needs as 23 I've described over the next 40 years.

24 So that's why we are also petitioning the NRC 25 to suspend the process now in the public interest. We need 26 E-05-LIC E-04-ALT cont to keep in mind we are talking about decisions now that will 1

affect future generations, people that aren't even born yet, 2

our children and grandchildren. Most of us here won't even 3

be alive when this plant is still chugging away under this 4

proposal.

5 So we need to be thinking very carefully about 6

what the impacts will be for their benefit, not just for a 7

current corporate interest that clearly has some financial 8

benefit or they wouldn't be here advocating for this at this 9

time.

10 We need to be thinking foremost about the 11 public benefit and the environmental benefit of our future 12 energy policy, and we need to be keeping that foremost in 13 deciding on whether to renew this plant at this time. Thank 14 you very much, and I will be submitting probably written 15 comments, and I think can provide these maps to you as well.

16 Thank you.

17 MS. BOWDEN-BERRY: Thank you, Mr. Bogen, and I 18 apologize for mispronouncing your name. We're going to have 19 Janet Guen, then Joe Casey and Tim Noonis next. So Janet 20 Guen. Can you spell your name for the record and tell us 21 what organization you're from? Thank you.

22 MS. GUEN: Good afternoon. My name is Janet 23 Guen. I'm a senior director with the United Way of the 24 Greater Seacoast. My last name is G-U-E-N. I'm not a 25 technical person and I'm not here in a technical capacity.

26 E-05-LIC cont I'm simply here to answer the question or part of the purpose 1

of the meeting, which was providing input on the scope of the 2

environmental review.

3 I'd simply ask that in a

definition of 4

environment, it be looked at in the broadest possible 5

context, to review not just the traditional definitions of 6

environment, but also environment as it relates to the 7

quality of life that we all experience in our communities, 8

and in particular the health and human service needs of the 9

people who live in our local area.

10 I would ask that the scope include looking at 11 the role that Nextera plays in helping to provide for the 12 health and human service needs in our area, the large number 13 of jobs it provides that pay a living wage, the taxes it pays 14 to its local communities, and the role that it plays a good 15 citizen in working with local health and human service and 16 other non-profit agencies, the leadership its employees 17 provide on boards and other committees, the financial support 18 that it provides, not just to United Way but other 19 organizations, and the volunteer time and energy that it puts 20 back into the community. Thank you.

21 MS. BOWDEN-BERRY: Thank you for your comments.

22 Joe Casey, and next is Tim Noonis. Thank you.

23 MR. CASEY: Good afternoon. Can you hear me?

24 Good afternoon. My name is Joe Casey. I am from Rochester, 25 F-01-SOC New Hampshire, and I am the president of the New Hampshire 1

Building and Construction Trades. Is this working?

2 I represent the outside construction workers 3

currently employed at Seabrook Station. I myself worked on 4

the construction and a couple of the maintenance, first 5

maintenance refuels, refuelages at the plant. I'm no longer 6

involved with the plant, other than representing the 7

construction workers on site. I worked as an electrician by 8

the way.

9 Currently, there are about 110 craftsmen that 10 work on the maintenance year-round at Seabrook Station.

11 During the refueling cycle, that number grows to about 600 12 construction workers, and it's vitally important to the 13 construction economy in the state of New Hampshire. This is 14 a continuing cycle of good paying jobs for our people.

15 I deal with Florida Power and Light, the owners 16 of Seabrook Station, and the current maintenance contractor 17 on site, and other than the skilled craftsmen that we supply 18 for the continued maintenance and the refueling outages, 19 there are very demanding tasks that they have to go through 20 and perform for every installation in the constructing and 21 maintaining of the facility.

22 Currently, when we send somebody down to 23 Seabrook, in my case it would be electricians, they're 24 already licensed or trained electricians and trained 25 construction workers.

26 G-01-PRO Seabrook Station puts them through rigorous 1

training for each and every task that they have to perform, 2

whether it be lift training or, you know, hilti training.

3 Any type of training that requires anything that's involved 4

with the maintenance, which is very critical to the plant.

5 They have to undergo rigorous testing, every 6

weld that's done and performed down there. They have to do 7

all kinds of certifications for it, and it's a very difficult 8

place to work. Excuse me.

9 A lot of my people, you know, can't work at 10 Seabrook Station, because they can't pass these exams that 11 they have to go through, which is fine and we understand 12 that, and are very cognizant to the fact that it is very 13 demanding down there.

14 The communication between the building trades, 15 we meet on a quarterly basis with the representatives from 16 each craft with Florida Power and Light, the maintenance 17 people and the building trades, and the number one issue is 18 the personnel safety, the safety of our personnel on site, as 19 they perform their tasks down there.

20 Florida Power and Light has been more than open 21 and honest in every question that has to be performed, and 22 safety is number one to our people. Now over the past three 23 years, the last three years, I ran the numbers this morning, 24 the building and construction trades has accumulated over 1.4 25 million man hours in the last three years.

26 G-01-PRO cont Now that's a significant number of man hours, 1

and these are all New Hampshire people who work and support 2

families in the sea coast area in the state of New Hampshire.

3 These jobs are, you know, top-paying jobs with health care 4

and pensions. I also, you know, since the wind industry has 5

been dried up, I also was involved with the New Hampshire's 6

first wind farm up in Lempster, which we constructed just 7

over a year ago.

8 I had 20 people on that job. There was about 9

12 towers that was put up over there. We had about 20 people 10 on that job, 20 electricians. They worked for about four 11 months, completed the project and now they're off the job, 12 you know. It's a beautiful job and the wind's blowing and 13 it's generating electricity, and there's not one person left 14 up there maintaining those wind towers.

15 Over the next 20 years, there will be zero man 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> produced out of that wind farm into the New Hampshire 17 economy. So you know, the significance to the New Hampshire 18 building trades of the continuation of the operation of 19 Seabrook Station is unbelievable, and you know, there's a lot 20 of people that count on and look forward to continued work 21 down there.

22 I can guarantee you that the construction 23 workers that are working on that site are professional, and 24 every task that they perform is overlooked and overlooked 25 again by Florida Power and Light and the NRC.

26 G-01-PRO cont MS. BOWDEN-BERRY: Thank you, Mr. Casey. Can 1

we have Tim Noonis?

2 MR. NOONIS: Yes, hi. That's N-O-O-N-I-S. I'm 3

actually wearing two hats today. My first hat is I am the 4

chairman of the board of directors of the Hampton Area 5

Chamber of Commerce. Seabrook Station is a very strong 6

supporter of the Hampton Area Chamber of Commerce, and 7

through it all the members that we serve.

8 Seabrook Station is always willing to sponsor 9

and participate in many events and festivities that the 10 Chamber promotes to encourage business and tourism in the 11 areas that we serve. I personally have had the privilege to 12 serve on various boards and civic committees with employees 13 of Seabrook Station. I have found them to be a very bright 14 and positive group, and an asset to the communities that we 15 live in.

16 Our Chamber runs the gamut, from small mom and 17 pop businesses to very large corporations. These businesses 18 depend on reliable and reasonably-priced electricity to 19 operate their businesses successfully.

The long-term 20 viability of Seabrook Station is integral to the success of 21 our members.

22 Seabrook Station is a crucial part of this 23 area's economy, and you could not ask for a better corporate 24 citizen than Seabrook Station. On behalf of the members of 25 H-01-PRO the Hampton Area Chamber of Commerce, I would encourage you 1

to extend Seabrook Station's operating license.

2 My second hat today is as a 17-year resident 3

and a homeowner here in Hampton. A few years ago I went to a 4

conference where the keynote speaker was the co-founder of 5

Greenpeace. In his address, he said the biggest mistake 6

Greenpeace made was equating nuclear power with nuclear 7

weapons. He continued on to say that nuclear power has 8

proven to be a safe and reliable source of electricity, and 9

that the operation of the plant does not contribute to 10 climate change.

11 I hear the clamoring for good jobs, cheap power 12 and a clean environment. But when it comes to siting a plant 13 or even a wind turbine, everyone screams "not in my 14 backyard." Seabrook Station is in my backyard, and I have 15 found them to be a very good neighbor. I encourage you to 16 extend Seabrook Station's license.

17 MS. BOWDEN-BERRY: Thank you. We're going to 18 have Bob Backus and then next we'll have Michael Schidlovsky.

19 I hope I pronounced that right, and I apologize if I didn't.

20 Can you spell your name when you get to the mic and tell us 21 where you're from.

22 MR. BACKUS: Okay. It is Bob Backus. You are 23 quite correct, B-A-C-K-U-S. I've represented -- I'm a lawyer 24 and I've represented the Seacoast Antipollution League for 25 many, many years. I'm from Manchester, New Hampshire.

26 H-01-PRO cont Like Mr. Gunter, I wanted to comment initially 1

on the slide that was shown about why 20 years, which says 2

the NRC has determined that 20 years of operational and 3

regulatory experience provides an applicant with substantial 4

amounts of information.

5 My questions, and I guess there's two NRC 6

lawyers here. I particularly address this to them. How can 7

you base your reasonable assurance on merely substantial 8

information? When you fill out an application for college or 9

practically anything

else, you're asked for complete 10 information, not substantial information.

11 Well, the answer's obvious. You can't have 12 substantial -- you can't have complete information, because 13 we're trying to relicense this plant 20 years before that 14 license will become effective.

15 One of the key questions, as many have said 16 here, is what's going to happen to age-related degradation on 17 systems and components and structures over the next 20 years?

18 We can't know that. So again, I want to 19 support those who have said that this application is 20 extremely premature. I don't know how you came up with a 21 rule that said you could apply 20 years in advance, you know.

22 Can I apply 20 years in advance for my next motor vehicle 23 license need? I don't think the State Department of Motor 24 Vehicles would permit that.

25 I-01-LIC And we know that as time goes on, as radiation 1

takes its effect and other wear and tear occurs, we are going 2

to have age degradation of important structures and 3

components. We know the Yankee Road plant had an embrittled 4

reactor vessel which led to its shutdown. But would we have 5

been able to detect that if we were licensing it 20 years 6

before that became known? I mean how long did it take that 7

to develop?

8 So I have a real grave concern of whether you 9

can meet the requirements you have to have for reasonable 10 reassurance

lining, just on the basis of accepting 11 substantial information rather than complete and accurate 12 information.

13 Obviously starting at this point, in 2010, 30 14 years, 20 years before the license is to be renewed, you 15 can't possibly have that. So I think this is extremely 16 premature.

17 The other reason you give for starting 20 years 18 ahead is that it takes maybe that long for it to come up with 19 alternative supplies. Well, you've heard others speak about 20 that, and there's going to be technological progress.

21 There's going to be developments in many areas, whether it be 22 solar or wind or other things that we can't foresee now.

23 We're really way out ahead of ourselves, and I 24 think being highly irresponsible in undertaking this license 25 review here in 2010, when the license will not be renewed for 26 I-01-LIC cont another 20 years. I was interested to hear you say there's a 1

couple of other plants that have applied early. But I didn't 2

hear anybody has applied as early as this one. So I think 3

that's a real problem.

4 Just a couple of other points I'd like to make.

5 As part of your review, I would hope that you would determine 6

that this plant is in full compliance with its current design 7

basis in all regards, and how will we find that out? How 8

will we know what the design basis is and whether the plant 9

is in compliance with it?

10 This plant, like so many of them, went through 11 any number of changes as a way of sort of being designed as 12 it was being built in some respects. So how will we know 13 that? It seems to me that that will have to be demonstrated.

14 On environmental impacts, you know, one of the 15 big issues when this plant was going through its original 16 licensing was the operation of the once-through cooling 17 system, which is a total mortality system with a total loss 18 of all entrained organisms in the plant. Will we be able to 19 have baseline data to know whether that plant is having an 20 adverse effect on the environment? How will that be looked 21 at? I assume that that will be covered.

22 We know the plant has routine releases, and as 23 somebody mentioned, I think Mr. Bogen mentioned, we know that 24 there's been some tritium releases which was certainly not 25 intended. We need to look at that. I was going to mention 26 I-03-ECO I-04-WST I-01-LIC cont I-02-SAF the sea level rise, but that was well-discussed by Mr. Bogen.

1 I won't go into that.

2 Lastly, of course, I know that these licensing 3

proceedings and these individual plant proceedings, we're 4

shuffled off with many of the important things are shuffled 5

off as a generic issue to how those are handled on a big 6

national basis. A quintessential example of that is of 7

course nuclear waste disposal.

8 But we think that this needs to be dealt with 9

in this specific context of this plant. If we're going to 10 license this plant for 20 more years, we're going to have a 11 lot more spent fuel. That means a lot of very much greater 12 level of high level waste disposal. We think that the 13 environmental impacts of that have to be considered in regard 14 to the particular characteristics of this site, where 15 there's, as we say, a spent fuel pool which is pretty close 16 to the ambient sea level and the concerns that that raises.

17 So those are the concerns that I have. But 18 again, my major point is 20 years ahead, to get your license 19 renewed 20 years ahead and do so on the basis of what you 20 apparently admit can only be substantial information, which I 21 think may be a generous term, it seems just not regulating 22 and not putting safety first, which should be what is first.

23 Thank you.

24 I-04-WST cont MS. BOWDEN-BERRY: Thank you. Could we have 1

Michael Schidlovsky? Please spell your name and the 2

organization you're with when you get up.

3 MR. SCHIDLOVSKY: Good afternoon. My name is 4

Michael Schidlovsky. I am the president of the Exeter Area 5

Chamber of Commerce, and I'm here to represent the board of 6

directors and the 400 plus members of the Chamber. I'll be 7

very short and sweet. I'm here to express the Chamber's and 8

the Chamber members' support of the application.

9 Like Mr. Noonis, he beat me to the punch.

10 Seabrook Station has been an outstanding corporate citizen.

11 There's support and willingness to help the business 12 community has been extraordinary, and I can only again 13 express that I hope that the NRC views this as a favorable 14 application. So thank you very much.

15 MS. BOWDEN-BERRY: Thank you. Could we have 16 Paul Blanch and then Dennis Wagner?

17 MR. BLANCH: Good afternoon. My name's Paul 18 Blanch. I reside in West Hartford, Connecticut. I'm here 19 solely on my own. I'm not being paid for by anyone, no 20 organization, no utility, and I am a registered professional 21 engineer working in the nuclear industry for close to 45 22 years.

23 In fact, I've worked for the company that 24 originally licensed this plant when it was licensed back in 25 around 1990. I was working for Northeast Utilities. I've 26 J-01-PRO worked in many different areas over the nuclear side, from 1

operating Navy nuclear power plants, engineering degree in 2

Electrical Engineering, registered professional engineer.

3 I've been an expert witness on litigation 4

involving Florida Power and Light at the St. Lucie plant, and 5

I've been involved as an expert witness on the litigation for 6

license renewal, working for the attorney general for the 7

state of New York.

8 I think people need to know what the effort is 9

to oppose a license renewal application such as this, and I 10 heard this afternoon for the first time that if anyone wants 11 to intervene, it has to be done by September 20th. Let me 12 just give an example of the manpower effort that went into 13 our litigation against Indian Point.

14 Needless to

say, there were
many, many 15 attorneys involved in that litigation. The effort and it 16 involved literally thousands if not tens of thousands of 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />. I've got to admit, and I'm speaking again on my own, 18 not for the state of New York. What I'm speaking of is the 19 license renewal application, and my areas are -- I'm not 20 addressing ten years, twenty years prior to the expiration of 21 the present license.

22 My concerns are the adequacy of maintaining 23 this plant in a safe condition for the next 20 years, and if 24 the license renewal is granted, which the NRC has never even 25 K-01-LIC hinted at not granting one, I want to assure that that plant 1

is operated safely.

2 Now it was said earlier by some of the NRC 3

representatives that their objective is to protect the public 4

health and safety, and I agree that is their mission. Their 5

mandate by Congress is to protect the health and safety of 6

the general public.

7 After working in this industry on the inside, 8

on the outside, as a consultant, as an expert witness, I've 9

come to the belief that the NRC is not fulfilling their 10 Congressional mandate of protecting the health and safety of 11 the public.

12 I'd like to provide a few examples, and again 13 it's very, very bothersome to me that I see September 20th as 14 a deadline date for formal intervention to oppose this 15 license. Believe me, it costs millions of dollars to 16 effectively intervene in opposing a

license renewal 17 application. The purpose of this whole license renewal 18 application, as was stated earlier by the NRC personnel, is 19 to assure that the CLB, which is the current licensing basis, 20 which is defined in 10 C.F.R. 54.3.

21 The current licensing basis includes all the 22 applicable regulations, and the public needs to and I believe 23 the NRC needs to, in order to protect the public health and 24 safety, assure the public that this current licensing basis 25 K-01-LIC cont is maintained for the next 20 years, and if the license 1

renewal is granted, for the 20 years following that.

2 Again, I mentioned I was an expert, am an 3

expert named in Indian Point litigation related to buried 4

pipes and vital cables, and other electrical devices 5

including transformers. The current licensing basis is not 6

available. In contrast to what Jeremy said, the current 7

licensing basis includes, and he said these documents were 8

available, it includes all regulations.

9 All the regulations of 10 C.F.R. Part 2, Part 10 20, Part 26, Part 50, Part 54, Part 72 and all the other 11 regulations that are applicable to Seabrook. The current 12 licensing basis also includes such items as the final safety 13 analysis report, orders and anyone can look under 10 C.F.R. 14 54.3 and find the definition.

15 What is really strange about the current 16 licensing basis, Mr. Pham is here and a few years ago, I 17 wrote Mr. Pham a letter. could you please identify for 18 Indian Point's Unit II and III what the current licensing 19 basis was, and what regulations are applicable to Indian 20 Point's Unit II and III.

21 His response, and again these responses are 22 public information, can be found on ADAMS. Mr. Pham's 23 response, Mr. Pham is sitting right in front of me, was one 24 can find the current licensing basis if you go into ADAMS.

25 K-01-LIC cont That is not an accurate statement. One cannot find the 1

current licensing basis in ADAMS.

2 There are certain portions of the current 3

licensing basis that are not in ADAMS. The FSAR, part of the 4

current licensing basis, is not in ADAMS.

5 In the Indian Point application, a license 6

renewal application and I'd like to make a comment right 7

here, and I have reviewed various applications for license 8

renewal, that this particular one for Seabrook is the most 9

deficient application I have reviewed so far.

10 Let me just provide just some contrast between 11 this application at Seabrook and Indian Point, and I don't 12 consider Entergy to be one of the more superior operating 13 companies in the country. But at least their application 14 identified things that an intervener who's concerned about 15 safety would want to know about before it was able to file a 16 meaningful contention.

17 For instance, in the Indian Point license 18 renewal application, all the drawings that identified the 19 buried pipe that are within scope of the buried pipe and tank 20 inspection program were supplied.

21 In fact, there were about, and don't hold me to 22 this number, somewhere between 50 and 100 detailed drawings 23 of Indian Point systems, and this is not only mechanical 24 systems, but also included the electrical systems that were 25 within the scope of license renewal.

26 K-01-LIC cont Seabrook, and I don't think I missed it, but 1

I've been wrong in the past, there are no drawings that 2

identify the buried pipes that are part of the buried pipe 3

inspection program. So I don't think there could be any 4

meaningful intervention contentions filed by the present 5

deadline, and for the NRC to accept this application that is 6

so extremely deficient in reality and from an engineering 7

standpoint, borders on irresponsibility.

8 I have a few examples, and by the way, I have 9

taken a few hours to go through, I believe it was somewhere 10 around a 1,800 page document of the license renewal. I would 11 just like to point out some of the technical shortcomings, 12 and again my expertise is not on severe accident management.

13 It's more on

systems, systems interaction, mechanical 14
systems, electrical
systems, cabling, requirements for 15 cabling and so on and so forth.

16 Let me and by the

way, just for 17 informational purposes and this may be informational also for 18 the Nuclear Regulatory Commission, that Congressman Markey 19 and I believe Congressman Hodes might be involved with it.

20 But Congressman Hall from New York, a few other 21 Congressmen from New York, Congressman Peter Welch from 22 Vermont have requested the

GAO, which is General 23 Accountability Office, to investigate the adequacy of the 24 NRC's program for buried pipe inspection program.

25 K-02-SAF And I have been working very, very closely with 1

the General Accounting Office in identifying shortcomings of 2

the proposed programs that the NRC accepts and considers 3

adequate for buried pipe inspection. And working with the 4

GAO, we found, and even though I've been working with this 5

for three or four years, we find new stuff.

6 It's interesting.

It's repeated in the 7

Seabrook license renewal application. If we look at the 8

Seabrook's application, for instance, for buried pipe, very 9

interesting in the fact that buried is not even defined 10 within the regulation. Nobody knows what "buried" means. We 11 saw the confusion up at Vermont Yankee, where they said we 12 didn't have buried pipes.

13

Well, that resulted in some criminal 14 investigation against some people. Unfortunately, some of 15 them are friends of mine who I used to work with. But buried 16 is not defined. Does "buried" mean in contact with the soil?

17 Yes, it does mean that among other things. Does it mean that 18 if it's in a pipe trench, a concrete trench that's located 14 19 feet underground, is that considered buried? We don't know.

20 Buried pipe does not necessarily include piping 21 that contains highly radioactive material. Buried pipe only 22 covers those items that are listed within the scope of the 23 license renewal, which I believe is 10 C.F.R. 54.4. So 24 buried pipes containing radioactive material are not 25 K-02-SAF cont necessarily covered by the license renewal application, and 1

that is reinforced by the license renewal application.

2 Another example, and again this is something 3

that I just found out recently, that the buried pipe and tank 4

inspection program only covers carbon steel and stainless 5

steel. It does not cover other materials such as titanium, 6

bronze, copper, nickel, aluminum and other exotic materials 7

that are used in vital systems at the Seabrook plant.

8 So Seabrook conveniently says, and NRC buys it, 9

that it only covers steel or ferrous material including cast 10 iron. But it's not going to cover any fiberglass pipe or any 11 of the other exotic metallic materials that are used in 12 safety-related systems.

13 Now we've seen a lot of recent information on 14 cables that are, and it's interesting how when we go to 15 piping, they use the term "buried." But when we go to 16 cables, they use the term "inaccessible." Well, I think we 17 need some consistency here between piping and cables.

18 Really, the intent to protect the public health and safety is 19 it should be inaccessible piping and not buried piping.

20 There's a lot of inaccessible piping.

21 But let me just move on to show and demonstrate 22 how the NRC can ignore protecting the health and safety of 23 the general public. By the way, I'm not here to close 24 Seabrook or to stop its license. My only intention is to 25 K-02-SAF cont assure that Seabrook operates safely for as long as it 1

continues to operate.

2 But I've recently identified a shortcoming with 3

respect to vital cables contained within these nuclear power 4

plants. We have many vital cables that go out to supply 5

motor operated valves, vital motors and many pieces of vital 6

equipment.

7 The NRC has recently acknowledged that some of 8

these vital cables are running conduits that are underground, 9

and many of these conduits, and in fact I've heard from the 10 NRC 95 percent of the plants, including Seabrook, these 11 cables are submerged. May be submerged under water, and at 12 Seabrook it's even worse, because that water contains high 13 salinity levels because it's right on the ocean.

14 This is a clear violation of NRC requirements 15 that are specifically stated in 10 C.F.R. 50, Appendix B. So 16 the NRC says well, Vermont Yankee, where it was originally 17 identified -- well not originally identified, but recently 18 identified in an inspection report. The NRC says "It's okay 19 to violate the regulations. You can continue to operate 20 because we consider the risk to be low."

21 The NRC does not have the authority within the 22 regulations to say you can violate those regulations without 23 going through the exemption process, which is under 50.12, to 24 allow a plant to continue to operate outside of the 25 regulations of 10 C.F.R. 50, Appendix B. Let me just give 26 K-02-SAF cont you a few examples of just some of the observations I found 1

and shortcomings in the license renewal application from the 2

Seabrook.

3 MS. BOWDEN-BERRY: Excuse me, excuse me. Can 4

you wrap it up in a few? Because we have about five more 5

minutes.

6 MR. SCHIDLOVSKY: I can wrap it up or I can 7

continue tonight, and in the interest of time, and I know 8

other people have very important things to say.

9 But I think this is premature, that the NRC 10 should not have accepted a license with all the shortcomings, 11 and without a clear identification of the current licensing 12 basis, which includes the regulations. And contrary to what 13 Jeremy said, those regulations, especially the ASME codes, 14 are not accessible to anyone in this area and they're not 15 accessible on ADAMS. Thank you very much for your time.

16 MS. BOWDEN-BERRY: Thank you, and you're 17 welcome to submit your comments. We have Dennis Wagner.

18 Again, spell your name and your affiliation, and identify 19 your affiliation.

20 MR. WAGNER: My name is Dennis Wagner. I'm a 21 citizen of Hampton. W-A-G-N-E-R. I didn't plan on speaking 22 today. I thought I'd just come and listen for a while. I am 23 pleased to see the diverse comments that are being offered to 24 the NRC, to guide them from what we're interested in as a 25 public.

26 I did feel compelled to make a couple of 1

comments, though. The comments that 20 years is too long I 2

disagree with. Looking at what companies have to cope with, 3

and the NRC has to regulate to go through these licensees, 4

probably 20 years is about the right time. Look, you know, 5

if you go ahead and delay it until a time closer to the 6

renewal, closer to the expiration, it just allows more time 7

for delaying tactics.

8 If you're going to plan major infrastructure, 9

you need to do it in advance, and you need to do it in as 10 much in advance as you can. This is reasonable. They're 11 allowing 20 years of operating experience to provide a basis 12 on which to look at past capability and look towards the 13 future. As an individual, that seems reasonable to me.

14 As far as other alternative forms of energy to 15 look at, I just spent a vacation in Maine. Beautiful 16 coastline. The potential for all the megawatts of power?

17 Give me a break. You can't get wind power in Cape Cod.

18 You're not going to get much wind power to compensate for the 19 need for energy in this country, and in our New England 20 states.

21 Those kinds of renewal energy are important and 22 are becoming more important, but they don't stack up with the 23 big picture. I am sick of being held hostage by foreign 24 countries for oil. I'm sick of the air pollution we get from 25 L-01-PRO coal. Those are where we get our energy in this country, 1

close over 75 percent of it, okay.

2 Nuclear power is a reasonable way to go. It's 3

proven it's been reasonable in this country, and it is an 4

answer for us in the future. I am confident, as I look 5

across the marsh from my home to Seabrook power plant, that 6

it's going to continue to be a safe generator of power. I'm 7

confident in the NRC in overseeing that operation, to make 8

sure it's going to stay safe for me and for my family.

9 We do make decisions in advance, 10, 20 years, 10 30 years. We all do that in our budgets, and we do that as a 11 country, and this advance planning is required. Thank you.

12 MS. BOWDEN-BERRY: Thank you for your comments.

13 We want to thank all of you for your comments. Our time is 14 up, so I'm going to turn it over to --

15 (Off mic comments.)

16 MS. BOWDEN-BERRY: Okay. Yes. Please just 17 identify yourself when you get up there.

18 MR. FLEMING: Thank you. Good afternoon, for 19 those of you -- is this the correct mic? For those of you 20 that might remember a Paul McGinnis auction here, I guess I 21 can be referred to as the next number, when they allow 22 somebody into the bidding at that point. So I thank you. A 23 little Hampton Falls reference there.

24 My name is Kevin Fleming, F-L-E-M-I-N-G, and I 25 work and live in the neighborhood here of Seabrook, within 26 L-01-PRO cont the ten-mile zone. That's my question, is really speaking to 1

the evacuation issue. Perhaps the general counsel or maybe 2

someone from the staff could offer some perspective. But 3

does the evacuation -- we get calendars in the mail annually.

4 Does the evacuation plan and the accuracy of 5

the evacuation plan figure into the process of license 6

renewal? That's my question. I'm sorry if that's something 7

I could have found online or, you know, other documents. But 8

with that, at the same time, with this license renewal then 9

being considered, then could evacuation be considered 10 further, such as the 2000 census data or does it go to a 11 2010? Is there a requirement for updating?

12 And then particularly we're talking about the 13 evacuation of special, "special needs," whether it be school 14 children, retirement communities, retirement homes, nursing 15 homes, elderly, of whatever or special needs people of any 16 sort. So that's all. My question coming here today is 17 really to ask if evacuation updating is required, and if it's 18 not, then could it be given consideration at this point?

19 Thank you.

20 MS. BOWDEN-BERRY: Okay, yes.

21 (Off mic comment.)

22 MS. BOWDEN-BERRY: All right.

23 MR. PHAM: Good afternoon again. My name is Bo 24 Pham. Just to answer your question, the emergency planning 25 is an issue that we consider and the need for update, you 26 M-01-SEC know. Our regulations require the licensees, regardless of 1

whether they put in an application for license renewal, to 2

have a plan in place, and to implement that plan working with 3

the local authorities as well as FEMA, and there are periodic 4

audits and inspections that we do, to make sure that they 5

have that in place. So it doesn't -- it's not part of the 6

license renewal review, because it is an ongoing review that 7

we do all the time.

8 MR. PHAM: Just to -- yes Mary.

9 MS. LAMPERT: Wait. I'll pass you the mic.

10 Mary. I was wondering whether you would entertain any other 11 comments, or is it cocktail hour now?

12 MR. PHAM: I was going to close it out, unless 13 somebody else had a yellow card that didn't -- that they 14 didn't have a chance to give us. Also, the staff's going to 15 be available for, you know, after the --

16 MS. LAMPERT: Oh, I had a yellow card. I 17 wanted to make another comment.

18 MR. PLASSE: I think we can make -- we'll hear 19 from you. Do you want to come up here?

20 MS. LAMPERT: I just wanted -- Mary Lampert, 21 speaking for C-10, director of Pilgrim Watch. I just wanted 22 to make a comment regarding the aging management program for 23 buried pipes, tanks, components within scope.

24 Currently, there seems to be a legal debate on 25 whether consideration will be given to the leaking of 26 A-02-HYD radioactive liquids or other toxics unmonitored off site.

1 The issue seems to be that currently only what will be 2

accepted will be the dysfunction, if you will, of those 3

components as it affects safety systems.

4 However logically, I'd like to bring to your 5

attention the potential of bringing it under the 6

environmental umbrella, because it seems clear if the aging 7

management program has not found to be sufficient to monitor 8

potential leaks going unmonitored off site, then in fact it 9

would be a violation of regulation and a negative impact on 10 the environment.

11 That also should go for components that are 12 buried, if we figure out how that's defined, that contain 13 fuel from the diesel fuel tanks. I think that would be 14 another way of getting at it, if you will. But the exam 15 question is what you should be doing in your review of the 16 SEIS.

17 So I would suggest that you fill in the blanks, 18 provide a map, a list first of all the components within 19 scope that are submerged, buried, what have you.

20 Second, provide a map of where they are on the 21 site. Provide to us in the SEIS information regarding the 22 age of those components, the history of repairs, the results 23 of sampling, the material that they're made of, specifics 24 such as their contours, their elbows, etcetera, that would 25 affect corrosion.

26 A-02-HYD cont Also very important, provide to us, and you 1

should be looking at this yourselves actually, what hydro geo 2

studies have been done to determine where the monitoring 3

wells are currently being placed, and provide those hydro geo 4

studies that have done subsurface investigation to the public 5

in your report, and the date at which those were done.

6 So were the monitoring wells, in other words, 7

put in helter skelter, or have there been very recent hydro 8

geo studies performed? So I think this can come. You can 9

deal with these components in two ways. You can bring it 10 under the safety review end, and also you should be able to 11 bring it under the environmental umbrella.

12 It belongs in the

SEIS, because of the 13 potential impact of leakage going unmonitored off site.

14 A-02-HYD cont 1

STATE SENATOR MAGGIE HASSAN: Yeah, just 2

directly into it? Okay. Good evening. My name is Maggie 3

Hassan. I am a New Hampshire State Senator and I'm honored 4

and privileged to represent District 23, which includes 5

Seabrook in the State Senate. I wanted to speak for a couple 6

purposes. My constituents have varying opinions on nuclear 7

power. They have varying opinions on whether they believe 8

the plant should have been licensed in the first place. To 9

the degree people are talking to me about it, they have 10 varying opinions about relicensure.

11 I wanted to speak about a couple of things.

12 First and foremost that when constituents have called me with 13 questions about the operation and safety of the plant or when 14 I've had those questions or when my colleagues in the 15 Legislature have had them -- we have been impressed or I have 16 been impressed with the openness of the Seabrook plant in 17 inviting us to the plant, giving us information, answering 18 our questions, touring us through the plant. They have been 19 cordial, responsive, specific. So, I give them kudos for 20 that. I think they have been a good participant, at least 21 since the time I have been in the State Senate, which is the 22 last six years.

23 The plant is obviously an enormously important 24 employer and taxpayer and community participant to many of 25 the communities in our area. So, from that perspective, I'm 26 N-01-PRO looking at the scope of the NRC's Environmental Review --

1 they are an incredibly important presence here and there are 2

many, many of my constituents who are very happy that they 3

are here. On the flip side of that -- this is an enormously 4

fragile ecosystem. There's just 18-miles of the New 5

Hampshire shoreline that we hold very, very dear. There is 6

the Great Bay Estuary that is really at a tipping point in 7

terms of its environmental quality. So, we would ask that 8

the NRC and its environmental and safety experts listen with 9

great care to the concerns that will be raised throughout 10 this process about the impact on this extraordinary part of 11 our state and our country.

12 I think more than anything else, people in my 13 district want to know that the plant is well-run and that the 14 people there hold as dear as my constituents do, this part of 15 our state and our country. They also want to know that the 16 NRC is doing its job. I can't stress enough as an elected 17 official how concerned people are right now that government 18 is capable of doing what the citizens trust it to do. I 19 can't think of a more important example of a nuclear power 20 plant sitting so close-by to so many levels of our ecosystem 21 and human life.

22 So, with that I just thank you all for being 23 here. I look forward in any way I can assist from the state 24 government point of view in making sure that this process is 25 as complete and informative for all of you as I can. I would 26 N-01-PRO cont N-02-LIC be happy to do that and I know my other legislatures and the 1

Governor's office feel the same way. To my constituents who 2

are in the room -- I hope that you will bring forward not 3

only to the NRC, but again if the Senate or the House or the 4

Governor's office can be helpful in facilitating 5

conversation, as that may need to happen, I look forward to 6

doing that as well. More than anything, we just want to know 7

that we are keeping New Hampshire beautiful and safe. Thank 8

you.

9 ELVA BOWDEN BERRY: Thank you. I have a stack 10 of cards here. So, the first three names I have are Chris 11 Nord, Paul Bamberger and -- excuse me if I pronounce your 12 name wrong -- Dr. Peter Somssich. I'm going to ask you to go 13 to the podium and state your name clearly and if you need to 14 spell it, spell it for the record and tell us what 15 organizations you're with. So, with that -- Chris Nord.

16 CHRIS NORD: Thank you. Is it possible to go 17 back to the early slide in this slideshow that talked about 18 why 20-years? Why we're looking at this 20-years ahead? Can 19 I see that?

20 Yeah -- well, as I was looking -- I've been 21 trying to think of an analogy -- sorry. I'll start by giving 22 you my name. My name is Chris Nord, N-O-R-D. I live in 23 Newton, New Hampshire. So, I'm inside the 10-mile radius for 24 Seabrook and I've basically lived in this region since 1981.

25 So, I've lived entirely within the 10-mile radius since 1981.

26 N-02-LIC cont I asked for this back because I've been trying to think of an 1

analogy -- hopefully a humorous one. I don't know how 2

humorous it is, but I've had a lot of old cars in my life. I 3

can tell you that the difference between a 10-year-old car 4

and a 15-year-old car -- there is not a linear relationship.

5 If you look at new, 10-years, 15 -- problems arise in that 6

next five-years. Problems would arise in the next 10-years 7

that are not in a linear relationship to the previous 20-8 years. So, for us to pretend that this is some how an 9

accurate look at what the plant's performance will be in 40-10 years is disingenuous. That must be stated. Onto my 11 comments.

12 Three areas -- high-level waste, evacuation 13 planning, and tritium and embrittlement -- those two 14 together.

15 So, for high-level waste -- as was asked 16 earlier -- where is the high-level waste to go? We have 20-17 times the radioactive activity of the Chernobyl accident's 18 release contained here at Seabrook in far less than adequate 19 a storage system -- far less than adequate. It's going to be 20 here for the foreseeable future, which might mean many 21 decades because Yucca Mountain is not going to open. That 22 was the plan -- the plan was no good.

23 Why isn't going off to some permanent disposal 24 site on Indian land somewhere a good idea? Well, the state 25 of Nevada doesn't want it. In fact, everyone feels like we 26 O-01-WST

- 100 -

would feel -- the state of New Hampshire it turned out didn't 1

want the DOE to take over seven towns by eminent domain.

2 Nobody's going to want that. So, all over the United States, 3

plants just like ours -- the people in those regions live in 4

sacrifice zones where the radioactive inventory, 20-times the 5

size of Chernobyl's release, is left right on site. That's 6

what we're left with. Why is our homegrown dumpsite not 7

adequate? First of all, it's here in Seabrook, which is one 8

of the fastest-growing summer populations in the -- well, 9

fastest-growing populations in the United States. One of the 10 most populous beach populations in the United States during 11 the summertime. So, we have a lot of people moving in.

12

Secondly, an above ground closely housed 13 unhardened dry-cask bunker constitutes one of the most 14 vulnerable terrorist targets on U.S. soil. Which is a huge 15 worry. Should be a huge worry for our elected officials, but 16 we don't seem to be getting traction in the state of New 17 Hampshire with that issue. Yet, Florida Power and Light's 18 bunker was rushed to construction years after whole agencies 19 of the federal government were established to protect the 20 American public from fiascos such as this. We have a roadmap 21 for better technologies than the new home system that was 22 implemented quickly by Florida Power and Light just as 23 Florida Power and Light is quickly trying to implement this 24 relicensing process. The process should be slowed down so 25 O-01-WST cont

- 101 -

that the proper technologies could be used to adequately 1

protect the public.

2 The disposition of Seabrook's reactors high-3 level waste should be included within the scope of any 4

license extension process. Sufficient time should be devoted 5

to finding the state-of-the-art storage technologies for all 6

U.S. commercial and military high-level waste now because so-7 called temporary storage must suffice to keep us safe for 8

perhaps many decades. I want to point out for the 9

technicians in this room that believe that this is not within 10 the scope of these upcoming hearings -- the Generic 11 Environmental Impact Statement, Section 5, allows for review 12 of high-level waste storage in terms of consequence. In this 13 case, it could be the consequence of a severe accident, for 14 instance, due to terrorist attack. Which is just how the 15 issue was raised in California and the Ninth Circuit Court of 16 Appeals upheld the contentions of those that brought that 17 litigation to court. So, this is a totally permissible arena 18 for high-level waste to be considered within the scope.

19 That's one.

20 Evacuation Planning -- it's the second one. I'm 21 going to just take a drink.

22 ELVA BOWDEN BERRY: I'm going to ask you to 23 wrap it up. I have a handful of cards. We want to get 24 everyone's comments in.

25 CHRIS NORD: Yup 26 O-01-WST cont

- 102 -

ELVA BOWDEN BERRY: I don't want to cut you 1

short, but --

2 CHRIS NORD: Well, you know, I bet everybody 3

that's here would like you to stay so that their comments can 4

be made. I'll do this really quickly.

5 Evacuation Planning was a snow job here 20-6 years ago. The reason -- the reason that so many rules got 7

changed -- the field got changed 20-years ago -- was because 8

the evacuation plans 20-years ago were not sufficient. So, 9

someone came up here earlier and said we're dealing with it 10 in the moment -- in the here and now. Well, in the here and 11 now, these evacuation plans are unworkable. They've been 12 unworkable for 20-years. Take a look. The Federal Emergency 13 Management Agency 20-years ago -- the Region One director, Ed 14 Thomas, said it's no good. And because of that, we have to 15 stop the license. The Reagan administration pulled him, 16 installed a new Region One director and they rubber-stamped 17 the evacuation plans. That's not an adequate evacuation 18 plan. We have twice as many people living in the seacoast 19 region than we did 20-years ago. So, how is that going to 20 work? That has to be included within the scope of 21 relicensing.

22 Tritium tritium and pipe degradation.

23 Almost 20-years ago, again, in a different part of New 24 England the Deerfield River Valley of western 25 Massachusetts -- exposure to tritium was linked to Down 26 O-02-SEC O-03-RAD

- 103 -

syndrome -- statistical significance -- for Down syndrome and 1

assorted other health maladies. The study was signed-off on 2

by the State of Massachusetts. The study is available. If 3

you needed the study and don't have it, I can give you the 4

study because I've got it at home. So, tritium is a known 5

evil quantity and the linkage was made 20-years ago to the 6

Yankee Atomic reactor in Rowe, Massachusetts. Yankee Atomic 7

was closed in the early 90s due to concerns around pipe 8

embrittlement. Is it possible that pipe embrittlement caused 9

the release of all of that tritium?

10 You know, I am not a technician. We've got 11 gentlemen like Paul Blanch here who hopefully will get a 12 chance to speak tonight, but if we've got pipes that are 13 inaccessible and can't be monitored, then that certainly 14 falls within the scope of the upcoming license extension 15 hearings. That stuff has to be looked at because we cannot 16 have tritium flowing into the groundwater and coming right 17 across the marsh into Hampton. I mean, Winnacunnet Road is 18 right on the marsh. I have friends that live on Winnacunnet 19 Road. So, is it true that Florida Power and Light is digging 20 test wells because they're trying to track tritium? I mean, 21 these are hugely important concerns and should be included 22 within the scope of these hearings. Thank you for your 23 audience.

24 ELVA BOWDEN BERRY: Thank you for your comment.

25 We're going to ask everyone to keep your comments to no more 26 O-03-RAD cont

- 104 -

than 10-minutes because I have really a stack of cards and I 1

want to let everybody have the opportunity to speak and I 2

just want to remind you that we're talking about 3

environmental scoping. Paul Bamberger is the next speaker.

4 If you could just go to the podium and state your name 5

clearly and where you're from. Thank you.

6 PAUL BAMBERGER: Is this all right? I'm not 7

familiar with this -- I just have one comment stated three 8

ways. Tonight I saw something happen twice already that's 9

bothered me for years in this.

10 Recently I read a quote from an official from 11 Seabrook who said -- We can handle the nuclear waste for the 12 next 20-years and beyond. Well, beyond's faith -- there's no 13 information. When people answer serious questions with words 14 like `beyond` it really scares me. And he also did it 15 tonight to me. He said -- Well, it's safe until the year 16 2080. But it's been decades now that you had a chance to 17 prepare for 2081 and I heard you say nothing about 2081.

18 It's another non-answer to a very serious question. And you 19 get this all the time. You have to be very careful with the 20 way they use the language.

21 And that other person -- all he had to say to 22 you was the number. And it's easier to engage you in some 23 foolishness rather than say -- None have been refused. It 24 would've taken two seconds and it would've been over. But 25 this circular non-answer has been going on ever since 26 P-01-WST

- 105 -

Seabrook has been going on. And not just in the Seabrook 1

issue, but generally. But there's three tonight -- two 2

tonight and one in the newspaper. Beyond `beyond` -- what 3

does that tell me? Nothing. 1980 -- what does that tell me 4

about my children in 1981? Nothing. It really scares me.

5 Thank you.

6 ELVA BOWDEN BERRY: Mr. Bamberger, could you 7

tell us where you're from?

8 PAUL BAMBERGER: New Hampshire.

9 ELVA BOWDEN BERRY: Now, Dr. Peter -- Somssich?

10 DR. PETER SOMSSICH: Yup, thank you.

11 ELVA BOWDEN BERRY: Please spell your name for 12 the record and tell us what organization you're with.

13 DR. PETER SOMSSICH: Yes. It's Peter Somssich, 14 S-O-M-S-S-I-C-H. I'm a resident of Portsmouth and since my 15 memory's not so good, I've written up my comments that I've 16 given to your clerk over there.

17 I'm attending the session to express my 18 opposition to the 20-year extension of Seabrook Nuclear Power 19 Plant's current operating license. Not only do I reside 20 within the official evacuation zone of this power plant 21 should an emergency be declared, but I'm also a trained 22 atomic scientist with both training and professional work 23 relevant to nuclear power safety. I have a Ph.D. from the 24 University of Heidelberg, Germany in physics and have worked 25 professionally as a research scientist on nuclear energy 26

- 106 -

related issues. Currently, I am employed as an analytical 1

scientist in a non-nuclear related field and do not have a 2

personal vested or financial interest to protect with regard 3

to Seabrook Nuclear Power Plant.

4 In addition to my initial training in various 5

professional positions, I have continued to be a permanent 6

student of energy related issues, nuclear power issues, 7

alternative energy issues surrounding nuclear proliferation 8

for the past 40-years. My objections to the 20-year 9

extension of the operating license can be grouped into four 10 categories. Number 1 -- What's the hurry? 2 -- Financial 11 liability. 3 -- Safety and security concerns. 4 --

12 Materials for nuclear weapons proliferation. Also I'd like 13 to propose an alternative suggestion to any operating license 14 extension should one be considered.

15 What is the hurry? I am sure that I'm not the 16 only member of the public who was surprised to see a request 17 for an extension of a license that is still valid for another 18 20-years. To apply for an extension 5-years before the 19 expiration date would not surprise me, but 20-years -- that 20 is strange. The only logical explanation I can think of is 21 that this is an insurance policy against possible problems 22 with the plant in the next 40-years and/or that the owners of 23 the plant see what all outside experts already know, that in 24 fact nuclear power is too expensive and will not be able to 25 Q-01-LIC

- 107 -

compete with other sources of power in the future, even as 1

recently as the next 10-years.

2 Financial viability. What independent energy 3

experts except those who are employed by nuclear power 4

industry already agree is that nuclear power is currently not 5

able to compete with other energy options on a free-market 6

basis, were it not for the federal government, which is 7

providing it with large low-risk loans and insurance 8

protection against liability. This type of power is already 9

the most expensive kind available and will not improve 10 significantly in the near term future, if at all. That is 11 why private investors have rejected even very generous 12 options to build a new power plant over the last 30-years.

13 This energy is not renewable and therefore not sustainable 14 and all indications are that at least in the United States 15 and most of the rest of the world, it will stay that way.

16 Safety and Security Concerns. The safety 17 record of many U.S. nuclear power plants over the past 30-18 years has been better than was expected by the critics.

19 However, the strong scrutiny brought to bear by both 20 environmental groups and government agencies must be credited 21 with most of this outcome, since otherwise profits would have 22 been the main focus. It is, however, also important to point 23 out that Seabrook's initial license was conditioned by the 24 requirement that a final destination point for its nuclear 25 waste be determined prior to initial operation. This never 26 Q-01 cont Q-02-LIC Q-03-SEC - 108 -

happened because the federal government never provided such a 1

location. If Seabrook had told the public at the time that 2

the final destination of the waste was in fact on the 3

property of Seabrook Station, perhaps that license would 4

never have been issued. Regardless of the disposal issue, 5

this power plant must be considered a possible terrorist 6

target and the level of security needed for adequate 7

protection must be very high. However, undisclosed visits by 8

government teams testing such security at nuclear power 9

plants have concluded that the current security measures are 10 not enough. This means that there will be added additional 11 expense for all nuclear power plants in the near future.

12 Materials for Nuclear Weapons Proliferation.

13 Not only is a nuclear power plant a potential terrorist 14 threat, but it must also be viewed as a target for groups 15 attempting to procure nuclear fuel materials to enable the 16 production of nuclear weapons. With increasing storage of 17 nuclear waste on-site, as is the current case currently at 18 most nuclear sites, without the full protection against theft 19 that a centralized facility could provide, the attraction for 20 both terrorists and nuclear weapons brokers will only 21 increase.

22 Finally, an alternative suggestion. As many of 23 you present today already know, most European countries have 24 already turned their backs on nuclear power for many of the 25 reasons already mentioned above. However, in Germany, which 26 Q-03-SEC cont Q-04-LIC

- 109 -

is phasing out its nuclear energy industry, a number of 1

environmental groups have supported the extension of nuclear 2

power licenses, if they are safe enough to operate, in 3

exchange for the payment into a renewable energy fund of some 4

portion of the windfall profits that operators and owners 5

will reap as the result of a license extension. Since most 6

nuclear power plants are built for a specific number of years 7

in operation and have been budgeted and paid for during these 8

years, a license extension provides extra operating years and 9

extra revenue. It would seem only a fair deal to ask for 10 some of that windfall profit, say 50%, to be invested in a 11 fund for truly renewable energy projects should an extension 12 be granted.

13 I appreciate this opportunity to submit this 14 statement. Thank you.

15 ELVA BOWDEN BERRY: Thank you. The next three 16 speakers will be Debbie Grinnell, Cathy Wolff and William 17 Harris.

18 Please state your name and your affiliation 19 when you get to the mic. Thank you.

20 DEBBIE GRINNELL: I'm Debbie Grinnell and I'm 21 with the C-10 Research and Education Foundation and serve 22 both as a staff person doing research and also as a founding 23 Board member. When Seabrook submitted their application 20-24 years in advance of their license expiration -- which would 25 bring the plant to 2050 -- we were very aware that the parts 26 Q-04-LIC cont R-01-SAF

- 110 -

and the underlining underpinning construction foundation of 1

this plant has parts from the 1970s. We looked over some 2

recent inspection reports to look at how NextEra was managing 3

their component systems and parts. What was immediately 4

brought to our attention after the last refueling and 5

inspection report was that NextEra was cited for submerged 6

electrical cables in two-vaults that were underwater --

7 underwater, which is saline, which is highly corrosive.

8 So, what we're looking at here is inaccessible 9

electric cables that are in water that is known to cause 10 early failure. So, we thought what's the most responsible 11 thing to do here? We looked into some recent research. We 12 looked into what the NRC was doing and the NRC had actually 13 contracted/sponsored a study with the Brookhaven National 14 Labs and asked them to assess the early cable failures before 15 the 40-year license expiration and to analyze which cables, 16 how many -- but they didn't actually do that because they 17 were a research institute and what the generic letter 18 requested was not to find/locate on the schematics every 19 buried/submerged underground pipe and electrical cable -- it 20 was to identify the ones that are already failed.

21 So, what we needed to know up-front was how 22 many have failed, where are they, what manufacturers are most 23 responsible. What were the years of the greatest failure?

24 1970s. We still don't know what manufacturer manufactured 25 and what usage NextEra has. What we do know is that none of 26 R-01-SAF cont

- 111 -

the cables that are submerged at Seabrook were qualified for 1

submersion. They are not marine cables. They are not 2

qualified, which means that the plant is now operating 3

outside of its design basis and in violation of Federal Regs.

4 The NRC has done a very minor citation. There is no fine.

5 They were asked to pump out the water and come up with a 6

long-term solution. What hasn't happened in this industry --

7 we haven't identified where all the cables are. How many 8

there are? How many are submerged? And what condition 9

they're in.

10 The reason we can't do that is because the only 11 way this can be done is visually. The Brookhaven National 12 report reported that the surveillance testing, the in-service 13 program, the maintenance rule, the aging program -- does not 14 identify the cables before failure. It is impossible to do.

15 So, short of instituting -- which has not been done by the 16 NRC -- a responsible program that is based on a regulation 17 that would enforce the industry to actually: know where all 18 the cables are, the condition of them. We cannot go forward 19 with this.

20 We have, as a result of this knowledge, asked 21 Paul Blanch, who is a energy consultant. He's an electrical 22 engineer. He worked for Northeast Utilities and many other 23 utilities. His expertise is in instrument and control 24 engineering. I would like to defer to him at this point 25 because we are not technically based and that's why we asked 26 R-01-SAF cont

- 112 -

an energy consultant to give us advice on this situation.

1 Paul -- can I ask you to speak for me?

2 ELVA BOWDEN BERRY: Debbie, we're not going to 3

take people out of order. Paul spoke earlier today, so we 4

want to get to the speakers who haven't been here.

5 AUDIENCE MEMBER: I'd like to hear him.

6 CATHY WOLFF: I'm next in line. Can I yield to 7

him if I'm next in line? Is that appropriate?

8 ELVA BOWDEN BERRY: Well, we won't --

9 PAUL BLANCH: I'm a neutral party here. Anyway 10 11 ELVA BOWDEN BERRY: We want to give everybody a 12 chance --

13 PAUL BLANCH: My name is Paul Blanch, B-L-A-N-14 C-H. Thank you, Debbie. And I just want to give another 15 example of NRC enforcement, or as some people talk about, NRC 16 enfarcement. I was tempted to get up here and light up a 17 cigarette and that would endanger the health and safety of 18 the people in this meeting room and I'm sure the police 19 officer in the back would come up here, drag me out, maybe 20 impose a fine and maybe even put me in jail or something like 21 that. I'm sure the local police would enforce the 22 regulations. Now, let's contrast that to Seabrook. Seabrook 23 is violating the regulations. They're emitting hazardous 24 substances -- tritium and possibly other -- which are 25 unmonitored that are a health hazard.

26 K-03-SAF

- 113 -

So, what does the NRC Office of Enforcement do?

1 They clearly identify it's a violation of regulations. Same 2

as with cable. And they issue them a severe non-cited Green 3

violation, but they don't make them put out the cigarette.

4 That thing is still leaking tritium. In the same respect, we 5

have the cable issues, which Mrs. Grinnell just talked about, 6

and we have cables that are clearly outside their capability 7

to operate per 10 CFR 50 Appendix B, Criterion I think is 15 8

and 16, Design/Control/Inspection. The NRC knowingly allows 9

these plants to operate outside of its design basis. We know 10 that the cables must be qualified in order to determine 11 whether that plant could safely operate and its emergency 12 equipment will properly operate.

13 I've just got so many examples -- the buried 14 pipe inspection program -- we just found out and again 15 working with the General Accountability Office that the 16 buried pipe inspection program only covers steel pipes.

17 Well, they've got every other kind of material pipes and then 18 the real shocking thing that came up in the GAO investigation 19 is the buried pipe inspection program only looks for external 20 corrosion. So Seabrook says -- We'll look at external 21 corrosion when the thing fails -- is basically what they say.

22 It just goes on and on and on. We need a regulatory agency 23 that will actually look at their regulations, enforce their 24 regulations and if the plant is not compliant with those 25 K-03-SAF cont

- 114 -

regulations change the regulations or shut down the plant 1

until the plant can operate.

2 Again, with this license renewal application --

3 it's just a license to continue to operate outside of the 4

regulations. The NRC accepts, as Mrs. Grinnell said, 5

Seabrook's program and other programs like Vermont Yankee who 6

have observed water in manholes. They acccept -- We'll look 7

at the manholes once every two-years to see whether there's 8

any water in. If there's any water in there, we'll pump them 9

out. Use a little engineering common sense. When you have 10 manholes connected by conduits that contain cables and if I 11 have water in each end of the conduit or the manholes and I 12 pump it out and it's good for another two-years -- how do we 13 ever, ever know that those cables are dry? We don't.

14 Take a look at the Brookhaven report, which is 15 sponsored by NRC research. They say -- You must take a look 16 and determine if these cables are submerged. Nothing is 17 being done presently or for the next 40-years other than 18 Seabrook says -- We'll look at them every once in awhile and 19 see if they're dry. If not, we'll pump them dry and we'll 20 continue to generate those mega-dollars everyday.

21 I can go on and on on the shortcomings of this 22 application. The fact that insufficient information is 23 provided in there for anyone to determine whether this plant 24 is safe -- whether it is in compliance with the regulations.

25 I think that the NRC needs to give a hard look at how they 26 K-03-SAF cont

- 115 -

take enforcement action and they cannot just turn a blind eye 1

to clear regulations, whether it be environmental 2

qualifications or whether it be 10 CFR 50, 55(a) for piping 3

inspections and leaky terminations, structural integrity of 4

pipes. There is no assurance. I was in the Navy, as Mr. Bo 5

Pham was in the Navy. Those nuclear power plants -- we slept 6

less than 100 feet away from them. Those were safe. They 7

were regulated properly. They were operated properly. When 8

I got out of the Navy and I saw how these power plants were 9

built and not regulated -- I was totally shocked. This is a 10 different world from the Navy program. It's my belief that 11 unless this regulatory agency can really do its job --

12 enforce its regulation -- that these plants should not 13 continue to operate as they are right now with unqualified 14 cables and pipes in unknown conditions leaking God knows 15 what. Thank you.

16 ELVA BOWDEN BERRY: Thank you for your comment.

17 Okay -- Cathy Wolff. And please I'd ask you not to defer 18 your time because there are people who haven't had the 19 opportunity to speak, so they need to have that opportunity 20 and some people have already spoken once today. Thank you.

21 State your name and your affiliation.

22 CATHY WOLFF: My name is Cathy Wolff. I live 23 in Kittery, Maine. I belong to different groups, but I'm a 24 concerned citizen. This is not going to address the 25 K-03-SAF cont

- 116 -

technical or the environmental. You're getting a lot of 1

information on that. This will be fairly short.

2 It was almost 40-years ago that other NRC 3

representatives sat in similar rooms in New Hampshire 4

listening to citizens suggest that the salt marshes in 5

Seabrook might not be environmentally and otherwise the best 6

place to put a nuclear power plant. I'm sure you are all 7

knowledgeable of this history. But -- anyway. While those 8

people carefully and sometimes emotionally outlined their 9

concerns, some of the NRC reps talked, even laughed with each 10 other or sat there looking bored. They clearly were not 11 listening. And why should they?

12 The hearings -- and there were many hearings in 13 those years -- were pro forma. Soon, a construction permit 14 was issued with some changes in design brought about by the 15 Herculean efforts of people who believed that if they could 16 not stop the nuke, at least they could try to make it safer.

17 Despite the

permit, protests continued drawing 18 international attention to an industry that had essentially 19 gone unquestioned even by the NRC. Public opinion began to 20 shift as people realized there were a lot safer, a lot 21 cheaper and a

lot more effective ways to generate 22 electricity. The nuclear industry suffered. Wall Street 23 withdrew support. Nuke plants were shelved. But we did not 24 freeze in the dark -- a promise that had been made to us by 25 the builders of Seabrook.

26

- 117 -

Then, in the last few years the industry, as 1

you well know I'm sure, launched a new political offensive to 2

help assure its comeback would not be derailed again by 3

public opinion. It sought even larger tax subsidies with a 4

lot of help from the last administration. A streamlined 5

licensing process that gives an even shorter shrift to public 6

input than existed previously. And they moved quickly to 7

extend the lifetime of existing plants. I believe there have 8

been 50, so far, that have applied for and received operating 9

license extensions. Ironically, those extensions will only 10 increase the chances of a serious accident. An accident that 11 could be a PR nightmare for the nuclear industry -- not to 12 mention what it might do to the people who live nearby.

13 There were reasons that your predecessors set a 14 lifetime of 40-years before a plant should be decommissioned.

15 It wasn't whim. Do any other power generating plants -- oil, 16 coal -- have decommissioning dates set by law? I haven't 17 been able to find out, but I don't think they do. It's nice 18 to see that manners -- and I'm mentioning this mainly because 19 that's the way it felt this afternoon, not necessarily at the 20 beginning of this evening's session -- or perhaps maybe just 21 improved PR device -- although after the beginning of this 22 evening's session, I doubt that -- has creeped into the NRC's 23 public hearing process since the 1970s, but I would hope 24 that's not all that's changed. I would hope that you -- you 25 NCR [sic] representatives -- will go back to Washington and 26 S-01-LIC

- 118 -

please don't just review the issues raised here -- which you 1

have to admit, at least this afternoon and beginning already 2

this evening, are substantial and thought-provoking. You may 3

not be able to stop nuclear companies from applying for 4

absurdly premature license renewals -- although let's hope 5

that a rule change will -- but you certainly don't have to 6

smooth the way for their approval. You can, with diligent 7

study, recommend -- Hey, wait 10-years, try it then.

8 Please consider as you deliberate that you have not 9

heard -- at least not this afternoon and not so far this 10 evening -- a single argument today directly related to why an 11 operating license should be extended 20-years before it 12 expires. Not a single argument. Even the handout from the 13 company that I picked up out there that's seeking the 14 extension does not make a lot of sense. So they can plan 15 ahead, they argue. Well, does that mean that without an 16 extension they plan to let things fall into dangerous 17 disrepair? In fact, your very own PowerPoint fails to 18 provide even a substantial -- a word that got bantered around 19 earlier today -- reason much less a complete one.

20 The fact that the folks at Seabrook provide 21 jobs, give money to the United Way and are generally good 22 guys and good community members does not address the issue.

23 I am sure that 10-years from now they will still be good guys 24 and loyal Chamber of Commerce members both in Exeter and 25 Hampton.

26 S-01-LIC cont

- 119 -

The only final thing I have to say is in your 1

PowerPoint, you have on page 21 or slide 21 -- the Final 2

Agency Decision the Commission considers Safety 3

Evaluation, Environmental

Impact, NRC inspections, 4

recommendations from the ACRS -- how about also considering 5

public input? Thank you.

6 ELVA BOWDEN BERRY: Thank you. Next we're 7

going to have William Harris, then Skip Medford and Gil Brown 8

. Please state your name and your affiliation when you get 9

to the mic. Thanks.

10 WILLIAM HARRIS: Good evening. My name's 11 William Harris. I live in Newburyport, Massachusetts where 12 we have many people concerned about emergency evacuation.

13 But my primary interest comes from managing research projects 14 at the RAND Corporation in Santa Monica, California on 15 nuclear

energy, economics, reprocessing, nuclear 16 proliferation for Robert Seamans and Bob Fri of ERDA, then 17 the Department of Energy. I served on advisory panels to 18 assess nuclear alternative fuel systems as to their 19 proliferation resistance. I did research projects on 20 alternative energy systems -- solar, et cetera. I've been an 21 environmental attorney, so I've also litigated environmental 22 issues.

23 I'd like to address mainly issues relating to 24 the scope of the Environmental Review. First, what has 25 changed significantly since the licensing hearing that ended 26 T-01-SEC S-01-LIC cont

- 120 -

with the license in 1990 for the Seabrook plant? Several 1

significant changes have occurred. We have a significant 2

population increase -- both in southern New Hampshire and in 3

northern Massachusetts. You'll get the 2010 census data 4

during your review for this license. We have increased 5

mobility of people.

So, during the summer, we have 6

much more peaking of beach traffic. We have a great infusion 7

of population at the beaches, which raises a challenge for 8

evacuation planning. We have some setbacks in long-term 9

high-level waste management, but I think the Yucca Mountain 10 thing is not entirely over. It may depend on elections this 11 year and later. There's also an issue of alternative dry-12 cask storage as a technology that might be considered for 13 mitigation in lieu of on-site swimming pool storage of waste 14 from this plant. And another major change since 1990 -- and 15 this is the primary field I work with. I used to plan and 16 draft arms-control treaties on leave working for the State 17 Department -- The Arms Control and Disarmament Agency -- the 18 United States through this Nunn-Lugar Program has bought and 19 repossessed by various means both high-level waste and low-20 level waste and nuclear fuel rods from other countries, which 21 are important for our non-proliferation efforts.

So, I 22 believe it is a positive factor that needs to be considered 23 that since the United States has now accumulated much more 24 nuclear material -- from other nations and has decommissioned 25 a substantial number of nuclear weapons -- that the recycling 26 T-01-SEC cont T-02-WST

- 121 -

of this material in low-level enriched fuel assemblies is a 1

much safer alternative for those fuels than to leave them 2

abroad in a Kazakhstan or any other number of other places.

3 So, these are major changes that need to be considered in the 4

relicensing. Though I also find it troubling that the 5

relicensing is done so far ahead. I believe there's some 6

opportunities that ought to be included in the design of the 7

Environmental Review.

8 My first concern has to do with emergency 9

evacuation planning and recovery operations. Not only did 10 FEMA have trouble with the original evacuation planning, but 11 the governor of Massachusetts, then Governor Dukakis, could 12 not approve in 1990 the evacuation plan. We already had 13 traffic saturation troubles then.

14 I've been working on mitigation for the 15 Whittier Bridge Project, which is I-95 crossing the Merrimack 16 River. We're going from 6 to 10-lanes -- 8-lanes and two 17 emergency lanes. There've been significant studies mainly 18 from Florida since hurricane Andrew -- many important reports 19 from the National Research Council on contraflow evacuation 20 opportunities and so ultimately we will have more flow-21 capacity -- we'll have a significant, about a two thirds 22 increase, in flow south in the event of an emergency at 23 Seabrook. But we're getting saturation on I-95. We have not 24 yet had the adequate modeling of connectors between say Route 25 110 going east/west between I-95 and 495. So, we really 26 T-03-SEC T-02-WST cont

- 122 -

don't have the flow-capability to handle evacuations in a 1

major emergency, especially in the summer when we have beach 2

traffic.

3 Now, a most significant change since 1990 that 4

I think needs to be considered in the Environmental Review 5

and I think also in the Safety Review -- has to do 6

unfortunately with the development of volitional actors --

7 terrorists -- who would like to take out high-value targets 8

that can cause great harm.

9 We have two important de-classified findings 10 that are pertinent to the Seabrook relicensing. First we 11 have the 9/11 Commission, which in its official release 12 indicated that those who planned the World Trade Center 13 bombings had actually had Seabrook as a priority target just 14 before that. That's all online in the 9/11 Commission 15 report.

16 Then more recently Curt Weldon, the Congressman 17 from Pennsylvania who served on the Armed Services Committee 18 of the House, released information that a group of mainly 19 Pakistani citizens in Canada with 19 arrests were considering 20 an attack on Seabrook after 9/11. So, I think as we're 21 planning for the operation of this plant past 2030 -- even in 22 the next decade -- we need now to take a re-look as part of 23 the environmental mitigation and risk assessment for this 24 relicensing, the consequences of having actors who are 25 T-03-SEC cont

- 123 -

malevolent rather than just the risk that come from nature 1

and from failures of technology that are inadvertent.

2 I believe the C-10 Coalition -- I am not a 3

member. I am not opposed to nuclear power -- but I believe 4

they've done some important work to model weather patterns 5

from Seabrook. It may have made sense for the 1990 6

assessment to look at prevailing winds. Prevailing winds 7

mainly go west to east. Unfortunately, when you are dealing 8

with malevolent actors, you will not get an attack when the 9

prevailing winds go from west to east. You may get it when 10 they go north/south because that would pick up a much larger 11 population north of Boston that would be exposed in the event 12 of a terrorist attack.

13 So, I suggest that there are opportunities if 14 you take the weather modeling that was done by the C-10 15 organization and other studies and get the assistance from 16 the Defense Threat Reduction Agency -- they have the nation's 17 best models. They have a declassifiable version that can do 18 the plume analysis when the winds are blowing in any number 19 of directions, but you should include as the greatest threat 20 a north/south wind pattern and then you should probably 21 include the prevailing wind patterns and you should include 22 summer beach times -- our summer traffic on I-95 peaks 23 between May and October. The main peaks are July/August to 24 Labor Day. You have major peaks in congestion on weekends.

25 If you do that -- I believe if you did that analysis and the 26 T-03-SEC cont

- 124 -

U.S. Department of Transportation now has excellent models --

1 their Office of Emergency Evacuation -- they have excellent 2

software models. NRC has a group of excellent software 3

models on emergency evacuation.

4 If you get the help of the Defense Threat 5

Reduction Agency, which has a colonel in this region who 6

would do the modeling for you, I believe you would be able to 7

develop much better mitigation planning. So, you do not 8

evacuate everybody in a major emergency. You only evacuate 9

the people who are at high risks of radiation or other 10 threats. That would be essential to do.

11 You should also include consideration of what's 12 been developed by the U.S. Department of Transportation for 13 contraflow traffic where they provide in their contracting 14 that all contractors working on interstates are responsible 15 to remove their construction equipment in an emergency 16 because during hurricane evacuations in Florida and 17 elsewhere, we've had problems with contraflow traffic when 18 equipment is left on these interstates. So, I believe that 19 this is at least one advantage of this early relicensing 20 application, which is we have an inadequate set of emergency 21 plans to evacuate people. We have good software in the 22 federal government in different parts. And an excellent 23 plume analysis done by the Defense Threat Reduction Agency 24 that's available to NRC. I hope that as part of this 25 relicensing, you consider mitigation measures that would be 26 T-03-SEC cont

- 125 -

important for both evacuation and recovery operations in the 1

event of a terrorist attack or just an accident at the plant.

2 I also hope you'll consider dry-cask storage 3

options, so that you can get the spent-fuel assemblies that 4

are now on site at Seabrook off that site. That could also 5

reduce a target of attack and radiological harm.

6 So, one other aspect I think that you should 7

consider in a relicensing application is alternative nuclear 8

energy systems where there are scale economies to be on the 9

same site because you already have a site with all the 10 infrastructure and the security systems that are now likely 11 to be much less vulnerable. Some of the Babcock and Wilcox -

12

- I may not have the name right -- plants that are underwater 13 at all times, so that even if an aircraft were to come at 14 just the right angle -- and I've supervised modeling of 15 aircraft attacking nuclear power plants and LNG plants and 16 these plants were not designed for direct attack by aircraft 17 that are purposely trying to take out the plant.

18 But these plants do have some redundant 19 features -- under many conditions they would survive an 20 aircraft attacking a nuclear plant -- but a safer option is 21 to have plants that are always protected, so even if an 22 aircraft came at just the right angle with just the right 23 amount of energy that you would have a safer outcome. So, I 24 believe that when you're considering relicensing for this 25 long period of time, one ought to consider alternative 26 T-04-ALT T-03-SEC cont

- 126 -

nuclear plants at the same site as an option to consider in 1

lieu of just automatically extending a license for a plant 2

that simply was not designed for an era of terrorism.

3 So, I will at some point provide written 4

comments. I've taken much time and I thank you.

5 ELVA BOWDEN BERRY: Mr. Harris, thank you.

6 Could you stay there for a minute. You mentioned ERDA and 7

could you specify what that is for the record?

8 WILLIAM HARRIS: ERDA -- The Energy Research 9

and Development Administration had a research council and I 10 supervised many of their research projects at the RAND 11 Corporation. That was then run by a Robert Seamans and the 12 Deputy Director Robert Fri, F-R-I. So, they were between the 13 Atomic Energy Commission and the Department of Energy. I 14 also worked for the Department of Energy doing studies, as 15 well. I think that period is 1976, when the AEC goes out of 16 business, to about 1980 with the Department of Energy. So, 17 E-R-D-A is in the middle.

18 ELVA BOWDEN BERRY: Okay. Thank you very much.

19 We'll have Skip Medford.

20 SCOTT MEDFORD: Thanks very much for the 21 opportunity. You stated my name. I'm a biologist. I also 22 live in New Hampshire, perhaps closer than other commenters 23 this evening. I'll keep my comments very brief. In case 24 nobody said it yet -- as long as the owner/operators can 25 U-01-PRO T-04-ALT cont

- 127 -

satisfy valid concerns about the plants continued viability, 1

I support license renewal.

2 Second -- and primarily addressed to the NRC 3

members here. Will you conduct or will you ensure the 4

applicant conducts an equitable review of taxes paid and 5

contributions made to various states, towns, residences 6

impacted by the siting and continued operation of the plant?

7 Perhaps on a per megawatt basis, per area impacted basis or 8

other comparable metric within the industry or within the 9

region? Thank you very much.

10 ELVA BOWDEN BERRY: Thank you. Gil Brown. Can 11 you state your organization when you get to the mic.

12 PROFESSOR GILBERT BROWN: Sure.

13 ELVA BOWDEN BERRY: Thank you.

14 PROFESSOR GILBERT BROWN: Hi, good evening.

15 I'm Gilbert Brown, a professor of nuclear engineering at the 16 University of Massachusetts in Lowell. So, I'm not exactly a 17 resident, although I do swim at the beach and I certainly 18 enjoy the seacoast as much as anybody that does live around 19 here. So, you might ask why am I here? What are my 20 comments? Well, it's a very good question, actually. I'm 21 listening to a lot of the technical comments or comments that 22 deal with technical issues -- this probably isn't the forum 23 to debate each one of the issues, but all these issues need 24 some airing. I'm confident that you will air those. As a 25 previous speaker said, if there are issues with the safe 26 U-02-SOC U-01-PRO

- 128 -

operation of the plant, then the NRC has the right and the 1

responsibility to say -- Stop. I know you've done that to 2

plants in New England and elsewhere and if the plants aren't 3

safe to run, they shouldn't run.

4 So, one of my main points is to separate the 5

issues about license renewal from the running of the plant.

6 I'm almost certain in the presentation that you make that 7

point. So a lot of the comments here I think deal with that 8

piece of the NRC business of being a independent regulator 9

overseen by

Congress, commissioners appointed by the 10 president and reviewed by the Senate, ACRS appointed by this 11 process of independence challenging those assumptions --

12 challenge the very basis upon which this nation is a stable 13 democracy. I'm not here to challenge that. Do your job.

14 And I'm comfortable with the answers. If the answer is -- no 15 go. Then it's no go.

16 License renewal -- I think the issue of why 17 now? Why not N minus five and whatever that is -- 15-years 18 down -- at the last minute? Oh, I think you'd be really, 19 really uncomfortable. I would be if it was a last-minute 20 rush to get the license renewal. License renewal is not a 21 permission to operate the plant. That happens every day with 22

-- two on-site inspectors? A myriad of inspection reports.

23 People were asking what's different from 40-years ago? Oddly 24 enough, I can remember 40-years ago. Better than maybe 25 yesterday, sometimes. But, really and I'll be the first in 26 V-01-PRO

- 129 -

this audience to mention TMI, which I know you know what it 1

means and my students think it means To Much Information.

2 But we established the Institute -- we, the country, the 3

nation, the owners of the plant -- established the Institute 4

for Nuclear Power Operations. This is a level independent 5

from the requirements of the NRC. This is an excellence 6

model. The plants that you knew 25-years ago, 30-years ago -

7

- in Seabrook's case 20-years ago -- are not the plants that 8

are operating today. The performance speaks to that. The 9

attention to detail. The maturation of -- if you'll pardon 10 the expression -- safety culture. Three-way communication.

11 Attention to detail. And in my business that I do for a 12 living -- educate the workforce for the future.

13 The attention to detail, the knowledge base --

14 it's a very different environment than it was. If you 15 haven't been around up close and personal -- I know you have 16 issues. There are issues every day. We fly on airplanes.

17 There are issues every day. We cross the street. There are 18 issues every day. I mean life is an issue with one 19 certainty. So, it's different though today. It's better.

20 The bar has been raised and the performance speaks to that.

21 The quality, the detail, the attention to safety -- the 22 oversight by the commissioners and the staff. It's a 23 different world. I can attest to that.

24 One of the things I do is independently review 25 the training and issue decisions as to -- Is this an 26 V-01-PRO cont

- 130 -

accreditable training program? Are the people at the site --

1 and every site has to do this -- training the workers to the 2

standards not of the NRC, but of the INPO standards. They 3

are so high that they carry the weight of regulation.

4 And I can attest to the fact that people take 5

this seriously. And the plants are running safer and 6

therefore better -- a figure of merit, which speaks to the 7

economics. It's a red herring to say the nuclear plants 8

aren't economic. Every analysis says baseload electricity 9

provided by nuclear power plants are the most economic 10 electricity in the country. For sure it's the greenest. No 11 CO2. You can shake your head. There isn't a -- well --

12 AUDIENCE MEMBER: Yes, there is.

13 PROFESSOR GILBERT BROWN: I'm glad you finished 14 my thought, thank you. We study this -- I'm studying this 15 right now with a graduate student putting out a sort of a 16 white paper. There is no -- too coin a phrase -- free lunch.

17 We all leave footprints. Every energy source leaves a 18 footprint, be at a windmill, be it a solar panel or be it a 19 nuclear plant. You know what - we're going to need all of 20 them to meet the requirements -- I know the congresswoman, 21 the State Senator -- I don't know if she's still here. Is 22 that you? I can't -- I guess she left -- talked about in her 23 opening comments about keeping New Hampshire safe. But it's 24 also keeping New Hampshire with electricity because without 25 electricity, nobody is safe.

26 V-01-PRO cont

- 131 -

That's what Seabrook does -- it provides 24/7 1

electricity and it does it over 90% of the time. In the 80s, 2

if you were 80% of the time you were a good performer. The 3

average was in the 60s. Even in school, that's not a good 4

average. So, the industry average now is over 90%. I don't 5

know what Seabrook's number is today. It could be 95% --

6 something like that. It's really run well. That's a figure 7

of merit. It means attention to detail is being paid. So, I 8

want to --

9 MARY LAMBERT: Is this the S-E-I-S?

10 PROFESSOR GILBERT BROWN: I beg your pardon?

11 MARY LAMBERT: Is this speaking to the exam 12 question -- the S-E-I-S?

13 ELVA BOWDEN BERRY: Hold on, Mary. Let me 14 bring you the mic.

15 PROFESSOR GILBERT BROWN: It's as much to that 16 question, ma'am, as I believe I've heard from all the other 17 speakers and no one else made comments to the ideas of 18 terrorism, the ideas of plant performance, which is the 19 everyday job. I have spoken to the issue that 20-years, I 20 believe -- and here's my last point, frankly. The 20-year 21 license renewal is, albeit, arbitrary -- for sure. It's a 22 regulation. They say you can do in 20-years, so why not do 23 it in 20-years. That's not the point.

24 The point, I believe, is that this is a mature 25 technology. In the business I'm in, we're talking about 26 V-01-PRO cont

- 132 -

careers. We're not talking about consulting, coming to show 1

up to work one day and doing another job. These are lifelong 2

careers. We're training our students to work in a field --

3 to work at the power plant -- as a career. I believe that 4

that's maybe one of the unstated positive aspects of going 5

forward with a

plan that has the plant licensable, 6

operationable, for that period of time. We can create 7

academic programs. We can work with the community college to 8

train people to work in the plants and keep providing 9

reliable energy for the good citizens of, not just New 10 Hampshire, but New England. Thank you.

11 ELVA BOWDEN BERRY:

Thank you for your 12 comments. I'm going to remind everyone as Jeremy said, 13 there's four-ways to submit comments as indicated on the 14 slide that's up right now. At this point, I don't have any 15 cards for any new speakers anymore, so the cards I have left 16 are for people who have spoken already today. So, I want to 17 invite anyone new if they want to give a comment before I 18 open the floor to people who have commented before.

19 Okay, the first person is Tom Noonis. I just 20 want to ask that you keep your comments brief since we have 21 your comments already in the record today.

22 TIM NOONIS: Thank you. For the record, it's 23 Tim.

24 ELVA BOWDEN BERRY: Tim -- sorry.

25 V-01-PRO cont

- 133 -

TIM NOONIS: That's all right. The last is N-1 O-O-N-I-S.

2 My name is Tim Noonis and this evening I'm 3

wearing two different hats. My first hat is that I am the 4

chairman of the Board of Directors of the Hampton Area 5

Chamber of Commerce. Seabrook Station is a very strong 6

supporter of the Hampton Area Chamber of Commerce and through 7

it, all the members that we serve.

8 Seabrook Station is always willing to sponsor 9

and participate in the many events and festivities that the 10 Chamber promotes to encourage business and tourism in the 11 areas that we serve. I have the privilege to serve on 12 various boards and civic committees with the employees of 13 Seabrook Station. I have found them to be a very bright and 14 positive group and an asset to the communities that we live 15 in.

16 Our Chamber membership runs the gamut from 17 small mom-and-pop businesses to very large corporations.

18 These businesses depend on reliable and reasonably priced 19 electricity to operate their businesses successfully. The 20 long-term viability of Seabrook Station is integral to the 21 success of our members. Seabrook Station is a crucial part 22 of this area's economy and you could not ask for a better 23 corporate citizen.

24 H-02-PRO

- 134 -

On behalf of the members of the Hampton Area 1

Chamber of Commerce, we would encourage you to extend 2

Seabrook Station's operating license.

3 My second hat this evening is a 17-year 4

resident and homeowner here in Hampton. A few years ago, I 5

went to a conference where the keynote speaker was the 6

cofounder of Greenpeace. In his address, he said the biggest 7

mistake that Greenpeace made was equating nuclear power with 8

nuclear weapons.

9 He continued on to say that nuclear power has 10 proven to be a safe and reliable source for generating 11 electricity and that the operation of these nuclear power 12 plants does not contribute to climate change.

13 I hear the clamoring for good jobs, cheap power 14 and a clean environment. But when it comes time to site one 15 of these power plants or even a wind turbine, everyone 16 screams -- Not in my backyard. Seabrook Station is in my 17 backyard and I have found them to be a very good neighbor. I 18 would encourage you to extend Seabrook Station's license.

19 ELVA BOWDEN BERRY: Thank you. Can I have 20 Janet Guen and then Doug Bogen. Is Janet still here? Okay -

21

- Doug Bogen.

22 DOUG BOGEN: I would like to pass. I'd make 23 all the points that I think others have made as well tonight.

24 ELVA BOWDEN BERRY: Okay, thank you. Paul 25 Gunter.

26 H-02-PRO cont

- 135 -

PAUL GUNTER: Thank you. My name is Paul 1

Gunter, G-U-N-T-E-R. You got the spelling this afternoon as 2

well. I'm not going to -- I want to reiterate a couple of 3

points. First of all, I'm the Director of the Reactor 4

Oversight Project for Beyond Nuclear, which is in Washington, 5

DC area. I had been a resident of New Hampshire for about 6

23-years. But, I wanted to note a couple of things that 7

we've heard tonight and ask you if you see a pattern?

8 First of all, it is beyond the scope of this 9

proceeding in its Environmental Review to address the issue 10 of there's no management for the nuclear waste that would be 11 generated in that 20-year cycle -- beginning in 2030/2050.

12 So, we have an unmanaged issue and it is beyond the scope.

13 We are also not allowed to address the issue 14 within the licensing process about security, even though we 15 know and I think it's been referenced by an expert here today 16

-- but clearly it was already a public document by one of the 17 federal labs -- I believe it was Oak Ridge. No, I'm sorry, 18 it was Argon National Lab -- that the reactor design for 19 Seabrook was never designed nor constructed nor evaluated for 20 fire and explosion from a direct impact from an aircraft.

21 Matter of public record. That public record disappeared for 22 a while after 9/11, but it is now back a part of the NRC 23 public document room.

24 Now, again, we have what appears to be an 25 unmanaged problem that's beyond the scope of being addressed 26 D-02-LIC

- 136 -

within the context of extending this reactor's operation 1

another 20-years. Also, you've heard comment and concern 2

with regard to an evacuation plan that's proved to be a very 3

prickly problem -- a lot of uncertainties. That too is now 4

beyond the scope of this proceeding. And we can go on.

5 There are several that present this unmanaged problem for the 6

NRC and I think that it begins to suggest that we have an 7

obsolete and antiquated review process that has to be 8

challenged. I think that you're getting some of that 9

challenge tonight.

10 As one of the petitioners to change the rule 11 that facilitates Florida Power and Light submitting an 12 application 20-years in advance of the expiration date -- I 13 suggest to you that this is yet another one of these 14 streamlining of a very problematic issue that does not serve 15 to benefit public health and safety and security nor does it 16 offer adequate protection to the environment necessarily.

17 But it provides and facilitates a conveyor belt for this 18 licensing process. As a consequence, that has to be 19 challenged today. We have, as of yesterday, formally 20 challenged the 10 CFR 54 Part 17(c), which says you can do 21 that. But, I just want the Agency, the public, the various 22 experts on both sides to see that there appears to be a 23 pattern here that facilitates this

process, but not 24 necessarily to the benefit that is mandated by Congress or 25 presented to us publicly.

26 D-02-LIC cont

- 137 -

I'll just close my remarks by pointing out one 1

other piece here. I'm just going to read into the record one 2

of the aspects of this 10 CFR 54 Part 17(c) that presents a 3

problem for those of us who would like a fair airing of a 4

relicensing process -- filing for license renewal midterm of 5

the current license finds the licensee at a place in this 6

system/structure/and component service-life where the 7

industry experiences few failures that are observed and 8

generally those that are observed are episodic or anomalous 9

in nature and thus cannot be readily plotted as a trend for 10 prediction purposes. The time of an elevated rate of 11 failures due to design/manufacturing/construction defects has 12 passed. That's what we call early component failure in what 13 is traditionally called a bathtub curve. I'm sure Dr. Brown 14 is quite familiar with the bathtub curve.

15 In that early failure rate, it's largely 16 irrelevant to aging management in the proposed extended 17 period of operation. The anticipated end-of-design-life and 18 aging issues have barely, if at all, begun to emerge. We're 19 basically at the bottom of this bathtub curve where you have 20 a high incidence early on as you work the bugs out -- whether 21 it's a nuclear power plant or an electric toaster or an early 22 model of a car -- there are these early failures. But now 23 we're at the bottom of that bathtub curve that has been 24 described to us as a highly efficient period of operation of 25 any facility.

26 D-02-LIC cont

- 138 -

So, little or no specific information on how a 1

given plant will age is available to be trended, provide 2

lessons or otherwise illuminate the path forward. It is 3

generally observed that for many system structures and 4

components, such information flow rates increase rapidly in 5

the fourth quarter and toward the end of the license. This 6

system/structure/component reliability progression is well 7

known and often illustrated in the so-called bathtub curve.

8 Additionally, corrosion risk is a function of 9

time. For example, the Beaver Valley Nuclear Power 10 containment was discovered to have been rusting from the 11 outside of an inner liner that was inaccessible for 12 inspection. So, the evidence of this through-wall corrosion 13 on the containment component surfaced when a bubble appeared 14 in the paint on the inside of the containment. So, it was a 15 outside/in corrosion process that escaped inspection and 16 maintenance until it was discovered by a bubble in the paint 17 on the inside.

18 Now, similarly -- I was very involved in the 19 Seabrook controversy. It was well known to us that the pores 20 in that concrete were facilitated by such things as cutting 21 of rebar that -- there were a whole host of issues that 22 raised concerns about the integrity of both the construction 23 and the documentation of quality control in that facility --

24 a whole host of systems and structures and components. And I 25 submit to you that our concern that this review process now 26 D-02-LIC cont

- 139 -

is coming at the bottom of this bathtub where things are 1

relatively stable, but the Agency is proposing to give its 2

approval for the latter life -- escaping the operational 3

experience of the latter life of this plant for the next 20-4 years, we believe is to be responsible, both in terms of how 5

this application is being presented and how it's being 6

reviewed.

7 We strongly urge you to again -- we are asking 8

the Agency both formally and in its review process to reject 9

this application. It's premature. It doesn't provide the 10 staff with enough information to give a fair assessment of 11 how this plant can be or if it can be well-managed in this 12 period of 2030/22050. Thank you.

13 ELVA BOWDEN BERRY: Thank you. Mary Lambert.

14 MARY LAMBERT: I'll be quick and -- well, here 15 it is. He's a lot taller. I'll be quick. I spent most of 16 my time on the Severe Accident Mitigation Analysis, which is 17 within scope. And focused mainly on the fact that the 18 computational tool -- the computer code -- that they are 19 using, the MACCS2, is an antiquated code. It is not properly 20 Q/A'd for licensing. It was done for research and it very 21 much underestimates impact by having embedded in it the 22 straight-line Gaussian plume model, which is inappropriate 23 for this coastal site for largely underestimating clean-up 24 because it was based upon WASH 1400, which in turn was based 25 upon cleanup after a weapons event. But there is not a 26 A-03-SAMA D-02-LIC cont

- 140 -

comparability -- as WASH pointed out and also some of the NRC 1

staff reviewer's of 1150 pointed out -- between a weapons 2

event with large particles and large mass loadings to a 3

reactor accident. So, I won't go into it.

4 There was also underestimating by a very large 5

measure health costs and also underestimating Evacuation Time 6

Estimates because it's apparent from at least reading the 7

application they did not quote any ETEs for us to even 8

question what the assumptions -- if they used KLD -- whether 9

they considered peak traffic times, holidays, beach traffic, 10 etc., etc. and also ignoring spent-fuel pool accidents, which 11 seem to be in scope because of Section 5 of the GEIS.

12 But I would say, for something different, that 13 my comments on the MACCS2 particularly in regard to clean-up 14 and the gross underestimation of cost that result from it --

15 even the author of the code, David Shannon, has written to 16 the fact that if you are interested in economic costs, don't 17 use this code. And who should know better than the person 18 who wrote it. That seems obvious. But, you should bring it 19 in to your discussion of alternatives because in comparing 20 alternative energies, you should be having a chart on 21 economics. The only fair way to do it is not as suggested by 22 a previous speaker that all you look at is the running costs 23 because if that were the case, then a lot of people's houses 24 would be real cheap if somebody else paid their mortgages, if 25 A-03-SAMA cont

- 141 -

someone else paid their insurance, et cetera, et cetera.

1 That seems to be the case with the nuclear industry.

2 So, when you compare costs -- when you have to 3

do your alternatives comparison -- I ask you to take the 4

economics -- what the difference in subsidies for each are 5

and then to tie in the MACCS2 code when you're talking about 6

liability and insurance because the MACCS2 -- it was MACCS, 7

actually -- which is the same in every respect to the MACCS2 8

-- is the underpinning, also the Price Anderson Act. So, the 9

amount of insurance that is provided through the Price 10 Anderson Act that the industry is responsible for rests upon 11 this inadequate code estimation of costs. So, that too 12 should be factored in.

13 Now, I'm not trying to screw the industry.

14 What I'm trying to do is get an honest assessment of what the 15 costs are, so in fact then we can have an honest appraisal 16 and also then come up with a fair accounting of mitigations 17 as they are offset by the cost. So, thank you for that 18 thought -- or listening to that thought.

19 A-03-SAMA cont

- 142 -

K-04-LIC

- 143 -

K-05-SAF

- 144 -

K-05-SAF cont

- 145 -

K-05-SAF cont

- 146 -

K-05-SAF cont

- 147 -

E-06-RAD E-07-CLI

- 148 -

E-07-CLI cont E-08-ALT

- 149 -

- 150 -

- 151 -

X-01-SEC - 152 -

X-01-SEC cont

- 153 -

- 154 -

T-05-SEC - 155 -

T-05-SEC cont

- 156 -

T-06-SEC T-05-SEC cont

- 157 -

T-07-ALT

- 158 -

T-08-SEC - 159 -

T-09-PRO

- 160 -

N-03-PRO

- 161 -

Z-01-LIC

- 162 -

W-01-SEC - 163 -

W-01-SEC cont

- 164 -

Y-01-LIC