ML12352A141
Letter Sequence Other | |
---|---|
TAC:ME3959, (Approved, Closed) | |
Initiation Questions
Answers
Results Other: ML103070056, ML103360209, ML103360212, ML11126A365, ML11343A025, ML12352A141, ML13352A511, ML13353A536, ML18127A116 | |
MONTHYEARML1006401882010-03-0505 March 2010
[Table View]Charter for the Groundwater Contamination Task Force Project stage: Request SBK-L-10077, Application for Renewed Operating License2010-05-25025 May 2010 Application for Renewed Operating License Project stage: Request ML1016203312010-06-0101 June 2010 Drawing LR-001 Through Drawing PID-1-CO-LR20423, Rev. 14 Project stage: Request ML1016203332010-06-0101 June 2010 Drawing PID-1-CO-LR20426, Rev. 30, Through Drawing PID-1-DW-LR20600, Rev. 11 Project stage: Request SBK-L-10095, Drawing PID-1-MAH-LR20497, Rev. 9, Through Drawing PID-1-SF-LR204822010-06-0101 June 2010 Drawing PID-1-MAH-LR20497, Rev. 9, Through Drawing PID-1-SF-LR20482 Project stage: Request ML1016203342010-06-0101 June 2010 Drawing PID-1-DW-LR20601, Rev. 1, Through Drawing PID-1-MAH-LR20496, Rev. 12 Project stage: Request ML1016203292010-06-0101 June 2010 Drawing PID-1-SF-LR20483, Rev. 15, Through Drawing PID-1-WT-LR20041, Rev. 7 Project stage: Request ML1016803692010-06-17017 June 2010 Commission Memorandum and Order (CLI-10-14) Project stage: Request ML1022205712010-08-10010 August 2010 License Renewal Process Overview and Scoping Public Meeting Slides Project stage: Meeting ML1024200372010-08-19019 August 2010 Comment (1) of Maggie Hassan on Behalf of Constituents Different Opinion on the Relicensing of Seabrook Nuclear Power Plant Project stage: Request ML1025202072010-08-19019 August 2010 Transcript for Evening Public Scoping Meeting ISO Seabrook LRA SEIS Project stage: Request ML1025201832010-08-19019 August 2010 Transcript for Afternoon Public Scoping Meeting ISO Seabrook LRA SEIS, August 19, 2010. Pp 1-88 Project stage: Request ML1025002712010-08-23023 August 2010 Comment (2) of William R. Harris, on Behalf of Self, on Nextera Energy Seabrook, LLC Application for Renewal of License for Seabrook Project stage: Request ML1024200432010-08-25025 August 2010 Comment (3) of William Harris, Additional Reference Document for Seabrook Relicensing Environmental Review - Threat Assessment of Emp for Critical Infrastructure Project stage: Request ML1024505252010-09-0101 September 2010 Comment (4) of Geordie Vining on Behalf of Himself Opposing Relicensing Seabrook Plant for the Years 2030-2050 Project stage: Request ML1026504862010-09-20020 September 2010 Comment (6) of Joseph W. Fahey on Behalf of Amesbury on Environmental Impact & Mitigation Scoping for Relicensing of the Seabrook Nuclear Plant Project stage: Request ML1026403712010-09-20020 September 2010 Comment (6) of Joyce Kemp, Opposing NRC-2010-0206-0002, Environmental Impact Statements; Availability, Etc.: Nextera Energy Seabrook; Seabrook Station (Unit 1) Project stage: Request ML1026603312010-09-20020 September 2010 Comment (7) of Andrew R. Port on Behalf of City of Newburyport Office of Planning & Development on Environmental Scoping Review Regarding Application for an Operating License Extension for Seabrook, Unit 1 from Year 2030 to Year 2050 Project stage: Request ML1025202222010-09-20020 September 2010 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959 and ME4028) Project stage: Meeting ML1028612172010-10-29029 October 2010 Request for Additional Information for the Review of the Seabrook Station License Renewal Application Environmental Review Project stage: RAI ML1030808802010-11-0404 November 2010 Letter from Nhdes to NextEra Energy Seabrook Czma Compliance for the Seabrook LRA Project stage: Request ML1030700562010-11-0808 November 2010 Environmental Project Manager Change for the License Renewal of Seabrook Station, Unit 1 Project stage: Other ML1029502712010-11-10010 November 2010 10/05-07/2010-Summary of Site Audit Related to the Review of the License Renewal Application for Seabrook Station, Unit 1 Project stage: Approval ML1030902152010-11-16016 November 2010 Request for Additional Information for the Review of the Seabrook Station License Renewal Application-SAMA Review Project stage: RAI ML1033701692010-11-23023 November 2010 Attachment 2, Vol. 2, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603262010-11-23023 November 2010 Attachment 2, Vol. 6, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI SBK-L-10185, Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report.2010-11-23023 November 2010 Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report. Project stage: Response to RAI SBK-L-10190, Response to Request for Additional Information, Submittal of Cultural Resource Plan in Accordance with 36 CFR 800.11 (C)2010-11-23023 November 2010 Response to Request for Additional Information, Submittal of Cultural Resource Plan in Accordance with 36 CFR 800.11 (C) Project stage: Response to RAI ML1033506392010-11-23023 November 2010 Seabrook Station - Response to Request for Additional Information - NextEra Energy Seabrook License Renewal Environmental Report Project stage: Response to RAI ML1101003122010-11-23023 November 2010 Attachment 2, Vol. 1, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1101003112010-11-23023 November 2010 Attachment 2, Vol. 1, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033701672010-11-23023 November 2010 Attachment 3 to SBK-L-10185 -Seabrook Station Response to Request for Additional Information, NextEra Energy Seabrook License Renewal Environmental Report Project stage: Response to RAI ML1033700922010-11-23023 November 2010 Attachment 2, Vol. 3, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603112010-11-23023 November 2010 Attachment 2, Vol. 2, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603062010-11-23023 November 2010 Attachment 2, Vol. 4, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603002010-11-23023 November 2010 Attachment 2, Vol. 7, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033602982010-11-23023 November 2010 Attachment 2, Vol. 5, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1029806932010-12-21021 December 2010 Summary of Telephone Conference Call Held on 10/21/10 Btw the USNRC and NextEra Energy Seabrook, LLC, Concerning the Request for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML1033602122010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (3:3) Appendix A-761 - End Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Other ML1033602092010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (2:3) Appendix A-454 - A-760 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Other ML1033504382010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (1:3) Cover - Appendix A-453 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Acceptance Review ML1033504422010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 3 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Public Comments Continued, Appendices Project stage: Acceptance Review ML1035704012011-01-0303 January 2011 12/21/2010-Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning the RAI Pertaining to the Seabrook Station, License Renewal Application Project stage: RAI SBK-L-11001, Response to Request for Additional Information, NextEra Energy License Renewal Application2011-01-13013 January 2011 Response to Request for Additional Information, NextEra Energy License Renewal Application Project stage: Response to RAI SBK-L-11031, Environmental Permit Renewals2011-02-18018 February 2011 Environmental Permit Renewals Project stage: Request ML1104901652011-02-28028 February 2011 02/15/2011 Summary of Telephone Conference Call with the USNRC and NextEra Energy Seabrook, LLC, to Clarify the Responses to the RAIs Pertaining to the SAMA Review of the Seabrook Station License Renewal Application Project stage: RAI ML1105603622011-03-0101 March 2011 2/3/11 Summary of Telephone Conference Calls Held Between the USNRC and Nextera Energy Seabrook, LLC, to Clarify Information Pertaining to the Review of the Seabrook Station License Renewal Application Project stage: Approval ML1101001132011-03-0101 March 2011 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Nextera Energy Seabrook, LLC for Renewal of the Operating License for Seabrook Station Project stage: Approval ML1105906382011-03-0404 March 2011 Schedule Revision and Request for Additional Information for the Review of the Seabrook Station License Renewal Application Environmental Review Project stage: RAI SBK-L-11044, Response to Request for Additional Information Regarding License Renewal Environmental Report2011-03-16016 March 2011 Response to Request for Additional Information Regarding License Renewal Environmental Report Project stage: Response to RAI 2010-08-10 |
ML12352A141 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 01/15/2013 |
From: | David Wrona License Renewal Projects Branch 2 |
To: | Freeman P, Okeefe M NextEra Energy Seabrook |
James L, 415-3306 | |
References | |
TAC ME3959 | |
Download: ML12352A141 (3) | |
Similar Documents at Seabrook | |
---|---|
Category:Letter
MONTHYEARIR 05000443/20244022024-10-17017 October 2024
[Table view]Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 15, 2013 Mr. Paul Freeman Site Vice President clo Mr. Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
ENVIRONMENTAL PRO~IECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF SEABROOK STATION, UNIT 1 (TAC NO. ME3959)
Dear Mr. Freeman:
This letter is to inform you that, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Seabrook Station, Unit 1, license renewal review is transferred from Mr. Michael Wentzel to Ms. Lois James.
All correspondence for the Project Manager associated with the environmental review should be sent to:
Ms. Lois James, Project Manager Projects Branch 2 Division of license Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555 Ms. James may be reached at 301-415-3306 or bye-mail at lois.james@nrc.gov.
Sincerely, David J. Wrona, Chief Projects Branch 2 Division of license Renewal Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via listserv
January 15, 2013 Mr. Paul Freeman Site Vice President clo Mr. Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF SEABROOK STATION, UNIT 1 (TAC NO.ME3959)
Dear Mr. Freeman:
This letter is to inform you that, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Seabrook Station, Unit 1, license renewal review is transferred from Mr. Michael Wentzel to Ms. Lois James.
All correspondence for the Project Manager associated with the environmental review should be sent to:
Ms. Lois James, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555 Ms. James may be reached at 301-415-3306 or bye-mail at lois.james@nrc.gov.
Sincerely, IRA Elaine Keegan fori David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
See next page ADAMS Accession No ... ML12352A141 "'concurrence via e-mail OFFICE PM:RPB2:DLR LA:RPB1 :DLR BC:RPB2:DLR NAME LJames YEdmonds DWrona (EKeegen for)
DATE 1/14/2013 12/18/2012 111512013 OFFICIAL RECORD COpy
Letter to P. Freeman from D. Wrona dated, January 15, 2012
SUBJECT:
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF SEABROOK STATION, UNIT 1 (TAC NO.ME3959)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource MWentzel LJames DWrona JLamb ICouret, OPA EDacus,OCA MSpencer, OGC WRaymond, RI DTifft, RI NMcNamara, RI NSheehan, RI DScrenci, RI JJohnson, RI ABurritt, RI