Acceptance of Requested Licensing Action Amendment Request Permanently Defueled Technical Specifications
ML21082A011
Person / Time
Site: Pilgrim
Issue date: 03/23/2021
From: Amy Snyder
Reactor Decommissioning Branch
To: Sterdis A
Holtec Decommissioning International
Snyder A
References
EPID L-2021-LLA-0049
Download: ML21082A011 (3)


Text

March 23, 2021 Andrea L. Sterdis Vice President Regulatory and Environmental Affairs Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT REQUEST PERMANENTLY DEFUELED TECHNICAL SPECIFICATIONS (EPID L-2021-LLA-0049)

Dear Ms. Sterdis:

By letter dated March 17, 2021 (Agencywide Documents Access and Management System Accession [ADAMS] No. ML21076A404), Holtec Decommissioning International, LLC (HDI) submitted a license application request seeking U.S. Nuclear Regulatory Commission (NRC) review and approval the Pilgrim Nuclear Power Station revision and license amendment application to revise the Pilgrim Nuclear Power Station Permanently Defueled Technical Specifications to reflect permanent removal of spent fuel from the spent fuel pool.

The NRC has completed its acceptance review and determined that the application is acceptable for the NRC staff to begin its detailed technical review. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

In its March 17, 2021, letter, HDI stated that [I]n order to support the site transition to "ISFSI only" status, HDI is requesting the NRC approval of this proposed license amendment by September 30, 2021. HDI requests an implementation period of 30 days following HDl's submittal of written notification to the NRC that the remaining spent fuel assemblies have been transferred from the spent fuel pool to the ISFSI. The NRC staff expects to complete this review by July 30, 2021 (approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />). If there are emergent complexities or challenges in our review, such as multiple rounds of requests for additional information, unanticipated addition of scope to the review, or hearing-related activities that would cause changes to the initial forecasted completion date, the reasons for the changes, along with a new estimate, will be communicated during the routine interactions with the assigned project manager.

The acceptance of the application for detailed technical review and the draft no significant hazards determination is scheduled to be published in the Federal Register on April 20, 2021, with a 60-day hearing request period ending June 21, 2021.

A. Sterdis In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions, please contact, me at (301) 415-6822.

Sincerely, Signed by Snyder, Amy on 03/23/21 Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-293 and 72-1044 cc: Pilgrim Listserv Pierre Paul Oneid Senior Vice President and Chief Nuclear Officer Holtec International Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104 Ms. Pamela B. Cowan Senior Vice President and Chief Operating Officer Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

ML21082A011 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME ASnyder AS BWatson BW ASnyder AS DATE Mar 23, 2021 Mar 23, 2021 Mar 23, 2021