TAC:MD5544, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications, TSTF-49 (Open) TAC:MD5545, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications, TSTF-49 (Open) |
|
|
|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24088A1012024-03-29029 March 2024 Summary of March 6, 2024, Public Meeting with NSPM Regarding Planned LAR to Modify Technical Specifications Definitions and Incorporate Plant-Specific Methods for Response Time Testing for Prairie Island Nuclear Plant, Units 1 & 2 ML24059A4042024-03-0606 March 2024 March 6, 2023, Presubmittal Meeting for License Amendment Request to Modify Technical Specifications Definitions & Approve Plant-Specific Methods for Response Time Testing (EPID L-2024-LRM-0034) - Slides ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23115A4072023-04-26026 April 2023 Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22300A2232022-11-0101 November 2022 Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels ML22188A0852022-07-15015 July 2022 Correction Letter for Amendments 238 and 226 to Renewed Facility Operating Licenses ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 ML21312A0212021-11-23023 November 2021 Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply Header ML21008A0012021-03-19019 March 2021 Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20283A3422020-11-18018 November 2020 Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position Requirements ML20217L1852020-10-0202 October 2020 Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test Frequency ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML19276F6842019-11-12012 November 2019 Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power Reactors ML19232A1512019-11-0707 November 2019 Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment ML19255H2012019-09-19019 September 2019 Correction Letter for Amendment Nos. 228 and 216 to Renewed Facility Operating License Nos. DPR-42 and DPR-60 ML19225D2172019-08-24024 August 2019 Correction Letter for Amendment Nos 228 and 216 to Renewed Facility Operating License Nos. DPR-42 and DPR-60 ML19140A4472019-07-30030 July 2019 Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 Modifications ML19128A1332019-06-0606 June 2019 Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML18100A7882018-05-0101 May 2018 Issuance of Amendment Special Heavy Lifting Device Nondestructive Examination Frequency (CAC Nos. MG0072 and MG0073; EPID L-2017-LLA-0280) ML17346A3612018-03-0606 March 2018 Issuance of Amendment Nos. 224 and 211 to Adopt Changes to the Emergency Plan ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML17334A1782017-11-30030 November 2017 Issuance of Amendment Request Related to Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121 and MF7122, EPID L-2015-LLA-0002) Non-Proprietary ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17163A0272017-08-0808 August 2017 Issuance of Amendments Transition to NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML17130A7162017-06-20020 June 2017 Issuance of Amendments Technical Specification 3.8.7 Inverters-Operating ML16256A5142016-10-13013 October 2016 Issuance of Amendment One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources - Operating ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown ML14239A2572014-11-28028 November 2014 and Prairie Island Nuclear Generation Plant, Units 1 and 2 - Issuance of License Amendments Regarding Cyber Security Plan Implementation Schedule Milestones ML14296A6662014-11-19019 November 2014 Issuance of Amendments Regarding Nuclear Methodology References ML13270A2792014-01-25025 January 2014 Issuance of Amendments Emergency Plan Changes ML13175A2082013-09-11011 September 2013 Issuance of Amendment Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement ML13241A3832013-08-29029 August 2013 Issuance of Amendments Spent Fuel Pool Criticality Changes ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. ML1122008562011-10-27027 October 2011 Operating Plant, Units 1 and 2 - Issuance of Amendments Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology ML1119904692011-08-16016 August 2011 Issuance of Amendments Changes to Security Plan 2024-09-27
[Table view] Category:Safety Evaluation
MONTHYEARML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 ML23115A4072023-04-26026 April 2023 Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22300A2232022-11-0101 November 2022 Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML22270A3252022-09-30030 September 2022 (Prairie Island), Unit 2 - Authorization and Safety Evaluation for Alternative Request No. RR-08 ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 ML21312A0212021-11-23023 November 2021 Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply Header ML21008A0012021-03-19019 March 2021 Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20283A3422020-11-18018 November 2020 Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position Requirements ML20217L1852020-10-0202 October 2020 Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test Frequency ML20276A0032020-10-0202 October 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML20230A0512020-09-0303 September 2020 Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML20153A4012020-06-0101 June 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20134H9582020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML19276F6842019-11-12012 November 2019 Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power Reactors ML19232A1512019-11-0707 November 2019 Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment ML19140A4472019-07-30030 July 2019 Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 Modifications ML19177A3802019-07-0303 July 2019 Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML19128A1332019-06-0606 June 2019 Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19046A1662019-02-25025 February 2019 Relief from the Requirements of the ASME Code ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code ML18100A7882018-05-0101 May 2018 Issuance of Amendment Special Heavy Lifting Device Nondestructive Examination Frequency (CAC Nos. MG0072 and MG0073; EPID L-2017-LLA-0280) ML17346A3612018-03-0606 March 2018 Issuance of Amendment Nos. 224 and 211 to Adopt Changes to the Emergency Plan ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML17334A1782017-11-30030 November 2017 Issuance of Amendment Request Related to Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121 and MF7122, EPID L-2015-LLA-0002) Non-Proprietary ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17163A0272017-08-0808 August 2017 Issuance of Amendments Transition to NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML17130A7162017-06-20020 June 2017 Issuance of Amendments Technical Specification 3.8.7 Inverters-Operating ML17110A2752017-05-0404 May 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16320A0212016-11-28028 November 2016 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Review of Changes to the Northern States Power Company Quality Assurance Topical Report ML16256A5142016-10-13013 October 2016 Issuance of Amendment One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources - Operating ML16246A2002016-10-0404 October 2016 Request for Relief 1RR-4-11 and 2-RR-4-11 Associated with Certain Inservice Inspection of Component Welds for the Fourth 10-Year Interval ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15196A2132015-08-17017 August 2015 Requests 1-RR-4-9 and 2-RR-4-9 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program ML15196A2412015-08-12012 August 2015 Requests 1-RR-5-6 and 2-RR-5-6 Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program 2024-09-27
[Table view] |
Text
October 31, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: (TAC NOS. MD5544 AND MD5545)
Dear Mr. Wadley:
The Commission has issued the enclosed Amendment No. 181 to Facility Operating License No. DPR-42 and Amendment No. 171 to Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated May 10, 2007.
The requested changes are a partial adoption of Technical Specification Task Force (TSTF-491), Revision 2, Removal of Main Steam and Feedwater Valve Isolation Times which was proposed by the TSTF by letter on May 18, 2006. The proposed changes revise TS 3.7.2 Main Steam Valves Closure Times by relocating the isolation valve closure times to a licensee-controlled document identified as a Bases reference. The proposed amendments deviate from TSTF-491 in that the current PINGP TS (3.7.3) and associated surveillance requirements for the main feedwater isolation valves do not include valve closure times, and thus the changes to TS 3.7.3 provided for in TSTF-491 are not applicable to the PINGP TSs and are not adopted.
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosures:
- 1. Amendment No. 181 to DPR-42
- 2. Amendment No. 171 to DPR-60
- 3. Safety Evaluation cc w/encls: See next page
ML072770295, Package: ML072770342, TS: ML072840354 OFFICE NRR/LPL3-1 NRR/LPL3-1 NRR/LPL3-1/PM NRR/LPL3-1/LA DIRS/ITSB/BC OGC/NLO NRR/LPL3-1/(A)BC NAME JPoole AMuniz MChawla THarris TKobetz JBonanno CMunson DATE 10 /17 /07 10 /17/07 10/30/07 10/18/07 10/26/07 10/24/07 10/31/07 NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 181 License No. DPR-42
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated May 10, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-42 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 181, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Cliff G. Munson, Acting Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: October 31, 2007
NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-306 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. DPR-60
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated May 10, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-60 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 171, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Cliff G. Munson, Acting Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: October 31, 2007
ATTACHMENT TO LICENSE AMENDMENT NOS. 181 AND 171 FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 DOCKET NOS. 50-282 AND 50-306 Replace the following pages of the Facility Operating License No. DPR-42 and DPR-60 with the attached revised pages. The changed areas are identified by a marginal line.
REMOVE INSERT DPR-42, License Page 3 DPR-42, License Page 3 DPR-60, License Page 3 DPR-60, License Page 3 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 3.7.2-2 3.7.2-2
(4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, NMC to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to transfer byproduct materials from other job sites owned by Northern States Power Company for the purpose of volume reduction and decontamination.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l: Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1650 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 181, are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection NMC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program," Revision 1, submitted by letters dated October 18, 2006, and January 10, 2007.
Unit 1 Amendment No. 181
(5) Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to transfer byproduct materials from other job sites owned by Northern States Power Company for the purposes of volume reduction and decontamination.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l: Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1650 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 171, are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection NMC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled:
'Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program," Revision 1, submitted by letters dated October 18, 2006, and January 10, 2007.
Unit 2 Amendment No. 171
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 181 TO FACILITY OPERATING LICENSE NO. DPR-42 AND AMENDMENT NO. 171 TO FACILITY OPERATING LICENSE NO. DPR-60 NUCLEAR MANAGEMENT COMPANY, LLC PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306
1.0 INTRODUCTION
By letter dated May 10, 2007, (Agencywide Document and Management System (ADAMS)
Accession No. ML071300622), Nuclear Management Company, LLC (NMC), (the licensee),
proposed changes to the technical specifications (TS) for Prairie Island Nuclear Generating Plant (PINGP) Units 1 and 2. The requested changes are a partial adoption of Technical Specification Task Force (TSTF) -491, Revision 2, Removal of Main Steam and Feedwater Valve Isolation Times which was proposed by the TSTF by letter on May 18, 2006. The proposed changes revise TS 3.7.2 Main Steam Valves Closure Times by relocating the isolation valve closure times to a licensee-controlled document identified as a Bases reference.
The proposed amendments deviate from TSTF-491 in that the current PINGP TS (3.7.3) and associated surveillance requirements for the main feedwater isolation valves do not include valve closure times, and thus the changes to TS 3.7.3 provided for in TSTF-491 are not applicable to the PINGP TSs and are not adopted. TSTF-491, Revision 2, was announced for availability in the Federal Register on December 29, 2006, as part of the consolidated line item improvement process (CLIIP).
2.0 REGULATORY EVALUATION
Section 182(a) of the Atomic Energy Act (the Act) requires applicants for nuclear power plant operating licenses to include TS as part of the license. The TS ensure the operational capability of structures, systems and components that are required to protect the health and safety of the public. The Commissions regulatory requirements related to the content of the TS are contained in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36. That regulation requires that the TS include items in the following specific categories: (1) safety limits, limiting safety systems settings, and limiting control settings (50.36(c)(1)); (2) limiting conditions for operation (50.36(c)(2)); (3) surveillance requirements (50.36(c)(3)); (4) design features (50.36(c)(4)); and (5) administrative controls (50.36(c)(5)).
In general, there are two classes of changes to TS: (1) Changes needed to reflect modifications to the design basis (TS are derived from the design basis), and (2) voluntary changes to take advantage of the evolution in policy and guidance as to the required content and preferred format of TS over time. This amendment deals with the second class of changes. In determining the acceptability of revising Standard Technical Specifications (STS) 3.7.2, the
Nuclear Regulatory Commission (NRC) staff used the accumulation of generically-approved guidance in NUREG-1431, Revision 3, Standard Technical Specifications, Westinghouse Plants, dated June 2004. Licensees may revise the TS to adopt current improved STS format and content provided that plant-specific review supports a finding of continued adequate safety because: (1) the change is editorial, administrative or provides clarification (i.e., no requirements are materially altered), (2) the change is more restrictive than the licensees current requirement, or (3) the change is less restrictive than the licensees current requirement, but nonetheless still affords adequate assurance of safety when judged against current regulatory standards.
The Commissions regulatory requirements regarding codes and standards are specified in 10 CFR 50.55a, which incorporates portions of industry codes and standards, such as the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, into the regulations and the associated requirements for Inservice Testing (IST). Much of the information associated with a licensees implementation of the testing and surveillance requirements in 10 CFR 50.55a, is contained in their IST Program. The 10 CFR 50.59 criteria provide adequate assurance that prior staff review and approval will be requested by the licensee for changes to the Bases or Licensee-Controlled Document (LCD) requirements with the potential to affect the safe operation of the plant.
The detailed application of this general framework, and additional specialized guidance, are discussed in Section 3.0 in the context of specific proposed changes. Nomenclature specific to the Westinghouse Plants is used in the following technical evaluation.
3.0 TECHNICAL EVALUATION
The NRC staff has reviewed the justification for the proposed TSTF as described in the September 13, 2005, submittal. The detailed evaluation below will support the conclusion that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
3.1 Main Steam Isolation Valves (MSIV)
One MSIV is located in each main steamline outside of the containment. Closing the MSIVs isolates each steam generator from the others and isolates the turbine, steam bypass system, and other auxiliary steam supplies from the steam generator. By isolating the steam flow from the secondary side of the steam generator, the MSIVs prevent overcooling the reactor core following a high-energy line break. By preventing core overcooling the MSIVs protect the reactor core from being damaged. TSTF-491 is proposing to relocate the required closure times for the MSIVs to the LCD, Technical Requirements Manual, that is referenced in the Bases. Changes to the LCD are subject to the 10 CFR 50.59 process. The 10 CFR 50.59 criteria provide adequate assurance that prior NRC staff review and approval will be requested by the licensee for changes to the Bases or LCD requirements with the potential to affect the safe operation of the plant. Furthermore, the MSIVs are subject to periodic testing and acceptance criteria in accordance with the IST Program. Compliance with the IST Program is required by Section 5.5.7 of the STS and 10 CFR 50.55a. The IST Program includes specific reference value baseline operating times for valves that are not subject to arbitrary changes.
The regulation at 10 CFR 50.36 requires the inclusion of the periodic testing of the MSIVs in the surveillance requirements, not the actual closure time of the valves. TSTF-491 change maintains the periodic testing requirements for MSIVs in accordance with 10 CFR 50.36. Based on the requirements of 10 CFR 50.36, 10 CFR 50.59 and IST Program, the NRC staff concludes that relocating the MSIV closure time to the LCD as referenced in the Bases is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Minnesota State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or change the surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 39083). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: A. Jason Lising Date: October 31, 2007
Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esquire Tribal Council Vice President, Counsel & Secretary Prairie Island Indian Community Nuclear Management Company, LLC ATTN: Environmental Department 700 First Street 5636 Sturgeon Lake Road Hudson, WI 54016 Welch, MN 55089 Manager, Regulatory Affairs Nuclear Asset Manager Prairie Island Nuclear Generating Plant Xcel Energy, Inc.
Nuclear Management Company, LLC 414 Nicollet Mall, R.S. 8 1717 Wakonade Drive East Minneapolis, MN 55401 Welch, MN 55089 Michael B. Sellman Manager - Environmental Protection Division President and Chief Executive Officer Minnesota Attorney General=s Office Nuclear Management Company, LLC 445 Minnesota St., Suite 900 700 First Street St. Paul, MN 55101-2127 Hudson, MI 54016 U.S. Nuclear Regulatory Commission Douglas E. Cooper Resident Inspector's Office Senior Vice President and Chief 1719 Wakonade Drive East Nuclear Officer Welch, MN 55089-9642 Nuclear Management Company, LLC 700 First Street Administrator Hudson, WI 54016 Goodhue County Courthouse Box 408 Joel P. Sorenson Red Wing, MN 55066-0408 Director, Site Operations Prairie Island Nuclear Generating Plant Commissioner Nuclear Management Company, LLC Minnesota Department of Commerce 1717 Wakonade Drive East 85 7th Place East, Suite 500 Welch, MN 55089 St. Paul, MN 55101-2198 June 2006