ML072840354

From kanterella
Jump to navigation Jump to search

Tech Spec Page for Amendments 181 and 171, Revise TS 3.7.2 Main Steam Valves Closure Times by Relocating the Isolation Valve Closure Times to a Licensee-Controlled Document Identified as a Bases Reference
ML072840354
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/31/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Chawla M, NRR/DORL/LPL3-1, 301-415-8371
Shared Package
ML072770342 List:
References
TAC MD5544, TAC MD5545
Download: ML072840354 (1)


Text

MSIVs 3.7.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D. Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ---------------------------- NOTE ----------------------------

Only required to be performed in MODES I.and 2.

Verify the isolation time of each MSIV is within In accordance limits. with the Inservice Testing Program SR 3.7.2.2 ---------------------------- NOTE ----------------------------

Only required to be performed in MODES 1 and 2.

Verify each MSIV actuates to the isolation position 24 months on an actual or simulated actuation signal.

Prairie Island Unit I - Amendment No. 4-58 1f81l Units i and 2 ,.J. I .Z--, Unit 2 - Amendment No. 449171