Summary of the July 12, 2007 Category 2 Public Meeting Between the Nuclear Regulatory Commission Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea)
ML072060229
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/24/2007
From: Mauricio Gutierrez
NRC/RES/DFERR/DDME/CIB
To: Uhle J
NRC/RES/DFERR
References
Download: ML072060229 (6)


Text

July 24, 2007 MEMORANDUM TO: Jennifer L. Uhle, Director Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU: Robert Hardies, Chief /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM: Mauricio Gutierrez, General Engineer /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research

SUBJECT:

SUMMARY

OF THE JULY 12, 2007 CATEGORY 2 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FINITE ELEMENT ANALYSES (FEA)

On July 12, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 2 public meeting with industry representatives. The meeting was conducted by means of teleconference with presentations available through a webcast. A list of attendees, and the NRC staff presentation, NRC contractor presentation, and industry presentation are enclosed.

The meeting was a continuation of ongoing discussions between industry representatives and NRC staff regarding the likelihood that pressurizer nozzle dissimilar metal welds susceptible to stress corrosion cracking will leak before potentially rupturing under certain conditions.

The meeting specifically provided the NRC staff with the opportunity to ask questions and provide initial comments on the industry draft report submitted to the NRC on July 10, 2007.

The NRC staff stated that there had not been sufficient time to conduct a detailed review but did state that case 17 is under evaluation and that the results of the surge line seem to be sensitive to the applied weld residual stresses (WRS). Battelle Memorial Institute and Dominion Engineering, Inc. provided two presentations on their WRS validation efforts of the European Union round robin study on dissimilar metal butt weld WRS modeling and measurements.

Questions were posed regarding how the industry intends to address WRS uncertainties considering their validation efforts showed varied results and in light of the comments made by the Advisory Committee on Reactor Safeguards on July 11, 2007.

CONTACT: Mauricio Gutierrez, RES/DFERR 301-415-1122

J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.

Enclosure:

1. List of Attendees
2. NRC Presentation
3. Battelle Presentation
4. Dominion Engineering Presentation

J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.

Enclosure:

1. List of Attendees
2. NRC Presentation
3. Battelle Presentation
4. Dominion Engineering Presentation DISTRIBUTION:

DFERR r/f ME r/f MEvans RidsNrrDprPspb RidsNrrDciCpnb RidsOpaMail RidsNrrAdro RidsNrrDpr TLupold RidsOgcMailCenter RidsNrrDe JGrobe TMensah WBateman Chai-Fu Sheng RidsACrsAcnwMailCenter RHardies ESullivan TChan G:¥DFERR¥Mauricio Gutierrez¥July 12 Meeting¥July 12 Meeting Summary.doc OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO.: ML072060241 TEMPLATE NO. RES- 006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC 07/26/2007 SENSITIVE? N To receive a copy of this document, indicate in the box: "C" = Copy without enclosure "E" = Copy with enclosure AN" = No copy OFFICE RES/DFERR/CIB RES/DFERR/CIB BC:RES/DFERR/CI SUNSI Review SUNSI Review B Complete Complete NAME MGutierrez ACsontos RHardies MGutierrez RHardies DATE 07/23/07 07/24/07 07/24/07 07/23/07 07/24/07 OFFICIAL RECORD COPY

Nuclear Regulatory Commission Meeting with the Expert Panel for Wolf Creek Finite Element Analysis July 12, 2007 U.S. NUCLEAR REGULATORY COMMISSION Edmund Sullivan Aladar Csontos Tim Lupold Simon Sheung Dave Rudland (NRC Contractor)

INDUSTRY Craig Harrington, EPRI Tim Gilman, Structural Integrity Glenn White, DEI John Broussard, DEI Carl Corbin, STARS Regulatory Affairs Jack Hicks, STARS Regulatory Affairs Guy DeBoo, Exelon Lee Goyette, DCCP Terry McAlister, VC Summer Mike Melton, NEI Sam Patel, STP Pete Riccardella, Structural Integrity Warren Bamford, Westinghouse Doug Killian, AREVA David Hills PUBLIC Daniel Horner, Platts/McGraw Hill Enclosure 1

cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Mr. Alexander Marion, Executive Director Nuclear Energy Institute Nuclear Operations & Engineering 1776 I Street, NW, Suite 400 Nuclear Energy Institute Washington, DC 20006-3708 1776 I Street, NW, Suite 400 arp@nei.org Washington, DC 20006-3708 am@nei.org Mr. Jack Roe, Director Operations Support Mr. Jay Thayer, Vice President Nuclear Energy Institute Nuclear Operations 1776 I Street, NW, Suite 400 Nuclear Energy Institute Washington, DC 20006-3708 1776 I Street, NW, Suite 400 jwr@nei.org Washington, DC 20006-3708 jkt@nei.org Mr. Charles B. Brinkman Washington Operations Mr. John Butler, Director ABB-Combustion Engineering, Inc. Safety-Focused Regulation 12300 Twinbrook Parkway, Suite 330 Nuclear Energy Institute Rockville, MD 20852 1776 I Street, NW, Suite 400 brinkmcb@westinghouse.com Washington, DC 20006-3708 jcb@nei.org Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector Mr. James H. Riley, Director EPRI Engineering 2000 L Street, NW, Suite 805 Nuclear Energy Institute Washington, DC 20036 1776 I Street, NW gvine@epri.com Washington, DC 20006-3708 jhr@nei.org Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Mr. David J. Modeen Westinghouse Electric Company Vice President and Chief Nuclear Officer P.O. Box 355 EPRI Pittsburgh, PA 15230-0355 1300 W. T. Harris Boulevard greshaja@westinghouse.com Charlotte, NC 28262-8550 dmodeen@epri.com Ms. Barbara Lewis Assistant Editor Mr. John Gaertner Platts, Principal Editorial Office EPRI 1200 G St., N.W., Suite 1100 1300 W.T. Harris Boulevard Washington, DC 20005 Charlotte, NC 28262-8550 Barbara_lewis@platts.com jgaertner@epri.com Mr. Gary Welsh Ms. Rosa Yang Institute of Nuclear Power Operations EPRI Suite 100 3412 Hillview Avenue 700 Galleria Parkway, SE Palo Alto, CA 94304-1338 Atlanta, GA 30339-5957 ryang@epri.com welshgc@inpo.org

Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com