Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23012A2172023-02-0909 February 2023 Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing Definition ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22187A0252022-11-16016 November 2022 Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML22221A1682022-09-0606 September 2022 Issuance of Amendment Nos. 241 and 242 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspection ML21160A1742021-09-0202 September 2021 Issuance of Amendment Nos. 239 and 240 Revising Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)), to Implement Methodology from WCAP-17661, Revision 1 ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) ML20218A2762020-09-11011 September 2020 Issuance of Amendment Nos. 237 and 239 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to Updated Final Safety Analysis Report ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML19196A3092019-08-21021 August 2019 Issuance of Amendment Nos. 233 and 235 Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML17212A3792017-09-25025 September 2017 Diablo Canyon Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 231 and 233 Re: Emergency Action Level Scheme Change (CAC Nos. MF8528 and MF8529) ML17012A2462017-04-27027 April 2017 Issuance of Amendments Revise Licensing Bases to Adopt Alternative Source Term ML17018A3412017-02-23023 February 2017 Issuance of Amendments Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML16330A6722017-01-0505 January 2017 Issuance of Amendment Nos. 228 and 230, Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML16139A0082016-12-21021 December 2016 Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation System DCL-16-061, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-06-0909 June 2016 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-061, Diablo Canyon, Units 1 and 2 - Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-06-0909 June 2016 Diablo Canyon, Units 1 and 2 - Supplement to License Amendment Request 15-03, Application of Alternative Source Term. ML16117A2522016-05-19019 May 2016 Issuance of Amendment Nos. 226 and 228, Revise Minimum Flow Value Specified in Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML16055A3592016-03-0909 March 2016 Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML16032A0062016-02-19019 February 2016 Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing Basis ML15029A1732016-01-0505 January 2016 ISFSI - Issuance of Amendment Nos. 222, 224, and 4, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC MF2809, MF2810, and L24991) ML15281A1642015-12-0303 December 2015 Issuance of Amendment Nos. 221 and 223, Revise Updated Final Safety Analysis Report and Approval to Perform Fuel Assembly Structural Analyses That Considers Application of Leak Before Break ML15245A5422015-09-30030 September 2015 Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation Date ML15204A2222015-08-27027 August 2015 Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) ML15162A8822015-07-0101 July 2015 Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator Testing ML14042A1932014-02-27027 February 2014 Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960) ML13178A0052013-09-0505 September 2013 Issuance of Amendment Nos. 216 and 218, Adoption of TSTF-421-A, Revision to RCP Flywheel Inspection Program (WCAP-15666), Using Consolidated Line Item Improvement Process ML12352A0672013-01-31031 January 2013 Issuance of Amendment Nos. 215 and 217, Revise Technical Specifications Related to Auxilary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 ML12345A3792013-01-0909 January 2013 Issuance of Amendment Nos. 214 and 216, Revise Final Safety Analysis Report Update Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML12338A0202012-12-0404 December 2012 Issuance of Amendment Nos. 213 and 215, Revise Technical Specification 3.7.10, Control Room Ventilation System (Crvs), Required Action A.1 Completion Time (Emergency Circumstances) ML1207903382012-03-29029 March 2012 Issuance of Amendment Nos. 211 and 213, Revise Technical Specifications to Adopt TSTF-163, Rev. 2, Minimum Vs. Steady State Voltage and Frequency, and Final Safety Analysis Report Update ML1116402742011-07-15015 July 2011 Issuance of Amendment Nos. 210 and 212, License Amendment Request to Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1020100842011-01-24024 January 2011 Issuance of Amendment Nos. 209 and 211, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions ML1025304432010-09-29029 September 2010 Issuance of Amendment Nos. 208 and 210, Revise FSAR Update to Include Damping Values for Seismic Design/Analysis - Integrated Head Assembly ML1018901172010-07-30030 July 2010 Issuance of Amendment Nos. 207 and 209, Revise FSAR Update to Include Critical Damping Value for Structural Dynamic Qualification of Control Rod Drive Mechanism Pressure Housings ML0925405442009-09-17017 September 2009 Issuance of Amendment No. 208, Revise Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15 (Exigent Circumstances) ML0921203992009-08-19019 August 2009 Issuance of Amendment Nos. 206 and 207, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0907701812009-04-29029 April 2009 License Amendment, Issuance of Amendment Nos. 205 and 206, Revise TS 3.3.1, Reactor Trip System (RTS) Instrumentation, to Delete High-Negative Rate Trip Function ML0906308082009-03-30030 March 2009 Issuance of Amendment Nos. 204 and 205, Revise TS 3.7.5, Auxiliary Feedwater (AFW) System, and TS 3.7.6, Condensate Storage Tank (CST) and Fire Water Storage Tank (Fwst) ML0900803872009-01-15015 January 2009 Issuance of Amendment Nos. 203 and 204, Changes to Technical Specification 5.5.16, Containment Leakage Rate Testing Program ML0834601732008-12-31031 December 2008 Issuance of Amendment No. 202 and 203 Increase the Completion Times for Required Actions Related to Technical Specifications 3.5.2, the ECCS, and 3.6.6, CS & CS (Tac MD7512 & MD7513) ML0832906092008-12-23023 December 2008 Issuance of Amendment Nos. 201 and 202, Adoption of Changes to Standard Technical Specifications Under Technical Specifications Task Force (TSTF)-448 ML0824102622008-10-30030 October 2008 Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b) ML0732400062008-01-0808 January 2008 Units, 1 and 2, Issuance of Amendment Nos. 198 and 199, Revise Technical Specification (TS) 3.3.2, TS 5.5.9, and TS 5.6.10 to Support Replacement of Steam Generators ML0719102142007-07-11011 July 2007 License Amendments, Incorporated the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0713707312007-06-26026 June 2007 Issuance of License Amendment Nos. 197 and 198 TS 5.5.16, Containment Leakage Rate Testing Program, for Consistency with 10 CFR 50.55a(g)(4) 2024-05-29
[Table view] Category:Safety Evaluation
MONTHYEARML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML24270A1662024-10-0909 October 2024 Authorization and Safety Evaluation for Alternative Request No. REP-RHR-SWOL ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23199A3122023-07-20020 July 2023 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22340A6752023-03-0606 March 2023 Approval of Certified Fuel Handler Training and Retraining Program ML23012A2172023-02-0909 February 2023 Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing Definition ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 ML22334A0822022-12-0101 December 2022 Correction to Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML22187A0252022-11-16016 November 2022 Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML22221A1682022-09-0606 September 2022 Issuance of Amendment Nos. 241 and 242 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspection ML21160A1742021-09-0202 September 2021 Issuance of Amendment Nos. 239 and 240 Revising Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)), to Implement Methodology from WCAP-17661, Revision 1 ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) ML20249C8502020-10-22022 October 2020 Proposed Alternative NDE-RCS-SE-2R22 to the Requirements of the ASME Code ML20218A2762020-09-11011 September 2020 Issuance of Amendment Nos. 237 and 239 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to Updated Final Safety Analysis Report ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances ML19274B0822019-10-0707 October 2019 Correction to Issuance of Amendment Nos. 233 and 235 to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for ERO Positions ML19196A3092019-08-21021 August 2019 Issuance of Amendment Nos. 233 and 235 Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML19176A0082019-06-28028 June 2019 Request for Relief from the Inservice Inspection Program Requirements of ASME Code, Section XI, for Steam Generator and Pressurizer Nozzle Inside Radius Sections ML19023A0262019-01-25025 January 2019 Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 ML17263A0592017-10-0606 October 2017 Diablo Canyon Power Plant, Unit 2 - Relief Requests to Allow Use of Proposed Alternatives to Implement Requirements of ASME Code, for Reactor Pressure Vessel Welds for the Third ISI Interval (CAC Nos. MF9386, MF9387, MF9388, MF9389, and MF9390) ML17212A3792017-09-25025 September 2017 Diablo Canyon Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 231 and 233 Re: Emergency Action Level Scheme Change (CAC Nos. MF8528 and MF8529) ML17132A2312017-05-16016 May 2017 Diablo Canyon Power Plant, Units 1 and 2 - Correction Letter Regarding Amendment Nos. 230 and 232 to Adopt Alternative Source Term (CAC Nos. MF6399 and MF6400) ML17012A2462017-04-27027 April 2017 Issuance of Amendments Revise Licensing Bases to Adopt Alternative Source Term ML17037D2672017-03-0909 March 2017 Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternate Depth Sizing Criteria for the Fourth Inservice Inspection ML17018A3412017-02-23023 February 2017 Issuance of Amendments Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML16349A3862016-12-28028 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16139A0082016-12-21021 December 2016 Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation System ML16207A3972016-07-27027 July 2016 Relief Request NDE-SIF-U1, Allow Use of Alternate Examination Volume Coverage Requirements, Class 2 Seal Injection Welds, for the Third 10-Year Inservice Inspection Interval ML16117A2522016-05-19019 May 2016 Issuance of Amendment Nos. 226 and 228, Revise Minimum Flow Value Specified in Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML16055A3592016-03-0909 March 2016 Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML16056A5132016-03-0707 March 2016 Relief Request FLIG-U1, Request to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Stud Hole Ligament Examinations ML16055A2812016-02-26026 February 2016 Relief Request NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements, Third 10-Year Inservice Inspection Interval ML16032A0062016-02-19019 February 2016 Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing Basis ML16013A3402016-01-27027 January 2016 Relief Request NDE-PNS-U2A, ASME Code Section XI Requirements to Allow Use of Alternate Exam Volume Coverage Requirements, for the Third 10-year Inservice Inspection Interval ML15037A0062016-01-0505 January 2016 ISFSI - Safety Evaluation, Encl. 4, Amendment Nos. 222, 224, and 4 - Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC MF2809, MF2810, and L24991) ML15029A1732016-01-0505 January 2016 ISFSI - Issuance of Amendment Nos. 222, 224, and 4, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC MF2809, MF2810, and L24991) ML15337A0212015-12-0808 December 2015 Relief Request NDE-SG-MS-IR - Relief from Exam Requirements for Main Steam Nozzles in Replacement Steam Generators, Third 10-Year Inservice Inspection Interval ML15281A1642015-12-0303 December 2015 Issuance of Amendment Nos. 221 and 223, Revise Updated Final Safety Analysis Report and Approval to Perform Fuel Assembly Structural Analyses That Considers Application of Leak Before Break ML15299A0342015-11-0404 November 2015 Relief Request NDE-RCS-SE-2R19, Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer, Third 10-Year Inservice Inspection Interval ML15245A5422015-09-30030 September 2015 Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation Date ML15261A0072015-09-18018 September 2015 Request for Relief PRS-3, Proposed Alternative to Requirements for System Leakage Testing Class 1 Piping Vent, Drain, and Test Isolation Devices, for the Third 10-year Inservice Inspection Interval (TAC MF6520-MF6521) ML15204A2222015-08-27027 August 2015 Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) ML15187A0352015-07-15015 July 2015 Relief Request REP-SI, Revision 2, Proposed Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years ML15162A8822015-07-0101 July 2015 Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator Testing ML15168A0242015-06-19019 June 2015 Request for Alternative RPV-U1 - Extension to Allow Use of Alternate Reactor Inspection Interval Requirements for the Third 10-Year Inservice Inspection Interval ML14251A4682014-09-16016 September 2014 Relief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval ML14196A0952014-08-0404 August 2014 Request for Relief from ASME Code Requirements for Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary ML14104B6132014-05-14014 May 2014 Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML14042A1932014-02-27027 February 2014 Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960) 2024-05-29
[Table view] |
Text
October 2, 2006 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENTS RE: DELETION OF ANTITRUST LICENSE CONDITIONS (TAC NOS. MC9673 AND MC9674)
Dear Mr. Keenan:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 189 to Facility Operating License No. DPR-80 and Amendment No. 191 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. The amendments consist of changes to the facility operating licenses in response to your application dated January 19, 2006, as supplemented on June 20, 2006.
The amendments delete the antitrust conditions from the facility operating licenses.
A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely,
/RA/
Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
- 1. Amendment No. 189 to DPR-80
- 2. Amendment No. 191 to DPR-82
- 3. Safety Evaluation cc w/encls: See next page
October 2, 2006 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENTS RE: DELETION OF ANTITRUST LICENSE CONDITIONS (TAC NOS. MC9673 AND 9674)
Dear Mr. Keenan:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 189 to Facility Operating License No. DPR-80 and Amendment No. 191 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. The amendments consist of changes to the facility operating licenses in response to your application dated January 19, 2006, as supplemented on June 20, 2006.
The amendments delete the antitrust conditions from the facility operating licenses.
A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely,
/RA/
Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 DISTRIBUTION:
and 50-323 PUBLIC GHill LPLIV Reading RidsNrrDirsItsb
Enclosures:
- 1. Amendment No. 189 to DPR-80 RidsNrrDorl (CHaney/CHolden)
- 2. Amendment No. 191 to DPR-82 RidsNrrDorlLpl4 (DTerao) RidsOgcRp
- 3. Safety Evaluation RidsNrrPMAWang RidsNrrLALFeizollahi cc w/encls: See next page RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones)
RidsNrrDorlDpr SHom Accession No.: ML062280659 OFFICE NRR/LPL4/PM NRR/LPL4/LA DPR OGC - NLO NRR/LPL4/BC NAME AWang LFeizollahi HNieh SUttal DTerao DATE 8/29/06 8/29/06 9/8/06 9/21/06 10/2/06 OFFICIAL RECORD COPY
Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Richard F. Locke, Esq.
Diablo Canyon Power Plant Pacific Gas & Electric Company c/o U.S. Nuclear Regulatory Commission P.O. Box 7442 P.O. Box 369 San Francisco, CA 94120 Avila Beach, CA 93424 City Editor Sierra Club San Lucia Chapter The Tribune ATTN: Andrew Christie 3825 South Higuera Street P.O. Box 15755 P.O. Box 112 San Luis Obispo, CA 93406 San Luis Obispo, CA 93406-0112 Ms. Nancy Culver Director, Radiologic Health Branch San Luis Obispo State Department of Health Services Mothers for Peace P.O. Box 997414, MS 7610 P.O. Box 164 Sacramento, CA 95899-7414 Pismo Beach, CA 93448 Mr. James D. Boyd, Commissioner Chairman California Energy Commission San Luis Obispo County 1516 Ninth Street (MS 31)
Board of Supervisors Sacramento, CA 95814 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. James R. Becker, Vice President Diablo Canyon Operations Mr. Truman Burns and Station Director Mr. Robert Kinosian Diablo Canyon Power Plant California Public Utilities Commission P.O. Box 56 505 Van Ness, Room 4102 Avila Beach, CA 93424 San Francisco, CA 94102 Jennifer Tang Diablo Canyon Independent Safety Field Representative Committee United States Senator Barbara Boxer ATTN: Robert R. Wellington, Esq. 1700 Montgomery Street, Suite 240 Legal Counsel San Francisco, CA 94111 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 March 2006
PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 189 License No. DPR-80
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated January 19, 2006, as supplemented on June 20, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Facility Operating License No. DPR-80 as indicated in the attachment to this license amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. DPR-80 Date of Issuance: October 2, 2006
PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 191 License No. DPR-82
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated January 19, 2006, as supplemented on June 20, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Facility Operating License No. DPR-82 as indicated in the attachment to this license amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Facility Operating License No. DPR-82 Date of Issuance: October 2, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 189 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 191 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Remove Appendix C of the Facility Operating Licenses.
REMOVE INSERT Appendix C ---
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO APPLICATION FOR LICENSE AMENDMENTS TO DELETE ANTITRUST LICENSE CONDITIONS DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 FACILITY OPERATING LICENSES DPR-80 AND DPR-82 DOCKET NOS. 50-275 AND 50-323
1.0 INTRODUCTION
By application dated January 19, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML060300299), as supplemented by letter dated June 20, 2006 (ADAMS Accession No. ML061780306), Pacific Gas and Electric Company (PG&E or the licensee) requested that the U.S. Nuclear Regulatory Commission (NRC/the Commission),
pursuant to Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), amend the Facility Operating Licenses, Nos. DPR-80 and DPR-82, for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP or facility). The proposed amendments would delete the antitrust conditions from the facility operating licenses.
A Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing was published in the Federal Register on April 14, 2006 (71 FR 19551). No requests for a hearing were received. The Northern California Power Agency (NCPA) filed comments by letter dated May 12, 2006, from its counsel, Spiegel & McDiarmid. In addition, the Antitrust Division of the U.S. Department of Justice (DOJ) in a letter dated June 1, 2006, stated that it had no comments concerning the proposed amendments.
The supplemental letter dated June 20, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination.
2.0 BACKGROUND
The operating licenses for DCPP have contained antitrust conditions since the mid-1980s. See Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI-03-2, 57 NRC 19, 31 (2003). In general, the conditions contain requirements concerning transmission services, interconnections, coordination, and the sale of certain power to interconnected and neighboring entities. The conditions also provide that certain entities could have sought an ownership interest in another nuclear unit built by PG&E within a specified time frame, which has since expired.
The DCPP licenses were issued under Section 104.b of the Atomic Energy Act of 1954, as amended (AEA). The antitrust conditions, known as the Stanislaus Commitments, were originally developed in the context of a Section 105.c antitrust review involving the never-built Stanislaus Nuclear Project, which would have been licensed to PG&E under Section 103 of the AEA had it gone forward. The Stanislaus Commitments were added to the DCPP construction permits in 1978 with the consent of PG&E at that time, and later carried forward in the DCPP operating licenses when they were issued. PG&E originally agreed to the Stanislaus Commitments in connection with the DOJs antitrust review of the Stanislaus Nuclear Project.
Such agreement was the basis for the DOJ to recommend to the NRC that no antitrust hearing would be necessary in connection with Stanislaus construction permit.
3.0 REGULATORY FRAMEWORK The licensee is requesting the amendment of the licenses to remove the antitrust conditions pursuant to 10 CFR 50.90, Application for amendment of license or construction permit. The NRC has determined that it has the authority to amend a license at the request of a licensee seeking to modify, suspend, or revoke its antitrust license conditions. See Ohio Edison Co.
(Perry Nuclear Power Plant, Unit 1), CLI-92-11, 36 NRC 47, 59 (1992); Kansas Gas and Electric Co. (Wolf Creek Generating Station, Unit 1), 49 NRC 441, 466 n.23 (1999).
4.0 EVALUATION 4.1 Changed Circumstances As PG&E points out in its application, significant legal and factual developments have occurred since the antitrust conditions were first imposed in 1978 against PG&E in the DCPP construction permits. The Federal Energy Regulatory Commission (FERC) in the last decade has issued several orders providing for non-discriminatory open access to transmission service.
See, e.g., FERC Orders 888, 889, and 2003. In addition, the California legislature in 1995 established the California Independent System Operator (CAISO) to, among other things, provide open access to non-discriminatory transmission service and operate energy and ancillary services markets, according to the application. The CAISO is subject to FERC jurisdiction, and now has operational control over PG&Es transmission facilities.
The application states that FERCs implementation of its open access policies ensures a competitive power market, and thus the concerns underlying the Stanislaus Commitments no longer exist. According to PG&E, in 2004 FERC specifically found that the services available under the CAISO tariff meet PG&Es obligations under the Stanislaus Commitments. See Opinion and Order Affirming Initial Decision, 107 FERC P61,154 (May 10, 2004).
Dating back to the DCPP construction permits, the antitrust conditions are now 28 years old.
Their age, particularly given the above changed circumstances of law and fact, weighs against retaining the conditions in the licenses. See Diablo Canyon, CLI-03-2, 57 NRC at 35 n.62.
4.2 Private Contractual Rights According to the application, the Stanislaus Commitments are the subject of agreements between PG&E and others, such as a November 1991 agreement with NCPA regarding interconnection issues and transmission service rates. PG&E asserts that it will continue to
meet these contractual obligations, regardless of whether the antitrust conditions are deleted from the DCPP operating licenses. It also points out that the Commission in CLI-03-2 noted that parties to the Stanislaus-related contracts can enforce those contracts quite apart from any NRC license conditions. NCPA, in its comments filed, informed the NRC that it has negotiated a new settlement agreement with PG&E under which the November 1991 agreement as well as the new settlement agreement may be enforced at the FERC or in court; NCPA agreed that it will not oppose or attempt to condition in any way PG&Es license amendment request.
Thus, in view of the foregoing, deleting the antitrust license conditions would not have any impact on the antitrust remedies negotiated by PG&E with the parties to the contracts related to the Stanislaus commitments.
4.3 Legal Authority to Continue to Impose Antitrust Conditions in the DCPP Licenses In CLI-03-2, the Commission was required to address the appropriate disposition of the DCPP antitrust license conditions in the context of a proposed license transfer. The Commission, after analyzing the NRCs antitrust authority under Section 105 of the AEA and the history of the DCPP antitrust conditions, concluded that the NRC now lacks an antitrust hold on PG&E.
CLI-03-2, 57 NRC at 34. Essentially, the Commission decided that because the basis for the DCPP antitrust conditions was the Section 103 Stanislaus proceeding and not the Section 104 Diablo Canyon proceeding, where an antitrust review under Section 105 was not authorized, and because the Stanislaus proceeding will clearly not be reopened, there is no authority under the AEA to continue to impose antitrust conditions on PG&E with respect to DCPP.
The staff notes that even though CLI-03-2 was later vacated as moot (see Northern California Power Agency v. NRC, 393 F.3d 223 (D.C. Cir. 2004)) due to the license transfer not occurring, the analysis in CLI-03-2 of the NRCs antitrust authority under the AEA is still sound.1 Accordingly, consideration of the legal basis of the antitrust license conditions weighs in favor of their deletion from the DCPP licenses.
4.4 U.S. Department of Justice and Public Comments The Antitrust Division of the DOJ played the key role in the original review of the competitive situation in PG&Es geographic markets and subsequent development of the conditions that were incorporated into the DCPP licenses. By letter dated April 20, 2006, the NRC staff informed the DOJ of the amendment request and provided the DOJ with a copy of the application. The NRC staff requested the DOJ to provide any comments by the close of the 1
In footnote 12 on page 7 of the application, PG&E suggests that if the Commission concluded that it now has authority to continue to impose the antitrust conditions in the current licenses, PG&E could avoid that jurisdiction by a corporate reorganization that would involve transferring the plant to an affiliated entity. In light of this statement, it is worth noting that, as a general principle, the staff in license transfer matters involving existing antitrust conditions will take into consideration when deciding whether to continue antitrust conditions in a transferred license whether a proposed transferee will be essentially the transferor superficially reorganized, and whether the license transfer is simply a transaction designed to obtain relief from the conditions.
60-day hearing opportunity period provided in the Federal Register notice of the application. As noted in the introduction to this safety evaluation, the DOJ stated in a letter to the NRC dated June 1, 2006, that it had no comments on the request to remove the conditions from the licenses.
In addition, no hearing requests or expressions of opposition to the amendments were filed by members of the public or, more significantly, beneficiaries of the antitrust conditions or competitors of PG&E.2 The absence of any such filings or submittals was viewed by the staff as one indication that the conditions are not critical to competitors or are not necessary to maintain a competitive situation, thus weighing in favor of granting the amendment request.
5.0
SUMMARY
OF FINDINGS Circumstances have changed significantly from those that existed when the antitrust license conditions were first imposed 28 years ago. In particular, there have been recent developments in the law at both the federal and state levels to ensure competition in the industry in California and elsewhere. Moreover, agreements binding PG&E related to the Stanislaus Commitments will continue to be in effect whether or not the antitrust conditions actually remain a part of the DCPP licenses, and competitors have voiced no opposition to the removal of the conditions.
Finally, under the limited statutory authority granted to the NRC under Section 105 the AEA, it appears that the NRC lacks the authority now to continue to impose the antitrust conditions against PG&E through the DCPP licenses. Accordingly, in consideration of all of the foregoing, the NRC staff finds the proposed amendments acceptable.
6.0 STATE CONSULTATION
In accordance with the Commission's regulations, the California State official was notified of the proposed issuance of the amendments. The State official had no comments.
7.0 ENVIRONMENTAL CONSIDERATION
Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact was published in the Federal Register on September 20, 2006 (71 FR 55035).
Accordingly, based on the environmental assessment, the Commission has determined that issuance of these amendments will not have a significant effect on the quality of human environment.
8.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the 2
As discussed in Section 4.2 of this safety evaluation, NCPA did submit a letter to the NRC stating it has agreed with PG&E not to oppose the amendment request or seek conditions.
Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: S. Hom Date: October 2, 2006