Category:Code Relief or Alternative
MONTHYEARML20249C8502020-10-22022 October 2020 Proposed Alternative NDE-RCS-SE-2R22 to the Requirements of the ASME Code ML19176A0082019-06-28028 June 2019 Request for Relief from the Inservice Inspection Program Requirements of ASME Code, Section XI, for Steam Generator and Pressurizer Nozzle Inside Radius Sections ML19023A0262019-01-25025 January 2019 Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 ML17263A0592017-10-0606 October 2017 Diablo Canyon Power Plant, Unit 2 - Relief Requests to Allow Use of Proposed Alternatives to Implement Requirements of ASME Code, for Reactor Pressure Vessel Welds for the Third ISI Interval (CAC Nos. MF9386, MF9387, MF9388, MF9389, and MF9390) ML17138B1152017-05-18018 May 2017 10 CFR 50.55a Request for Approval of Alternative - RI-ISI-2 ML17037D2672017-03-0909 March 2017 Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternate Depth Sizing Criteria for the Fourth Inservice Inspection ML16207A3972016-07-27027 July 2016 Relief Request NDE-SIF-U1, Allow Use of Alternate Examination Volume Coverage Requirements, Class 2 Seal Injection Welds, for the Third 10-Year Inservice Inspection Interval ML16056A5132016-03-0707 March 2016 Relief Request FLIG-U1, Request to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Stud Hole Ligament Examinations ML16055A2812016-02-26026 February 2016 Relief Request NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements, Third 10-Year Inservice Inspection Interval ML16013A3402016-01-27027 January 2016 Relief Request NDE-PNS-U2A, ASME Code Section XI Requirements to Allow Use of Alternate Exam Volume Coverage Requirements, for the Third 10-year Inservice Inspection Interval ML15337A0212015-12-0808 December 2015 Relief Request NDE-SG-MS-IR - Relief from Exam Requirements for Main Steam Nozzles in Replacement Steam Generators, Third 10-Year Inservice Inspection Interval ML15299A0342015-11-0404 November 2015 Relief Request NDE-RCS-SE-2R19, Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer, Third 10-Year Inservice Inspection Interval DCL-15-118, Response to NRC Request for Additional Information Regarding Relief Request FLIG-U12015-10-12012 October 2015 Response to NRC Request for Additional Information Regarding Relief Request FLIG-U1 ML15261A0072015-09-18018 September 2015 Request for Relief PRS-3, Proposed Alternative to Requirements for System Leakage Testing Class 1 Piping Vent, Drain, and Test Isolation Devices, for the Third 10-year Inservice Inspection Interval (TAC MF6520-MF6521) DCL-15-086, ASME Section XI Inservice Inspection Program Request for Relief PRS-32015-07-28028 July 2015 ASME Section XI Inservice Inspection Program Request for Relief PRS-3 ML15187A0352015-07-15015 July 2015 Relief Request REP-SI, Revision 2, Proposed Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years ML15168A0242015-06-19019 June 2015 Request for Alternative RPV-U1 - Extension to Allow Use of Alternate Reactor Inspection Interval Requirements for the Third 10-Year Inservice Inspection Interval DCL-15-075, Relief Request REP-SI - Supplement2015-06-18018 June 2015 Relief Request REP-SI - Supplement ML14251A4682014-09-16016 September 2014 Relief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval ML14196A0952014-08-0404 August 2014 Request for Relief from ASME Code Requirements for Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary ML14104B6132014-05-14014 May 2014 Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML13350A1512014-01-0303 January 2014 Relief Request NDE-RCS-SE-1R18, Alternative to ASME Code, Section XI, App. Viii, Suppl. 2 and 10 as Modified by CC N-695 and CC N-696, to Allow Use of Alternative Depth-Sizing Criteria ML13192A3542013-09-12012 September 2013 Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval DCL-13-038, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria2013-04-11011 April 2013 ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria ML1106003562011-03-29029 March 2011 Relief Request NDE-RCS-SE-2R16, Alternative to Requirements of ASME Code, Section XI, Supplement 10 as Modified by Code Case N-695, Qualification Requirements for Dissimilar Metal Piping Welds ML0801100012008-02-0606 February 2008 Approval of Relief Request REP-1 U2, Revision 1, for the Application of Weld Overlay on Dissimilar Metal Welds of Pressurizer Nozzles ML0716200722007-06-25025 June 2007 Relief Requests NDE-SLH U2 and NDE-LSL U2 for Second 10-year Inservice Inspection Interval Re Reactor Vessel Shell Weld Inspections ML0707803692007-03-29029 March 2007 Relief Request NDE-SBR for the Second 10-Year Interval Inservice Inspection and Examination Program for Snubbers DCL-07-032, Response to NRC Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U22007-03-23023 March 2007 Response to NRC Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2 ML0621200382006-09-20020 September 2006 Relief, Relief Request for Relief NDE-SLH (TAC No. MC9474) - Reactor Pressure Vessels Welds DCL-06-069, Residual Heat Removal Weld RB-119-11 - Flaw Analytical Evaluation Results2006-06-0606 June 2006 Residual Heat Removal Weld RB-119-11 - Flaw Analytical Evaluation Results ML0608203592006-04-0404 April 2006 Relief, Relief Request for Second Inservice Inspection Interval for Steam Generator Welds, MC9473 ML0603302512006-01-30030 January 2006 Relief Requests 1, 2, and 3 Approval ML0526603312005-10-26026 October 2005 Diablo Canon Pp, Units 1 & 2 - Approval of Requests for Relief from the (ASME) Boiler and Pressure Vessel Code (Code) Section XI Inservice Inspection Program Requirements (Tac Nos MC6693 & MC6694) ML0208502842002-04-11011 April 2002 Relief, Approval of Inservice Inspection Relief Request - Use of ASME Code Case N-597 (TAC MB1693 and MB1694) 2020-10-22
[Table view] Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Safety Evaluation
MONTHYEARML23199A3122023-07-20020 July 2023 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22340A6752023-03-0606 March 2023 Approval of Certified Fuel Handler Training and Retraining Program ML23012A2172023-02-0909 February 2023 Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing Definition ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 ML22334A0822022-12-0101 December 2022 Correction to Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML22187A0252022-11-16016 November 2022 Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML22221A1682022-09-0606 September 2022 Issuance of Amendment Nos. 241 and 242 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspection ML21160A1742021-09-0202 September 2021 Issuance of Amendment Nos. 239 and 240 Revising Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)), to Implement Methodology from WCAP-17661, Revision 1 ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) ML20249C8502020-10-22022 October 2020 Proposed Alternative NDE-RCS-SE-2R22 to the Requirements of the ASME Code ML20218A2762020-09-11011 September 2020 Issuance of Amendment Nos. 237 and 239 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to Updated Final Safety Analysis Report ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances ML19274B0822019-10-0707 October 2019 Correction to Issuance of Amendment Nos. 233 and 235 to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for ERO Positions ML19196A3092019-08-21021 August 2019 Issuance of Amendment Nos. 233 and 235 Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML19176A0082019-06-28028 June 2019 Request for Relief from the Inservice Inspection Program Requirements of ASME Code, Section XI, for Steam Generator and Pressurizer Nozzle Inside Radius Sections ML19023A0262019-01-25025 January 2019 Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 ML17263A0592017-10-0606 October 2017 Diablo Canyon Power Plant, Unit 2 - Relief Requests to Allow Use of Proposed Alternatives to Implement Requirements of ASME Code, for Reactor Pressure Vessel Welds for the Third ISI Interval (CAC Nos. MF9386, MF9387, MF9388, MF9389, and MF9390) ML17212A3792017-09-25025 September 2017 Diablo Canyon Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 231 and 233 Re: Emergency Action Level Scheme Change (CAC Nos. MF8528 and MF8529) ML17132A2312017-05-16016 May 2017 Diablo Canyon Power Plant, Units 1 and 2 - Correction Letter Regarding Amendment Nos. 230 and 232 to Adopt Alternative Source Term (CAC Nos. MF6399 and MF6400) ML17012A2462017-04-27027 April 2017 Issuance of Amendments Revise Licensing Bases to Adopt Alternative Source Term ML17037D2672017-03-0909 March 2017 Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternate Depth Sizing Criteria for the Fourth Inservice Inspection ML17018A3412017-02-23023 February 2017 Issuance of Amendments Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML16349A3862016-12-28028 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16139A0082016-12-21021 December 2016 Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation System ML16207A3972016-07-27027 July 2016 Relief Request NDE-SIF-U1, Allow Use of Alternate Examination Volume Coverage Requirements, Class 2 Seal Injection Welds, for the Third 10-Year Inservice Inspection Interval ML16117A2522016-05-19019 May 2016 Issuance of Amendment Nos. 226 and 228, Revise Minimum Flow Value Specified in Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML16055A3592016-03-0909 March 2016 Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML16056A5132016-03-0707 March 2016 Relief Request FLIG-U1, Request to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Stud Hole Ligament Examinations ML16055A2812016-02-26026 February 2016 Relief Request NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements, Third 10-Year Inservice Inspection Interval ML16032A0062016-02-19019 February 2016 Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing Basis ML16013A3402016-01-27027 January 2016 Relief Request NDE-PNS-U2A, ASME Code Section XI Requirements to Allow Use of Alternate Exam Volume Coverage Requirements, for the Third 10-year Inservice Inspection Interval ML15037A0062016-01-0505 January 2016 ISFSI - Safety Evaluation, Encl. 4, Amendment Nos. 222, 224, and 4 - Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC MF2809, MF2810, and L24991) ML15029A1732016-01-0505 January 2016 ISFSI - Issuance of Amendment Nos. 222, 224, and 4, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (CAC MF2809, MF2810, and L24991) ML15337A0212015-12-0808 December 2015 Relief Request NDE-SG-MS-IR - Relief from Exam Requirements for Main Steam Nozzles in Replacement Steam Generators, Third 10-Year Inservice Inspection Interval ML15281A1642015-12-0303 December 2015 Issuance of Amendment Nos. 221 and 223, Revise Updated Final Safety Analysis Report and Approval to Perform Fuel Assembly Structural Analyses That Considers Application of Leak Before Break ML15299A0342015-11-0404 November 2015 Relief Request NDE-RCS-SE-2R19, Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer, Third 10-Year Inservice Inspection Interval ML15245A5422015-09-30030 September 2015 Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation Date ML15261A0072015-09-18018 September 2015 Request for Relief PRS-3, Proposed Alternative to Requirements for System Leakage Testing Class 1 Piping Vent, Drain, and Test Isolation Devices, for the Third 10-year Inservice Inspection Interval (TAC MF6520-MF6521) ML15204A2222015-08-27027 August 2015 Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) ML15187A0352015-07-15015 July 2015 Relief Request REP-SI, Revision 2, Proposed Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years ML15162A8822015-07-0101 July 2015 Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator Testing ML15168A0242015-06-19019 June 2015 Request for Alternative RPV-U1 - Extension to Allow Use of Alternate Reactor Inspection Interval Requirements for the Third 10-Year Inservice Inspection Interval ML14251A4682014-09-16016 September 2014 Relief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval ML14196A0952014-08-0404 August 2014 Request for Relief from ASME Code Requirements for Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary ML14104B6132014-05-14014 May 2014 Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML14042A1932014-02-27027 February 2014 Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960) ML13192A3542013-09-12012 September 2013 Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML13178A0052013-09-0505 September 2013 Issuance of Amendment Nos. 216 and 218, Adoption of TSTF-421-A, Revision to RCP Flywheel Inspection Program (WCAP-15666), Using Consolidated Line Item Improvement Process ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval 2023-07-20
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 7, 2016 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 1 - RELIEF REQUEST FLIG-U1 TO EXTEND THIRD 10-YEAR INSERVICE INSPECTION INTERVAL FOR PERFORMING REACTOR VESSEL STUD HOLE LIGAMENT EXAMINATIONS (CAC NO. MF6790)
Dear Mr. Halpin:
By letter dated October 7, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A505), as supplemented by letter dated October 12, 2015 (ADAMS Accession No. ML15285A021), Pacific Gas & Electric Company (the licensee) submitted relief request (RR) FLIG-U 1 for an extension of the third 10-year in service inspection (ISi) interval for Diablo Canyon Power Plant (DCPP), Unit 1 by approximately 13 months beyond the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components,"
Paragraph IWA-2430(d)(1) Code-allowed end of interval 1-year extension. This extension is required to re-perform reactor vessel (RV) stud hole ligament examinations.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensee's submittal and determined that the proposed extension of the third 10-year ISi interval to complete the inspections of the RV stud holes provides reasonable assurance of the leak tightness and structural integrity of the components. The NRC staff has concluded that examining the RV stud holes in the current refueling outage (RFO) would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations (10 CFR), Part 50, paragraph 10 CFR 50.55a(z)(2). Therefore, the NRC authorizes the use of RR FLIG-U1 to extend the third 10-year ISi interval to the end of the 20th RFO at DCPP, Unit 1, which is currently scheduled to end in June 2017.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
E. Halpin If you have any questions, please contact the Project Manager, Siva P. Lingam, at 301-415-1564 or via e-mail at Siva.Lingam@nrc.gov.
Sincerely, 1:, o~+ lCg,\A-~
QA --\,_..
Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-275
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NDE-FWNS-U1/U2 FOR FEEDWATER NOZZLE-TO-SHELL WELD TO ALLOW USE OF ALTERNATE EXAMINATION VOLUME COVERAGE REQUIREMENTS PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNIT NOS. 1 AND 2 DOCKET NOS. 50-275 AND 50-323
1.0 INTRODUCTION
By letter dated October 7, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A505), as supplemented by letter dated October 12, 2015 (ADAMS Accession No. ML15285A021), Pacific Gas and Electric Company (the licensee) submitted Relief Request (RR) FLIG-U 1 requesting to extend the third 10-year inservice inspection (ISi) interval to the end of the 201h refueling outage (RFO) at Diablo Canyon Power Plant (DCPP), Unit 1, which is currently scheduled to end in June 2017. This would extend the 10-year ISi interval by approximately 13 months beyond that which is allowed by the American Society for Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Paragraph IWA-2430(d)(1 ).
Specifically, pursuant to Title 1O of the Code of Federal Regulations, Part 50 (1 O CFR 50),
paragraph 50.55a(z)(2), the licensee proposes to extend the third 10-year ISi interval on the basis that performing the reactor vessel (RV) stud hole ligament inspections in the current RFO would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Verbal authorization of this RR was granted on October 15, 2015 (ADAMS Accession No. ML15289A099).
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that repair and replacement activities comply with the requirements in the Enclosure
latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month inspection interval, subject to the conditions listed therein.
Paragraph 10 CFR 50.55a(z), "Alternatives to codes and standards requirements" states, in part, that alternatives to the requirements of 10 CFR 50.55a(g) may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), if (1) the proposed alternative would provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(z)(2), the licensee is requesting to use an alternative to the requirements of Article IWA-2430 of the ASME Code,Section XI.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to authorize the alternative requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1 Affected Components The affected components are 54 threaded stud holes in the RV flange. The ASME Code,Section XI, Examination Category B-G-1, Item No. 86.40, "Threads in Flange," are applicable.
3.2 ASME Code of Reference ASME Code,Section XI, 2001 Edition through 2003 Addenda.
3.3 Reason for the Request During the 18'h RFO (1R18) in February 2014, the licensee performed stud hole ligament ultrasonic (UT) examinations under water using specifically procured tooling and equipment to reduce personnel exposure, to improve safety, and to move the examinations off the critical path refueling schedule.
The adequacy of coverage using this tooling versus the Code-required volume depicted in Figure IWB-2500-12 was questioned by the NRC inspector. The tooling positions the UT transducer relative to the stud hole using the installed stud hole plug or RV head alignment pin for centering an associated long-handled tool for moving the transducer and scanning the examination volume. It was considered that the use of the tooling would not result in the maximum achievable examination volume coverage due to occlusion by the plug or pin. It was noted that although NRC Information Notice (IN) 98-42, "Implementation of 10 CFR 50.55a(g) lnservice Inspection Requirements," dated December 1, 1998 (ADAMS Accession No. ML031040542), and ASME Code Case N-460, "Alternative Examination Coverage for Class 1 and 2 Welds,Section XI, Division 1," allows for crediting "essentially 100 percent" when greater
than 90 percent coverage is obtained, this only applies when the inspection is limited by geometry or other restrictions caused by design or configuration issues.
3.4 Proposed Alternative Refueling outage 1R19 is the last outage in the third ISi interval. The third interval was extended beyond May 7, 2015, the 30th anniversary of commercial operation, to November 6, 2015, as allowed by Section XI, Paragraph IWA-2430(d)(1 ), to include 1R19. In the event that the NRC concludes that the examinations of the RV stud hole ligaments were not in compliance with ASME Code,Section XI, requirements and that re-performance of the examinations is required, the proposed alternative will allow time to re-perform the UT examinations for all 54 RV stud hole ligaments in 1R20, which is currently scheduled from April 30 to June 2, 2017. This additional extension will exceed the 1-year allowable extension provided by IWA-2430(d)(1) by 13 months. In accordance with 10 CFR 50.55a(z)(2), this interval extension is requested on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
This request for extension allows time for further consideration and resolution of the Code requirements. However, if it is determined that the examinations which have been performed do not meet ASME Code requirements and are required to be re-performed, this request for extension will give the licensee time to perform proper planning to ensure that the examinations are done safely, to minimize radiation exposure, and to ensure that the examinations are in complete compliance with the ASME Code.
3.5 Hardship To perform the examinations on the RV stud hole ligaments the outage schedule would need to be changed to extend a RV head lift for the duration of the examinations, install blocking of the suspended load to allow safe personnel access underneath, perform inspections of the accessible portions, lift and secure the RV head, and complete the examinations. The process is estimated to exceed 600 milli roentgen equivalent man (mrem).
3.6 Duration of Proposed Relief The third interval was originally scheduled to end on May 7, 2015. However, per ASME Code,Section XI, Paragraph IWA-2430(d)(1), the third interval was extended past the nominal end date to November 6, 2015, to coincide with the dates of the 19th RFO. The alternative is requested to extend the third ISi interval by approximately 13 months past the ASME Code,Section XI, Paragraph IWA-2430(d){1) allowed extension of 1 year for the potential re-performance of the examinations. This request is applicable for the third ISi interval. If this RR is approved, the third ISi interval for these subject examinations will end at the conclusion of the 20th RFO, which is currently scheduled to end in June 2017.
3.7 NRC Staff Evaluation Pursuant to 10 CFR 50.55a(z)(2), the licensee is proposing to extend its 1O year inspection interval by 13 months to accommodate an inspection of 54 RV stud hole ligaments. The license poses that performing the inspections under the current schedule would create a hardship without a compensating increase in the level of quality and safety.
Inspecting the RV stud holes in the third 10-year ISi interval would require the licensee to extend an RV head lift for the duration of the examinations, preparation for and installing blocking of the suspended load to allow safe personnel access underneath, performance of the accessible portion of the examinations (around the blocking), and lifting the RV head. The inspection and associated manipulation of the head is estimated to result in doses that exceed 600 mrem.
The licensee inspected the RV stud hole ligaments in February 2014 using tooling designed to perform the inspections underwater. The inspection using this tooling was not able to achieve 100 percent of the volumetric coverage required by the ASME Code,Section XI. ASME Code Case N-460, which is listed in Regulatory Guide 1.147, Revision 17, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," August 2014 (ADAMS Accession No. ML13339A689), as acceptable for use without conditions, allows for reduced coverage of inspections "due to interference by another component or part geometry." There are no provisions allowing reduced coverage in ASME Code Case N-460 or IN 98-42 for tooling.
The licensee stated that the 2014 inspection achieved a coverage value of 98 percent. The NRC staff is still evaluating the effectiveness of this examination and the code coverage obtained. The NRC staff has determined that based on operational experience with RV stud holes and the coverage obtained that there is reasonable assurance that significant cracking has not occurred in the RV stud holes.
As described in the licensee's letter dated October 12, 2015, the inspections currently scheduled for the 20th RFO will be conducted as normal and credited to the fourth 10-year ISi interval. Thus, extending the third 10-year ISi interval will only affect the RV stud hole inspections.
A 600 mrem radiation dose for an examination is often not considered sufficient by the NRC staff to cancel or significantly delay a required inspection. The licensee has recently conducted an inspection with significant coverage and the licensee will either perform an RV stud hole inspection with 100 percent coverage or demonstrate that the inspection performed in February 2014 met the Code requirements. The NRC staff has determined that this hardship is sufficient to permit the extension of the third 10-year ISi interval to the end of the 20th RFO.
4.0 CONCLUSION
As set forth above, the NRC staff has determined that the proposed extension of the third 10-year ISi interval to complete the inspections of the RV stud holes provides reasonable assurance of the leak tightness and structural integrity of the components. The NRC staff has concluded that examining the RV stud holes in the current RFO would result in a hardship or
unusual difficulty without a compensating increase in the level of quality and safety.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC authorizes the use of RR FLIG-U 1 to extend the third 10-year ISi interval to the end of the 2Q1h RFO at DCPP, Unit 1, which is currently scheduled to end in June 2017.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: S. Cumblidge Date: March 7, 2016
ML16056A513 *SE via email OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DE/EPNB/BC* NRR/DORL/LPL4-1/BC NAME Slingam JBurkhardt DAiiey RPascarelli (BSingal for)
DATE 2/29/16 2/29/16 2/25/16 3/7/16