Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b)
ML082410262
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/30/2008
From: Wang A
Plant Licensing Branch IV
To: Conway J
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD8911, TAC MD8912
Download: ML082410262 (126)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 30, 2008 Mr. John Conway Senior Vice President - Station Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 -ISSUANCE OF AMENDMENTS RE: TECHNICAL SPECIFICATIONS CHANGE TO RELOCATE SURVEILLANCE TEST INTERVALS TO A LICENSEE-CONTROLLED PROGRAM (RISK-INFORMED INITIATIVE 5B) (TAC NOS. MD8911 AND MD8912)

Dear Mr. Conway:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 200 to Facility Operating License No. DPR-80 and Amendment No. 201 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated October 15, 2007, and as supplemented by letter dated July 8, 2008.

The amendments relocate surveillance frequencies of most surveillance tests from the TSs to a licensee-controlled document, the Surveillance Frequency Control Program. Once relocated, changes to the surveillance frequencies may be made using a risk-informed methodology, Nuclear Energy Institute (NEI) document NEI 04-10 Rev. 1, as specified in the Administrative Controls of the TS. The NRC staff has previously approved NEI 04-10 Rev. 1, as acceptable for referencing in licensing applications.

A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

Sincerely, ClQu~. vJ U40~/.

Alan B. Wang, P oj ct Manager Plant Licensing B nch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. Amendment No. 200 to DPR-80
2. Amendment No. 201 to DPR-82
3. Safety Evaluation cc w/encls: See next page

Diablo Canyon Power Plant, Units 1 and 2 cc:

Sierra Club San Lucia Chapter AnN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Chairman San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Attn: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Additional Distribution via Listserv (6/2008)

Jennifer Post, Esq.

Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis, Obispo, CA 94306-0112 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414, IVIS 7610 Sacramento, CA 95899-7414 Mr. James R. Becker Site Vice President Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 200 License No. DPR-80

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Pacific Gas and Electric Company (the licensee), dated October 15, 2007, and as supplemented by letter dated July 8, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

-2

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 360 days.

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. DPR-80 and Technical Specifications Date of Issuance: October 30, 3008

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 201 License No. DPR-82

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Pacific Gas and Electric Company (the licensee), dated October 15, 2007, and as supplemented by letter dated July 8, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

-2

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:

(2)

Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 201, are hereby incorporated in the license.

Pacific Gas &Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 360 days.

FOR THE NUCLEAR REGULATORY COMMISSION Michael 1. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. DPR-82 and Technical Specifications Date of Issuance: October 30, 2008

ATTACHMENT TO LICENSE AMENDMENT NO. 200 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 201 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Replace the following pages of the Facility Operating License Nos. DPR-80 and DPR-82, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Operating License Nos. DPR-80 and DPR-82 REMOVE INSERT -3 Technical Specifications REMOVE INSERT REMOVE INSERT REMOVE INSERT 1.1-6 1.1-6 3.4-9 3.4-9 3.7-16 3.7-16 3.1-1 3.1-1 3.4-11 3.4-11 3.7-19 3.7-19 3.1-3 3.1-3 3.4-13 3.4-13 3.7-21 3.7-21 3.1-9 3.1-9 3.4-15 3.4-15 3.7-22 3.7-22 3.1-10 3.1-10 3.4-17 3.4-17 3.7-24 3.7-24 3.1-12 3.1-12 3.4-22 3.4-22 3.7-26 3.7-26 3.1-17 3.1-17 3.4-25 3.4-25 3.7-27 3.7-27 3.2-2 3.2-2 3.4-26 3.4-26 3.7-33 3.7-33 3.2-4 3.2-4 3.4-28 3.4-28 3.8-4 3.8-4 3.2-7 3.2-7 3.4-30 3.4-30 3.8-5 3.8-5 3.2-8 3.2-8 3.4-31 3.4-31 3.8-6 3.8-6 3.2-11 3.2-11 3.4-34 3.4-34 3.8-7 3.8-7 3.3-8 3.3-8 3.4-36 3.4-36 3.8-8 3.8-8 3.3-9 3.3-9 3.5-1 3.5-1 3.8-9 3.8-9 3.3-10 3.3-10 3.5-2 3.5-2 3.8-10 3.8-10 3.3-11 3.3-11 3.5-4 3.5-4 3.8-17 3.8-17 3.3-11a 3.5-5 3.5-5 3.8-19 3.8-19 3.3-25 3.3-25 3.5-7 3.5-7 3.8-24 3.8-24 3.3-25a 3.5-8 3.5-8 3.8-24a 3.3-26 3.3-26 3.6-4 3.6-4 3.8-26 3.8-26 3.3-36 3.3-36 3.6-9 3.6-9 3.8-28 3.8-28 3.3-39 3.3-39 3.6-10 3.6-10 3.8-30 3.8-30 3.3-41 3.3-41 3.6-11 3.6-11 3.8-32 3.8-32 3.3-42 3.3-42 3.6-12 3.6-12 3.9-1 3.9-1 3.3-45 3.3-45 3.6-15 3.6-15 3.9-2 3.9-2 3.3-48 3.3-48 3.6-16 3.6-16 3.9-2a 3.3-48a 3.7-5 3.7-5 3.9-3 3.9-3 3.3-51 3.3-51 3.7-7a 3.7-7a 3.9-4 3.9-3a 3.4-1 3.4-1 3.7-9 3.7-9 3.9-5 3.9-5 3.4-1a 3.7-12 3.7-12 3.9-7 3.9-7 3.4-4 3.4-4 3.7-13 3.7-13 3.9-8 3.9-8 3.4-6 3.4-6 3.7-14 3.7-14 5.0-17 5.0-17 3.4-7 3.4-7 3.7-15 3.7-15

  • The current technical specifications in ADAMS contain two pages numbered 3.9-4.

The first instance is entitled "Containment Penetrations" for SRs 3.9.4.1 and 3.9.4.2; the second is entitled "RHR and Coolant Circulation* High Water Level" for LCO 3.9.5. Please replace page 3.9-4 for SRs 3.9.4.1 and 3.9.4.2 with page 3.9-3a for SRs 3.9.4.1 and 3.9.4.2.

-3 (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix S, as revised through Amendment No. 200, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3)

Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:

a.

Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No. 200

-3 (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incor porated below:

(1)

Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix S, as revised through Amendment No. 201

, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3)

Initial Test Program (SSER 31 J Section 4.4.1)

Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 201

Definitions 1.1 1.1 Definitions (continued)

SLAVE RELAY TEST THERMAL POWER TRIP ACTUATING DEVICE OPERATIONAL TEST (TADOT)

A SLAVE RELAY TEST shall consist of energizing all slave relays and verifying the OPERABILITY of each required slave relay. The SLAVE RELAY TEST shall include a continuity check of associated required testable actuation devices. The SLAVE RELAY TEST may be performed by means of any series of sequential, overlapping, or total steps.

THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.

A TADOT shall consist of operating the trip actuating device and verifying the OPERABILITY of all devices in the channel required for trip actuating device OPERABILITY. The TADOT shall include adjustment, as necessary, of the trip actuating device so that it actuates at the required setpoint within the necessary accuracy. The TADOT may be performed by means of any series of sequential, overlapping or total channel steps.

DIABLO CANYON - UNITS 1 & 2 1.1-6 Unit 1 - Amendment No. 4-J5, 200 Unit 2 - Amendment 1\\10. 4-J5, 201

SDM 3.1.1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)

LCO 3.1.1 SDM shall be within the limits provided in the COLR.

APPLICABILITY:

MODE 2 with keff < 1.0, MODES 3, 4, and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

SDM not within limit.

A.1.

Initiate boration to 15 minutes restore SDM to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM to be within limits.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.1-1 Unit 1 - Amendment No. ~,~, 200 Unit 2 - Amendment No. ~,+7G, 201

3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.1.2.1


NOTE--------------------------------

The predicted reactivity values may be adjusted (normalized) to correspond to the measured core reactivity prior to exceeding a fuel burnup of 60 effective full power days (EFPD) after each fuel loading.

Verify measured core reactivity is within +/- 1% ~k1k of predicted values.

Core Reactivity FREQUENCY Once prior to entering MODE 1 after each refueling AND


NOTE-------

Only required after 60 EFPD In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.1-3 Unit 1 - Amendment No. 4-Je, 200 Unit 2 - Amendment No. 4-Je, 201

3.1.4 Rod Group Alignment Limits SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify individual rod positions within alignment limit.

In accordance with the Surveillance Frequency Control Program SR 3.1.4.2 Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core ~ 10 steps in either direction.

In accordance with the Surveillance Frequency Control Program SR 3.1.4.3 Verify rod drop time of each rod, from the fully withdrawn position, is::;; 2.7 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with:

a. Tavg ~ 500 OF; and
b. All reactor coolant pumps operating.

Prior to reactor criticality after each removal of the reactor head DIABLO CANYON - UNITS 1 & 2 3.1-9 Unit 1 - Amendment No. 4Ja, 200 Unit 2 - Amendment No. 4Ja, 201

Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.

APPLICABILITY:

MODE 1, MODE 2 with any control bank not fully inserted.


NOTE-------------------------------------------------------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more shutdown banks not within limits.

A.1.1 Verify SDM to be within the limits provided in the COLR.

OR A.1.2 Initiate boration to restore SDM to within limit.

AND A.2 Restore shutdown banks to within limits.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.1.5.1 Verify each shutdown bank is within the limits specified in the COLR.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.1-10 Unit 1 - Amendment No. 4-J&, 200 Unit 2 - Amendment No. 4-J&, 201

3.1.6 Control Bank Insertion Limits SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify estimated critical control bank position is within the limits specified in the COLR.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving criticality SR 3.1.6.2 Verify each control bank insertion is within the limits specified in the COLR.

In accordance with the Surveillance Frequency Control Program SR 3.1.6.3 Verify sequence and overlap limits specified in the COLR are met for control banks not fUlly withdrawn from the core.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.1-12 Unit 1 - Amendment No. 4Ja, 200 Unit 2 - Amendment No. 4Ja, 201

3.1.8 PHYSICS TESTS Exceptions - MODE 2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 Perform a CHANNEL OPERATIONAL TEST on power range and intermediate range channels per SR 3.3.1.7, SR 3.3.1.8, and Table 3.3.1-1.

Prior to initiation of PHYSICS TESTS SR 3.1.8.2 Verify the RCS lowest operating loop average temperature is ~ 531 0 F.

In accordance with the Surveillance Frequency Control Program SR 3.1.8.3 Verify THERMAL POWER is :$: 5% RTP.

In accordance with the Surveillance Frequency Control Program SR 3.1.8.4 Verify SDM is within the limits provided in the COLR.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 Unit 1 - Amendment No. m, 200 Unit 2 - Amendment No. m, 201

3.2.1 Fa{Z)

SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

During power escalation following shutdown, THERMAL POWER may be increased until an equilibrium power level has been achieved, at which a power distribution map is obtained.

SURVEILLANCE SR 3.2.1.1 Verify Fg (Z) is within limit.

FREQUENCY Once after each refueling prior to THERMAL POWER exceeding 75%

RTP AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving equilibrium conditions after exceeding, by ~

20% RTP, the THERMAL POWER at which Fg(2) was last verified AND In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.2-2 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.2.1.2 (continued)

Fa{Z)

FREQUENCY Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving equilibrium conditions after exceeding, by ~

20% RTP, the THERMAL POWER at which F~ (2) was last verified AND In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.2-4 Unit 1 - Amendment No. 4-Ja, 200 Unit 2 - Amendment No. 4-Ja, 201

3.2.2 F~

SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

During power escalation following shutdown, THERMAL POWER may be increased until an equilibrium power level has been achieved, at which a power distribution map is obtained.

SURVEILLANCE SR 3.2.2.1 Verify F~ is within limits specified in the COLR.

FREQUENCY Once after each refueling prior to THERMAL POWER exceeding 75%

RTP AND In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.2-7 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

AFD 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3 AXIAL FLUX DIFFERENCE (AFD)

LCO 3.2.3 The AFD in % flux difference units shall be maintained within the limits specified in the COLR.


NOTE----------------------------------------------

The AFD shall be considered outside limits when two or more OPERABLE excore channels indicate AFD to be outside limits.

APPLICABILITY:

MODE 1 with THERMAL POWER ~ 50% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

AFD not within limits.

A.1 Reduce THERMAL POWER to < 50% RTP.

30 minutes SURVEILLANCE REQUIREMENTS SURVEI LLANCE SR 3.2.3.1 Verify AFD within limits for each OPERABLE excore channel.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.2-8 Unit 1 - Amendment No. 4-Ja, 200 Unit 2 - Amendment No. 4-Ja, 201

QPTR 3,2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.4.1


N()TES----------------------------

1. With input from one Power Range Neutron Flux channel inoperable and THERMAL P()WER ~

75% RTP, the remaining three power range channels can be used for calculating QPTR.

2. SR 3.2.4.2 may be performed in lieu of this Surveillance, Verify QPTR is within limit by calculation.

In accordance with the Surveillance Frequency Control Program SR 3.2.4.2


N()TE-----------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the input from one or more Power Range Neutron Flux channels is inoperable with THERMAL P()WER

> 75% RTP.

Verify QPTR is within limit using core power distribution measurement information.

In accordance with the Surveillance Frequency Control Program DIABL() CANY()N - UNITS 1 & 2 3.2-11 Unit 1 - Amendment No. +Ja,4-94,200 Unit 2 - Amendment No. +Ja,4W,201

3.3.1 RTS Instrumentation SURVEILLANCE REQUIREMENTS


NOTE---------------------------------------------------------

Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function.

SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2


NOTE--------------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is 2: 15% RTP, but prior to exceeding 30% RTP.

Compare results of calorimetric heat balance calculation to power range channel output. Adjust power range channel output if calorimetric heat balance calculation results exceed power range channel output by more than + 2% RTP.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.3


NOTE--------------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is ~ 50% RTP.

Compare results of incore power distribution measurements to Nuclear Instrumentation System (NIS) AFD. Adjust NIS channel if absolute difference is 2:3%.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.4


NOTE--------------------------------

This Surveillance must be performed on the reactor trip bypass breaker, for the local manual shunt trip only, prior to placing the bypass breaker in service.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.5 Perform ACTUATION LOGIC TEST.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-8 Unit 1 - Amendment No. ~,4a+,4-94,4-7Q, 200 Unit 2 - Amendment No. 135,157,~,484, 201

3.3.1 RTS Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.6

~----------------------------NOTE--------------------------------

Not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after THERMAL POWER ~ 75% RTP.

Calibrate excore channels to agree with incore power distribution measurements.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.7


NOTE--------------------------------

1.

Not required to be performed for source range instrumentation prior to entering MODE 3 from MODE 2 until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entry into MODE 3.

2.

For source range instrumentation, this Surveillance shall include verification that interlocks P-6 and P-10 are in their required state for existing unit conditions.

Perform COT.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-9 Unit 1 - Amendment No. ~.~.4-7Q,4S4. 200 Unit 2 - Amendment No. ~.400,-1-84.4W. 201

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.8


NOTE--------------------------------

This Surveillance shall include verification that interlocks P-6 and P-10 are in their required state for existing unit conditions.

Perform COT.


N0 TE-------

Only required when not performed within previous 184 days Prior to reactor startup AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reducing power below P-1 0 for power and intermediate instrumentation AND Four hours after reducing power below P-6 for source range instrumentation AND In accordance with the Surveillance Frequency Control Program SR 3.3.1.9


NOTE--------------------------------

Verification of setpoint is not required.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.10


NOTE--------------------------------

This Surveillance shall include verification that the time constants are adjusted to the prescribed values.

Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.3-10 Unit 1 - Amendment No. ~A-7Q, 200 Unit 2 - Amendment No. ~,.:t-84, 201

3.3.1 RTS Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.11


N()TE--------------------------------

1. Neutron detectors are excluded from CHANNEL CALIBRATI()N.
2. This Surveillance shall include verification that the time constants are adjusted to the prescribed values.
3. Power and Intermediate Range detector plateau voltage verification is not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after achieving equilibrium Conditions with Thermal Power ~ 95%

RTP.

Perform CHANNEL CALIBRATI()N.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.12 Perform CHANNEL CALIBRATI()N.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.13 Perform C()T.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.14


N()TE--------------------------------

Verification of setpoint is not reqUired.

Perform TAD()T.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.15


N()TE--------------------------------

Verification of setpoint is not required.

Perform TAD()T Prior to exceeding the P-9 interlock whenever the unit has been in M()DE 3, if not performed in the previous 31 days.

(continued)

DIABL() CANY()N - UNITS 1 & 2 3.3-11 Unit 1 - Amendment No. +Ja, 200 Unit 2 - Amendment No. +Ja, 201

3.3.1 RTS Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.3.1.16


NOTE--------------------------------

Neutron detectors are excluded from response time testing.

Verify RTS RESPONSE TIMES are within limits.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-11 a Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.

FREQUENCY SURVEILLANCE SR 3.3.2.1 Perform CHANNEL CHECK.

SR 3.3.2.2 Perform ACTUATION LOGIC TEST.

SR 3.3.2.3 SR 3.3.2.4 Not used.

Perform MASTER RELAY TEST.

SR 3.3.2.5 Perform COT.

SR 3.3.2.6 Perform SLAVE RELAY TEST.

SR 3.3.2.7 SR 3.3.2.8 Not used.


NOTE-----------------------------------

Verification of setpoint not required for manual initiation functions.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-25 Unit 1 - Amendment No. ~, 4-79, 200 Unit 2 - Amendment No. ~, ~, 201

3.3.2 ESFAS Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.2.9


I\\JOTE-----------------------------------

This Surveillance shall include verification that the time constants are adjusted to the prescribed values.

Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program SR 3.3.2.10


NOTE-----------------------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SG pressure is 2 650 psig.

Verify ESF RESPONSE TIMES are within limits.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-25a Unit 1 - Amendment No. 4Ja, 200 Unit 2 - Amendment No. 4Ja, 201

3.3.2 ESFAS Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.2.11


NOTE-----------------------------------

Verification of setpoint not required.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program SR 3.3.2.12 Perform ACTUATION LOGIC TEST In accordance with the Surveillance Frequency Control Program SR 3.3.2.13


NOTE-----------------------------------

Verification of setpoint not required for manual initiation functions.

Perform TADOT In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.3-26 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.3.3 PAM Instrumentation SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

SR 3.3.3.1 and SR 3.3.3.2 apply to each PAM instrumentation Function in Table 3.3.3-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required instrumentation channel that is normally energized.

In accordance with the Surveillance Frequency Control Program SR 3.3.3.2


NOTE---------------------------------

Neutron detectors are excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-36 Unit 1 - Amendment No. 4-Ja,~14.e8,200 Unit 2 - Amendment No. 4-Ja1~,4W,201

3.3.4 Remote Shutdown System SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1 Perform CHANNEL CHECK for each required instrumentation channel.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.2 Verify each required control circuit and transfer switch is capable of performing the intended function.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.3


NOTE------------------------------

Reactor Trip Breaker position is excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION for each required instrumentation channel.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-39 Unit 1 - Amendment No. m, 200 Unit 2 - Amendment 1\\10. m, 201

LOP DG Start Instrumentation 3.3.5 3.3 INSTRUMENTATION 3.3.5 Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation LCO 3.3.5 One channel per bus of loss of voltage DG start Function; and two channels per bus of degraded voltage Function shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4, When associated DG is required to be OPERABLE by LCO 3.8.2, "AC Sources-Shutdown."

ACTIONS


NOTE-------------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A,

One or more Functions with one or more channels per bus inoperable.

A,1


NOTE--------------

One channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing.

Enter applicable Condition(s) and Required Action(s) for the associated DG made inoperable by LOP DG start instrumentation.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.5.1 Not used SR 3.3.5.2 Perform TADOT.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.3-41 Unit 1 - Amendment No. 4-Ja,.:f.42,4-&a, 200 Unit 2 - Amendment No. 4-Ja,.:f.42, 201

LOP DG Start Instrumentation 3.3.5 SURVEILLANCE SR 3.3.5.3 Perform CHANNEL CALIBRATION with Allowable Value setpoints as follows:

a. Loss of voltage Diesel Start Allowable Value

~ aV with a time delay of::; 0.8 seconds and

~ 2583 V with a ::; 10 second time delay.

Loss of voltage initiation of load shed with one relay Allowable Value ~ aV with a time delay of

4 seconds and ~ 2583 V with a time delay
25 seconds and with one relay Allowable Value

~ 2870 V, instantaneous.

b. Degraded voltage Diesel Start Allowable Value

~ 3785 V with a time delay of ::; 10 seconds.

Degraded voltage initiation of Load Shed Allowable Value ~ 3785 V with a time delay of

20 seconds.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-42 Unit 1 - Amendment No. -+Ja,~,-+ea,200 Unit 2 - Amendment No. -+Ja,~,201

3.3.6 Containment Ventilation Isolation Instrumentation SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------------------------------

Refer to Table 3.3.6-1 to determine which SRs apply for each Containment Ventilation Isolation Function.

FREQUENCY SURVEILLANCE SR 3.3.6.1 SR 3.3.6.2 SR 3.3.6.3 SR 3.3.6.4 SR 3.3.6.5 SR 3.3.6.6 SR 3.3.6.7 SR 3.3.6.8 Perform CHANNEL CHECK.


NOTE-----------------------------------

This surveillance is only applicable to the actuation logic of the ESFAS Instrumentation.

Perform ACTUATION LOGIC TEST.


NOTE-----------------------------------

This surveillance is only applicable to the master relays of the ESFAS Instrumentation.

Perform MASTER RELAY TEST.

Perform CFT.

Perform SLAVE RELAY TEST.

Not used Perform CHANNEL CALIBRATION.

Verify ESF Containment Ventilation Isolation RESPONSE TIME is within limits.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 Unit 1 - Amendment No. ~,4-79,200 Unit 2 - Amendment No. ~,~,201

3.3.7 CRVS Actuation Instrumentation ACTIONS (continued)

CONDITION D. Required Action and associated Completion Time for Condition A or B not met during movement of recently irradiated fuel assemblies.

E. Required Action and associated Completion Time for Condition A or B not met in MODE 5 or 6.

REQUIRED ACTION D.1 Suspend movement of recently irradiated fuel assemblies.

E.1 Initiate action to restore one CRVS train to OPERABLE status.

COMPLETION TIME Immediately Immediately SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

Refer to Table 3.3.7-1 to determine which SRs apply for each CRVS Actuation Function.

SURVEILLANCE FREQUENCY SR 3.3.7.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.2 Perform CFT.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.3 Perform ACTUATION LOGIC TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.4 Perform MASTER RELAY TEST.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-48 Unit 1 - Amendment No. ~,-i-M,200 Unit 2 - Amendment No. ~,48e,201

3.3.7 CRVS Actuation Instrumentation SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.7.5 Perform SLAVE RELAY TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.6


NOTE-------------------------------

Verification of setpoint is not required.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program SR 3.3.7.7 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-48a Unit 1 - Amendment No. -+JS,200 Unit 2 - Amendment No. -+JS,201

3.3.8 FBVS Actuation Instrumentation SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------------

Refer to Table 3.3.8-1 to determine which SRs apply for each FBVS Actuation Function.

SURVEILLANCE FREQUENCY SR 3.3.8.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.3.8.2 Perform CFT.

In accordance with the Surveillance Frequency Control Program SR 3.3.8.3 Not used SR 3.3.8.4


NOTE-------------------------------

Verification of setpoint is not required.

Perform TADOT.

In accordance with the Surveillance Frequency Control Program SR 3.3.8.5 Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.3-51 Unit 1 - Amendment No. 4-3a,200 Unit 2 - Amendment No. 4-3a,201

RCS Pressure, Temperature, and Flow DNB Limits 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:

a.

Pressurizer pressure is greater than or equal to the limit specified in the COLR;

b.

RCS average temperature is less than or equal to the limit specified in the COLR; and

c.

RCS total flow rate within limits shown on Table 3.4.1-1 for Unit 1 and Table 3.4.1-2 for Unit 2.

APPLICABILITY:

MODES 1.


NOTE-------------------------------------------

Pressurizer pressure limit does not apply during:

a.

THERMAL POWER ramp> 5% RTP per minute; or

b.

THERMAL POWER step> 10% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

One or more RCS DNB parameters not within limits.

A,1 Restore RCS DNB parameter(s) to within limit.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure is greater than or equal to the limit specified in the COLR.

In accordance with the Surveillance Frequency Control Program SR 3.4.1.2 Verify RCS average temperature is less than or equal to the limit specified in the COLR.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.4-1 Unit 1 - Amendment No. ~,4ge,200 Unit 2 - Amendment No. ~,+W,201

3.4.1 ReS Pressure. Temperature. and Flow DNB Limits SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.1.3 Verify RCS total flow rate is within limits.

In accordance with the Surveillance Frequency Control Program SR 3.4.1.4 Verify measured RCS total flow rate is within limits.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-1a Unit 1 - Amendment No. ~.200 Unit 2 - Amendment No. ~,201

RCS Minimum Temperature for Criticality 3.4.2 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.2 RCS Minimum Temperature for Criticality LCO 3.4.2 Each operating RCS loop average temperature (Tavg) shall be ~ 541°F.

APPLICABILITY:

MODES 1, MODE 2 with kelf ~ 1.0.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Tavg in one or more operating RCS loops not within limit.

A.1 Be in MODE 2, with Kelf

<1.0 30 minutes SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1 Verify RCS Tavg in each operating loop ~ 541°F.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-4 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.4.3 RCS PIT Limits SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.4.3.1


NOTE--------------------------------

Only required to be performed during RCS heatup and cooldown operations and RCS inservice leak and hydrostatic testing.

Verify RCS pressure. RCS temperature, and RCS heatup and cooldown rates are within the limits specified in the PTLR.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-6 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

RCS Loops - MODES 1 and 2 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Loops-MODES 1 and 2 LCO 3.4.4 Four RCS loops shall be OPERABLE and in operation.

APPLICABILITY:

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Requirements of LCO not met.

A.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify each RCS loop is in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-7 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~. 201

3.4.5 RCS Loops - MODE 3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

Four RCS loops inoperable.

OR D.1 Place the Rod Control System in a condition incapable of rod withdrawal.

Immediately No RCS loop in operation.

AI\\ID D.2 Suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.

Immediately AND D.3 Initiate action to restore one RCS loop to OPERABLE status and operation.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify required RCS loops are in operation.

In accordance with the Surveillance Frequency Control Program SR 3.4.5.2 Verify steam generator secondary side water levels are ~ 15% for required RCS loops.

In accordance with the Surveillance Frequency Control Program SR 3.4.5.3 Verify correct breaker alignment and indicated power are available to the required pump that is not in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-9 Unit 1 - Amendment No. 4-Ja,4a8,200 Unit 2 - Amendment No. 4-Ja,-tW,201

RCS Loops - MODE 4 3.4.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Two required loops inoperable.

OR No RCS or RHR loop in operation.

B.1 AND B.2 Suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.

Initiate action to restore one loop to OPERABLE status and operation.

Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify one RHR or RCS loop is in operation.

In accordance with the Surveillance Frequency Control Program SR 3.4.6.2 Verify SG secondary side water levels are ~ 15% for required RCS loops.

In accordance with the Surveillance Frequency Control Program SR 3.4.6.3 Verify correct breaker alignment and indicated power are available to the required pump that is not in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-11 Unit 1 - Amendment No. ~ ~ M 200 Unit 2 - Amendment No. ~ ~ +W 201

3.4.7 RCS Loops - MODE 5, Loops Filled ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RHR loop inoperable.

AND Required SGs secondary side water levels not within limits.

B.

Required RHR loops inoperable.

OR No RHR loop in operation.

A.1 OR A.2 B.1 AND B.2 Initiate action to restore a second RHR loop to OPERABLE status.

Initiate action to restore required SG secondary side water levels to within limits.

Suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.

Initiate action to restore one RHR loop to OPERABLE status and operation.

Immediately Immediately Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 Verify one RHR loop is in operation.

In accordance with the Surveillance Frequency Control Program SR 3.4.7.2 Verify SG secondary side water level is ~ 15% in required SGs.

In accordance with the Surveillance Frequency Control Program SR 3.4.7.3 Verify correct breaker alignment and indicated power are available to the required RHR pump that is not in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-13 Unit 1

  • Amendment No. ~ 4§g 200 Unit 2 - Amendment No. ~ ~ 201

3.4.8 RCS Loops - MODE 5, Loops Not Filled SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one RHR loop is in operation.

In accordance with the Surveillance Frequency Control Program SR 3.4.8.2 Verify correct breaker alignment and indicated power are available to the required RHR pump that is not in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-15 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment 1\\10. ~, 201

3.4.9 Pressurizer SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify pressurizer water level is :s; 90%.

In accordance with the Surveillance Frequency Control Program SR 3.4.9.2 Verify capacity of each required group of pressurizer heaters is ~ 150 kW.

In accordance with the Surveillance Frequency Control Program SR 3.4.9.3 Verify by transferring power, that required pressurizer heaters can be powered from an emergency power supply.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-17 Unit 1 - Amendment No. +Ja, 200 Unit 2 - Amendment No. +Ja, 201

Pressurizer PORVs 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1


NOTE--------------------------------

Not required to be performed with block valve closed in accordance with the Required Actions of this LCO.

Perform a complete cycle of each block valve.

In accordance with the Surveillance Frequency Control Program SR 3.4.11.2


NOTE--------------------------------

Required to be performed during MODES 3 or 4.

Perform a complete cycle of each PORV.

In accordance with the 1ST Plan.

SR 3.4.11.3 Demonstrate OPERABILITY of the safety related nitrogen supply for the Class I PORVs.

In accordance with the Surveillance Frequency Control Program SR 3.4.11.4 Perform a COT on each required Class 1 PORV, excluding actuation.

In accordance with the Surveillance Frequency Control Program SR 3.4.11.5 Perform CHANNEL CALIBRATION for each required Class 1 PORV actuation channel.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-22 Unit 1 - Amendment No. m. 47-+. 200 Unit 2 - Amendment No. 4-da, ~. 201

3.4.12 LTOP System ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. (continued)

LTOP System inoperable for any reason other than Condition A, 8, C, D, E, or F.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify a maximum of zero safety injection pumps are capable of injecting into the RCS.

SR 3.4.12.2 Verify a maximum of one centrifugal charging pump is capable of injecting into the RCS.

SR 3.4.12.3 Verify each accumulator is isolated when accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed by the PIT limit curves provided in the PTLR.

SR 3.4.12.4 Not used SR 3.4.12.5 Verify required RCS vent ~ 2.07 square inches open.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SR 3.4.12.6 Verify PORV block valve is open for each required In accordance with Class I PORV.

the Surveillance Frequency Control Program SR 3.4.12.7 Not used (continued)

DIABLO CANYON - UNITS 1 & 2 3.4-25 Unit 1 - Amendment No..:l-Ja, 200 Unit 2 - Amendment No..:l-Ja, 201

3.4.12 LTOP System SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.12.8


NOTE--------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing any RCS cold leg temperature to $ LTOP arming temperature specified in the PTLR.

Perform a COT on each required Class 1 PORV, excluding actuation.

In accordance with the Surveillance Frequency Control Program SR 3.4.12.9 Perform CHANNEL CALIBRATION for each required Class I PORV actuation channel.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-26 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

RCS Operational LEAKAGE 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1


NOTES-------------------------------

1.

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

2.

Not applicable to primary to secondary LEAKAGE.

Verify RCS operational LEAKAGE is within limits by performance of RCS water inventory balance.

In accordance with the Surveillance Frequency Control Program SR 3.4.13.2


NOTE---------------------------------

Not req uired to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

Verify primary to secondary LEAKAGE is s 150 gallons per day through anyone SG.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.4-28 Unit 1 - Amendment No. 4Ja,.:1-94, 200 Unit 2 - Amendment No. 4Ja, -Wa. 201

3.4.14 RCS PIV leakage ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.2.1 A.2.2 Isolate the high pressure portion of the affected system from the low pressure portion by use of a second closed manual, deactivated automatic, or check valve.

OR Restore RCS PIV to within limits.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours B.

Required Action and associated Completion Time for Condition A not met.

B.1 AND Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.4.14.1


NOTES------------------------------

1.

Not required to be performed in MODES 3 and 4.

2.

Not required to be performed on the RCS PIVs located in the RHR flow path when in the shutdown cooling mode of operation.

3.

RCS PIVs actuated during the performance of this Surveillance are not required to be tested more than once if a repetitive testing loop cannot be avoided.

FREQUENCY DIABLO CANYON - UNITS 1 & 2 3.4-30 Unit 1 - Amendment No. ~ 142 Unit 2 - Amendment No. ~ 142

RCS PIV leakage 3.4.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.14.1 (continued)

Verify leakage from each RCS PIV is equivalent to

c:;: 0.5 gpm per nominal inch of valve size up to a maximum of 5 gpm at an RCS pressure ~ 2215 psig and :c:;: 2255 psig.

In accordance with the Inservice Testing Program, AND In accordance with the Surveillance Frequency Control Program AND Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve except for valves 8701, 8702, 8802A,88028, and 8703 SR 3.4.14.2 Not used I

SR 3.4.14.3 Not used DIABLO CANYON - UNITS 1 & 2 3.4-31 Unit 1 - Amendment No. ~ ~ 200 Unit 2 - Amendment No. ~ ~ 201

3.4.15 RCS Leakage Detection Instrumentation ACTIONS (continued)

CONDITION D. Required Action and associated Completion Time not met.

E. All required monitors inoperable.

D.1 AND D.2 E.1 REQUIRED ACTION Be in MODE 3.

Be in MODE 5.

Enter LCO 3.0.3.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.15.1 Perform CHANNEL CHECK of the required containment atmosphere particulate and gaseous radioactivity monitors.

In accordance with the Surveillance Frequency Control Program SR 3.4.15.2 Perform CHANNEL FUNCTIONAL TEST of the required containment atmosphere particulate and gaseous radioactivity monitors.

In accordance with the Surveillance Frequency Control Program SR 3.4.15.3 Perform CHANNEL CALIBRATION of the required containment sump monitors.

In accordance with the Surveillance Frequency Control Program SR 3.4.15.4 Perform CHANNEL CALIBRATION of the required containment atmosphere particulate and gaseous radioactivity monitors.

In accordance with the Surveillance Frequency Control Program SR 3.4.15.5 Perform CHANNEL CALIBRATION of the required CFCU condensate collection monitors.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.4-34 Unit 1 - Amendment No. 4Ja. 200 Unit 2 - Amendment No. ~, 201

3.4.16 RCS Specific Activity SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.16.1


NOTE------------------------

Only required to be performed in MODE 1.

Verify reactor coolant DOSE EQUIVALENT XE-133 specific activity s 600.0 IJCi/gm.

In accordance with the Surveillance Frequency Control Program SR 3.4.16.2


NOTE--------------------------------

Only required to be performed in MODE 1.

Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity :$ 1.0 IJCi/gm.

In accordance with the Surveillance Frequency Control Program AND Between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERMAL POWER change of 2: 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.

DIABLO CANYON - UNITS 1 & 2 3.4-36 Unit 1 - Amendment No. ~,~, 200 Unit 2 - Amendment No. ~,+QJ, 201

Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1 Four ECCS accumulators shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2, MODE 3 with RCS pressure> 1000 psig.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

One accumulator inoperable due to boron concentration not within limits.

A,1 Restore boron concentration to within limits.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.

One accumulator inoperable for reasons other than Condition A, B.1 Restore accumulator to OPERABLE status.

24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C.

Required Action and associated Completion Time of Condition A or B not met.

C.1 AND Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> C.2 Reduce RCS pressure to ~ 1000 psig.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D.

Two or more accumulators inoperable.

D.1 Enter LCO 3.0.3.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify each accumulator isolation valve is fully open.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.2 Verify borated water volume in each accumulator is

~ 814 fe and ~ 886 fe.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.3 Verify nitrogen cover pressure in each accumulator is

~ 579 psig and ~ 664 psig.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.5-1 Unit 1 - Amendment No.~, 447, 4W, 200 Unit 2 - Amendment No. ~, 447, 4-64, 201

3.5.1 Accumulators SURVEILLANCE REQUIREMENTS (continued)

SR 3.5.1.4 SURVEILLANCE Verify boron concentration in each accumulator is

~ 2200 ppm and ~ 2500 ppm.

FREQUENCY In accordance with the Surveillance Frequency Control Program AND


NOTE------

Only required to be performed for affected accumulators.

SR 3.5.1.5 Verify power is removed from each accumulator isolation valve operator when RCS pressure is > 1000 psig.

Once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of ~ 5.6%

of narrow range indicated level that is not the result of addition from the refueling water storage tank.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.5-2 Unit 1 - Amendment No.~, 200 Unit 2 - Amendment No. ~, 201

3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.5.2.1 Verify the following valves are in the listed position with power to the valve operator removed.

Number Position Function 8703 Closed RHR to RCS Hot Legs 8802A Closed Safety Injection to RCS Hot Legs 8802B Closed Safety Injection to RCS Hot Legs 8809A Open RHR to RCS Cold Legs 8809B Open RHR to RCS Cold Legs 8835 Open Safety Injection to RCS Cold Legs 8974A Open Safety Injection Pump Recirc.

to RWST 8974B Open Safety Injection Pump Recirc.

to RWST 8976 Open RWST to Safety Injection Pumps 8980 Open RWST to RHR Pumps 8982A Closed Containment Sump to RHR Pumps 8982B Closed Containment Sump to RHR Pumps 8992 Open Spray Additive Tank to Eductor 8701 Closed RHR Suction 8702 Closed RHR Suction SR 3.5.2.2 Verify each ECCS manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.2.3 Verify ECCS piping is full of water.

ECCS - Operating FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.5-4 Unit 1 - Amendment No.~, 200 Unit 2 - Amendment No. ~, 201

3.5.2 ECCS - Operating SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.4 Verify each ECCS pump's developed head at the test flow point is greater than or equal to the required developed head.

In accordance with the Inservice Testing Program.

SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.5.2.7 Safety Injection Throttle Valves Verify, for each ECCS throttle valve listed below, each mechanical position stop is in the correct position.

Charging Injection Throttle Valves 8810A 8810B 8810C 88100 8822A 8822B 8822C 88220 In accordance with the Surveillance Frequency Control Program SR 3.5.2.8 Verify, by visual inspection, each ECCS train containment recirculation sump suction inlet is not restricted by debris and the suction inlet trash racks and screens show no evidence of structural distress or abnormal corrosion.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.5-5 Unit 1 - Amendment No..:t-J5, 200 Unit 2 - Amendment No. ~, 201

RWST 3.5.4 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.4 Refueling Water Storage Tank (RWST)

LCO 3.5.4 The RWST shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

RWST boron concentration not within limits.

OR RWST borated water temperature not within limits.

A,1 Restore RWST to OPERABLE status.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> B.

RWST inoperable for reasons other than Condition A, B.1 Restore RWST to OPERABLE status.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C.

Required Action and associated Completion Time not met.

C.1 AND C.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SR 3.5.4.1 SU RVEI LLANCE


NOTE---------------------------

Only required to be performed when ambient air temperature is < 35°F.

FREQUENCY SR 3.5.4.2 SR 3.5.4.3 Verify RWST borated water temperature is

~ 35°F.

Verify RWST borated water volume is ~ 455,300 gallons.

Verify RWST boron concentration is ~ 2300 ppm and

~ 2500 ppm.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.5-7 Unit 1 - Amendment No. J§, +W, 200 Unit 2 - Amendment No. J§, ~, 201

Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 Reactor coolant pump seal injection flow resistance shall be

~ 0.2117 ft/gpm 2

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Seal injection flow resistance not within limit.

A.1 Adjust manual seal injection throttle valves to give a flow resistance within limit.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 AND 8.2 Be in MODE 3.

Be in MODE 4.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.5.1


NOTE------------------------------

Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the Reactor Coolant System pressure stabilizes at

~ 2215 psig and ~ 2255 psig.

Verify manual seal injection throttle valves are adjusted to give a flow resistance ~ 0.2117 ft/gpm 2.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.5-8 Unit 1 - Amendment No. +Ja,.+48, 200 Unit 2 - Amendment No. +Ja,.+48, 201

3.6.2 Containment Air Locks ACTIONS (continued)

CONDITION REQUIRED ACTION C.

One or more containment C.1 Initiate action to evaluate air locks inoperable for overall containment reasons other than leakage rate per Condition A or B.

LCO 3.6.1.

AND C.2 Verify a door is closed in the affected air lock.

AND C.3 Restore air lock to OPERABLE status.

D.

Required Action and D.1 Be in MODE 3.

associated Completion AND Time not met.

D.2 Be in MODE 5.

COMPLETION TIME Immediately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 24 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1


NOTES-------------------------

1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1 Perform required air lock leakage rate testing in accordance with the Containment Leakage Rate Testing Program.

In accordance with the Containment Leakage Rate Testing Program SR 3.6.2.2 Verify only one door in the air lock can be opened at a time.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.6-4 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.6.3 Containment Isolation Valves SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.6.3.1 Not used SR 3.6.3.2 Verify each 48 inch containment purge supply and exhaust and 12 inch vacuum/pressure relief valve is closed, except when these valves are open for pressure control, ALARA or air quality considerations for personnel entry, or for Surveillances that require the valves to be open.

SR 3.6.3.3


NOTE--------------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative controls.

Verify each containment isolation manual valve and blind flange that is located outside containment and not locked, sealed or otherwise secured and required to be closed during accident conditions is closed, except for containment isolation valves that are open under administrative controls.

SR 3.6.3.4


NOTE--------------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

Verify each containment isolation manual valve and blind flange that is located inside containment and not locked, sealed or otherwise secured and required to be closed during accident conditions is closed, except for containment isolation valves that are open under administrative controls.

SR 3.6.3.5 Verify the isolation time of each automatic power operated containment isolation valve is within limits.

SR 3.6.3.6 Not used FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days In accordance with the Inservice Testing Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.6-9 Unit 1 - Amendment No. -=t-Ja, 200 Unit 2 - Amendment No. -=t-Ja, 201

3.6.3 Containment Isolation Valves SURVEILLANCE REQUIREMENTS (continued)

SR 3.6.3.7 SURVEILLANCE


NOTE--------------------------

This surveillance is not required when the penetration flow path is isolated by a leak tested blank flange.

FREQUENCY SR 3.6.3.8 SR 3.6.3.9 Perform leakage rate testing for containment purge supply and exhaust and vacuum/pressure relief valves with resilient seals.

Verify each automatic containment isolation valve that is not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.

Not used In accordance with the Surveillance Frequency Control Program AND For containment purge supply and exhaust valves only, within 92 days after opening the valve In accordance with the Surveillance Frequency Control Program SR 3.6.3.10 Verify each 12 inch containment In accordance with the vacuum/pressure relief valve is blocked to restrict Surveillance Frequency the valve from opening> 50°.

Control Program SR 3.6.3.11 Not used DIABLO CANYON - UNITS 1 & 2 3.6-10 Unit 1 - Amendment No. ~,4+a.200 Unit 2 - Amendment No. ~,.:t-77,201

Containment Pressure 3.6.4 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be =. -1.0 psig and::: +1.2 psig.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Containment pressure not within limits.

A.1 Restore containment pressure to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1 Verify containment pressure is within limits.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.6-11 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

Containment Air Temperature 3.6.5 3.6 CONTAINMENT SYSTEMS 3.6.5 Containment Air Temperature LCO 3.6.5 Containment average air temperature shall be ~ 120°F.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

Containment average air temperature not within limit.

A,1 Restore containment average air temperature to within limit.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.6.5.1 Verify containment average air temperature is within limit.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON* UNITS 1 &2 3.6-12 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.6.6 Containment Spray and Cooling Systems SURVEILLANCE REQUIREMENTS FREQUENCY SURVEILLANCE SR 3.6.6.1 Verify each containment spray manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

SR 3.6.6.2 Operate each CFCU for ~ 15 minutes.

SR 3.6.6.3 Verify component cooling water flow rate to each required CFCU is ~ 1650 gpm.

SR 3.6.6.4 Verify each containment spray pump's developed head at the flow test point is greater than or equal to the required developed head.

SR 3.6.6.5 Verify each automatic containment spray valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.6.6.6 Verify each containment spray pump starts automatically on an actual or simulated actuation signal.

SR 3.6.6.7 Verify each CFCU starts automatically on an actual or simulated actuation signal.

SR 3.6.6.8 Verify each spray nozzle is unobstructed.

SR 3.6.6.9 Verify each CFCU starts on low speed.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.6-15 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

Spray Additive System 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Spray Additive System LCO 3.6.7 The Spray Additive System shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Spray Additive System inoperable.

A.1 Restore Spray Additive System to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.

Required Action and associated Completion Time not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 84 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 SR 3.6.7.2 SR 3.6.7.3 SR 3.6.7.4 SR 3.6.7.5 Verify each spray additive manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

Verify spray additive tank solution volume is

~ 46.2% and ~ 91.9%.

Verify spray additive tank NaOH solution concentration is ~ 30% and ~ 32% by weight.

Verify each spray additive automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

Verify spray additive flow from each solution's flow path.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.6-16 Unit 1 - Amendment No. 4-3a, 200 Unit 2 - Amendment No. 4-3a, 201

3.7.2 MSIVs SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1


NOTE---------------------------

Only required to be performed in MODES 1 and 2.

Verify closure time of each MSIV is ::; 5 seconds.

In accordance with the Inservice Testing Program SR 3.7.2.2


NOTE---------------------------

Only required to be performed in MODES 1 and 2.

Verify each MSIV actuates to the isolation position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-5 Unit 1 - Amendment No.~, 200 Unit 2 - Amendment No. ~, 201

3.7.3 MFIVs, MFRVs, MFRV Bypass Valves, MFWP Turbine Stop Valves SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.3.3 Verify each MF/V, MFRV, MFRV bypass valve, and MFWP turbine stop valve actuates to the closed position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.7.3.4 Verify the closure time of each MFWP turbine stop valve is :5 1 second.

At each COLD SHUTDOWN, but not more frequently than once per 92 days.

DIABLO CANYON - UNITS 1 & 2 3.7-7a Unit 1 - Amendment No. 4-35,+40,.:1-84,200 Unit 2 - Amendment No. 4-35,+40,400,201

3.7.4 ADVs SURVEILLANCE REQUIREMENTS SR 3.7.4.1 SURVEILLANCE Verify one complete cycle of each ADV.

FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.7.4.2 SR 3.7.4.3 Verify one complete cycle of each ADV block valve.

Verify that the backup air bottle for each ADV has a pressure ~ 260 psig.

In accordance with the Inservice Testing Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-9 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify each AFW manual, power operated, and automatic valve in each water flow path. and in both steam supply flow paths to the steam turbine driven pump. that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.5.2


NOTE----------------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ~ 650 psig in the steam generator.

Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required developed head.

SR 3.7.5.3


NOTE----------------------------

Not applicable in MODE 4 when steam generator is relied upon for heat removal.

Verify each AFW automatic valve that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.5.4


N0 TES--------------------------

1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ~ 650 psig in the steam generator.
2. Not applicable in MODE 4 when generator is relied upon for heat removal.

Verify each AFW pump starts automatically on an actual or simulated actuation signal.

SR 3.7.5.5 Not used.

SR 3.7.5.6 Verify the FWST is capable of being aligned to the AFW system by cycling each FWST valve in the flow path necessary for realignment through at least one full cycle.

In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Test Program.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.7-12 Unit 1 - Amendment No. ~.+89J200 Unit 2 - Amendment No. ~,~.201

3.7.6 CST and FWST 3.7 PLANT SYSTEMS 3.7.6 Condensate Storage Tank (CST) and Fire Water Storage Tank (FWST)

LCO 3.7.6 The CST level shall be ~ 41.3% and the FWST level shall be ~ 22.2% for one unit operation and ~ 41.7% for two unit operation.

APPLICABILITY:

MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

CST or FWST level not within limit.

A.1 AND A.2 Verify by administrative means OPERABILITY of backup water supply.

Restore CST or FWST level to within limit.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 7 days B.

Required Action and associated Completion Time not met.

B.1 AND Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MODE 4, without reliance on steam generator for heat removal.

18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify the CST level is ~ 41.3%.

In accordance with the Surveillance Frequency Control Program SR 3.7.6.2 Verify the FWST level is ~ 22.2% for one unit operation and ~ 41.7% for two unit operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-13 Unit 1 - Amendment No. -tJa, 200 Unit 2 - Amendment No. -tJa, 201

CCW System 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Vital Component Cooling Water (CCW) System LCO 3.7.7 Two vital CCW loops shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

One vital CCW loop inoperable.

A,1


NOTE-------------

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4,"

for residual heat removal loops made inoperable by CCW.

Restore vital CCW loop to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.

Required Action and associated Completion Time of Condition A not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.7.1


NOTE---------------------------

Isolation of CCW flow to individual components does not render the CCW System inoperable Verify each CCW manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

FREQUENCY In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.7-14 Unit 1 - Amendment No. m, 200 Unit 2 - Amendment No. m, 201

3.7.7 SURVEILLANCE REQUIREMENTS continued SR 3.7.7.2 Verify each CCW automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.7.3 Verify each CCW pump starts automatically on an actual or simulated actuation signal.

CCW System In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-15 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.7.8 ASW 3.7 PLANT SYSTEMS 3.7.8 Auxiliary Saltwater (ASW) System LCO 3.7.8 Two ASW trains shall be OPERABLE.

APPLICABILITY:

MODES 1,2,3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

One ASW train inoperable.

A,1


NOTE-------------

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4,"

for residual heat removal loops made inoperable by ASW.

Restore ASW train to OPERABLE status 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.

Required Action and associated Completion Time of Condition A not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify each ASW manual and power operated, valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ASW power operated valve in the flow path that is not locked, sealed, or otherwise secured in position, can be moved to the correct position.

In accordance with the Inservice Test Program.

SR 3.7.8.3 Verify each ASW pump.starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-16 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

CRVS 3.7.10 ACTIONS (continued)

CONDITION E. Two CRVS trains inoperable in MODE 5 OR 6, or during movement of recently irradiated fuel assemblies.

F. Two CRVS trains inoperable in MODE 1, 2, 3, or 4 for reasons other than Condition B.

REQUIRED ACTION E.1 Suspend movement of recently irradiated fuel assemblies.

F.1 Enter LCO 3.0.3.

COMPLETION TIME Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Operate each CRVS train for ~ 15 minutes.

In accordance with the Surveillance Frequency Control Program SR 3.7.10.2 Verify that each CRVS redundant fan is aligned to receive electrical power from a separate OPERABLE vital bus.

In accordance with the Surveillance Frequency Control Program SR 3.7.10.3 Perform required CRVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

In accordance with VFTP SR 3.7.10.4 Verify each CRVS train automatically switches into the pressurization mode of operation on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.7.10.5 Verify one CRVS train can maintain a positive pressure of ~ 0.125 inches water gauge, relative to the outside atmosphere during the pressurization mode of operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-19 Unit 1 - Amendment No. +Ja,4-42,~,-+84,200 Unit 2 - Amendment No. +Ja,4-42,.m,-1-89,201

ABVS 3.7.12 3.7 PLANT SYSTEMS 3.7.12 Auxiliary Building Ventilation System (ABVS)

LCO 3.7.12 Two ABVS trains shall be OPERABLE.

APPLICABILITY:

ACTIONS MODES 1, 2, 3, and 4.

CONDITION REQUIRED ACTION COMPLETION TIME A.

The common HEPA filter and/or charcoal adsorber inoperable.

A.1 Restore the common HEPA filter and charcoal adsorber to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.

One ABVS train inoperable.

B.1 Restore ABVS train to OPERABLE status 7 days C.

Required Action and associated Completion Time not met.

C.1 AND C.2 Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.1 This surveillance shall verify that each ABVS train is aligned to receive electrical power from a separate OPERABLE vital bus.

Operate each ABVS train for ~ 15 minutes.

In accordance with the Surveillance Frequency Control Program SR 3.7.12.2 Perform reqUired ABVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

In accordance with the VFTP SR 3.7.12.3


NOTE-------------------------------

SR is not applicable to a specific ABVS train when that ABVS train is configured and performing its safety function.

Verify each ABVS train actuates on an actual or simulated actuation signal and the system realigns to exhaust through the common HEPA filter and charcoal adsorber.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.7-21 Unit 1 - Amendment No. ~J~,200 Unit 2 - Amendment No. ~)4ea,201

3.7.12 ABVS SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.12.4 Not Used.

SR 3.7.12.5 Not Used.

SR 3.7.12.6 Verifying that leakage through the ABVS Dampers M2A and M2B is less than or equal to 5 cfm when subjected to a Constant Pressure or Pressure Decay Leak Rate Test in accordance with ASME N510-1989. The test pressure for the leak rate test shall be based on a maximum operating pressure as defined in ASME N510 1989, of 8 inches water gauge.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-22 Unit 1 - Amendment No. +Ja, 200 Unit 2 - Amendment No. +Ja, 201

FHBVS 3.7.13 SURVEILLANCE REQUIREMENTS SR 3.7.13.1 SURVEILLANCE Operate each FHBVS train for ~ 15 minutes.

FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.7.13.2 SR 3.7.13.3 SR 3.7.13.4 SR 3.7.13.5 Perform required FHBVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

Verify each FHBVS train actuates on an actual or simulated actuation signal.

Verify one FHBVS train can maintain a pressure

~ -0.125 inches water gauge with respect to atmospheric pressure during the post accident mode of operation.

Verify damper M-29 can be closed.

In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-24 Unit 1 - Amendment No. ~ +42 200 Unit 2 - Amendment No. ~ +42 201

Spent Fuel Pool Water Level 3.7.15 3.7 PLANT SYSTEMS 3.7.15 Spent Fuel Pool Water Level LCO 3.7.15 The spent fuel pool water level shall be ~ 23 ft over the top of irradiated fuel assemblies seated in the storage racks.

APPLICABILITY:

During movement of irradiated fuel assemblies in the spent fuel pool.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Spent fuel pool water level not within limit.

A.1


NOTE-------------

LCO 3.0.3 is not applicable.

Suspend movement of irradiated fuel assemblies in the spent fuel pool.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.15.1 Verify the spent fuel pool water level is ~ 23 ft above the top of the irradiated fuel assemblies seated in the storage racks.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-26 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

Spent Fuel Pool Boron Concentration 3.7.16 3.7 PLANT SYSTEMS 3.7.16 Spent Fuel Pool Boron Concentration LCO 3.7.16 The spent fuel pool boron concentration shall be ~ 2000 ppm.

APPLICABILITY:

When fuel assemblies are stored in the spent fuel pool.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Spent fuel pool boron concentration not within limit.


NOTE----------------

LCO 3.0.3 is not applicable.

A.1 AND A.2 Suspend movement of fuel assemblies in the spent fuel pool.

Initiate action to restore spent fuel pool boron concentration to within limit.

Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.16.1 Verify the spent fuel pool boron concentration is within limit.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 &2 3.7-27 Unit 1 - Amendment No. ~,+e4,200 Unit 2 - Amendment No. ~,+e4,201

3.7.18 Secondary Specific Activity 3.7 PLANT SYSTEMS 3.7.18 Secondary Specific Activity LCO 3.7.18 The specific activity of the secondary coolant shall be ~ 0.10 I-LCi/gm DOSE EQUIVALENT 1-131.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Specific activity not within limit.

AND A.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> A.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.18.1 Verify the specific activity of the secondary coolant is ~ 0.10 I-LCi/gm DOSE EQUIVALENT 1 131.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-33 Unit 1 - Amendment No. +3a, 200 Unit 2 - Amendment No. +3a, 201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS FREQUENCY SU RVEI LLANCE SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required offsite circuit.

SR 3.8.1.2


NOTES------------------------------

1. Performance of SR 3.8.1.7 satisfies this SR.
2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

Verify each DG starts from standby conditions and achieves speed ~ 900 rpm, steady state voltage

~ 3785 V and ~ 4400 V, and frequency ~ 58.8 Hz and

<61.2Hz.

SR 3.8.1.3


NOTES------------------------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients outside the load range do not invalidate this test.
3. This Surveillance shall be conducted on only one DG at a time.
4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.7.

Verify each DG is synchronized and loaded and operates for ~ 60 minutes at a load ~ 2340 kW and

~ 2600 kW.

SR 3.8.1.4 Verify each day tank contains ~ 250 gal of fuel oil.

SR 3.8.1.5 Check for and remove accumulated water from each day tank.

SR 3.8.1.6 Verify the fuel oil transfer system operates to transfer fuel oil from storage tanks to the day tank.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 Unit 1 - Amendment No. 4-Je, 200 Unit 2 - Amendment No. ~, 201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.7 SURVEILLANCE


NOTE--------------------------------

All DG starts may be preceded by an engine prelube period.

FREQUENCY SR 3.8.1.8 Verify each DG starts from standby condition and achieves:

a.

in :c;; 10 seconds, speed ~ 900 rpm; and

b.

in :c;; 13 seconds, voltage ~ 3785 V and

c;; 4400 V, and frequency ~ 58.8 Hz and
c;;61.2Hz.

NOTE--------------------------------

This Surveillance shall not normally be performed for automatic transfers in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.9 Verify automatic and manual transfer of AC power sources from the normal offsite circuit to the alternate required offsite circuit and manual transfer from the alternate offsite circuit to the delayed access circuit.


NOTES------------------------------

1.

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant ;s maintained or enhanced.

2.

If performed with the DG synchronized with offsite power, it shall be performed at a power factor :c;; 0.9.

In accordance with the Surveillance Frequency Control Program Verify each DG rejects a load greater than or equal to its associated single largest post-accident load, and:

a.

Following load rejection, the frequency is :c;; 63 Hz;

b. Within 2.4 seconds following load rejection, the voltage is ~ 3785 V and :c;; 4400 V; and
c. Within 2.4 seconds folloWing load rejection, the frequency is ~ 58.8 Hz and :c;; 61.2 Hz.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.8-5 Unit 1 - Amendment No. -m,4-74,200 Unit 2 - Amendment No. -m,+79,201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY In accordance with does not trip and voltage is maintained ~ 5075 V SR 3.8.1.10 Verify each DG operating at a power factor ~ 0.87 the Surveillance during and following a load rejection of ~ 2340 kW Frequency Control Program and ~ 2600 kW.

SR 3.8.1.11


NOTES------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power In accordance with signal:

the Surveillance Frequency Control

a.

De-energization of emergency buses; Program

b.

Load shedding from emergency buses;

c.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in

~1 0 seconds,

2.

energizes auto-connected loads through auto-transfer sequencing timers,

3.

maintains steady state voltage ~ 3785 V and ~ 4400 V,

4.

maintains steady state frequency

~ 58.8 Hz and ~ 61.2 Hz, and

5.

supplies permanently connected and auto connected loads for ~ 5 minutes.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.8-6 Unit 1 - Amendment No. 4Ja,4-74,200 Unit 2 - Amendment No. ~,4-7e.201

3.8.1 AC Sources - Operating SURVEILLANCE FREQUENCY SR 3.8.1.12


NOTES------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated Safety Injection signal each DG auto-starts from standby condition and:

a.

In $; 13 seconds after auto-start and during tests, achieves voltage ~ 3785 V and $; 4400 V;

b.

In ~ 13 seconds after auto-start and during tests, achieves frequency ~ 58.8 Hz and

$; 61.2 Hz;

c.

Operates for ~ 5 minutes;

d.

Permanently connected loads are energized from the alternate offsite power source; and

e.

Emergency loads are auto-connected through the ESF load sequencing timers to the alternate offsite power source.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.13 Verify each DG's automatic trips are bypassed when the diesel engine trip cutout switch is in the cutout position and the DG is aligned for automatic operation except:

a.

Engine overspeed;

b.

Generator differential current; and In accordance with the Surveillance Frequency Control Program

c.

(continued)

Low lube oil pressure; DIABLO CANYON - UNITS 1 & 2 3.8-7 Unit 1 - Amendment No. ~,474,200 Unit 2 - Amendment No. ~,+79J201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.14 SURVEILLANCE


NOTES-----------------------------

1. Momentary transients outside the load and power factor ranges do not invalidate this test.

FREQUENCY SR 3.8.1.15 Verify each DG operating at a power factor sO.87 operates for ~ 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For ~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded ~ 2600 kW and s 2860 kW; and

b.

For the remaining hours of the test loaded

~ 2340 kW and s 2600 kW.


NOTES------------------------------

1.

This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated ~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded ~ 2340 kW and s 2600 kW.

Momentary transients outside of load range do not invalidate this test.

2.

All DG starts may be preceded by an engine prelube period.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.16 Verify each DG starts and achieves:

a.

in s 10 seconds, speed ~ 900 rpm; and

b.

in s 13 seconds, voltage ~ 3785 V, and s 4400 V and frequency ~ 58.8 Hz and s 61.2 Hz.


NOTE--------------------------------

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

In accordance with the Surveillance Frequency Control Program Verify each DG:

a.

Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power; In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.8-8 Unit 1 - Amendment No. ~A-74,200 Unit 2 - Amendment No. ~,4+e,201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16 (continued)

b.

Transfers loads to offsite power source; and

c.

Returns to ready-to-Ioad operation.

SR 3.8.1.17


NOTE--------------------------------

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify, with a DG operating in test mode and connected to its bus, an actual or simulated Safety Injection signal overrides the test mode by:

a.

Opening the auxiliary transformer breaker; and

b.

Automatically sequencing the emergency loads onto the DG.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.18


NOTE--------------------------------

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify each ESF and auto-transfer load sequencing timer is within its limits.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.19


NOTES------------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.8-9 Unit 1 - Amendment No. +3a,474,200 Unit 2 - Amendment No. ~,4+e,201

3.8.1 AC Sources - Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 Verify on an actual or simulated loss of offsite In accordance with (continued) power signal in conjunction with an actual or the Surveillance simulated Safety Injection signal:

Frequency Control Program

a.

De-energization of emergency buses;

b.

Load shedding from emergency buses; and

c.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in ::; 10 seconds,

2.

energizes auto-connected emergency loads through load sequencing timers,

3.

achieves steady state voltage ~ 3785 V and::; 4400 V,

4.

achieves steady state frequency ~ 58.8 Hz and::; 61.2 Hz, and

5.

supplies permanently connected and auto-connected emergency loads for

~ 5 minutes.

SR 3.8.1.20


NOTE--------------------------------

All DG starts may be preceded by an engine prelube period.

In accordance with condition, each DG achieves:

Verify when started simultaneously from standby the Surveillance Frequency Control

a.

in::; 10 seconds, speed ~ 900 rpm; and Program

b.

in ::; 13 seconds, voltage ~ 3785 V and

4400 V, and frequency ~ 58.8 Hz and

~ 61.2 Hz.

DIABLO CANYON - UNITS 1 & 2 3.8-10 Unit 1 - Amendment No. m,+74,200 Unit 2 - Amendment No. m,4+e,201

3.8.3 Diesel Fuel Oil, Lube Oil, Starting Air, and Turbocharger Air Assist SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.3.1 Verify fuel oil storage tanks contain combined storage within limits.

SR 3.8.3.2 Verify lubricating oil inventory is ~ 650 gal.

SR 3.8.3.3 SR 3.8.3.4 Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

Verify each DG has at least one air start receiver with a pressure is ~ 180 psig.

SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.

SR 3.8.3.6 Verify each DG turbocharger air assist air receiver pressure is ~ 180 psig.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Diesel Fuel Oil Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-17 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.8.4 DC Sources - Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or equal to the minimum established float voltage.

In accordance with the Surveillance Frequency Control Program SR 3.8.4.2 Verify each battery charger supplies ~ 400 amps at greater than or equal to the minimum established float voltage for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

In accordance with the Surveillance Frequency Control Program Verify each battery charger can recharge the battery to the fully charged state within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.

SR 3.8.4.3


NOTES----------------------------

1.

The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.

2.

This Surveillance shall not be performed in

. MODE 1, 2, 3, or 4.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-19 Unit 1 - Amendment No. ~,~,200 Unit 2 - Amendment No. ~,4-74,201

3.8.6 Battery Parameters SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1


NOTE--------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is :5 2 amps.

In accordance with the Surveillance Frequency Control Program SR 3.8.6.2 Verify each battery pilot cell voltage is ~ 2.07 V.

In accordance with the Surveillance Frequency Control Program SR 3.8.6.3 Verify each battery connected cell electrolyte level is greater than or equal to minimum established design limits.

In accordance with the Surveillance Frequency Control Program SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or equal to minimum established design limits.

In accordance with the Surveillance Frequency Control Program SR 3.8.6.5 Verify each battery connected cell voltage is

~ 2.07 V.

In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 &2 3.8-24 Unit 1 - Amendment No. ~..m.200 Unit 2 - Amendment No. ~.-1-74,201

3.8.6 SURVEILLANCE SR 3.8.6.6


NOTE--------------------------------

This Surveillance shall not be performed in MODE 1, 2,3, or 4.

Verify battery capacity is ~ 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.

Battery Parameters FREQUENCY In accordance with the Surveillance Frequency Control Program AND 24 months when battery shows degradation or has reached 85% of expected life with capacity < 100%

of manufacturer's rating.

AND 24 months when battery has reached 85% of the expected life with capacity

~ 100% of manufacturer's rating.

DIABLO CANYON - UNITS 1 & 2 3.8-24a Unit 1 - Amendment No. -tJa,~,200 Unit 2 - Amendment No. m,4-74,201

Inverters - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters-Operating LCO 3.8.7 Four Class 1E Vital 120 V UPS inverters shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required inverter inoperable.

A.1


NOTE--------------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems Operating" with any vital 120 V AC bus de-energized.

Restore inverter to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 AND Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.7.1 Verify correct inverter voltage and alignment to required AC vital buses.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-26 Unit 1 - Amendment No. 4Ja, 200 Unit 2 - Amendment No. 4Ja, 201

3.8.8 Inverters - Shutdown SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.8.1 Verify correct inverter voltage, and alignments to required AC vital buses.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-28 Unit 1 - Amendment No. 3a, 200 Unit 2 - Amendment No. 3a, 201

3.8.9 Distribution Systems - Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.9.1 Verify correct breaker alignments and voltage to required AC, DC, and 120 VAC vital bus electrical power distribution subsystems.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-30 Unit 1 - Amendment No. ~. 200 Unit 2 - Amendment No. ~, 201

3.8.10 Distribution Systems-Shutdown ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.4 Initiate actions to restore required AC, DC, and 120 VAC vital bus electrical power distribution sUbsystems to OPERABLE status.

AND A.2.5 Declare associated required residual heat removal subsystem(s) inoperable and not in operation.

Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.10.1 Verify correct breaker alignments and voltage to required AC, DC, and 120 VAC vital bus electrical power distribution subsystems.

FREQUENCY In accordance with the Surveillance Frequency Control Program Unit 1 - Amendment No...:J..Ja, 200 Unit 2 - Amendment No...:J..Ja, 201 DIABLO CANYON - UNITS 1 & 2

Boron Concentration 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of all filled portions of the Reactor Coolant System, the refueling canal, and the refueling cavity, that have direct access to the reactor vessel, shall be maintained within the limit specified in the COLR.

APPLICABILITY:

MODE 6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A,

Boron concentration not within limit.

A,1 AND A,2 Suspend CORE ALTERATIONS.

Suspend positive reactivity additions.

Immediately Immediately A,3 Initiate action to restore boron concentration to within limit.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.9.1.1 Verify boron concentration is within the limit specified in COLR.

FREQUENCY In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.9-1 Unit 1 - Amendment No. ~,4W,200 Unit 2 - Amendment No. ~,4-7Q,201

Nuclear Instrumentation 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Nuclear Instrumentation LCO 3.9.3 Two source range neutron flux monitors shall be OPERABLE.

APPLICABILITY:

MODE 6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required source range neutron flux monitor inoperable.

A.1 AND A.2 Suspend CORE ALTERATIONS except for latching control rod drive shafts and friction testing of individual control rods.

Suspend operations that would cause introduction of coolant into the RCS with boron concentration Jess than required to meet the boron concentration of LCO 3.9.1.

Immediately Immediately B.

Two required source range neutron flux monitors inoperable.

B.1 AND B.2 Initiate action to restore one source range neutron flux monitor to OPERABLE status.

Perform SR 3.9.1.1.

Immediately Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> DIABLO CANYON - UNITS 1 & 2 3.9-2 Unit 1 - Amendment No. ~ -1W 200 Unit 2 - Amendment No. ~ 4W 201

3.9.3 Nuclear Instrumentation SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.3.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.9.3.2


NOTE---------------------------

Neutron detectors are excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.9-2a Unit 1 - Amendment No. 4Ja, 200 Unit 2 - Amendment No. 4Ja, 201

Containment Penetrations 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Containment Penetrations LCO 3.9.4 The containment penetrations shall be in the following status:

a.

The equipment hatch capable of being closed and held in place by four bolts;

b.

One door in each air lock capable of being closed; and

c.

Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:

1.

closed by a manual or automatic isolation valve, blind flange, or equivalent, or

2.

capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation valve.


NOTE---------------------------------------------

Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere may be unisolated under administrative controls.

APPLICABI L1TY:

During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more containment penetrations not in required status.

A.1 AND A.2 Suspend CORE ALTERATIONS.

Suspend movement of irradiated fuel assemblies within containment.

Immediately Immediately DIABLO CANYON - UNITS 1 & 2 3.9-3 Unit 1 - Amendment No. 135155 200 Unit 2 - Amendment No. 135155 201

3.9.4 Containment Penetrations SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.4.1 Verify each required containment penetration is in the required status.

In accordance with the Surveillance Frequency Control Program SR 3.9.4.2 Verify each required containment purge and exhaust ventilation isolation valves actuates to the isolation position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.9-3a Unit 1 - Amendment No. 135155 200 Unit 2 - Amendment No. 135155 201

3.9.5 RHR and Coolant Circulation - High Water Level SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.9.5.1 With the reactor subcriticalless than 57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br />, verify one RHR loop is in operation and circulating reactor coolant at a flow rate of ~ 3000 gpm, OR With the reactor subcritical for 57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> or more, verify one RHR loop is in operation and circulating reactor coolant at a flow rate of ~ 1300 gpm.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.9-5 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.9.6 RHR and Coolant Circulation - Low Water Level SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 With the reactor subcriticalless than 57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br />, verify one RHR loop is in operation and circulating reactor coolant at a flow rate of ~ 3000 gpm, With the reactor subcritical for 57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> or more, verify one RHR loop ;s in operation and circulating reactor coolant at a flow rate of ~ 1300 gpm.

In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SR 3.9.6.2 Verify correct breaker alignment and indicated power available to the required RHR pump that is not in operation.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.9-7 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

3.9.7 Refueling Cavity Water Level 3.9 REFUELING OPERATIONS 3.9.7 Refueling Cavity Water Level LCO 3.9.7 Refueling cavity water level shall be maintained ~ 23 ft above the top of reactor vessel flange.

APPLICABILITY:

During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Refueling cavity water level not within limit.

A.1 Suspend movement of irradiated fuel assemblies within containment.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.7.1 Verify refueling cavity water level is ~ 23 ft above the top of reactor vessel flange.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON* UNITS 1 & 2 3.9-8 Unit 1 - Amendment No. ~, 200 Unit 2 - Amendment No. ~, 201

5.5 Programs and Manuals 5.5 Programs and Manuals 5.5.16 Containment Leakage Rate Testing Program (continued)

d.

Leakage rate acceptance criteria are:

1.

Containment overall leakage rate acceptance criterion is ~ 1.0 La. During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.60 La for the Type B and Type C tests and ~ 0.75 La for Type A tests;

2.

Air lock testing acceptance criteria are:

a)

Overall air lock leakage rate is ~ 0.05 La when tested at ~ Pa.

b)

For each door, leakage rate is ~ 0.01 La when pressurized to ~ 10 psig.

e.

The provisions of SR 3.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

f.

The provisions of SR 3.0.3 are applicable to the Containment Leakage Rate Testing Program.

5.5.17 Battery Monitoring and Maintenance Program This Program provides for restoration and maintenance, based on the recommendations of IEEE Standard 450, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications," or of the battery manufacturer, of the following:

a.

Actions to restore battery cells with float voltage < 2.13 V, and

b.

Actions to equalize and test battery cells that have been discovered with electrolyte level below the top of the plates.

5.5.18 Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The Program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.

a.

The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.

b.

Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1.

c.

The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

DIABLO CANYON - UNITS 1 & 2 5.0-17 Unit 1 - Amendment No. ~,.w7,4-98,200 Unit 2 - Amendment No. 74,4-98,-1-99,201

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 200 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 201 TO FACILITY OPERATING LICENSE NO. DPR-82 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323

1.0 INTRODUCTION

By application to the U.S. Nuclear Regulatory Commission (NRC) dated October 15,2007 (Agencywide Documents Access and ManClgement System (ADAMS) Accession No. ML072950183), as supplemented by letter dated July 8, 2008 (ADAMS Accession No. ML081980057), Pacific Gas and Electric Company (PG&E, the licensee) requested changes to the technical specifications (TS) for the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) in accordance with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR). The supplemental letter dated July 8, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register (FR) on November 20, 2007 (72 FR 65370).

1.1 Proposed License Amendment The proposed changes would relocate surveillance frequencies of most surveillance tests from the TS to a licensee-controlled document, the Surveillance Frequency Control Program (SFCP).

Once relocated, changes to the surveillance frequencies may be made using a risk-informed methodology, Nuclear Energy Institute (NEI) document NEI 04-10, "Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies,"

Rev. 1 (ADAMS Accession No. IVIL071360456) (Ref. 8), as specified in the Administrative Controls of the TS. By letter dated September 19, 2007, the NRC staff issued its "Final Safety Evaluation For Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5B, 'Risk-Informed Method For Control Of Surveillance Frequencies (TAC No. MD6111 ),'" (ADAMS Accession No. ML072570267)

(Ref. 9), which approved NEI 04-10 Rev. 1, as acceptable for referencing by licensees proposing to amend their TS to establish a surveillance frequency control program.

The term "STAGGERED TEST BASIS" in Section 1.1, "DEFINITIONS," is deleted since it is no longer contained in any TS. A new TS Section 5.5.18, "Surveillance Frequency Control Program" is added to the Administrative Controls:

This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications

- 2 are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.

a.

the Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program,

b.

changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI-04-10, "Risk-Informed Method for Control of Surveillance Frequencies", Revision 1,

c.

the provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

The following TS surveillance frequencies were proposed to be removed from the TS and relocated:

3.1.1.1 3.3.3.1 3.4.8.1 3.6.2.2 3.7.12.6 3.8.7.1 3.1.2.1

  • 3.3.3.2 3.4.8.2 3.6.3.2 3.7.13.1 3.8.8.1 3.1.4.1 3.3.4.1 3.4.9.1 3.6.3.3 3.7.13.3 3.8.9.1 3.1.4.2 3.3.4.2 3.4.9.2 3.6.3.7*

3.7.13.4 3.8.10.1 3.1.5.1 3.3.4.3 3.4.9.3 3.6.3.8 3.7.13.5 3.9.1.1 3.1.6.2 3.3.5.2 3.4.11.1 3.6.3.10 3.7.15.1 3.9.3.1 3.1.6.3 3.3.5.3 3.4.11.3 3.6.4.1 3.7.16.1 3.9.3.2 3.1.8.2 3.3.6.1 3.4.11.4 3.6.5.1 3.7.18.1 3.9.4.1 3.1.8.3 3.3.6.2 3.4.11.5 3.6.6.1 3.8.1.1 3.9.4.2 3.1.8.4 3.3.6.3 3.4.12.1 3.6.6.2 3.8.1.2 3.9.5.1 3.2.1.1*

3.3.6.4 3.4.12.2 3.6.6.3 3.8.1.3 3.9.6.1 3.2.1.2*

3.3.6.5 3.4.12.3 3.6.6.5 3.8.1.4 3.9.6.2 3.2.2.1*

3.3.6.6 3.4.12.5 3.6.6.6 3.8.1.5 3.9.7.1 3.2.3.1 3.3.6.7 3.4.12.6 3.6.6.7 3.8.1.6 3.2.4.1 3.3.6.8 3.4.12.8 3.6.6.8 3.8.1.7 3.2.4.2 3.3.7.1 3.4.12.9 3.6.6.9 3.8.1.8 3.3.1.1 3.3.7.2 3.4.13.1 3.6.7.1 3.8.1.9 3.3.1.2 3.3.7.3 3.4.13.2 3.6.7.2 3.8.1.10 3.3.1.3 3.3.7.4 3.4.14.1*

3.6.7.3 3.8.1.11 3.3.1.4 3.3.7.5 3.4.15.1 3.6.7.4 3.8.1.12 3.3.1.5 3.3.7.6 3.4.15.2 3.6.7.5 3.8.1.13 3.3.1.6 3.3.7.7 3.4.15.3 3.7.2.2 3.8.1.14 3.3.1.7 3.3.8.1 3.4.15.4 3.7.3.3 3.8.1.15 3.3.1.8*

3.3.8.2 3.4.15.5 3.7.4.1 3.8.1.16 3.3.1.9 3.3.8.4 3.4.16.1 3.7.4.3 3.8.1.17 3.3.1.10 3.3.8.5 3.4.16.2*

3.7.5.1 3.8.1.18 3.3.1.11 3.4.1.1 3.5.1.1 3.7.5.3 3.8.1.19 3.3.1.12 3.4.1.2 3.5.1.2 3.7.5.4 3.8.1.20 3.3.1.13 3.4.1.3 3.5.1.3 3.7.5.6 3.8.3.1 3.3.1.14 3.4.1.4 3.5.1.4*

3.7.6.1 3.8.3.2

- 3 3.3.1.16 3.4.2.1 3.5.1.5 3.7.6.2 3.8.3.4 3.3.2.1 3.4.3.1 3.5.2.1 3.7.7.1 3.8.3.5 3.3.2.2 3.4.4.1 3.5.2.2 3.7.7.2 3.8.3.6 3.3.2.4 3.4.5.1 3.5.2.3 3.7.7.3 3.8.4.1 3.3.2.5 3.4.5.2 3.5.2.5 3.7.8.1 3.8.4.2 3.3.2.6 3.4.5.3 3.5.2.6 3.7.8.3 3.8.4.3 3.3.2.8 3.4.6.1 3.5.2.7 3.7.10.1 3.8.6.1 3.3.2.9 3.4.6.2 3.5.2.8 3.7.10.2 3.8.6.2 3.3.2.10 3.4.6.3 3.5.4.1 3.7.10.4 3.8.6.3 3.3.2.11 3.4.7.1 3.5.4.2 3.7.10.5 3.8.6.4 3.3.2.12 3.4.7.2 3.5.4.3 3.7.12.1 3.8.6.5 3.3.2.13 3.4.7.3 3.5.5.1 3.7.12.3 3.8.6.6*

  • Event-based surveillance frequency portion is retained in TS.

1.2 Related NRC Actions By letter dated September 28, 2006 (ADAMS Accession No. ML062420049), Richard V.

Guzman, NRC, to Christopher M. Crane, Exelon, the NRC issued a Safety Evaluation related to Amendment Nos. 186 and 147 to Facility Operating License Nos. NPF-39 and NPF-85, Exelon Generation Company, LLC for Limerick Generating Station, Units 1 and 2, Docket Nos. 50-352 and 50-353. Limerick was the first pilot submittal in support of this risk-informed TS Initiative 5b.

2.0 REGULATORY EVALUATION

In the "Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors" published in the Federal Register on July 22, 1993 (58 FR 39132), the Nuclear Regulatory Commission (the Commission) addressed the use of Probabilistic Safety Analysis (PSA, currently referred to as Probabilistic Risk Analysis or PRA) in Standard Technical Specifications (STS). In this 1993 FR publication, the Commission states, in part:

The Commission believes that it would be inappropriate at this time to allow requirements which meet one or more of the first three criteria [of 10 CFR 50.36]

to be deleted from Technical Specifications based solely on PSA (Criterion 4).

However, if the results of PSA indicate that Technical Specifications can be relaxed or removed, a deterministic review will be performed.

Additionally, the Commission states in the 1993 Final Policy Statement:

The Commission Policy in this regard is consistent with its Policy Statement on

'Safety Goals for the Operation of Nuclear Power Plants,' 51 FR 30028, published on August 21, 1986. The Policy Statement on Safety Goals states in part, "... probabilistic results should also be reasonably balanced and supported through use of deterministic arguments. In this way, judgments can be made...

about the degree of confidence to be given these [probabilistic] estimates and assumptions. This is a key part of the process for determining the degree of regulatory conservatism that may be warranted for particular decisions. This

- 4

'defense-in-depth' approach is expected to continue to ensure the protection of public health and safety."

The Commission further states in the 1993 publication:

The Commission will continue to use PSA, consistent with its policy on Safety Goals, as a tool in evaluating specific line-item improvements to Technical Specifications, new requirements, and industry proposals for risk-based Technical Specification changes.

Approximately 2 years later, the Commission provided additional detail concerning the use of PRA in the "Final Policy Statement: Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities" published in the Federal Register (FR) (60 FR 42622, August 16, 1995) the NRC addressed the use of PRA. In this FR publication, the Commission's opening statement states, in part:

The Commission believes that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. In addition, the Commission believes that the use of PRA technology in NRC regulatory activities should be increased to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach.

The following excerpts are taken, in part, from the 1995 Commission Policy Statement:

PRA addresses a broad spectrum of initiating events by assessing the event frequency. Mitigating system reliability is then assessed, including the potential for mUltiple and common-cause failures. The treatment, therefore, goes beyond the single failure requirements in the deterministic approach. The probabilistic approach to regulation is, therefore, considered an extension and enhancement of traditional regulation by considering risk in a more coherent and complete manner.

Therefore, the Commission believes that an overall policy on the use of PRA in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that promotes regulatory stability and efficiency. This policy statement sets forth the Commission's intention to encourage the use of PRA and to expand the scope of PRA applications in all nuclear regulatory matters to the extent supported by the state-of-the-art in terms of methods and data.

Therefore, the Commission adopts the following policy statement regarding the expanded NRC use of PRA:

(1)

The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data

- 5 and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.

(2)

PRA and associated analyses (e.g., sensitivity studies, uncertainty analyses, and importance measures) should be used in regulatory matters, where practical within the bounds of the state-of-the-art, to reduce unnecessary conservatism associated with current regulatory requirements, regulatory guides, license commitments, and staff practices. Where appropriate, PRA should be used to support the proposal for additional regulatory requirements in accordance with 10 CFR 50.109 (Backfit Rule). Appropriate procedures for including PRA in the process for should be developed and followed. It is, of course, understood that the intent of this policy is that existing rules and regulations shall be complied with unless these rules and regulations are revised.

(3)

PRA evaluations in support of regulatory decisions should be as realistic as practicable and appropriate supporting data should be publicly available for review.

(4)

The Commission's safety goals for nuclear power plants and subsidiary numerical objectives are to be used with appropriate consideration of uncertainties in making regulatory judgments on the need for proposing and backfitting new generic requirements on nuclear power plant licensees.

In 10 CFR 50.36, the Commission established its regulatory requirements related to the content of TS. Pursuant to 10 CFR 50.36, TS are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements (SRs);

(4) design features; and (5) administrative controls. As stated in 10 CFR 50.36{c){3),

"Surveillance Requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The SRs are required by 10 CFR 50.36{c){3) to reside in TS and will remain in TS. The new TS SFCP will provide the necessary surveillance frequency programmatic controls and is located in the TS Administrative Controls Section (STS Section 5.0).

Changes to surveillance frequencies in the SFCP are made using the methodology contained in NEI 04-10, Rev. 1, including qualitative considerations, results of risk analyses, sensitivity studies and any bounding analyses, and recommended monitoring of SSCs are required to be documented. Changes to frequencies are subject to regulatory review and oversight of the SFCP implementation through the rigorous NRC review of safety related SSC performance provided by the reactor oversight program.

DCPP's SFCP ensures that surveillance requirements specified in the TS are performed at intervals sufficient to assure the above regulatory requirements are met. Existing regulatory requirements, such as 10 CFR 50.65 (maintenance rule) and 10 CFR 50 Appendix B {corrective

- 6 action program), require licensee monitoring of surveillance test failures and implementing corrective actions to address such failures. One of these actions may be to consider increasing the frequency at which a surveillance test is performed. In addition, the SFCP implementation guidance in NEI 04-10, Rev. 1, requires monitoring of the performance of structures, systems, and components (SSCs) for which surveillance frequencies are decreased to assure reduced testing does not adversely impact the SSCs.

This change is analogous with other NRC-approved TS changes in which the surveillance requirements are retained in technical specifications but the related surveillance frequencies are relocated to licensee-controlled documents, such as surveillances performed in accordance with the Inservice Testing Program and the Primary Containment Leakage Rate Testing Program.

Thus, this proposed change complies with 10 CFR 50.36(c)(3) by retaining the requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met and meets the first key safety principle articulated in Regulatory Guide (RG) 1.177 (Reference 3) for plant-specific, risk-informed TS changes by complying with current regulations.

Licensees are required by TS to perform surveillance test, calibration, or inspection on specific safety related system equipment such as reactivity control, power distribution, electrical, instrumentation, and others to verify system operability. Surveillance frequencies, currently identified in TS, are based primarily upon deterministic methods such as engineering judgment, operating experience, and manufacturer's recommendations. The licensee's use of NRC-approved PRA methodologies identified in NEI 04-10, Rev. 1, provides a way to establish risk-informed surveillance frequencies that complements the deterministic approach and supports the NRC's traditional defense-in-depth philosophy.

These regulatory requirements, and the monitoring required by NEI 04-10, Rev. 1, ensure that surveillance frequencies are sufficient to assure that the requirements of 10 CFR 50.36 are satisfied and that any performance deficiencies will be identified and appropriate corrective actions taken.

2.1 Optional Changes and Variations PG&E is not proposing any variations or deviations from the methodology for relocating surveillance frequencies from the TSs as described in the NRC staff's safety evaluation for NEI04-10. Because this amendment is adopting the methodology in NEI 04-10, the NRC staff reviewed the conditions of and limitations on the use of the methodology in NEI 04-10 for plant specific licensing applications that are given in Section 4.0 of the safety evaluation issued in the NRC letter dated September 19, 2007, that approved the use of NEI 04-10. The licensee's application and its supplemental letter provides the documentation on the PRA models and technical adequacy with respect to the NRC position in Sections 1.2, 1.3, and 4.2 of Regulatory Guide 1.200 (Ref. 5), which is required by the NRC safety evaluation that approved the use of NEI 04-10 in plant-specific license amendments. Therefore, the licensee's amendment application meets the conditions and limitation specified for the use of NEI 04-10.

- 7

3.0 TECHNICAL EVALUATION

PG&E submitted its proposed change to the TS, which provides for administrative relocation of applicable surveillance frequencies and provides for the addition of the SFCP to the Administrative Controls of the TS. In accordance with NEI 04-10, probabilistic risk assessment (PRA) methods are used, in combination with plant performance data and other considerations, to identify and justify modifications to the surveillance frequencies of equipment at nuclear power plants. nlis is in accordance with guidance provided in Regulatory Guides (RGs) 1.174 and 1.177 (Ref. 3 and 4, respectively) in support of changes to surveillance test intervals. The requirement to perform a surveillance frequency is retained in the TS, and the requirement for a frequency is retained in the TS, it is the specific frequency interval (number) that is relocated to a licensee controlled document. Initial surveillance frequencies were taken from vendor/manufacturer's recommendations, industry codes and standards, engineering judgement, TS completion times (allowed outage times), historical equipment reliability data, and when (under what plant conditions) can the surveillance frequency be performed. Once a surveillance frequency is determined in accordance with the SFCP it will be recorded in a licensee-controlled document, and as far as the operator/maintainer is concerned it is the same as having the actual frequency number in TS.

Figure 1 in NEI 04-10 provides a process flow map for making changes to surveillance frequencies in the SFCP. In approving the Limerick license amendment, six cases/proposals for changing surveillance test intervals (STI) were evaluated (some acceptable for change, others not), thereby testing all the logic paths in NEI-04-10 (see flow chart in NEI-04-10) prior to approval. Exelon's selection was based on the draft NEI 04-10 document which had additional process paths (HSS and LSS) that are not included in the current version. The current process in NEI 04-10 includes three different flow paths to follow depending on how the PRA is modeled, as shown in steps 8, 9, and 10 of Figure 1:

STI SSC Modeled in PRA STI SSC Not Modeled in PRA, but could be STI SSC Modeling is Impractical Consistent with NEI 04-10 and its objective of selecting sufficient STls to demonstrate each of the alternative process paths, PG&E has identified three technical specification surveillance frequencies to demonstrate the frequency change process. The surveillances selected to demonstrate the functionality of the three process paths at DCPP are:

TS Surveillance 3.3.5.2 - Diesel Generator Trip Actuating Device Operational Test (Path 1)

TS Surveillance3.6.3.3 - Containment Isolation Manual Valve Sealed Checklist (Path 2)

TS Surveillance 3.1.2.1 - Verify Measured Core Reactivity (Path 3)

The SFCP reviews the current surveillance frequency bases to determine if the surveillance frequency is amenable to the NEI process. This would include determining if the surveillance frequency can be changed. For instance, the surveillance frequency may have been established as a commitment to the NRC and cannot be changed. It should be noted that no

- 8 surveillance frequencies will be changed as a result of this amendment. The NRC staff concludes that the selected STI candidates, evaluated as part of the pilot process at DCPP, demonstrate the functionality of the three process paths for the frequency change process as proposed in NEI 04-10.

RG 1.177 identifies five key safety principles to be met for risk-informed changes to TS. As noted above, PG&E has not proposed any variations or deviations from the guidance in NEI 04-10. As such, the evaluations provided in NRC SE dated September 19, 2007, for each of these principles as addressed by the industry methodology document (NEI 04-10), are applicable to DCPP. In addition, the NRC staff has provided plant-specific discussions for several of the five key safety principles. The generic and plant-specific evaluations are provided below as DCPP is a pilot application and can be used for future reference:

1.

The proposed change meets the current regulations unless it is explicitly related to a requested exemption or rule change.

10 CFR 50.36(c)(3) provides that TSs will include surveillances which are "requirements relating to test, calibration, or inspection to assure that necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." NEI 04-10, Revision 1, provides guidance for relocating the surveillance frequencies from the TSs to a licensee-controlled program by providing a NRC-approved methodology for control of the surveillance frequencies. The surveillances themselves would remain in the TSs, as required by 10 CFR 50.36(c)(3).

This change is consistent with other NRC-approved TS changes in which the surveillance frequencies are relocated to licensee-controlled documents, such as surveillances performed in accordance with the In-Service Testing Program or the Primary Containment Leakage Rate Testing Program. Thus, this proposed change meets the first key safety principle of RG 1.177 by complying with current regulations.

2.

The proposed change is consistent with the defense-in-depth philosophy.

Consistency with the defense-in-depth philosophy is maintained if:

A reasonable balance is preserved among prevention of core damage, prevention of containment failure, and consequence mitigation.

Over-reliance on programmatic activities to compensate for weaknesses in plant design is avoided.

System redundancy, independence, and diversity are preserved commensurate with the expected frequency, consequences of challenges to the system, and uncertainties (e.g., no risk outliers). Because the scope of the proposed methodology is limited to revision of surveillance frequencies, the redundancy, independence, and diversity of plant systems are not impacted.

- 9 Defenses against potential common cause failures (CCFs) are preserved, and the potential for the introduction of new CCF mechanisms is assessed.

Independence of barriers is not degraded.

Defenses against human errors are preserved.

The intent of the General Design Criteria in 10 CFR Part 50, Appendix A, are maintained.

NEI 04-10, Revision 1, uses both the core damage frequency (CDF) and the large early release frequency (LERF) metrics to evaluate the impact of proposed changes to surveillance frequencies. Compliance with the guidance of RG 1.174 and RG 1.177 for changes to CDF and LERF is achieved by evaluation using a comprehensive risk analysis, which assesses the impact of proposed changes including contributions from human errors and CCFs. Defense-in-depth is also included in the methodology explicitly as a qualitative consideration outside of the risk analysis, as is the potential impact on detection of component degradation that could lead to increased likelihood of CCFs. Both the quantitative risk analysis and the qualitative considerations assure a reasonable balance of defense-in-depth is maintained to ensure protection of public health and safety, satisfying the second key safety principle of RG 1.177.

3.

The proposed change maintains sufficient safety margins.

The design, operation, testing methods, and acceptance criteria for SSCs, specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plant licensing basis (including the final safety analysis report and bases to TS), since these are not affected by changes to the surveillance frequencies. Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis.

Thus, safety margins are maintained by the proposed methodology, and the third key safety principle of RG 1.177 is satisfied.

4.

When proposed changes result in an increase in CDF or risk, the increases should be small and consistent with the intent of the Commission's Safety Goal Policy Statement.

RG 1.177 provides a framework for risk evaluation of proposed changes to surveillance frequencies, which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations. NEI 04-10, Revision 1, satisfies the intent of RG 1.177 requirements for evaluation of the change in risk, and for assuring that such changes are small.

Quality of the PRA.

The quality of the PRA must be compatible with the safety implications of the proposed TS change and the role the PRA plays in justifying the change. The NRC has developed regulatory guidance to address PRA technical adequacy,

- 10 RG 1.200 (Reference 5), which addresses the use of the American Society of Mechanical Engineers (ASME) RA-Sa-2005, Addenda to ASME RA-S-2002 Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications (Reference 6), and the NEI peer review process NEI 00-02, "PRA Peer Review Process Guidance" (Reference 7). NEI 04-10, Revision 1, requires an assessment of the PRA models used to support the SFCP against the requirements of RG 1.200 to assure that the PRA models are capable of determining the change in risk due to changes to surveillance frequencies of SSCs, using plant-specific data and models. Capability category II of ASME RA-Sa-2005 is applied as the standard, and any identified deficiencies to those requirements are assessed further in sensitivity studies to determine any impacts to proposed decreases to surveillance frequencies.

In addition, PG&E identified the completion of an industry peer review along with three separate gap assessments conducted for the DCPP PRA, which taken collectively assess the PRA internal events model compared to the applicable requirements of RG 1.200 and the ASME standard for capability category II, as required by NEI 04-10. All significant ("A n and liB" level) findings from the industry peer review have been resolved. The licensee further identified focused scope peer reviews conducted for the human reliability analysis (HRA) portion of the PRA model to address the upgrade implemented.

The findings from the gap assessments and the focused scope peer review of the HRA were provided by the licensee for staff review. The NRC staff reviewed the open items to determine how they might impact this application.

The HRA was found by the gap assessment to not conform to the standard in the areas of maximum credit for recovery in pre-initiator events (element HR-D4),

bases for success criteria for timing analyses (HR-G4), and validation of human action timing (HR-G5). The licensee stated that these issues are planned to be resolved in 2009, and in the interim will be addressed by sensitivity analyses.

The staff accepts this disposition as adequate to address this application.

The licensee's processes for evaluation of data for its PRA do not address element DA-D2 (no applicable generic data) or DA-D7 (eXisting plant experience no longer applicable). The reviewers identified that the current DCPP PRA model does not have these data conditions, and so the elements are not applicable, but still recommended that a process be in place. Since the elements do not apply to the current PRA model, they do not affect this application.

The definition of the human failure events is not sufficient to allow an independent analyst to easily replicate the analyses; the response time assumptions are not always directly traceable to a thermal-hydraulic analysis; procedure steps and manpower availability should be validated; documentation could be improved. The licensee stated that these issues are planned to be resolved in 2009, and in the interim will be addressed by sensitivity analyses.

The staff accepts this disposition as adequate to address this application.

- 11 Based on the evaluation of the DCPP PRA using RG 1.200 and the ASME standard, and the licensee's planned use of sensitivity analyses to address deficiencies in its HRA, the staff determined that the DCPP PRA internal events model satisfied the guidance of RG 1.200, Revision 1, and is acceptable for this application because this level of PRA quality is sufficient to support the evaluation of changes to surveillance frequencies within the SFCP, and is consistent with Regulatory Position 2.3.1 of RG 1.177.

Scope of the PRA.

NEI 04-10 requires evaluation of each proposed surveillance frequency change to determine its potential impact on risk, due to impacts from internal events, fires, seismic, other external events, and from shutdown conditions.

Consideration is made of both CDF and LERF metrics. Where quantitative risk models are unavailable, bounding analyses or other conservative quantitative evaluations are performed. A qualitative screening analysis may be used when the surveillance frequency impact on plant risk can be shown to be negligible or zero.

The DCPP PRA model is a full-scope, at-power model, and is acceptable for this application.

The scope of the PRA model does not include other external events (i.e., high winds, nearby facility accidents), which were found in the screening analyses of the Individual Plant Examination of External Events (IPEEE) to not represent unique site vulnerabilities, nor does the PRA model scope include shutdown conditions. The licensee will use the alternative evaluation methods consistent with NEI 04-10.

Fire PRA Model I'JEI 04-10 provides for the use of fire PRA models, bounding analyses, or other quantitative methods in assessing fire risk impacts for changes to surveillance frequencies. The licensee identified that it intends to use a fire PRA model to support changes made in the SFCP.

The licensee submitted relevant information about its fire PRA model in support of its SFCP. A fire PRA model is currently under development by the licensee to support transitioning to National Fire Protection Association (NFPA) standard NFPA-805. Portions of this model have been completed and peer reviewed against the American Nuclear Society PRA standard for fire PRA models (Ref. 11). The licensee cited NUREG/CR-6850 (Ref. 12) as the basis for development of most aspects of its fire PRA model.

Seismic PRA Model NEI 04-10 provides for the use of seismic PRA models, seismic margins, bounding analyses, or other quantitative methods in assessing seismic risk impacts for changes to surveillance frequencies. The licensee identified that it intends to use a seismic PRA model to support changes made in the SFCP.

- 12 The licensee submitted relevant information about its seismic PRA model in support of its SFCP. The seismic hazard evaluation uses site-specific seismic hazard levels resolved into six separate seismic initiating events, each with a unique frequency of occurrence. Structure and component fragility analysis provides unique fragility curves, defined by the median ground spectral acceleration capacities and accounting for randomness and uncertainty variables.

Seismic logic analyses of plant system structural and component failures are evaluated using the event tree logic for general transients. Although most nonsafety-related components and systems are assumed to fail during any seismic event, the seismically-induced loss of offsite power is probabilistically evaluated based on the switchyard seismic fragility.

The scope of the DCPP PRA model, and the evaluations of other external events and shutdown conditions, is sufficient to ensure the scope of the risk contribution of each surveillance are properly identified for evaluation, and is consistent with Regulatory Position 2.3.2 of RG 1.177.

PRA Modeling.

NEI 04-10 determines if the SSCs affected by a surveillance are modeled in the PRA. Where the SSC is directly or implicitly modeled, a quantitative evaluation of the risk impact is carried out. The methodology adjusts the failure probability of the impacted SSCs, including any impacted common cause failure modes, based on the proposed change to the surveillance frequency. Where the SSC is not modeled in the PRA, bounding analyses are performed to characterize the impact of the proposed change to surveillance frequency. Potential impacts on the risk analyses due to screening criteria and truncation levels are adequately addressed by the requirements for PRA technical adequacy addressed by RG 1.200, and by sensitivity studies identified in NEI 04-10. Guidance is provided for the quantitative evaluation of the impact of selected testing strategy (Le., staggered testing or sequential testing) consistent with the guidance of NUREG/CR-6141 and NUREG/CR-5497.

The licensee's program conforms to the guidance in NEI 04-10 Rev. 1 and is, therefore, acceptable because PRA modeling is sufficient to ensure an acceptable evaluation of risk due to the change in surveillance frequency, and is consistent with Regulatory Position 2.3.3 of RG 1.177.

Assumptions.

The failure probabilities of SSCs modeled in a PRA include a standby time-related contribution and a cyclic demand-related contribution. NEI 04-10 adjusts the time-related failure contribution of SSCs affected by the proposed change to surveillance frequency. This is consistent with RG 1.177 Section 2.3.3 which permits separation of the failure rate contributions into demand and standby for evaluation of surveillance requirements. If the available data do not support distinguishing between the time-related failures and demand failures, then the change to surveillance frequency is conservatively assumed to impact the total failure probability of the SSC, including both standby and demand contributions. The SSC failure rate (per unit time) is assumed to be unaffected by the change in test frequency, and this is confirmed by the required monitoring

- 13 and feedback implemented after the change in surveillance frequency is implemented.

The process requires consideration of qualitative sources of information with regards to potential impacts of test frequency on SSC performance, including industry and plant-specific operating experience, vendor recommendations, industry standards, and code-specified test intervals. Thus the process is not reliant upon risk analyses as the sole basis for the proposed changes.

The potential beneficial risk impacts of reduced surveillance frequency, including reduced downtime, lesser potential for restoration errors, reduction of potential for test-caused transients, and reduced test-caused wear of equipment, are identified qualitatively, but are conservatively not required to be quantitatively assessed.

The licensee's program conforms to the guidance in NEI 04-10 Rev. 1 and is, therefore, acceptable because it employs reasonable assumptions with regard to extensions of surveillance test intervals, and is consistent with Regulatory Position 2.3.4 of RG 1.177.

Sensitivity and Uncertainty Analyses.

NEI 04-10 requires sensitivity studies to assess the impact of uncertainties from key assumptions of the PRA, uncertainty in the failure probabilities of the affected SSCs, impact to the frequency of initiating events, and of any identified deviations from capability category II of ASME RA-Sb-2005. Where the sensitivity analyses identify a potential impact on the proposed change, revised surveillance frequencies are considered, along with any qualitative considerations that may bear on the results of such sensitivity studies. Required monitoring and feedback of SSC performance once the revised surveillance frequencies are implemented are also used. Thus, NEI 04-10 appropriately considers the possible impact of PRA model uncertainty and sensitivity to key assumptions and model limitations, consistent with Regulatory Position 2.3.5 of RG 1.177.

The licensee's program conforms to the guidance in NEI 04-10 Rev. 1 and is, therefore, acceptable because it appropriately considers the possible impact of PRA model uncertainty and sensitivity to key assumptions and model limitations, consistent with Regulatory Position 2.3.5 of RG 1.177.

Acceptance Guidelines.

NEI 04-10 quantitatively evaluates the change in total risk (including internal and external events contributions) in terms of CDF and LERF for both the individual risk impact of a proposed change in surveillance frequency and the cumulative impact from all individual changes to surveillance frequencies. Each individual change to surveillance frequency must be shown to result in a risk impact below 1E-6 per year for change to CDF, and below 1E-7 per year for change to LERF.

These are consistent with the limits of RG 1.174 for very small changes in risk.

- 14 Where the RG 1.174 limits are not met, the process either considers revised surveillance frequencies which are consistent with RG 1.174, or the process terminates without permitting the proposed changes. Where quantitative results are unavailable to permit comparison to acceptance guidelines, appropriate qualitative analyses are required to demonstrate that the associated risk impact of a proposed change to surveillance frequency is negligible or zero. Otherwise, bounding quantitative analyses are required which demonstrate the risk impact is at least one order of magnitude lower than the RG 1.174 acceptance guidelines for very small changes in risk.

In addition to assessing each individual SSC surveillance frequency change, the cumulative impact of all changes must result in a risk impact below 'I E-5 per year for change to CDF, and below 1E-6 per year for change to LERF, and the total CDF and total LERF must be reasonably shown to be less than 1E-4 per year and 1E-5 per year, respectively. These are consistent with the limits of RG 1.174 for acceptable changes in risk, as referenced by RG 1.177 for changes to surveillance frequencies. The staff interprets this assessment of cumulative risk as a requirement to calculate the change in risk from a baseline model utilizing failure probabilities based on the surveillance frequencies prior to implementation of the SFCP, compared to a revised model with failure probabilities based on changed surveillance frequencies. The staff further notes that NEI 04-10 includes a provision to exclude the contribution to cumulative risk from individual changes to surveillance frequencies associated with small risk increases (less than 5E-8 CDF and 5E-9 LERF) once the baseline PRA models are updated to include the effects of the revised surveillance frequencies.

The quantitative acceptance guidance of RG 1.174 is necessary but not sufficient to accept decreases in surveillance frequencies. The process also considers qualitative information to evaluate the proposed changes to surveillance frequencies, including industry and plant-specific operating experience, vendor recommendations, industry standards, the results of sensitivity studies, and SSC performance data and test history. The final acceptability of the proposed change is based on all of these considerations and not solely on the PRA results compared to numerical acceptance guidelines. Performance monitoring and feedback are also required to assure that lessons learned from past experience are considered.

These items are evaluated by an Integrated Decision-making Panel (IDP) in accordance with NEI04-10. Per NEI 04-10, the IDP is composed of the site Maintenance Rule Expert Panel, supplemented by a Surveillance Test Coordinator, and a Subject Matter Expert.

The licensee's program conforms to the guidance with NEI 04-10 Rev. 1 and is, therefore, acceptable because it provides reasonable acceptance guidelines and methods for evaluating the risk increase of proposed changes to surveillance frequencies, consistent with Regulatory Position 2.4 of RG 1.177.

Therefore, based on the technical adequacy of the licensee's PRA models and on the licensee's conformance to the gUidance of NEI 04-10 Rev. 1, the licensee's proposed change satisfies the

- 15 fourth key safety principle of RG 1.177 by assuring any increase in risk is small consistent with the intent of the Commission's Safety Goal Policy Statement.

5.

The impact of the proposed change should be monitored using performance measurement strategies.

The licensee's proposed change requires application of NEI 04-10 in the SFCP.

NEI 04-10 requires performance monitoring of SSCs whose surveillance frequency has been revised as part of a feedback process to assure that the change in test frequency has not resulted in degradation of equipment performance and operational safety. The monitoring and feedback includes consideration of Maintenance Rule monitoring of equipment performance. In the event of degradation of SSC performance, the surveillance frequency is reassessed in accordance with the methodology, in addition to any corrective actions which may apply as part of the Maintenance Rule requirements.

The licensee's program conforms to the guidance in NEI 04-10 Rev. 1 and is, therefore, acceptable because the performance monitoring and feedback is sufficient to reasonably assure acceptable SSC performance and is consistent with Regulatory Position 3.2 of RG 1.177. Thus, the fifth key safety principle of RG 1.177 is satisfied.

4.0

SUMMARY

AND CONCLUSIONS The NRC staff has reviewed the licensee's proposed TS changes for relocation of surveillance frequencies to a licensee controlled document, and controlling changes to surveillance frequencies in accordance with a new program, the SFCP, identified in the Administrative Controls of TS. The SFCP references NEI 04-10 Revision 1, which provides a risk-informed methodology using plant-specific risk insights and performance data to revise surveillance frequencies within an SFCP, allowing for licensee control of the surveillance frequencies.

The NRC staff finds that the proposed TS changes and implementation of the methodology of NEI 04-10 Revision 1, as referenced in the Administrative Controls of TS, satisfies the key principles of risk-informed decision making applied to changes to TS as delineated in RG 1.177 and RG 1.174, in that:

The proposed change meets current regulations; The proposed change is consistent with defense-in-depth philosophy; The proposed change maintains sufficient safety margins; Increases in risk resulting from the proposed change are small and consistent with the Commission's Safety Goal Policy Statement; and The impact of the proposed change is monitored with performance measurement strategies.

Based on the above evaluation, the NRC staff concludes the proposed changes meet the technical requirements in the regulations that are discussed in Section 2.0 of this safety evaluation. Based on this, the NRC staff further concludes that the proposed TS changes in the

- 16 proposed amendment meet 10 CFR 50.36 and, therefore, the proposed amendment is acceptable.

5.0 REGULATORY COMMITMENTS In its letter dated October 15, 2007, PG&E committed to the following actions as Regulatory Commitments.

1)

PG&E will conduct another Integrated Decisionmaking Panel (IDP) panel for the NRC to observe, that will review TS Surveillance 3.6.3.3 and discuss the two previously reviewed STls.

2)

PG&E commits to evaluate the impact of future model updates (internal

. model or external model) on the conclusions of the assessments that are performed in support of this application.

3)

The upgraded human reliability analysis was recently subjected to a focused peer review. All the findings of this focused review will be addressed prior to implementation of the proposed TS changes either by modifying the model or treatment of the issue via a sensitivity study.

4)

Three recent limited scope and independent assessments of the DCPP PRA Level 1 and Level 2 PRA models have been performed by leading industry PRA experts (i.e., Gap Analyses) to support several risk informed applications, including the MSPI [Mitigating System Performance Indicators] calculations and DCPP's transition to the National Fire Protection Association (NFPA) 805 Standard. All the findings of these assessments will be addressed prior to implementation of the proposed TS changes and based on the system being subject to change either by modifying the model or treatment of the issue via a sensitivity study.

5)

PG&E will either close all identified RG 1.200 gaps, or will address the gaps through sensitivity studies for the surveillance test interval being evaluated using the I\\lEI 04-10 process and methodology.

6.0 STATE CONSULTATION

In accordance with the Commission's regulations, the California State official was notified of the proposed issuance of the amendments. The State official had no comments.

- 17

7.0 ENVIRONMENTAL CONSIDERATION

The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on November 20, 2007 (72 FR 65370). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

8.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

9.0 REFERENCES

1.

Becker, J. R., Pacific Gas and Electric Company, letter to U.S. Nuclear Regulatory Commission, "Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Technical Specifications Initiative 5b)," October 15, 2007, ADAMS Accession No. ML072950183.

2.

Becker, J. R., Pacific Gas and Electric Company, letter to U.S. Nuclear RegUlatory Commission, "Response to Request for Additional Information on, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Technical Specifications Initiative 5b)," July 8,2008, ADAMS Accession No. ML081980057.

3.

U.S. Nuclear Regulatory Commission, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," Regulatory Guide 1.174, JUly 1998, ADAMS Accession No. ML003740133.

4.

U.S. Nuclear Regulatory Commission, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications," Regulatory Guide 1.177, August 1998, ADAMS Accession No. ML003740176.

5.

U.S. Nuclear Regulatory Commission, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"

Regulatory Guide 1.200 for Trial Use, ADAMS Accession No. ML070240001.

- 18

6.

American Society of Mechanical Engineers, Addenda to ASME RA-S-2002 Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, RA-Sb-2005, December 2005.

7.

NEI 00-02, Revision 43, "Probabilistic Risk Assessment (PRA) Peer Review Process Guidance," 2000, ADAMS Accession No. ML003728023.

8.

NEI 04-10, "Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," Revision 1, April 2007, ADAMS Accession No. ML071360456.

9.

Ho K. Nieh, NRC, Letter to Bift Bradley, Nuclear Energy Institute, "Final Safety Evaluation For Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5B, "Risk-Informed Method For Control Of Surveillance Frequencies (TAC No. MD6111 )," September 19, 2007, ADAMS Accession No. ML072570267.

10.

Richard V. Guzman, NRC, Letter to Christopher M. Crane, Exelon Generation Company, LLC, "Limerick Generating Station, Units 1 and 2 - Issuance of Amendment Re:

Relocate Surveillance Test Intervals to Licensee-Controlled Program (TAC Nos.

MC3567 and MC3568)," September 28,2006, ADAMS Accession No. ML062420049.

11.

American National Standards Institute/American Nuclear Society, ANSI/ANS-58.23-2007, "Fire PRA Methodology," November 20,2007.

12.

Kassawara, R.P., September 30,2005, EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview, NUREG/CR-6850, ADAMS Accession No. ML052580075.

Principal Contributor: Andrew J. Howe, NRR/DRA Date: October 30,2008

'.. ML082410262

'SE input "See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/Lf, DRAIAPLAlBC OGC /JJ-O NRR/LPL4/BC NRR/LPL4/PM NAME AWang **

GLappert~ MRubin'

[. LJ,'lIi~"" MMarkley ft'rCA-,

AWanglrrCl\\.PJ 1,.1 DATE 9/12/08 10/27/08 v v

8/22/2008 I ()/2<<'/ t>Y to (30(0<6 (ol:Jo(08