Issuance of Amendment Nos. 206 and 207, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26
ML092120399
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/19/2009
From: Wang A
Plant Licensing Branch IV
To: Conway J
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME1223, TAC ME1224
Download: ML092120399 (14)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 19, 2009 Mr. John 1. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3, Mail Code 104/6/601 Avila Beach, CA 93424 SUB~IECT: DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENTS RE: ADOPTION OF TSTF- 511, REVISION 0, "ELIMINATE WORKING HOUR RESTRICTIONS FROM TS 5.2.2 TO SUPPORT COMPLIANCE WITH 10 CFR PART 26" (TAC NOS. ME1223 AND ME1224)

Dear Mr. Conway:

The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 206 to Facility Operating License No. DPR-80 and Amendment No. 207 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP),

respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated May 5, 2009.

The amendments revise the DCPP TS 5.2.2, "Unit Staff," to eliminate working hour restrictions in paragraph d of TS 5.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The request is consistent with the guidance contained in NRC-approved TS Task Force (TSTF) change traveler TSTF-511, Revision 0, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The availability of this TS improvement was announced in the Federal Register on December 30, 2008 (73 FR 79923), as part of the consolidated line item improvement process.

J. Conway -2 A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

Sincerely, W-t~ \JCL~

Alan Wang, Project Man. er Plant Licensing Branch I' Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. Amendment No. 206 to DPR-80
2. Amendment No. 207 to DPR-82
3. Safety Evaluation cc w/encls: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 206 License No. DPR-80

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated May 5,2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1

J. Conway -2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 206, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3. This license amendment is effective as of its date of issuance and shall be implemented by October 1, 2009.

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. DPR-80 and Technical Specifications Date of Issuance: August 19, 2009

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 207 License No. DPR-82

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Pacific Gas and Electric Company (the licensee), dated May 5,2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 2

-2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:

(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 207, are hereby incorporated in the license. Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3. This license amendment is effective as of its date of issuance and shall be implemented by October 1, 2009.

FOR THE NUCLEAR REGULATORY COMMISSION

~:f~

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. DPR-82 and Technical Specifications Date of Issuance: August 19, 2009

ATTACHMENT TO LICENSE AMENDMENT NO. 206 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 207 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Replace the following pages of the Facility Operating License Nos. DPR-80 and DPR-82, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Operating License Nos. DPR-80 and DPR-82 REMOVE INSERT

-3 -3 Technical Specifications REMOVE INSERT 5.0-3 5.0-3

-3 (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 206, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3) Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-Ioading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:

a. Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No. 206

-3 (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2) Technical Specifications (SSER 32, Section 8)* and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 207, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3) Initial Test Program (SSER 31, Section 4.4.1)

Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 207

Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued)

d. Not used.
e. The operations manager shall either hold a senior reactor operator license, have at one time held a senior reactor operator license for a pressurized water reactor, or be certified to a senior reactor operator equivalent level of knowledge. If the operations manager does not hold a senior reactor operator license, the person assigned to the Operations middle manager position shall hold a senior reactor operator license.
f. An individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. This position shall be manned in MODES 1, 2, 3, and 4 unless an individual with a SRO license meets the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

DIABLO CANYON - UNITS 1 & 2 5.0-3 Unit 1 - Amendment No. ~,~ 206 Unit 2 - Amendment No. ~. 445 207

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 206 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 207 TO FACILITY OPERATING LICENSE NO. DPR-82 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-275 AND 50-323

1.0 INTRODUCTION

By application dated May 5, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091320563), Pacific Gas and Electric Company (PG&E)(the licensee) requested changes to the Technical Specifications (TSs, Appendix A to Facility Operating License Nos. DPR-80 and DPR-82) for the Diablo Canyon Power Plant, Units 1 and 2 (DCPP).

The proposed amendment would revise TS 5.2.2, "Unit Staff." Specifically, the proposed changes would eliminate working hour restrictions in paragraph d of TS 5.2.2 to support compliance with Code of Federal Regulations Title 10 Part 26. The licensee stated that the application is consistent with U.S. Nuclear Regulatory Commission (NRC)-approved Revision 0 to TS Task Force (TSTF) change traveler TSTF-511, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The availability of this TS improvement was announced in the Federal Register on December 30, 2008 (73 FR 79923), as part of the consolidated line item improvement process.

2.0 REGULATORY EVALUATION

The history of NRC regulations pertaining to prevention of worker impairment is summarized in the Federal Register notice containing the final rule that amended 10 CFR Part 26 (73 FR 16966, March 31, 2008). Subpart I, "Managing Fatigue," of 10 CFR Part 26 provides the regulatory requirements for managing worker fatigue at nuclear power plants.

In Section 50.36, "Technical specifications," of 10 CFR, the Commission established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs are required to include items in the following five specific categories related to station operation:

(1) safety limits, limiting safety systems settings, and limiting control settings; (2) limiting Enclosure 3

-2 conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TSs. The administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.

The NRC's guidance for the format and content of licensee TSs can be found in NUREG-1430, Revision 3.0, "Standard Technical Specifications Babcock and Wilcox Plants," NUREG-1431, Revision 3.0, "Standard Technical Specifications Westinghouse Plants," NUREG-1432, Revision 3.0, "Standard Technical Specifications Combustion Engineering Plants," NUREG 1433, Revision 3.0, "Standard Technical Specifications General Electric Plants, BWRl4," and NUREG-1434, Revision 3.0, "Standard Technical Specifications General Electric Plants, BWRl6," referred to as the Standard Technical Specifications (STS). Paragraph d of Section 5.2.2 of the STS contains requirements for administrative procedures to limit the working hours of personnel who perform safety-related functions. This paragraph represents NRC's guidance on how licensee TS requirements should address work hour controls.

Licensees adhere to the guidance to varying degrees due to minor administrative differences and differences in each licensee's current licensing basis. The inconsistent level of adherence to NRC guidance has lead to inconsistent TS interpretation and implementation. This has also made it difficult for NRC to enforce the requirements.

The new requirements of 10 CFR Part 26, Subpart I supersede the guidance for requirements found in paragraph d of Section 5.2.2 of all STS. SUbpart I distinguishes between work hour controls and fatigue management and strengthens the requirements for both. Subpart I requires nuclear power plant licensees to ensure against worker fatigue adversely affecting public health and safety and the common defense and security by establishing clear and enforceable requirements for the management of worker fatigue. Licensees are required to implement Subpart I by October 1, 2009, as announced in the Final rule that revised 10 CFR Part 26 (73 FR 16966, March 31, 2008). TSTF-511, Revision 0, proposed a change to the STS that would delete Paragraph d of STS 5.2.2. This change was approved in Federal Register notice on December 30,2008 (73 FR 79923).

3.0 TECHNICAL EVALUATION

Controls on work hours for personnel at nuclear power plants are necessary to prevent worker fatigue from adversely affecting public health and safety and the common defense and security.

Work hour controls for DCPP are currently located in paragraph d of TS 5.2.2. When implemented, the regulatory requirements of 10 CFR Part 26, Subpart I replace the plant specific TS requirements found in paragraph d of DCPP's TSs.

The licensee proposed deleting paragraph d of TS 5.2.2. The licensee committed to implement the new requirements of 10 CFR Part 26, Subpart I concurrently with the deletion of the TS requirements on work hour controls. The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitment is best provided by the licensee's administrative processes, including its commitment management program (see NRC Regulatory Issue Summary 2000-017, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated

-3 September 21, 2000). The above regulatory commitments do not warrant the creation of regulatory requirements (items requiring prior NRC approval of subsequent changes).

The NRC staff evaluated the licensee's proposed change against the applicable regulatory requirements listed in Section 2.0 of this safety evaluation. The NRC staff also compared the proposed change to the change made to the STS by TSTF-511, Revision O. The NRC staff considered the licensee's commitment to implement 10 CFR Part 26, Subpart I concurrently with the deletion of TS work hour control requirements in its evaluation of the proposed change.

Given the licensee's commitment, there is reasonable assurance that the licensee will comply with the regulations for work hour controls, either through TS requirements or through the requirements of 10 CFR Part 26, Subpart I, at all times at DCPP. The proper adoption of TSTF-511, Revision 0, and implementation of 10 CFR Part 26, Subpart I by the licensee provides reasonable assurance that the licensee will maintain limits on the working hours of personnel who perform safety-related functions and the licensee will continue to prevent worker fatigue from adversely affecting public health and safety and thereby protect common defense and security. Therefore, the NRC staff concludes that the proposed change is acceptable.

4.0 REGULATORY COMMITMENT In its letter May 5, 2009, letter, the licensee stated that it will make the following regulatory commitment:

Removal of the plant-specific TS requirements will be performed concurrently with the implementation of the 10 CFR Part 26, Subpart I requirements.

The licensee committed to complete the above commitment no later than October 1, 2009. The NRC staff finds this commitment is acceptable.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change recordkeeping, reporting, or administrative procedures. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributors: Victor Cusumano Matt Hamm Date: August 19, 2009

J. Conway -2 A copy of the related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

Sincerely, Ira!

Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. Amendment No. 206 to DPR-80
2. Amendment No. 207 to DPR-82
3. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrLAJBurkhardt Resource LPLIV Reading RidsNrrPMDiabloCanyon Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource VCusumano, NRRIDIRS/ITSB RidsNrrDorlLpl4 Resource MHamm, NRRIDIRS/ITSB ADAMS Accession No. ML092120399 *SE memo dated OFFICE NRRlLPL4/PM NRRlLPL4/LA DIRS/ITSB/BC OGC NRRlLPL4/BC NRRlLPL4/PM MSmith (NLO MMarkley NAME AWang JBurkhardt RElliott* w/comments) (MThadnai for) AWang DATE 8/12/09 8/10109 7/28/09 8/14/09 8/18/09 8/19/09 OFFICIAL RECORD COpy