Letter Sequence Other |
---|
|
|
MONTHYEARML0518702642005-06-0606 June 2005 Request for Additional Information Technical Specification Change for Long-Term Stability Solution - Oscillation Power Range Monitor Instrumentation Project stage: RAI ML0601202242006-01-26026 January 2006 Issuance of Amendment for Addition of Oscillation Power Range Monitors to Technical Specifications Project stage: Approval ML0603302132006-01-26026 January 2006 Technical Specification Pages Re Addition of Oscillation Power Range Monitor Project stage: Other ML0603200722006-01-31031 January 2006 Technical Specifications, Revises Technical Specification 3/4/10.2, Special Test Exceptions - Physics Tests, to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours Project stage: Other ML0606107112006-02-15015 February 2006 Technical Specifications, OPRM Instrumentation, Addition of Oscillation Power Range Monitor Project stage: Other ML0603307022006-02-15015 February 2006 Correction Letter Addition of Oscillation Power Range Monitor Project stage: Other 2006-01-26
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] Category:Technical Specifications
MONTHYEARRS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21193A1302021-07-14014 July 2021 Correction to Amendment No. 238 Issued June 28, 2021, Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML18303A3132019-01-0303 January 2019 Issuance of Amendment 221 Regarding Revised Alternative Source Term Dose Calculation RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15251A5842015-12-18018 December 2015 Issuance of Amendment Concerning Revision to Integrated Leak Test Intervals (TAC No. MF5291)(RS-14-308) ML15280A2582015-10-22022 October 2015 Issuance of Amendment Related to One-Time Extension of Completion Time for Shutdown Service Water (TAC No. MF6705)(RS-15-264) RS-15-260, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-09-30030 September 2015 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time RS-15-246, Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-09-10010 September 2015 Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) RS-15-121, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-04-21021 April 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training RS-14-308, License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2014-11-17017 November 2014 License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process ML1122319432011-10-0404 October 2011 Issuance of License Amendment No. Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Values to Licensee Control RS-11-117, License Amendment Request to Modify Technical Specifications Section 3.8.1, AC Sources - Operating.2011-08-15015 August 2011 License Amendment Request to Modify Technical Specifications Section 3.8.1, AC Sources - Operating. RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies.2011-06-13013 June 2011 License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. ML1109702192011-05-0606 May 2011 Correction to Issuance of License Amendments Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a License-controlled Program RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing2010-10-28028 October 2010 License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing RS-10-148, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2010-10-0808 October 2010 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-10-131, License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System2010-09-23023 September 2010 License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System RS-10-039, License Amendment Request to Administratively Revise Technical Specifications2010-06-0404 June 2010 License Amendment Request to Administratively Revise Technical Specifications RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B2010-05-21021 May 2010 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML1002000052010-01-15015 January 2010 License Amendment, Modify CPS License Condition 2.B.(6) and Create New License Conditions 1.J, 2.B.(7) and 2.C.(25) as Part of a Pilot Program to Irradiate Cobalt (Co)-59 Target to Produce Co-60 RS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-06-26026 June 2009 License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies ML0907108682009-04-0202 April 2009 Licensed Amendment, Adopted TSTF-2, Relocate the 10-year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML0829400102008-10-30030 October 2008 Issuance of Amendment Technical Specification Change as Part of Implementation of TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil ML0826103082008-09-12012 September 2008 Tech Spec Pages for Amendment 181 License Amendment to Increase the Interval Between Local Power Range Monitor ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0819601482008-06-30030 June 2008 Tech Spec Page for Amendment 179 Regarding TS Changes Related to Surveillance Frequency for Scram Discharge Volume Water Level Float Switch RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0731003892007-10-31031 October 2007 Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. RS-07-133, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2007-09-27027 September 2007 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0718704782007-07-0505 July 2007 Technical Specifications, Clipp, Revised Control Rod Scram Time Testing 2023-08-30
[Table view] |
Text
applicable, but should include an uncertainty treatment that accounts for the number of failed sensors permitted by the TSs of the plant's applicant.
The licensee stated that the methodology as described in NEDO-324165-A was followed for the PBDA including the analysis of sensor failure in the CPRM system, the cycle-specific analysis for the applicability of the scram setpoints, and the OPRM system operability. This is acceptable because the procedures specified in the approved methodology are used.
(c) Implementation of Option IlIl will require that the selected bypass region outside of which the detect and suppress action is deactivated be defined in the TSs.
The licensee confirmed that this region is included in surveillance requirement (SR) 3.3.1.3.5. The exclusion region methodology (safety analyses contained in NEDO-31960) would define a curved region on the power to flow operating map cutting across the corner of the map near the intersection of the natural circulation line and the highest flow control line. The staff finds this acceptable because the proposed exclusion region in conjunction with SR 3.3.1.'3.5 is consistent with the boundaries discussed in NEDO-32465-A, Section 2.2.
(d) If the algorithms detect oscillations, an automatic protective action should be initiated. This action may be a full scram or a selected rod insert (SRI).
The licensee confirmed that the automatic protective action of the OPRRMs at CPS will be a full reactor scramri, rather than an SRI. The staff finds this acceptable because the action is in compliance with GDCs 10 and 12.
(e) The LPRM groupings defined in NEDO-31960-A to provide input to Option IlIl algorithms are acceptable for the intended oscillation detection function. These LPRM groupings are the oscillation power range monitor for Option III.
The licensee stated that the LPRM assignments in Appendix D of NEDO-32465-A are identified as examples of the expected LPRM assignments that a licensee may choose without identifying the configuration which is used at CPS. The staff has reviewed the licensee's description and finds it acceptable because the configuration chosen is provided as one of the examples in NEDO-32465-A and NEDO-31960-A. However, the final configuration should be documented.
The staff finds that the licensee has adequately demonstrated the applicability of the topical reports by addressing the actions identified in the staff's SERs approving the topical reports.
- 3. Provide a plant-specific TS for the OPRM functions consistent with CENPD-400-P, Appendix A.
In its submittal, the licensee stated that the proposed TS is consistent with CENPD-400-P, Appendix A, except for the following deviations:
(a) A new TS for the OPRM instrumentation, which includes the limiting condition for operation (LCO), Applicability, Actions and SRs necessary to define the operability of the OPRM channels, and the actions that must be taken by the plant operators when the instruments become inoperable. TS Sectibn 3.3.1.3 requires four channels of the OPRM instrumentation to be operable when reactor power is 21.6 percent RTP. In addition, a note was added in the ACTIONS section which states that "Separate Condition entry is allowed for each channel."
(b) LCOs A, B and C have been added which are consistent with the referenced topical reports.
(c) SRs 3.3.1.3.1 through 3.3.1.3.6 have been added. There are some deviations from the referenced topical reports which are addressed in Section 3.2 of this safety evaluation. A note is added which states that "When a channel is placed in an inoperable status solely for performance of required Surveillance, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the OPRM maintains trip capability." Also, a statement is added to SR 3.3.1.3.3 to state that the setpoints for the trip function are specified in the COLR.
(d) Pages B 3.3-39a through B 3.3-39k have been added to provide the Bases for TS Section 3.3.1.3.
(2) Revise TS Section 3.4.1, "Recirculation Loop Operating" The licensee proposed to delete Figure 3.4.1-1, "Power versus Flow," and associated references to the figure from the LCO 3.4.1, Actions B, C, D, and F, and SR 3.4.1.2, to revise/renumber Actions E and G, and to add new Condition C with associated Action C1.
The staff has reviewed the proposed changes and finds them acceptable because the manual operator actions specified in TS LCO 3.4.1 (and its associated Conditions B, C, D, and F; Actions B.1, C.1, D.1, F.1, G.1, and G.2; and SR 3.4.1.2) are no longer in use due to the automatic functions provided by the OPRM.
(3) Revise TS Section 5.6.5, "Core Operal:ing Limits Report (COLR)"
The licensee proposed to add: (1) a new TS 5.6.5.a.5 "Oscillation Power Range Monitor (OPRM) Instrumentation;" and (2) a reference was added in TS 5.6.5.b. which is NEDO 32465, "BWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications."
The staff has reviewed the proposed changes and finds them acceptable because NEDO-32465 is an approved licensing topical report to support the new proposed TS 3.3.1.3 for determining the setpoint values of the applicable operating limits for OPRMs in the COLR.
OPRM Instrumentation 3.3.1.3 3.3 INSTRUMENTATION 3.3.1.3 Oscillation Power Range Moritor (OPRM) Instrumentation LCO 3.3.1.3 Four channels of thme OPRM instrumentation shall be OPERABLE within the limits specified in the COLR.
APPLICABILITY: THERMAL POWER > 21.6% RTP.
ACTIONS Separate Condition entry is allowed for each channel.
____-- _ - _ _ - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ -. I- - - - - - - - -
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in 30 days channels inoperable. trip.
OR A.2 Place associated RPS 30 days:
trip system in trip.
OR A.3 Initiate alternate 30 days method to detect and suppress thermal hydraulic instability oscillations.
B. OPRM trip capability B.1 Initiate alternate 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> not maintained. method to detect and suppress thermal hydraulic instability oscillations AND B.2 Restore OPRM trip 120 days capability.
C. Required Action and C.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion < 21.6W RTP.
Time not met.
CLINTON 3 .3-14a Amendment No.171
OPRM Instrumentation 3.3.1.3 SURVEILLANCE REQUIREMENTS
NOTE-----------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the OPRM maintains trip capability.
SURVEILLaNE FREQUENCY SR 3.3.1.3.1 Perform CHANNEL FUNCTIONAL TEST. 184 days SR 3.3.1.3.2 Calibrate the local power range monitors. 1000 MWD/T average core exposure SR 3.3.1.3.3 ------------------- NOTE--------------------
Neutron detectors are excluded.
Perform CHANNEL CALIBRATION. The setpoints 24 months for the trip function shall be as specified in the COLR.
SR 3.3.1.3.4 Perform LOGIC sys'rEM FUNCTIONAL TEST. 24 months SR 3.3.1.3.5 Verify OPRM is nol bypassed when THERMAL 24 months POWER is Ž 25t RTP and recirculation drive flow is < the value corresponding to 60% of rated core flow.
SR 3.3.1.3.6 ------------------- NOTE--------------------
Neutron detectors are excluded.
Verify the RPS RESPONSE TIME is within 24 months on a limits. STAGGERED TEST BASIS CLINTON 3.3-14b Amendment No. 171
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. LCO 3.2.1, Average Planar Linear Heat Generation Rate (APLHGR),
- 2. LCO 3.2.2, Minimum Critical Power Ratio (MCPR),
- 3. LCO 3.2.3, Linear Heat Generation Rate (LHGR),
- 4. LCO 3.3.1.1, RlPS Instrumentation (SR 3.3.1.1.14), and
- 5. LCO 3.3.1.3, Oscillation Power Range Monitor (OPRM)
Instrumentation.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in (1) General Electric Standard Application for Reactor Fuel (GESTAR), NEDE-24011-P-A, or (2) NEDO-32465, "EBWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology and Reload Applications."
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
(continued)
CLINTON !,.0-18 AmendmEnt No. 171