Letter Sequence RAI |
---|
|
|
MONTHYEARML0518702642005-06-0606 June 2005 Request for Additional Information Technical Specification Change for Long-Term Stability Solution - Oscillation Power Range Monitor Instrumentation Project stage: RAI ML0601202242006-01-26026 January 2006 Issuance of Amendment for Addition of Oscillation Power Range Monitors to Technical Specifications Project stage: Approval ML0603302132006-01-26026 January 2006 Technical Specification Pages Re Addition of Oscillation Power Range Monitor Project stage: Other ML0603200722006-01-31031 January 2006 Technical Specifications, Revises Technical Specification 3/4/10.2, Special Test Exceptions - Physics Tests, to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours Project stage: Other ML0606107112006-02-15015 February 2006 Technical Specifications, OPRM Instrumentation, Addition of Oscillation Power Range Monitor Project stage: Other ML0603307022006-02-15015 February 2006 Correction Letter Addition of Oscillation Power Range Monitor Project stage: Other 2006-01-26
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22312A5362022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 ML22255A1402022-09-12012 September 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21204A0152021-07-23023 July 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2021004 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21026A0582021-01-25025 January 2021 Notification of NRC Supplemental Inspection (95001) and Request for Information ML20315A0642020-11-0909 November 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000461/2021010 ML20307A6592020-10-27027 October 2020 NRR E-mail Capture - Request for Additional Information Regarding TSTF-505 and 50.69 Applications ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20128J8642020-05-0707 May 2020 NRR E-mail Capture - Preliminary RAIs for Clinton Load Tap Changer License Amendment Request ML20105A1082020-04-14014 April 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-01 ML20091F7892020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-05 ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18225A2882018-08-13013 August 2018 Ltr. 08/13/18 Clinton Power Station - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000461/2018011 (DRS-B.Jose) ML18214A4452018-08-0202 August 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18193A9732018-07-12012 July 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17276B7632017-10-0303 October 2017 NRR E-mail Capture - Clinton Power Station - Request for Additional Information Regarding License Amendment Request Related to Reactor Pressure Vessel Water Inventory Control ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17125A3212017-05-0202 May 2017 NRR E-mail Capture - Clinton Power Station, Unit 1 - Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing ML16356A0422016-12-20020 December 2016 Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000461/2017008 (Dxs) ML16130A6642016-05-11011 May 2016 Request for Additional Information Related to Incorporation of Revised Alternative Source Term (CAC No. MF7336)(RS-16-019) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15106A9282015-04-24024 April 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment ML15068A4212015-04-16016 April 2015 Request for Additional Information Regarding Relief Request 13R-11 ML15062A6482015-03-24024 March 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment ML15055A5942015-02-24024 February 2015 ISI RFI ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13134A0932013-06-0707 June 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation 2023-09-21
[Table view] |
Text
July 6, 2005 Mr. Christopher M. Crane, President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: TECHNICAL SPECIFICATION CHANGE FOR LONG-TERM STABILITY SOLUTION - OSCILLATION POWER RANGE MONITOR INSTRUMENTATION (TAC NO. MC6551)
Dear Mr. Crane:
By letter dated April 1, 2005, AmerGen Energy Company, LLC, submitted an application to amend the Technical Specifications (TSs) to add TS 3.3.1.3, "Oscillation Power Range Monitor (OPRM) Instrumentation", and to revise both TS 3.4.1, "Recirculation Loops Operating," and TS 5.6.5, "Core Operating Limits Report (COLR)."
Based on our review of your submittal, the U.S. Nuclear Regulatory Commission staff finds that a response to the enclosed request for additional information is needed before we can complete the review. This request for additional information was previously forwarded to your staff; and on July 5, 2005, it was discussed with them. Your staff agreed that a response would be provided by August 15, 2005.
If you have any comments or questions, please contact the Clinton Project Manager, Kahtan Jabbour, at (301) 415-1496.
Sincerely,
/RA/
Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
As stated cc: See next page
Clinton Power Station, Unit 1 cc:
Senior Vice President - Nuclear Services Clinton Power Station Plant Manager AmerGen Energy Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Clinton Power Station Warrenville, IL 60555 RR 3, Box 228 Clinton, IL 61727-9351 Vice President of Operations - Mid-West Boiling Water Reactors Resident Inspector AmerGen Energy Company, LLC U.S. Nuclear Regulatory Commission 4300 Winfield Road RR #3, Box 229A Warrenville, IL 60555 Clinton, IL 61727 Vice President - Licensing and Chief Operating Officer Regulatory Affairs AmerGen Energy Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road 4300 Winfield Road Warrenville, IL 60555 Warrenville, IL 60555 Regional Administrator, Region III Manager Licensing - Dresden, Quad Cities, U.S. Nuclear Regulatory Commission and Clinton 801 Warrenville Road AmerGen Energy Company, LLC Lisle, IL 60532-4351 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel AmerGen Energy Company, LLC Regulatory Assurance Manager - Clinton 4300 Winfield Road AmerGen Energy Company, LLC Warrenville, IL 60555 Clinton Power Station RR3, Box 228 R. T. Hill Clinton, IL 61727-9351 Licensing Services Manager General Electric Company Director - Licensing and Regulatory Affairs 175 Curtner Avenue, M/C 481 AmerGen Energy Company, LLC San Jose, CA 95125 4300 Winfield Road Warrenville, IL 60555 Chairman of DeWitt County c/o County Clerks Office Document Control Desk-Licensing DeWitt County Courthouse AmerGen Energy Company, LLC Clinton, IL 61727 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351
Clinton Power Station, Unit 1 cc:
J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109
ML051870264 OFFICE PM:PD3-2 LA:PD3-2 SC:EEIB SC:SRXB SC:PD3-2 NAME KJabbour PCoates AHowe FAkstulewicz GSuh DATE 7/5/05 7/5/05 7/5/05 7/5/05 7/6/05 REQUEST FOR ADDITIONAL INFORMATION OSCILLATION POWER RANGE MONITOR INSTRUMENTATION AMERGEN ENERGY COMPANY, LLC CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461
- 1. The NRC-approved topical report NEDO-32465-A, "BWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," dated August 1996, is a generic approval for the delta critical power ratio/initial critical power ratio vs. oscillation magnitude (DIVOM) correlation. Please provide a detailed description of the methodology for calculating the plant-specific DIVOM correlation and identify the NRC-approved methodologies used to calculate the Oscillation Power Range Monitor (OPRM) setpoints in Technical Specification (TS) 3.3.1.3.
- 2. Please provide a detailed description of the implementation status of the OPRM system including the detailed procedures to finalize system calibration and trip setpoints based on the approach discussed in NEDO-32465-A, or an approach utilizing the plant-specific data. Please provide justification why the OPRM system which was installed in the spring of 1999 is not currently armed.
- 3. Please provide detailed results of the system tests that support the accuracy and operability of the current OPRM instrumentation. Specifically, please include the available data obtained during shutdowns and subsequent startups from outages since the OPRM system was installed in 1999.
- 4. According to the BWROG [Boiling Water Reactor Owners Group] letter, BWROG-03048 dated September 30, 2003, "Utility Commitment to NRC for OPRM Operability at Option III Plants," plant-specific DIVOM curve is recommended. Please identify any plant-specific differences from the generic values specified in NEDO-32465-A, such as the period based detection algorithm (PBDA) confirmation setpoints in Table 3-1, PBDA trip setpoints in Table 3-2, and generic DIVOM curve slope. Also, provide plant-specific values for OPRM scram setpoints and the DIVOM correlation for the next cycle.
- 5. Please provide a detailed description of the procedure used to generate the OPRM's Period Based Algorithm Allowable Values and Confirmation Counts for future cycles.
Please discuss the rationale used to relocate the allowable values to the core operating limits report (COLR).
- 6. Surveillance Requirement (SR) 3.3.1.3.2 states that the setpoints for the trip function shall be as specified in the COLR. Please identify the specific setpoints and provide justification why "LCO 3.3.1.3 Four channels of the OPRM instrumentation shall be Operable" does not include the phrase "within the limits as specified in the COLR."
Enclosure
- 7. Please provide a detailed description of the alternate method to detect and suppress thermal-hydraulic instability oscillation stated in TS LCO 3.3.1.3, Actions A.3 and B.1.
Please include the calculation methodology used to define the regions of exclusion, exit, and controlled entry on the power-to-flow map.
- 8. Please discuss the rationale for the different thermal power values stated in the applicability section of LCO 3.3.1.3 (i.e., 21.6 percent) and in SR 3.3.1.3.4 (i.e., 25 percent). Also, please provide the technical basis for the completion time of 120 days in LCO 3.3.1.3 B.2. The staff notes that related information is discussed in CENPD-400-P-A, Rev. 1, "Generic Topical Report for the ABB Option III Oscillation Power Range Monitor (OPRM)," dated May 1995.
- 9. Since the OPRM system was in test mode before the trip output will be activated, please describe the lessons learned during the testing period of the system. Please include any changes that were necessary in order to avoid any spurious scrams at Clinton Power Station, Unit 1, and whether the deviations from the NRC approved methodology, if any, were conservative.
- 10. Page 9 of Attachment 1 states that there are no allowable values associated with the OPRM upscale trip function. Please discuss how the operability of the OPRM upscale function is determined in the absence of the allowable values. If some other value has been used by the procedure, then please discuss how this value meets the requirements of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36(c)(1)(ii)(A).
- 11. In order to ensure that the proposed OPRM trip will perform its intended design function, the equipment should be qualified for all environmental conditions where it is installed, as required by General Design Criterion 4, Appendix A to 10 CFR Part 50. Please confirm that the OPRM equipment at Clinton has been qualified for electromagnetic interference (EMI) and radio frequency interference (RFI) based on either the worst case EMI/RFI levels at its installed location or using the generic levels identified in the Electric Power Research Institutes Report, TR-102323, Guidelines for Electromagnetic Interference Testing in Power Plants, and Regulatory Guide 1.180, Guidelines for Evaluating Electromagnetic and Radio Frequency Interference in Safety-Related Instrumentation and Control Systems, dated October 2003.
- 12. Page 8 of Attachment 1 states that the calibration of the Low Power Range Monitors (LPRMs) is included in SR 3.3.1.1.8 for the Average Power Range Monitors (APRMs).
Therefore, it is not listed in the SR for OPRM. However, listing the SR in OPRM assures that the inoperability of LPRMs will be taken into account for OPRM also, instead of relying on the technician to take appropriate corrective actions. The improved TSs were developed on this basis and should be followed. Please discuss how you intend to address this concern.