Correction to Amendment No. 238 Issued June 28, 2021, Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B
ML21193A130
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/14/2021
From: Joel Wiebe
Plant Licensing Branch III
To: Rhoades D
Exelon Generation Co
Wiebe J
References
EPID L-2020-LLA-0097
Download: ML21193A130 (6)


Text

July 14, 2021 Mr. David P. Rhoades Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT NO. 1 - CORRECTION TO AMENDMENT NO. 238 ISSUED JUNE 28, 2021, RE: TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-505, REVISION 2, PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B (EPID L-2020-LLA-0097)

Dear Mr. Rhoades:

By letter dated June 28, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21132A288), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 238 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1. The amendment was in response to your application dated April 30, 2020 (ADAMS Accession No. ML20121A178) as supplemented by letters dated November 24, 2020 (ADAMS Accession No. ML20329A433) and March 23, 2021 (ADAMS Accession No. ML21082A268).

Subsequent to issuance of the amendment, your staff informed me that there were unintended characters on issued technical specification (TS) page 3.5-12 and an unintended underscore on issued TS page 3.3-2. The attached TS pages correct these unintended changes. These corrections do not change any of the conclusions in the safety evaluation associated with the issuance of the amendment.

D. Rhoades If you have any questions, please contact me at 301-415-6606 or Joel.Wiebe@nrc.gov.

Sincerely,

/RA/

Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

Corrected TS pages cc: Listserv

ENCLOSURE CLINTON POWER STATION, UNIT NO. 1 CORRECTED TS PAGES FOR AMENDMENT NO. 238

RPS Instrumentation 3.3.1.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Enter the Condition Immediately associated referenced in Completion Time of Table 3.3.1.1-1 for Condition A, B, or C the channel.

not met.

E. As required by E.1 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Required Action D.1 to < 33.3% RTP.

and referenced in Table 3.3.1.1-1.

F. As required by F.1 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Required Action D.1 to < 21.6% RTP.

and referenced in Table 3.3.1.1-1.

G. As required by G.1 Be in MODE 2. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Required Action D.1 and referenced in Table 3.3.1.1-1.

H. As required by H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action D.1 and referenced in Table 3.3.1.1-1.

I. As required by I.1 Initiate action to Immediately Required Action D.1 fully insert all and referenced in insertable control Table 3.3.1.1-1. rods in core cells containing one or more fuel assemblies.

CLINTON 3.3-2 Amendment No. 238

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)

WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS


NOTE-------------------------------------

LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. administrative means High Pressure Core Spray System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

OR In accordance with the Risk Informed Completion Time Program B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to 150 psig.

CLINTON 3.5-12 Amendment No. 238

ML21193A130 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NAME JWiebe SRohrer NSalgado DATE 7/13/21 7/13/21 7/14/21 OFFICE NRR/DORL/LPL3/PM NAME JWiebe DATE 7/14/21