Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

During single controlrod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

U SURVEILLANCE FREQUENCY

+

SR 3.1.4.1 Verify each control rod scram time is within Prior to the limits of Table 3.1.4-1 with reactor exceeding steam dome pressure Ž 950 psig. 40% RTP after fuel movement within the reactor pressure vessel AND Prior to exceeding 40% RTP after each reactor shutdown

Ž 120 days SR 3.1.4.2 Verify, for a representative sample, each tested control rod scram time is within the 200 days cumulative I

limits of Table 3.1.4-1 with reactor steam operation in dome pressure Ž 950 psig. MODE 1 SR 3.1.4.3 Verify each affected control rod scram time Prior to is within the limits of Table 3.1.4-1 with declaring any reactor steam dome pressure. control rod OPERABLE after work on control rod or CRD System that could affect scram time (continued)

CLINTON 3.1-12 Amendment No. 177