Tech Spec Pages for Amendment 181 License Amendment to Increase the Interval Between Local Power Range Monitor
ML082610308
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/12/2008
From:
Plant Licensing Branch III
To:
Sands S,NRR/DORL, 415-3154
Shared Package
ML082180847 List:
References
TAC MD3795
Download: ML082610308 (3)


Text

(4) AmerGen Energy Company, LLC, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) AmerGen Energy Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) AmerGen Energy Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level AmerGen Energy Company, LLC is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix.A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 181 ; are hereby incorporated into this license.

AmerGen Energy Company, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 181

RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.1.5 Perform CHANNEL FUNCTIONAL TEST. 7 days SR 3.3.1.1.6 Verify the source range monitor (SRM) and Prior to intermediate range monitor (IRM) channels withdrawing overlap. SRMs from the fully inserted position SR 3.3.1.1.7 ----------------- NOTE ----------.--------

Only required to be met during entry into MODE 2 from MODE 1.

Verify the IRM and APRM channels overlap. 7 days SR 3.3.1.1.8 Calibrate the local power range monitors. 2000 MWD/T average core exposure SR 3.3.1.1.9 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.1.1.10 Calibrate the analog trip module. 92 days (continued)

CLINTON 3.3-4 Amendment No. 181

OPRM Instrumentation 3.3.1.3 SURVEILLANCE REQUIREMENTS


t.------------------NOTE -----------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the OPRM maintains trip capability.

SURVEILLANCE FREQUENCY SR 3.3.1.3.1 Perform CHANNEL FUNCTIONAL TEST. 184 days SR 3.3.1.3.2 Calibrate the local power range monitors. 2000 MWD/T average core exposure SR 3.3.1.3.3 --------- NOTE--------------------

Neutron detectors are excluded.

Perform CHANNEL CALIBRATION. The setpoints 24 months for the trip function shall be as specified in the COLR.

SR 3.3.1.3.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months SR 3.3.1.3.5 Verify OPRM is not bypassed when THERMAL 24,months POWER is Ž 25% RTP and recirculation drive flow is

  • the value corresponding to 60% of rated core flow.

SR 3.3.1.3.6 ------------------- NOTE--------------------

Neutron detectors are excluded.

Verify the RPS RESPONSE TIME is within 24 months on a limits. STAGGERED TEST BASIS CLINTON 3 .3-14b Amendment No. 181