Drawing M526-2, Rev 1, Flow Diagram Fuel Pool Cooling and Clean-up System.
ML053270128
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/20/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M526-2, Rev 1
Download: ML053270128 (1)


Text

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 NOTES:

EL. 507'-0" FOR NOTES SEE DWG. M526-1 1"SA(1)-1 CONT. FROM DWG.

M510-3 (C/3)

DETAIL "A" NOTE 1 1/2"FPC(29)-1-3 (DOME DRAIN)

K 6" 2"

1" K (1/2"FPC(29)-1-4)

(EFFLUENT & BACKWASH IN) 2"FPC(29)-1-1 (VENT)

SA-F-5 1/2"FPC(32)-1-9 FUEL POOL 1/2"FPC(32)-1-1 1/2"FPC(32)-1-3 FILTER (2"FPC(29)-1-2)

FUEL POOL F/D CELL DEMINERALIZER FILTER 1/2"x1/4" FPC-DM-1A DEMINERALIZER RED (TYP.)

(1/2"FPC(32)-1-10) (1/2"FPC(32)-1-2) (1/2"FPC(32)-1-4)

FPC-DM-1B SA-V-710 1/4"TYP.

FI FE 201 1/2"FPC(32)-1-7 SA 201 (1/2"FPC(32)-1-8) LEGEND:

SA SA-V-709 6" 1. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) 1/2"FPC(32)-1-5 6" SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE (1/2"FPC(32)-1-6)

EL. 487'-0" EXCEPT AS NOTED.

J SA-V-706 RMS DPS AH RMS NOTE: ALL PIPING, INSTRUMENTATION,

2. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) J PI (1/2"FPC(32)-1-2)

RMS SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.

(6"FPC(3)-1-2) 13A ETC. SHOWN AT FPC-DM-1A IS IDENTICAL 1/2"FPC(32)-1-1 6"FPC(3)-1-3 201 FPC (6"FPC(27)-1-2)

FPC-SPV-7A FOR FPC-DM-1B EXCEPT FOR SUFFIX LETTER.

6"FPC(27)-1-1 (PRECOAT FEED, INFLUENT IN)

FPC-V-12A SA C PI TO C UNIQUE LINE NUMBERS IN PARENTHESIS 3. ALL VALVES SUFFIXED WITH A (TH) DENOTE A FPC-SPV-12A IDENTIFY PIPING IN THE FPC `B' DEMINERALIZER. THROTTLED VALVE.

C 13B DPT/13B PI FPC FPC-SPV-13A (H/4)

FPC-1 380 TRAP BACK WASH O SA-V-48 CF COND. SUPPLY C O DPR O FPC-V-7A AO 4"COND(29)-1 C 13 C CF-V-715 DWG. M527-2 (H/6)

FPC-1 12A AO FPC FPC SA-1 13A 1"CF(85)-1 FPC PI FPC 3/4"FPC(60)-1-21 AO NOTE 1 FPC-V-13A 13A (3/4"FPC(60)-1-22) 7A RESIN EDUCTOR 1"SA(1)-1 PI PI FPC PVR-1 3/4"CF(85)-1 15 TO FPC-DM-1B FPC-SPV-9A 13A1G 13A2G RMS SA-1 FPC-1 FPC NOTE COND-V-538 CF-ED-1 CF-V-123 PI 3/4"FPC(60)-1-27 DPT FPC FPC-V-712A CF-1 COND-1 CF-SPV-114 PI 13A 303 3/4"FPC(53)-1-4 TO WASTE COLLECTOR (3/4"FPC(60)-1-28) FPC-V-713A 4"FPC(24)-1-2 RMS COND FPC 381 TANK EDR-TK-2 CF-V-716 3/4"COND(29)-1 COND-V-783 CF CF DWG. M532 (E/9) 2"FPC(2)-1-7 FPC-V-605(V)

CF-V-114 H 1"SA (1)-1 (BACKWASH AIR)

FPC-1 H

FPC-RV-21A CONT. TO FPC-DM-1B EDR-1 (2"FPC(2)-1-8) O AO 114 C (K/4) 3/4"CF(85)-1 3"EDR(54)-1 3"EDR(54)-1 FROM AO (6"FPC(2)-1-6)

RMS FPC-RV-21B FUEL 6"FPC(27)-1-1 6"FPC(2)-1-5 BUILDING COND-1 FPC-1 9A 1"COND(29)-1 FPC-V-604(V)

BUILDING FPC POOL (BACKWASH OUT)

COND-V-539 3"FPC(28)-1-1 3/4"FPC(53)-1-3 (3"FPC(28)-1-2) HOLDING CF-MX-17 FPC-V-25B (3/4"FPC(53)-1-4) FPC-V-9A 4"FPC(24)-1-1 PUMP 3"FPC(23)-1-1 RADWASTE (3"FPC(23)-1-2)

REACTOR FPC-P-2A PVR-1 FPC-1 3/4" FPC-V-25A (4"FPC(24)-1-2) FPC-V-37A FPC-V-60A FPC-V-14A 2" NOTE 15 4"COND(29)-1 FPC-V-35A RMS AO O 3/4"FPC(60)-1-31 3/4"FPC(60)-1-29 F.C.

3/4"FPC(60)-1-37 3/4"FPC(60)-1-35 3/4"FPC(60)-1-33 C

RESIN TANK 462 (3/4"FPC(60)-1-38)

COND-V-462 COND COND-SPV-462 AO CF-TK-17 4"COND(29)-1 (3/4"FPC(59)-1-2) 1/4" 3/4"FPC(59)-1-1 O 14A FPC-V-714A FPC C

4"COND(29)-1 2"COND(10)-1 (3/4"FPC(60)-1-32) (3/4"FPC(60)-1-30)

FPC-SPV-14A (3/4"FPC(60)-1-36) (3/4"FPC(60)-1-34)

G G COND AH COND-V-781 1 1/2" FT FI FPC-V-168A (2"FPC(40)-1-2)

FE DRAIN (6"FPC(31)-1-2)

DPIS 2"FPC(40)-1-1 DR.

303 303 FPC-V-170A 6"FPC(31)-1-1 303 RMS FPC-V-725A FPC-V-726A 6"FPC(3)-1-3 14A (6"FPC(3)-1-2)

DRAIN COND COND FPC-V-728A FPC FPC-V-727A COND-V-782 BEDPLATE (COND. BACKWASH SUPPLY & PRECOAT RET.)

BACKWASH FPC-SPV-6A 1"COND(29)-1 CASING RMS FPC-V-715A O C CF-V-113 FPC FPC-1 PX PX TRAP RMS (3/4"FPC(60)-1-40)

PI PS 16A2 16A1 AO 6A RM 3/4"FPC(60)-1-39 FPC-V-6A 16A 16A FPC FPC FPC-V-10A FPC COND-V-540 (BACKWASH OUT)

FPC-ST-11A 2"FPC(33)-1-3 MWR-1 AGITATOR AO (3"FPC(33)-1-2)

CF-MX-5 DUST (2"FPC(33)-1-4) RMS 3"FPC(33)-1-1 542 COND COND-SPV-542 AH2 EVACUATOR O RM RMS COND-V-542 C DEACTIVATED 2"MWR(40)-1 (CHEMICAL CLEANING SUPPLY)

CF-EX-5 SEE NOTE 19 FPC-1 MWR-1 F FPC-V-43A CHEM. CLEANING F

LS 1" 15 RM DWG. M534 (E/2) 2"CF(10)-1 304 CF-V-752 3"x2" RED 2"MWR(38)-1 (CHEM. CLEANING RETURN)

NOTE CF COND-1 CF-1 FPC-V-26A AL FPC-V-79A NOTE 1 AL O FPC-1 6" 2"FPC(26)-1-1 FS C 3/4"CF(85)-1 4"CF(52)-1 (OVERFLOW) 1 1/2"CF(50)-1 INACTIVATED NOTE 15 15A (2"FPC(26)-1-2) 3/4"FPC(60)-1-23 FPC-V-11A FQ FUEL POOL SP FPC (3/4"FPC(60)-1-24) FPC CF-1 15A PRECOAT TANK 72 FPC AO S

CF-TK-5 AO 11A FPC-V-716A 111 FPC PI FT CF CF-V-721 FE AO 3"FPC(33)-1 301 4"CF(10)-1 FIC 15A 15A FPC-V-8A CF 8A 15A FPC FPC-SPV-11A 4" RMS CF-V-7 CF-V-118 1" CF-FCV-111 FPC FPC FPC-V-717A 15 (DOME DRAIN)

O NOTE C

2" DRAIN 3/4"FPC(60)-1-25 RMS E FPC-SPV-8A E

6"FPC(3)-1-3 (6"FPC(21)-1-2)

ED SEE FIG. 1 RMS (3/4"FPC(60)-1-26) 6"FPC(21)-1-1 CF-V-117 ZONE (D/2)

(2"FPC(22)-1-2)

DWG. M540 6" SP 2"FPC(22)-1-1 A

O 25A 2" S C

6"CF(11)-1 FPC-V-166A 6"CF(12)-1 CF-SPV-117 6" CF-V-109 CF-V-301(V) 2"CF(59)-1 CF-V-100 6"FPC(27)-1 2"PVR(9)-1 AO PX FPC-FCV-15A RMS 117 301A PI CF CF-V-717 CF-SPV-111/1 2"CF(50)-1 CF 302 3/4"FPC(58)-1-3 CF-V-105 FPC-SPV-15A CONT ON DWG PX RMS CF (3/4"FPC(58)-1-2)

FPC-SPV-36B TRAP BACK M531 (D/8)

CF-1 RMS 301B RMS CF-V-719 6"CF(10)-1 8"COND(71)-1S CF-V-718 WASH OUT (PRECOAT FEED)

CF CONT. ON DWG.

4" 6" FPC-V-53A M527-1 (G/2)

(INFLUENT)

RMS 15 MWR-1 1/2" 3/8" CF-V-110 CF-V-106 NOTE 1/2" FUEL POOL FPC-SPV-53A CF-PCV-111/1 RMS FPC-1 O

CF-V-632 PRECOAT PUMP C C AO SAS COND-1S BEDPLATE DRAIN FPC-SPV-148 CF-P-5 O AO 53A 15 4"CF(10)-1 D FPC D

MWR-1 148 6"FPC-V-148 FPC CF-V-177 CF-V-698 3/4"CF(59)-1 AO NOTE 6"CF(12)-1 FPC-1 RMS FPC-SPV-36A 6"FPC(2)-1 CF-1 COND-1 36B 2"MWR(59)-1 FPC CF-FCV-111 CF-SPV-111/2 CF-PCV-111/2 FPC-V-138 6"FPC(3)-1-3 TO CHEM. WASTE TANK O AO CONT. ON DWG.

C 8"FPC(20)-1-1 1/2"COND(29)-1 O 36A M533-1 (G/8) (NOTE 1) 6"FPC(21)-1-2 FPC FIG. 1 PUMP SEAL C 6"CF(10)-1 (COND. BACKWASH SUPPLY DWG. M527-2 (H/7) ZONE (E/11)

FPC-V-36A (PRECOAT RETURN) & PRECOAT RETURN) FPC-V-36B ED CF-1 FPC-1 DWG. M540 FPC-1 CF-1 8"FPC(3)-1-3 8"FPC(3)-1-3 (EFFLUENT) 8"FPC(3)-1-3 (EFFLUENT) 6"FPC(3)-1-2 (EFFLUENT)

CONT. ON DWG.

M526-1 (C/4)

CF-V-302(V) 6"CF(12)-1 (PRECOAT FEED)

C C 8"FPC(2)-1-5 8"FPC(2)-1-5 (INFLUENT) 8"FPC(2)-1-5 (INFLUENT) 6"FPC(2)-1-6 (INFLUENT)

CONT. FROM DWG.

M526-1 (B/4) 3"PVR(52)-1 2"PVR(9)-1 NOTE 1 (DOME DRAIN)

FPC-V-723 3/4"FPC(58)-1-1 2"MWR(59)-1 3"MWR(59)-1 CORRIDOR SP EL. 467'-0" 24 FPC 2"MWR(59)-1 3"PVR(52)-1 TO WASTE SLUDGE PHASE SEPARATOR BLDG.

CONT. ON DWG.

M531 (D/8) (NOTE 1)

REFERENCES TO CONTRACT NUMBERS, RADWASTE 6"FPC(27)-1 SUCH AS 215, 206, 220, FOUND IN THE (BACKWASH OUT) NOTES ON THIS DRAWING REFER TO 3"MWR(59)-1 4"MWR(59)-1 ORIGINAL CONSTRUCTION DESIGN B TO CHEM. WASTE TANK REQUIREMENTS.

B CONT. ON DWG.

M533-1 (G/6) CURRENT DESIGN REQUIREMENTS ARE (NOTE 1) DOCUMENTED IN THE STATION DESIGN SPECIFICATIONS AND ACTIVE CONTRACT 6"FPC(27)-1 SPECIFICATIONS WHICH STILL APPLY.

TO WASTE SLUDGE PHASE SEPARATOR NOTE 4 PS CONT. ON DWG.

201 M531 (D/9) (NOTE 1)

FPC-V-SVR1/V2 FSAR FIG.

RADWASTE BLDG.

FPC-V-SVR1/V4 FPC-V-SVR1/V1 REACTOR BLDG. FPC FPC-V-SVR1/V3 NOTE 4 NOTE 3 FPC-IR-SVR/1 COLUMBIA GENERATING 1"CAS(5)-1 CONT. FROM DWG. STATION M510-2 (D/8) REV DATE DESCRIPTION DWN CHK APVD SIGNATURE DATE TITLE FPC-IR-1 APPROVED A 0 5-3-02 NEW DRAWING PER 01485-015, REVISED PER 01422-018 NT HL DRJ A

D.R. JACOBSEN 5-3-02 1 10-20-05 CORRECTED INCORPORATION OF 01485-015 (H/9-10) KB HL DRJ FLOW DIAGRAM CHECKED FUEL POOL COOLING H. LE 04-04-02 AND CLEAN-UP SYSTEM DRAWN N. THEISEN 01-11-01 SCALE DWG NO. REV.

NONE M526-2 1 PDS2-E1 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 SERVER84\00\DWG