ML053270084

From kanterella
Jump to navigation Jump to search
Drawing M502, Rev 29, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 1 of 3
ML053270084
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/08/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M502, Rev 29
Download: ML053270084 (1)


Text

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 NOTES:

PS PI A

8C 8C 1. ALL TEMPERATURE WELL CONNECTIONS TO BE 1 1/2" UNLESS TR SPECIFICALLY NOTED OTHERWISE.

SMT (VAC)

2. ALL INSTRUMENTATION ON THIS DRAWING TO BE IDENTIFIED BY PR TG PREFIX "MS" UNLESS SPECIFICALLY NOTED OTHERWISE.

1C PEN 2 STEAM METAL TEMP RECORDER GENERATOR (EXAMPLE:)

POINT ELEMENT ZONE T TE BS TO TG-TR-SMT (K/15) 1 TG-TE-SMT1S F/9 K C 3B

3. ALL INSTRUMENT ROOT VALVES TO BE 3/4" GLOBE K 2 TG-TE-SMTGOV F/9 TG SMT VALVES UNLESS SPECIFICALLY NOTED OTHERWISE.

A0010 3 TG-TE-SMTGEN F/9 PT

4. ALL ITEMS MARKED
  • ARE FURNISHED WITH ASSOCIATED EQUIPMENT.

4 TG-TE-SMT1A G/8 8C MS-RV-116F

  • A0487 MS-RV-116C
  • 5. ALL PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING 53 TO TG-TR-SMT PI PT PI PI PT PI 5 TG-TE-SMT1B H/8 C SPARE IN EXCEPT RPS/MSIV LOGIC INSTRUMENTS, MS(1)-4, MD(16)-4, (K/15) 6B3G 6A3G 6B3 6B3 6A3 6A3 1ST STAGE REHEATER TUBE BUNDLE 2ND STAGE REHEATER TUBE BUNDLE 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE PLACE TE 53 MS(58)-1 AND MS(60)-1 SYSTEMS SHALL BE CLASSIFIED 6 TG-TE-SMT2A H/8 24" HV(19)-1 C 24" HV(19)-1 TE 65A3 AS FOLLOWS:

7 TG-TE-SMT2B J/7 HO TE AO484 TE C C HO 3IC HO QUALITY CLASS II 61 3LH MS-V-721C 65B3 MOISTURE SEPARATOR CHEVRONS MOISTURE SEPARATOR CHEVRONS 8 TG-TE-SMT3A J/9 MS-V-717C A0014 TG SMT A0015 SEISMIC CATEGORY II TG SMT 9 TG-TE-SMT3B K/9 MS-V-166C MS-V-163C CODE GROUP D MS-V-770C (L-3RV) MS-V-164C (R-3RV) 10 TG-TE-SMT1RH G/7 MS-V-724B MS-V-715B 6. ALL PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING 11 TG-TE-SMT1LH G/10 IN THE RPS/MSIV LOGIC INSTRUMENTATION, MS(1)-4 (EXCEPT FOR PT MS-V-723C 1" PI(1)-ST-MS-PS-56D MS-V-165C (R-3IV) PT LINES AT MS-T-1A, MS-T-1B, MS-T-1C AND MS-T-1D AS SHOWN 12 TG-TE-SMT2RH H/7 14B 102 (L-3IV) 14A ON M502-2 (E/2)), MD(16)-4, MS(58)-1 AND MS(60)-1 (EXCEPT 13 TG-TE-SMT2LH J/10 102 1" 102 AS NOTED IN NOTE 11) SHALL BE CLASSIFIED AS FOLLOWS:

1" PI(1)-ST MS-V-722C PT 1/2" PX TE HO 14 TG-TE-SMT3RH J/7 COND-HX-9C PX QUALITY CLASS I PX -MS-PS-56B (VAC) 25 3RH TO DEH FOR ATC 6A3 15 TG-TE-SMT3LH K/10 5B2 PI TE MS-V-718C TG SMT (HP ZONE) 101 10" 5A2 C SEISMIC CATEGORY I PX C T PX 7CG 3A CODE GROUP B 4B1 B22-NO56D 4A3 16 SPARE PI TE A0479 A0480 PS PS PI TG SMT LP TURBINE 3(C) EXCEPT AS NOTED ON M619 INSTRUMENT CONNECTION DIAGRAMS.

BS-V-773 2B TO TG-TR-SMT BS-V-775 17 SPARE BS-V-706A 8B 56B 56D 8CG TO TG-TR-SMT BS-V-705C (K/15)

J 18 SPARE B22-NO56B (K/15) TG SMT 7.

100 NUMBERS IN HEXAGON DENOTE ITEM NUMBERS FOR WECO J CONDENSER NOZZLE CONNECTIONS.

PX TO 18" MS(4)-2 19 SPARE PX A0486 5B1 TG-TR-SMT PI PT PI PI PT PI TO MSIV 5A1 20 SPARE PX C C PX 8. (DELETED)

(K/15) 6B2G 6A2G PS LOGIC 6B2 6B2 6A2 6A2 TE 21 SPARE 4B2 PT C 4A2 9. (DELETED)

A0009 1 65A2 MS-V-724A 8B HO TE 22 SPARE BS-V-706B TE A0483 MS-V-715A BS-V-705B 10. THESE COMPUTER INPUT POINTS ARE NOT USED.

HD 74 C HO HO C 2LH MS-V-721B 23 SPARE (SEE NOTE 15) 65B2 MS-V-717B 11. PIPING DOWNSTREAM OF ROOT VALVES MS-V-705A, -705B, A0013 A0012 TG SMT MS-HX-1B MS-HX-1A -705C & -705D SHALL BE CLASSIFIED AS FOLLOWS:

24 SPARE MS-V-166B MS-V-163B MS-V-770B (L-2RV) MS-V-164B (R-2RV) QUALITY CLASS II TG-TE-SCS-LH F/10 PX PX 25 SEISMIC CATEGORY II TG-TE-SCD-LH F/10 4B3 4A1 CODE GROUP D MS-V-723B MOISTURE SEPARATOR CHEVRONS MOISTURE SEPARATOR CHEVRONS MS-RV-116E

  • MS-V-165B (R-2IV) MS-RV-116B
  • TG-TE-SCS-RH F/7 BS-V-706C 47 102 47 BS-V-705A
12. (DELETED)

MS-V-722B 1ST STAGE REHEATER TUBE BUNDLE 2ND STAGE REHEATER TUBE BUNDLE 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE 26 (L-2IV)

TG-TE-SCD-RH F/7 102 1" 102 24" HV(19)-1 T TO TG-TR-SMT 1/2" HO PX TE COND-HX-9B TG-TE-ZB-GOV F/8 98 (K/15) 13. ALL INSTRUMENT LINES ARE DESIGNATED BY CODE & LINE NUMBER.

(VAC) 6A2 2RH 27 BS-V-772 (IP ZONE) BS-V-771 EXAMPLE: LINES ORIGINATING OUTSIDE CONTAINMENT.

TG-TE-ZC-GOV F/8 PI MS-V-718B 24" HV(19)-1 B22-NO56C TE TG SMT 8AG 1/2" PI(1)-ST (H22-P021)-A6 TG-TE-ZB-GEN G/8 1" PI(1)-ST-MS 1" PI(1)-ST-MS-PS-56C 2A LP TURBINE 2(B) A0011 100 10" 16" 28 PS PS PI TG-TE-ZC-GEN G/8 18" BS(5)-2 -PS-56A TG SMT C TO TG-TR-SMT 56A 56C 7AG CONT'D DWG BS-V-774 BS-V-776 CODE DESIGNATION LINE NUMBER B22-NO56A (K/15)

TG-TE-SMT-MSB F/9 PS PI M502-2 (C/11) 29 14. MS-ST-7A, -7B, -7C & -7D HAVE THE STRAINER BASKET REMOVED.

TG-TE-SMT-MSC F/9 A0482 H PX 8A 8A SPARE IN PI PT PI PX 15. SEE M505-2 (ZONE E/2 & E/14) FOR HD-PS-1 SIGNAL H TO MSIV 6A1 6A1 6A1G COND-HX-9A 5A3 5B3 TE PLACE INPUTS TO HD-SPV-28, -128, -29 & -129. SEE M505-3 LOGIC C (LP ZONE) (ZONE F/7) FOR HD-PS-1 INPUTS TO HD-LIC-5A22 & HD-LIC-5B22.

(VAC) 1B SMT TE (NOTE 16)

(VAC)

C TG 1IC HO 16.

MS-V-723A MS-V-722A 102 MS-V-717A MS-V-716 TO COND-SPV-30A, -30B & -30C ON DRAWING M504-1 (K/3) AND HO MS-V-724C TG SMT TE MS-V-715C PT A0008 1/2" TO MD-SPV-75, -76, -77, -78, -79, -80, -81, -82, -85, 1"

MS-V-166A 1" TO TG-TR-SMT 65A1 MS-V-163A 8A 102 -86 & -87 ON DRAWING M506 (G-K/7-12).

102 (L-1RV) (K/15) MS-V-164A MS-V-761 (R-1RV)

17. TRAP LINES THAT ATTACH TO THE MAIN STEAM LINES MS(1)-4 IN THE TURBINE BUILDING ARE CLASSIFIED PER NOTE 6 OUT THROUGH MS-RV-116D
  • MS-V-165A (R-1IV) MS-RV-116A
  • 87 THE FIRST VALVE . PIPING DOWNSTREAM OF THE FIRST VALVE IS A0016 38 (L-1IV) PS MS-V-770A MS-V-718A CLASSIFIED AS FOLLOWS:

20" HV(19)-1 HO TE TE TO TG-TR-SMT 1/2" PX 31 COND HO 20" HV(19)-1 MS-V-721A C QUALITY CLASS II 38 1LH 65B1 (K/15) 6A1 SEISMIC CATEGORY II MS-V-720A 1/2" MS(21)-2 TG SMT TE (SUPPORTED SEISMIC I)

PT TE PI PT PI CODE GROUP D TE R/I TS 1A LP TURBINE 1(A) TO OVERSPEED TE R/I TS 132 10 1RH 99 10" 18" TO TG-TR-SMT A0485 C 6B1G 6B1 6B1 TG SMT PROTECTION 40B 40B 40B MS-V-719 40A 40A 40A 1/2" MS(21)-2 BS TG SMT (K/15)

C C TO TG-TR-SMT (K/15)

A0477 TO TG-TR-SMT (K/15)

A0272 A0271 16" BS(12)-1 TO DWG M504-1 (K/10) C TO DWG M504-1 (K/10)

G FROM T0-0S-1 PT PX TE TE G M960 (J/10) TO SS-PS-4B 3B3 3B3 BS-V-759 GEN GEN DWG M502-3 (C/8)

CONTINUED ON BS BS-V-703C TG ZB TG ZC PX PX DWG M505-2 (E/10)

MS-MS-1B1 3A2 3A1 BS-V-769 MS-MS-1B2 BS-V-701B BS-V-701A BS-V-760 BS-V-761 CONT ON MS-V-GV/2 FOR DET SEE FOR DET SEE LEGEND:

MS-V-GV/1 HP TURBINE MS-V-TV/1 HO M506 (G/11) M505-3 (E/5) M505-3 (E/4) HO MS-V-TV/2 BS-V-770 BS-V-762 1. ALL VALVES SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE.

1ST STAGE TE CONT ON PI PI TO TG-TR-SMT 2. ALL VALVES SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.

TE GEN M506 12 12G TG SMT TE (K/15)

HO LH (G/11) HO 3. ALL VALVES SUFFIXED WITH A (TH) DENOTE A THROTTLED VALVE.

1S TG SCD TO TG SMT TG-TR-SMT MS-V-712 HO (K/15) CONT ON HO TE TE TE 1ST STAGE M506 (K/11) C A0019 TE TE LH MSC MSB PT MS-V-GV/3 MS-V-GV/4 CONTINUED ON RH RH TG SCS TG SMT TG SMT 12 DWG M502-2 (B/8) TG SCD TG SCS MS-V-TV/3 TO TE MS-V-TV/4 HO HO CONT ON TG-TR-SMT F GOV F LEFT STEAM CHEST M506 (H/11) (K/15)

TG SMT RIGHT STEAM CHEST MS-V-602(V)

MS-MS-1A1 MS-MS-1A2 BS-V-767 BS-V-763 PX PX FOR DET SEE BS-V-701C TE TE FOR DET SEE 3B2 3B1 M505-3 (C/5) PI CONTINUED ON BS-V-768 BS-V-765 GOV GOV M505-2 (B/8)

BS-V-703B BS-V-703A FOR DET SEE 20BG C T M505-2 (E/6)

BS-V-764 ZB TG ZC TG M505-3 (C/4)

FOR DET SEE M505-2 (B/8) A0017 BS-V-766 TO TG-TR-SMT (K/15) MS-V-728B PT PI PX TE R/I TS 18" MS(2)-4 20B 20B TO TG BUILDING RMS 28" 3A3 10 10 10 MS-V-728A 28" SAMPLING STATION SR1 6" BS(12)-1 DWG M607-1 (J/12) 6" MS(1)-4-29 *L DPIS H 1/2" C A

BS-RV-47B 1/2" PI(1)-ST-30" MS(4)-2 A 63 PT A0018 (IR-81)-3 TO DWG M504-1 BS-RO-47B MS-SPV-155C 3/4" MS(58)-4-3 TO MSIV LOGIC 3A3 PS (K/11)

BS-V-750B CONTRACT CONTRACT PT 1/2" PI(1)-ST-(IR-83)-3 BS 15C PIC B22-N015C A ANTI-MOTORING C O 20A 4" BS(2)-2 220 215 TO TURBINE A 18B MS-V-154C 1/2" PI(1)-ST-(IR-83)-1 TRAP STA #3 PROTECTION A0476 C FC

  • CONTROL SYSTEM SEE NOTE 17 E MS-V-707C SEE M502-2 (E/2) C34-N007 C34-R609 TO SS-PS-4A E 1/2" PI(1)-ST-MS-PT-54A PX M502-3 (B/8)

MS-V-155C TE BS-PCV-18B MS-PCV-18B MS-V-703 3/4" MS(60)-4-3 PT PR C 20 FROM REACTOR PRIMARY 1C 7 609 STEAM SYSTEM, 30" MS(1)-4-3 (LINE C) A0001 STEAM C72-N003A C72-N003C PROTECTION SYSTEM M529 (E-F/2)

EVAPORATOR BS-2 MS-4 TX PS PS T TO FEEDWATER 8" BS(2)-2 R/I TI SS-EV-1B PIC MS-V-704 TO REACTOR 1C 3A 3C CONTROL SYSTEM A

18B 3" MD(16)-4-3 1C 1C CONT'D DWG M506 (J/15) SP BS MS-V-706C 2B FROM RFW-PT-808 C PS C72-N003B C72-N003D 3/4" MS(58)-4-4 TO MSIV LOGIC DWG M529(H/13) 15D TRAP STA #4 A0021 PT PI B22-N015D PS PS 18" MS(1)-4-25 SEE NOTE 17 18B 18B TX 3B 3D 1/2" PI(1)-ST-(IR-84)-1 SEE M502-2 (E/2) LX BS BS 1D 24" MS(4)-2 2

MS-V-707D 16" BS(12)-1 3/4" MS(60)-4-4 FROM REACTOR PRIMARY BS-V-704B LX MS-V-752 TURBINE BY-PASS MANIFOLD (BY WECO) MS-V-748 LX STEAM SYSTEM, PT PS 3 MS-V-751 MS-V-749 1 M529 (E-F/2) 30" MS(1)-4-4 (LINE D) 54A 654A 1/2" 1/2" PI(1)-ST-MS-PT-54B 18" MS(1)-4-26 BPV-4 BPV-3 BPV-2 BPV-1 MS-V-706D TI R/I TE C

C12-N054A C12-N654A MS-V-750 1 1/2" HO HO HO HO 1D 1D 1D 3" X 1/2" 3" MD(19)-2 3" MD(16)-4-4 A0000 6" MS(1)-4-30 D CONT'D DWG M506 (J/15) TO REACTOR MANUAL RED (TYP) D 1" MS(60)-4-6 CONTROL SYSTEM MS-V-160A MS-V-160B MS-V-160C MS-V-160D SLOPE 24" MS(1)-4-31 BS-1 FOR CONT. SEE DISCHARGE FROM DISCHARGE FROM 2" BS(12)-1 REACTOR BLDG TURBINE BLDG 1" MS(60)-4-7 DWG M506 (D/8) 2" BS(12)-1 PS PT TRAP STA #17 TRAP STA #15 PEN 1 (ZONE B/13) (ZONE B/12)

MD-V-89A 654B 54B MD-V-90A (STEAM TUNNEL)

MD-2 6" BS(12)-1 PR C12-N654B C12-N054B 6" MS(3)-4 2" MD(1)-2 2" MD(22)-2 BS-RO-47A 1C TO TURBINE TO TURBINE 8" 8" 8" 8" 2" BS-RV-47A TRAP STA #34 (ZONE B/12) (ZONE B/13)

CONTROL SYSTEM CONTROL SYSTEM DISCHARGE FROM TRAP STA #14 DISCHARGE FROM TRAP STA #16 C

TO TG BUILDING SEE M502-2 (E/5) 8" 2" 8" 2" 8" 2" 8" A0004 SAMPLING STATION PT PI PT PT MS-V-250(V)

DWG M607-1 (J/12)

MD-2 NOTE 11 T 1CG 1C 1B 1A 1/2" PI(1)-ST-MS-PT-1A 10" BS(12)-1 T MD-V-89B MD-V-90B RMS 1/2" PI(1)- MS-V-246(V) MS-V-247(V) MS-V-248(V) MS-V-249(V)

BS-1 SR1 ST-MS-PT-1B MS-V-705A 2" BS(12)-1 NOTE 6 A

MS-V-705C MS-V-705B 1" MS(3)-4 TO TRAP STA #9A MS-V-705D 2" BS(12)-1 MS-SPV-155A 3/4" MS(58)-4-1 3/4" MS(60)-4-11 SEE M502-2 (E/2)

(SPARE) 3/4" MS(60)-4-10 PRESSURE MS-V-709A MS-V-709B MS-V-709C MS-V-709D CONTRACT CONTRACT 4" MS(60)-4-8 AVERAGING C O C BS-RV-26C MS-V-706A 1" MS(3)-4 1" MS(3)-4 1" MS(3)-4 1" MS(3)-4 220 215 MANIFOLD MS-V-154A 3/4" MS(60)-4-12 3/4" MS(60)-4-9 C FC TI R/I TE C

10" MS(3)-4 10" MS(3)-4 10" MS(3)-4 10" MS(3)-4 1A 1A 1A 10" BS(12)-1 1" MS(60)-4-14 A0002 MS-V-155A MS-V-701 MS-V-108B(TH) 30" MS(1)-4-1 (LINE A) 28" 10" BS(12)-1 6" BS(2)-2 FROM REACTOR PRIMARY 10" BS(12)-1 BS-RV-26D O STEAM SYSTEM, O

M529 (E-F/15) 3/4" MS(60)-4-1 C 6" MS(1)-4-27 MO RMS C 6" BS(2)-2 MS-V-707A NOTE 14 MS-ST-7A NOTE 14 MS-ST-7B NOTE 14 MS-ST-7C NOTE 14 MS-ST-7D MS-V-702 TX BD B TRAP STA #17 3" MD(16)-4-1 1" MS(60)-4-15 1/2" PI(1)-ST-(IR-81)-1 1A TRAP STA #1 SEE M502-2 (E/3) CONT'D DWG M506 (G/15) SP * * *

  • MO SEE NOTE 17 2A PS SEE M502-2 (E/2) 3/4" MS(58)-4-2 TI R/I TO MSIV LOGIC TE 15A BS-V-22B(TH) BS-V-25B C B22-N015A 6" BS(2)-2 18" MS(1)-4-23 MS-V-706B 1B 1B 1B A0003 8" BS(2)-2 RMS FROM REACTOR PRIMARY 30" MS(1)-4-2 (LINE B) 28" BD B STEAM SYSTEM, TRAP STA #16 M529 (E-F/15) 3/4" MS(60)-4-2 SEE M502-2 (E/2) 18" MS(1)-4-24 6" MS(1)-4-28 4" BS(2)-2 MS-V-707B TRAP STA #15 BS-V-22A(TH) TX SEE M502-2 (E/2) 3" MD(16)-4-2 1/2" PI(1)-ST-(IR-82)-1 1B TRAP STA #2 B BS-RV-26A MO RMS CONT'D DWG M506 (G/15) SEE NOTE 17 O MO RMS B BD B PS TO MSIV LOGIC SEE M502-2 (E/2) C BD B A 15B MS-V-708A B22-N015B O MS-V-226(V) MS-V-146 24" MS(3)-4 C

BS-RV-26B TRAP STA #14 BS-V-25A SEE M502-2 (E/2) MS (1)-4 MS (3)-4 PIC TRAP STA #9A A 18" MS(2)-4 6" BS(2)-2 SEE M502-2 (E/2) 18A TRAP STA #9B BS-V-750A MS-V-108A(TH) 6" BS(2)-2 6" MS(6)-4 SEE M502-2 (E/2) 3/4" WELD CAP 3/4" WELD CAP 3/4" WELD CAP A

BS-PCV-18A MS-PCV-18A O MO RMS 8" MS(5)-4 18" MS(2)-4 FSAR FIG.

CONT ON DWG M502-2 (D/9)

C BD B 10" MS(5)-4 BS-2 MS-4 COLUMBIA STEAM GENERATING EVAPORATOR STATION SS-EV-1A PIC A REV DATE DESCRIPTION DWN CHK APVD SIGNED DATE TITLE 18A A BS 25 2-8-02 REV PER 01487-007 (E/2, G/5,10-11, H/1). NT HL SRP A C APPROVED JE PARKER 3-11-87 FLOW DIAGRAM A0020 PT PI 26 04-19-02 REV PER 01607-003 (C/10) JFT BLS DRJ MAIN & EXHAUST STEAM SYSTEM ENGINEER JE PARKER 3-11-87 18A 18A 27 6-27-03 REV PER 02417-003 (D/10) CMO KB DRJ BS BS DESIGN SUPV JR MILLER TURBINE GENERATOR BUILDING 3-11-87 28 4-7-05 REV PER 03633 (B/13, E/13) H.AL HL SRP BS-V-704A 29 7-8-05 REV PER 03970-006 (H-K/8), 03970-007 (J/15) PL HL SRP CHECKED S R PAYNE 4-24-86 DRAWING # M502 SCALE REV. SHEET OF DRAWN D JACOBSEN 4-23-86 N/A 29 1 3 15 14 13 12 11 10 9 8 7 6 5 4 3 2