Drawing M502, Rev 29, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 1 of 3
ML053270084
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/08/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M502, Rev 29
Download: ML053270084 (1)


Text

PEN 1 PEN 2 FOR DET SEE FOR DET SEE FOR DET SEE M505-3 (C/5)

FOR DET SEE M505-3 (C/4)

M505-3 (E/4)

M505-3 (E/5)

JR MILLER JE PARKER JE PARKER 3-11-87 3-11-87 3-11-87 TO TRAP STA #9A SEE M502-2 (E/2) 1" MS(3)-4 1" MS(3)-4 1" MS(3)-4 1" MS(3)-4 1" MS(3)-4 10" MS(3)-4 MS-ST-7D NOTE 14 10" MS(3)-4 MS-ST-7C NOTE 14 10" MS(3)-4 MS-ST-7B NOTE 14 10" BS(12)-1 BS-2 MS-4 STEAM METAL TEMP RECORDER 24 TG-TE-SMT-MSC F/9 29 TG-TE-SMT-MSB F/9 TG-TE-ZC-GEN G/8 28 TG-TE-ZB-GEN G/8 TG-TE-ZC-GOV F/8 27 TG-TE-ZB-GOV F/8 TG-TE-SCD-RH F/7 26 TG-TE-SCS-RH F/7 F/10 25 TG-TE-SCS-LH TG-TE-SCD-LH F/10 SPARE 23 SPARE 22 SPARE 21 SPARE 20 SPARE 19 SPARE 18 SPARE 17 SPARE 16 SPARE 15 TG-TE-SMT3LH K/10 14 TG-TE-SMT3RH J/7 13 TG-TE-SMT2LH J/10 12 TG-TE-SMT2RH H/7 11 TG-TE-SMT1LH G/10 10 TG-TE-SMT1RH G/7 9

TG-TE-SMT3B K/9 8

TG-TE-SMT3A J/9 7

TG-TE-SMT2B J/7 6

TG-TE-SMT2A H/8 5

TG-TE-SMT1B H/8 4

TG-TE-SMT1A G/8 3

TG-TE-SMTGEN F/9 2

TG-TE-SMTGOV F/9 TO TG-TR-SMT (K/15)

TG TO TG-TR-SMT (K/15)

TG TO TG-TR-SMT (K/15)

TG TG TO TO TG-TR-SMT (K/15)

TG TG TO TG-TR-SMT (K/15)

TO TG-TR-SMT (K/15)

TO TG-TR-SMT (K/15)

TO TG-TR-SMT (K/15)

TG TG (K/15)

TO TG-TR-SMT TG SCD TG TG TG TG TG TG-TR-SMT TO (K/15)

TG SEE M502-2 (E/2)

SEE M502-2 (E/2)

SEE M502-2 (E/2)

SEE M502-2 (E/5) 6" BS(12)-1 DISCHARGE FROM TRAP STA #16 (ZONE B/13)

(ZONE B/12) 2" BS(12)-1 2" BS(12)-1 DISCHARGE FROM TRAP STA #14 BS-1 MD-2 2" MD(1)-2 2" MD(22)-2 DISCHARGE FROM TRAP STA #17 (ZONE B/13)

(ZONE B/12) 2" BS(12)-1 2" BS(12)-1 10" BS(12)-1 6" BS(2)-2 10" BS(12)-1 10" BS(12)-1 DISCHARGE FROM TRAP STA #15 BS-1 MD-2 TRAP STA #16 TRAP STA #15 RIGHT STEAM CHEST LEFT STEAM CHEST M502-3 (B/8)

BPV-1 BPV-2 BPV-3 S R PAYNE 4-24-86 MS-V-166C (L-3RV)

MS-V-165A (L-1IV)

MS-V-165B (L-2IV)

MS-V-165C (L-3IV)

MS-V-164B (R-2IV)

MS-V-164C MS-V-163A MS-V-163B MS-V-163C TO DWG M504-1 (K/10)

GENERATOR COND-HX-9C COND-HX-9B COND-HX-9A (VAC) 1" 1" PI(1)-ST-MS-PS-56D TO DEH FOR ATC 1" PI(1)-ST

-MS-PS-56B TO MSIV LOGIC B22-NO56D B22-NO56B (VAC) 1" (VAC)

TG 1" PI(1)-ST-MS-PS-56C 1" PI(1)-ST-MS

-PS-56A TO MSIV LOGIC B22-NO56C B22-NO56A TO DWG M504-1 (K/11)

LP TURBINE 1(A)

TG LP TURBINE 2(B)

LP TURBINE 3(C)

TO TG-TR-SMT (K/15)

TO DWG M504-1 (K/10) 16" BS(12)-1 20" HV(19)-1 24" HV(19)-1 24" HV(19)-1 (VAC) 1" (VAC) 1" 18" MS(4)-2 10" 16" 10" 18" 30" MS(4)-2 20" HV(19)-1 24" HV(19)-1 24" HV(19)-1 (IP ZONE)

MS-V-166A (L-1RV)

(R-1RV) 1/2" 1/2" MS(21)-2 1/2" MS(21)-2 1/2" TO OVERSPEED PROTECTION (NOTE 16)

MS-V-164A (R-1IV)

MS-V-166B (L-2RV)

(R-2RV)

POINT 1

TG-TE-SMT1S F/9 ELEMENT ZONE 1/2" 18" BS(5)-2 CONT'D DWG M502-2 (C/11)

(R-3RV)

(R-3IV) 1/2" (SEE NOTE 15)

(HP ZONE)

TO TG-TR-SMT (K/15)

TG TG TO TG-TR-SMT (K/15)

TO TG-TR-SMT (K/15)

TG-TR-SMT (K/15)

TG TG TG (LP ZONE) 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE MOISTURE SEPARATOR CHEVRONS MOISTURE SEPARATOR CHEVRONS MS-HX-1B 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE C72-N003D C12-N054B C12-N654B 1/2" PI(1)-ST-MS-PT-54B DWG M502-3 (C/8)

TO SS-PS-4B C72-N003C C72-N003B TO REACTOR PROTECTION SYSTEM C12-N054A C12-N654A TO REACTOR MANUAL CONTROL SYSTEM 1/2" PI(1)-ST-MS-PT-54A C72-N003A TG TG

  • L H

1/2" PI(1)-ST-(IR-83)-3 1ST STAGE 1ST STAGE TG M505-2 (B/8)

FOR DET SEE FOR DET SEE M505-2 (B/8) 1/2" ANTI-MOTORING PROTECTION C34-R609 C34-N007 TO FEEDWATER CONTROL SYSTEM FROM RFW-PT-808 DWG M529(H/13)

TO SS-PS-4A 1/2" PI(1)-ST-(IR-81)-3 TO TURBINE CONTROL SYSTEM 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE MOISTURE SEPARATOR CHEVRONS MOISTURE SEPARATOR CHEVRONS MS-HX-1A 2ND STAGE REHEATER TUBE BUNDLE 1ST STAGE REHEATER TUBE BUNDLE TO TG-TR-SMT (K/15)

TO TG BUILDING SAMPLING STATION DWG M607-1 (J/12)

MS-SPV-155C 18" MS(1)-4-25 3/4" MS(58)-4-4 CONTRACT CONTRACT 220 215 30" MS(1)-4-3 (LINE C)

FROM REACTOR PRIMARY STEAM SYSTEM, M529 (E-F/2)

HP TURBINE ZB CONTINUED ON M505-2 (E/6) 1" MS(60)-4-6 1" MS(60)-4-7 PRESSURE AVERAGING MANIFOLD TRAP STA #3 6" MS(1)-4-29 SEE M502-2 (E/2)

TO MSIV LOGIC 3" MD(16)-4-3 3/4" MS(60)-4-3 1/2" PI(1)-ST-(IR-83)-1 CONT'D DWG M506 (J/15)

FC 3/4" MS(58)-4-3 18" MS(1)-4-26 30" MS(1)-4-4 (LINE D)

FROM REACTOR PRIMARY STEAM SYSTEM, M529 (E-F/2)

SEE NOTE 17 28" 28" 28" 28" 6" MS(1)-4-30 SEE M502-2 (E/2)

TO MSIV LOGIC 3" MD(16)-4-4 3/4" MS(60)-4-4 1/2" PI(1)-ST-(IR-84)-1 CONT'D DWG M506 (J/15) 3/4" MS(60)-4-10 1/2" PI(1)-ST-MS-PT-1A TO TURBINE CONTROL SYSTEM 3/4" MS(60)-4-9 1/2" PI(1)-

ST-MS-PT-1B TO TURBINE CONTROL SYSTEM 3/4" MS(60)-4-11 MS-SPV-155A 18" MS(1)-4-23 3/4" MS(58)-4-2 CONTRACT CONTRACT 220 215 SAMPLING STATION TO TG BUILDING DWG M607-1 (J/12) 30" MS(1)-4-1 (LINE A)

FROM REACTOR PRIMARY STEAM SYSTEM, M529 (E-F/15) 24" MS(1)-4-31 1" MS(60)-4-15 1" MS(60)-4-14 TRAP STA #1 6" MS(1)-4-27 TO MSIV LOGIC 3" MD(16)-4-1 3/4" MS(60)-4-1 1/2" PI(1)-ST-(IR-81)-1 CONT'D DWG M506 (G/15) 4" BS(2)-2 FC 3/4" MS(58)-4-1 BS STEAM EVAPORATOR SS-EV-1B TRAP STA #14 BS-2 MS-4 8" MS(5)-4 8" BS(2)-2 TRAP STA #17 SEE M502-2 (E/3) 6" BS(12)-1 4" BS(2)-2 16" BS(12)-1 CONT ON DWG M502-2 (D/9)

MS (3)-4 MS (1)-4 BS STEAM EVAPORATOR SS-EV-1A 3/4" WELD CAP 3/4" WELD CAP TRAP STA #9A SEE M502-2 (E/2)

SEE M502-2 (E/2) 3/4" WELD CAP TRAP STA #9B 24" MS(3)-4 4" MS(60)-4-8 NOTE 6 NOTE 11 (SPARE) 3/4" MS(60)-4-12 18" MS(1)-4-24 30" MS(1)-4-2 (LINE B)

FROM REACTOR PRIMARY STEAM SYSTEM, M529 (E-F/15)

TRAP STA #2 SEE M502-2 (E/2)

SEE M502-2 (E/2) 6" MS(1)-4-28 TO MSIV LOGIC 3" MD(16)-4-2 3/4" MS(60)-4-2 1/2" PI(1)-ST-(IR-82)-1 CONT'D DWG M506 (G/15) 10" MS(5)-4 6" MS(6)-4 6" BS(2)-2 6" BS(2)-2 6" BS(2)-2 8" BS(2)-2 6" BS(2)-2 18" MS(2)-4 CONTINUED ON CONTINUED ON DWG M502-2 (B/8)

DWG M505-2 (E/10) 18" MS(2)-4 18" MS(2)-4 2"

2" 2"

24" MS(4)-2 TRAP STA #34 8"

8" 8"

8" 8"

8" 8"

8" BPV-4 FOR CONT. SEE DWG M506 (D/8)

SLOPE 1/2" 3"

10" MS(3)-4 MS-ST-7A NOTE 14 2"

6" MS(3)-4 3" MD(19)-2 10" 1 1/2" X 1/2" RED (TYP)

TURBINE BY-PASS MANIFOLD (BY WECO) 15.

SEE M505-2 (ZONE E/2 & E/14) FOR HD-PS-1 SIGNAL INPUTS TO HD-SPV-28, -128, -29 & -129. SEE M505-3 (ZONE F/7) FOR HD-PS-1 INPUTS TO HD-LIC-5A22 & HD-LIC-5B22.

14.

MS-ST-7A, -7B, -7C & -7D HAVE THE STRAINER BASKET REMOVED.

11.

PIPING DOWNSTREAM OF ROOT VALVES MS-V-705A, -705B,

-705C & -705D SHALL BE CLASSIFIED AS FOLLOWS:

QUALITY CLASS II SEISMIC CATEGORY II CODE GROUP D 12.

(DELETED) 13.

ALL INSTRUMENT LINES ARE DESIGNATED BY CODE & LINE NUMBER.

EXAMPLE: LINES ORIGINATING OUTSIDE CONTAINMENT.

1/2" PI(1)-ST (H22-P021)-A6 CODE DESIGNATION LINE NUMBER 100 8.

(DELETED) 7.

NUMBERS IN HEXAGON DENOTE ITEM NUMBERS FOR WECO CONDENSER NOZZLE CONNECTIONS.

EXCEPT AS NOTED ON M619 INSTRUMENT CONNECTION DIAGRAMS.

ON M502-2 (E/2)), MD(16)-4, MS(58)-1 AND MS(60)-1 (EXCEPT 6.

ALL PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING IN THE RPS/MSIV LOGIC INSTRUMENTATION, MS(1)-4 (EXCEPT FOR QUALITY CLASS I SEISMIC CATEGORY I CODE GROUP B

MS(58)-1 AND MS(60)-1 SYSTEMS SHALL BE CLASSIFIED AS FOLLOWS:

AS NOTED IN NOTE 11) SHALL BE CLASSIFIED AS FOLLOWS:

LINES AT MS-T-1A, MS-T-1B, MS-T-1C AND MS-T-1D AS SHOWN 10.

THESE COMPUTER INPUT POINTS ARE NOT USED.

(EXAMPLE:)

LEGEND:

1. ALL VALVES SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE.
2. ALL VALVES SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.
3. ALL VALVES SUFFIXED WITH A (TH) DENOTE A THROTTLED VALVE.

SPECIFICALLY NOTED OTHERWISE.

2.

ALL INSTRUMENTATION ON THIS DRAWING TO BE IDENTIFIED BY PREFIX "MS" UNLESS SPECIFICALLY NOTED OTHERWISE.

3.

ALL INSTRUMENT ROOT VALVES TO BE 3/4" GLOBE VALVES UNLESS SPECIFICALLY NOTED OTHERWISE.

5.

ALL PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING EXCEPT RPS/MSIV LOGIC INSTRUMENTS, MS(1)-4, MD(16)-4, QUALITY CLASS II SEISMIC CATEGORY II CODE GROUP D 4.

ALL ITEMS MARKED

  • ARE FURNISHED WITH ASSOCIATED EQUIPMENT.

9.

(DELETED)

ALL TEMPERATURE WELL CONNECTIONS TO BE 1 1/2" UNLESS NOTES:

1.

FLOW DIAGRAM MAIN & EXHAUST STEAM SYSTEM TURBINE GENERATOR BUILDING A

B C

D E

F G

H J

K A

B C

D E

F G

H J

K 4

5 7

6 8

9 10 11 12 13 14 15 2

3 1

4 5

7 6

8 9

10 11 12 13 14 15 2

3 D JACOBSEN 4-23-86 N/A 29 1

3 M502 TITLE DATE SIGNED APPROVED ENGINEER DESIGN SUPV CHECKED DRAWN SCALE REV.

SHEET OF DRAWING #

BS MS-V-750 101 MS-V-249(V)

MS-V-709B MS-V-709A MS-V-749 LX 1

MS-V-748 LX 2

MS-V-751 LX 3

MS-V-752 MS-V-248(V)

MS-V-247(V)

MS-V-246(V)

MS-V-250(V)

MS-V-709C MS-V-709D MO RMS BD B PS 15B B22-N015B C

A0003 TI 1B R/I 1B TE 1B TX 1B MS-V-707B PI 1CG MS-V-705D MS-V-708A A

A BS-PCV-18A O

C C

A0020 BS-V-704A PI 18A PT 18A BS PIC 18A BS PIC 18A O

C RMS BD B MO MS-V-146 BS-V-750A BS-V-25A BS-RV-26B BS-RV-26A BS-RV-47A C

O RMS BD B MO BS-V-22B(TH)

BS-V-25B BS-V-22A(TH)

RMS BD B MO A

MS-V-108A(TH)

MS-PCV-18A O

C RMS BD B MO MS-V-108B(TH)

A A

BS-PCV-18B C

A0021 BS-V-704B PI 18B PT 18B BS PIC 18B BS A

MS-V-155A BS-RV-47B PS 15A B22-N015A C

A0002 TI 1A R/I 1A TE 1A TX 1A MS-V-706A MS-V-706B MS-V-707A MS-V-154A MS-V-701 O

C SP 2A MS-V-702 RMS SR1 MS-V-705C T

PT 1B MS-V-705A T

PT 1A C

A0004 PR 1C PT 1C MS-V-705B PS 15D B22-N015D C

A0000 TI 1D R/I 1D TE 1D TX 1D MS-V-707D A

MS-V-155C PS 15C B22-N015C C

A0001 TI 1C R/I 1C TE 1C TX 1C MS-V-706D TE GEN TG MS-V-707C MS-V-154C MS-V-703 O

C SP 2B MS-V-704 RMS SR1 HO MS-V-TV/1 HO MS-V-GV/1 MS-V-TV/3 MS-V-GV/3 HO PX 20 PT 20A MS-V-728B MS-V-728A T

C A0017 PI 20B PT 3A3 BS C

A0476 PX 3A3 BS-V-701C PR 609 T

PT 7

TE 1S SMT DPIS 63 PI 20BG PT 20B TE GOV ZC TE GOV ZB PX 3B1 BS-V-705A PX 4A1 PX 3B2 PS 3A PS 654A PT 54A PS 3B PS 3C PS 654B C

A0477 PT 3B3 BS PX 3B3 BS-V-703C PX 3A1 PX 3A2 MS-MS-1B1 PT 54B PS 3D MS-RV-116C

  • TE 3RH SMT TE 3A SMT TE 3LH SMT TE 2LH SMT TE 2B SMT 53 MS-RV-116A
  • MS-RV-116B
  • BS-V-705B PX 4A2 BS-V-705C PX 4A3 BS-V-706C PX 4B3 BS-V-706B PX 4B2 BS-V-706A PX 4B1 PS 1

HD C

A0015 PI 6A3 MS-V-717C PI 6A3G PT 6A3 PX 6A3 MS-V-718C PX 5A3 MS-V-715C HO C

A0014 PI 6B3 MS-V-721C PI 6B3G PT 6B3 PX 5B3 MS-V-724C C

AO484 TE 65A3 C

A0012 PI 6A2 MS-V-717B PI 6A2G PT 6A2 PX 6A2 MS-V-718B PT 14A C

A0479 PX 5A2 MS-V-715B C

A0013 PI 6B2 MS-V-721B PI 6B2G PT 6B2 HO C

A0483 TE 65A2 C

A0486 TE 65B2 C

A0011 HO PI 6A1 MS-V-716 MS-V-761 PI 6A1G PT 6A1 MS-V-718A PX 6A1 PS 31 COND PT 10 BS MS-V-719 MS-V-720A PX 5A1 MS-V-715A C

A0016 PI 6B1 MS-V-721A PI 6B1G PT 6B1 PX 5B1 MS-V-724A HO C

A0482 TE 65A1 C

A0485 TE 65B1 MS-V-717A 47 38 MS-V-602(V)

TS 40A R/I 40A TE 40A C

A0271 99 100 MS-RV-116F

  • 61 53 PT 8A PI 8B 102 PT 8B MS-RV-116D
  • MS-RV-116E
  • 74 47 TS 40B 132 98 R/I 40B TE 40B MS-V-770A C

A0272 87 38 TE 1IC SMT TS 10 R/I 10 TE 10 C

A0018 C

A0008 PS 8A PI 8A 102 C

A0010 T

PS 56A PT 8C PI 8AG 102 T

TE 3B SMT A

PR 1C PS 8C PI 8C MS-V-723B MS-V-722B 102 PS 56C PI 7AG T

PS 56B PT 25 PI 7CG 102 MS-V-723C MS-V-722C 102 PS 56D PI 8CG HO HO HO HO HO HO HO C

A0487 TE 65B3 HO HO MS-V-160A HO MS-V-160B HO MS-V-160C HO MS-V-160D HO HO MS-V-TV/2 HO MS-V-GV/2 MS-V-TV/4 MS-V-GV/4 HO HO MS-V-712 PI 12 C

A0019 PT 12 PI 12G C

A0480 PT 14B PX 5B2 MS-V-724B MS-V-226(V)

O C

MD-V-89B MD-V-90B BS-RV-26D BS-RV-26C MD-V-90A MD-V-89A BS-V-703A BS-V-703B TE LH SCD TE LH SCS TE MSB SMT TE MSC SMT TE GOV SMT TE GEN SMT TE RH TG TE RH SCS BS-V-701A BS-V-701B TE GEN ZC TE 1LH SMT TE 1RH SMT TE 2RH SMT TE 2A SMT TE 3IC SMT TE 1A SMT TE 1B SMT TR SMT TG PIC 18B BS-V-750B A

MS-PCV-18B C

A0009 MS-MS-1B2 MS-MS-1A2 MS-MS-1A1 MS-V-722A MS-V-770B MS-V-723A MS-V-770C 16.

TO COND-SPV-30A, -30B & -30C ON DRAWING M504-1 (K/3) AND TO MD-SPV-75, -76, -77, -78, -79, -80, -81, -82, -85,

-86 & -87 ON DRAWING M506 (G-K/7-12).

BS-V-760 BS-V-759 BS-V-762 BS-V-761 BS-V-767 BS-V-763 BS-V-768 BS-V-764 BS-V-770 BS-V-769 BS-V-766 BS-V-765 BS-V-775 BS-V-771 BS-V-776 BS-V-773 BS-V-772 BS-V-774 102 102 102 FROM T0-0S-1 M960 (J/10)

17. TRAP LINES THAT ATTACH TO THE MAIN STEAM LINES MS(1)-4 IN THE TURBINE BUILDING ARE CLASSIFIED PER NOTE 6 OUT THROUGH THE FIRST VALVE. PIPING DOWNSTREAM OF THE FIRST VALVE IS CLASSIFIED AS FOLLOWS:

CONT ON M506 (G/11)

CONT ON M506 (K/11)

CONT ON M506 (G/11)

CONT ON M506 (H/11)

TRAP STA #4 SEE NOTE 17 SEE NOTE 17 SEE NOTE 17 TURBINE BLDG REACTOR BLDG (STEAM TUNNEL)

QUALITY CLASS II SEISMIC CATEGORY II (SUPPORTED SEISMIC I)

CODE GROUP D BS-RO-47A BS-RO-47B COLUMBIA GENERATING STATION FSAR FIG.

DATE REV DESCRIPTION APVD CHK DWN 25 2-8-02 REV PER 01487-007 (E/2, G/5,10-11, H/1).

NT HL SRP 26 04-19-02 REV PER 01607-003 (C/10)

JFT BLS DRJ MS-V-706C 27 6-27-03 REV PER 02417-003 (D/10)

CMO KB DRJ A

A 28 4-7-05 REV PER 03633 (B/13, E/13)

H.AL HL SRP PLACE SPARE IN PLACE SPARE IN 29 7-8-05 REV PER 03970-006 (H-K/8), 03970-007 (J/15)

PL HL SRP