ML102440385
From kanterella
Jump to navigation
Jump to search
ML102440385 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 08/27/2009 |
From: | Energy Northwest |
To: | Office of Nuclear Reactor Regulation |
References | |
GO2-10-117 M515-3, Rev 4 | |
Download: ML102440385 (1) | |
Similar Documents at Columbia | |
---|---|
Category:Drawing
MONTHYEARML18191A2052018-06-19019 June 2018
[Table view]Forwards Response to NRC Comments of July 7, 1977 and February 23, 1978 on Caorso Test Plan ML16244A8332016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-1-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. GO2-16-112, License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg.2015-06-17017 June 2015 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. ML1024404282010-08-19019 August 2010 Drawing 15, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System Reactor Building Diesel Generator Building and Radwaste Building ML1024404302010-08-19019 August 2010 Drawing 17, LR-M573-2, Rev. 1, License Renewal Boundary Drawing Potable Water Cold & Fire Protection System Pumphouses ML1024403772010-08-19019 August 2010 Drawing 10, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024403782010-08-19019 August 2010 Drawing 1, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403792010-08-19019 August 2010 Drawing 2, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403802010-08-19019 August 2010 Drawing 3, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403812010-08-19019 August 2010 Drawing 4, LR-M515-1, Rev. 1, License Renewal Boundary Drawing Fire Protection System ML1024403822010-08-19019 August 2010 Drawing 5, LR-M515-2, Rev. 1, License Renewal Boundary Drawing Fire Protection System Details ML1024403832010-08-19019 August 2010 Drawing 6, LR-M515-2, Rev. 1, License Renewal Boundary Drawing Fire Protection System ML1024404242010-08-19019 August 2010 Drawing 11, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024404252010-08-19019 August 2010 Drawing 12, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024404262010-08-19019 August 2010 Drawing 13, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Diesel Generator Building and Radwaste Building ML1024404272010-08-19019 August 2010 Drawing 14, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System Reactor Building Diesel Generator Building and Radwaste Building ML1024404292010-08-19019 August 2010 Drawing 16, LR-M573-2, Rev. 1, License Renewal Boundary Drawing Potable Water Cold & Fire Protection System Pumphouses ML1024403842009-08-27027 August 2009 Drawing 7, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution ML1024403852009-08-27027 August 2009 Drawing 8, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution ML0532700932005-10-20020 October 2005 Drawing M510-3, Rev 19, Flow Diagram Control, Service and Breathing Air Systems. ML0532701282005-10-20020 October 2005 Drawing M526-2, Rev 1, Flow Diagram Fuel Pool Cooling and Clean-up System. ML0532701132005-10-14014 October 2005 Drawing M523-1, Rev 104, Flow Diagram Reactor Water Clean-Up System Reactor Bldg. ML0532701152005-10-14014 October 2005 Drawing M523-2, Rev 6, Flow Diagram Reactor Water Clean Up System. Sheet 2 of 2 ML0532701412005-09-19019 September 2005 Drawing M539, Rev 78, Flow Diagram Floor Drain System Reactor Building. ML0532701472005-09-0101 September 2005 Drawing M544, Rev 69, Flow Diagram HVAC - Standby Gas Treatment Reactor Building. ML0532701062005-09-0101 September 2005 Drawing M520, Rev 92, Flow Diagram HPCS and LPCS Systems Reactor Building ML0532701512005-08-11011 August 2005 Drawing M554, Rev 59, Flow Diagram - H. & V. Containment Atmospheric Control System Reactor Bldg. ML0532700912005-08-11011 August 2005 Drawing M510-2, Rev 31, Flow Diagram Control and Service Air Systems ML0532701182005-08-10010 August 2005 Drawing M524-1, Rev 105, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S and Yard. ML0532701212005-08-0808 August 2005 Drawing M524-3, Rev 11, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S and Yard. GO2-10-117, Drawing 24, 133D9133, Rev. 9, Rev Per 03372-208 (D-G/9-11), Scanned Drawing2005-08-0404 August 2005 Drawing 24, 133D9133, Rev. 9, Rev Per 03372-208 (D-G/9-11), Scanned Drawing ML0532701202005-08-0404 August 2005 Drawing M524-2, Rev 98, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S, and Yard. ML0532701082005-08-0404 August 2005 Drawing M521-1, Rev 99, Flow Diagram Residual Heat Removal System Loop 'A' . ML0532701092005-08-0404 August 2005 Drawing M521-2, Rev 100, Flow Diagram Residual Heat Removal Loop 'B'. ML0532700842005-07-0808 July 2005 Drawing M502, Rev 29, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 1 of 3 ML0532701402005-06-24024 June 2005 Drawing M537, Rev 70, Flow Diagram Equipment Drain System Reactor Building. ML0532701522005-06-16016 June 2005 Drawing M556, Rev 49, Flow Diagram Containment Instrument Air System Sheet 1 of 2 ML0532700922005-02-10010 February 2005 Drawing M510-2A, Rev 11, Flow Diagram Control and Service Air Systems CAS Tables and Details. ML0532700892005-02-10010 February 2005 Drawing M510-1, Rev 77, Flow Diagram Control and Service Air System ML0532700942005-02-10010 February 2005 Drawing M510-4, Rev 7, Flow Diagram Control and Service Air Systems ML0532700982005-01-25025 January 2005 Drawing M512-2, Rev 29, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532700992005-01-25025 January 2005 Drawing M512-3, Rev 31, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building ML0532701102004-12-29029 December 2004 Drawing M521-3, Rev 1, Flow Diagram Residual Heat Removal Loop 'C'. ML0532701422004-12-16016 December 2004 Drawing M543-1, Rev 81, Flow Diagram - Reactor Bldg. Primary Containment Cooling and Purging System. GO2-04-204, Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval2004-12-0606 December 2004 Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval ML0532701002004-09-16016 September 2004 Drawing M512-4, Rev 8, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532701162004-07-22022 July 2004 Drawing M523-3, Rev 1, Flow Diagram Reactor Water Clean-Up System Radwaste Bldg. ML0532701292004-07-0909 July 2004 Drawing M528-1, Rev 73, Flow Diagram Control Rod Drive System. ML0532700962004-03-0404 March 2004 Drawing M512-1, Rev 37, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532700882003-11-14014 November 2003 Drawing M502, Rev 16, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 3 of 3 2018-06-19 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML102440385&oldid=961746"