1. ALL INSTRUMENT ROOT VALVES NOT LABELED WILL BE 3/4" GLOBE VALVES UNLESS SPECIFICALLY NOTED OTHER WISE.
- 2. PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING SHALL BE CLASSIFIED AS FOLLOWS EXCEPT AS STATED IN NOTES 12 & 13: (BREAK POINTS ARE INDICATED ON FLOW DIAGRAM)
- a. PIPING AND VALVES OUT THROUGH OUTERMOST REACTOR ISOLATION VALVES SEISMIC CATEGORY I QUALITY CLASS I CODE GROUP A
- b. PIPING AND VALVES BEYOND OUTERMOST REACTOR ISOLATION VALVES PLUS ALL INSTRUMENT LINES, EXCEPT THE PUMP SEAL DRAIN LINES DESIGNATED AS 3/4" LPCS(56)-2 AND 3/4"HPCS(56)-4 SEISMIC CATEGORY I QUALITY CLASS I CODE GROUP B
- c. INSTRUMENTATION AIR LINES AND LEAK-OFF PIPING INSIDE CONTAINMENT ISOLATION VALVE:
SEISMIC CATEGORY I QUALITY CLASS I CODE GROUP B
- d. INSTRUMENTATION AIR LINES AND LEAK-OFF PIPING OUTSIDE CONTAINMENT ISOLATION VALVE: AND THE PUMP SEAL DRAIN LINES DESIGNATED 3/4"LPCS(56)-2 AND 3/4"HPCS(56)-4 AND OTHER PIPING AND VALVES DESIGNATED BY THIS NOTE SEISMIC CATEGORY II +
QUALITY CLASS II CODE GROUP D
+ HANGERS TO BE DESIGNED TO SEISMIC CATEGORY I LOADS.
EXCEPT AS NOTED ON M619 INSTR. CONN.
DIAG.
"HPCS(55)-4-9 HPCS-V-713 "HPCS(55)-4-10 HPCS-V-715 HPCS-V-716 HPCS-V-11 COND-1S HPCS-4 "HPCS(60)-4-2 10"COND(155)-1S TO CONDENSATE STORAGE TANK SEE M527-1 (B/7)
HPCS-V-10 10"HPCS(9)-4-1 MO 10 HPCS POT 8
HPCS E22-F010 E22-N008 RMS PO1 606 HPCS E22-R606 FA TO HPCS-V-15 MO 11 HPCS E22-F011 RMS P01 604 HPCS E22-R604 POT 10 HPCS E22-N010 TO HPCS-V-15 FA HPCS-V-711 HPCS-4 PSR-4S 3/4"HPCS(58)-4-1 1/4"PSR(20)-4S CONT ON DWG M607-2 (D/4-5) 1" X-73a PI-V-X73a PI-EFC-X73a AH DPIS 9
HPCS E22-N009 PRESS ABOVE CORE PLATE SENSING LINE - SEE DWG.
M530 (G/15) 1/2" SEE NOTE SEE NOTE 2a 2b HPCS-V-76 4"HPCS(11)-4-1 L.O.
DETAIL "B" (H/8) 2 1
3 15 14 13 12 11 10 9
8 7
6 5
4 F
E D
C B
F E
D C
B K
J H
G K
J H
G 13 14 15 A
PDS2-E1 R0 (9/94)
DWN CHK APVD 4
DESCRIPTION 5
6 DATE REV 7
8 9
10 11 12 COLUMBIA GENERATING STATION TITLE DATE SIGNATURE REV.
APPROVED CHECKED SCALE DRAWN 3
1 2
DWG NO.
A FLOW DIAGRAM HPCS AND LPCS SYSTEMS REACTOR BUILDING M520 92 NONE K. LUCAS 5-6-99 H. LE 11-9-99 JP FLERCHINGER 11-15-99 SERVER84\\00\\G HPCS-V-37 HPCS-V-38 L.C.
TEST CONN.
3/4"HPCS(55)-4-1 10" N16 HPCS-V-51 L.O.
C O
E22-F038 SEE DET. B (J/5)
HPCS-V-5 C
O T
DEACTIVATED AO 5
HPCS E22-F005 HPCS-V-103(V)
HPCS-V-65 L.C.
HPCS-V-69 HPCS-V-68 L.C.
NOTE NOTE 2c 2d HPCS-SPV-5 3/8"PI(1)-ST-X78e FROM M510-2 (H/6)
(CAS-V-97/2)
X-78e 3/4"PI(1)-1-X78e CHEM.
CLEANING 4"HPCS(1)-4-3 X-6 12"HPCS(1)-4-1 HPCS(1)-4-X6 HPCS-V-21 HPCS-V-22 E22-F021 E22-F022 "HPCS(55)-4-2 HPCS-V-4 (SEE NOTE 17)
"HPCS(55)-4-11 MO 4
O T
SEE NOTE 2a SEE NOTE 2b E22-F004 HPCS-V-60 HPC-V-61 "HPCS(50)-4-1 "HPCS(50)-1 HPCS-4 HPCS-1 HPCS-1 COND-1 EDR HPCS-V-54 HPCS-V-55 "HPCS(55)-4-3 3"HPCS(10)-4-1 HPCS-V-3 E22-F003 L.C.
HPCS-V-78(V)
HPCS-V-79(V)
"HPCS(55)-4-8 HPCS-V-31 E22-F031 HPCS-V-601 "HPCS(55)-4 2b 2d SEE NOTE SEE NOTE HPCS-V-101 CODE CODE GROUP B GROUP C 3"COND(76)-1 CONDENSATE FLUSHING SUPPLY SEE M527-1 (G/6) 16"HPCS(1)-4-1 RO 2
HPCS "HPCS(3)-4-1 HPCS-V-57 HPCS-V-718 12"HPCS(3)-4-1 "HPCS(55)-4-4 HPCS-V-23 HPCS HPCS HPCS-V-36
-1
O T
FROM MOTOR CONTROL CENTER MC-4A "HPCS(55)-1-2 HPCS-V-64 (TEST LINE)
"HPCS(55)-1-1 12"HPCS(3)-1-1 HPCS-V-83(V)
HPCS-V-84(V) 3/4"HPCS(55)-1-7 1"HPCS(55)-1-3 X-49 12"HPCS(3)-1-1 16"HPCS(1)-4-1 (MINIMUM PUMP FLOW)
RO 7
HPCS 1 1/2"HPCS(7)-1-1 E22-F014 1"HPCS(5)-1-2 1"HPCS(54)-1-1 1"HPCS(8)-1-1 2"
HPCS-V-34 RMS M
1" 2"HPCS(5)-1-1 E22-F034 WATER LEG PUMP E22-C003 HPCS-P-3 HPCS-V-7 HPCS-V-707 PI 1G HPCS E22-F007 6"HPCS(4)-1-1 RO 6
HPCS 2"HPCS(54)-1-2 HPCS-1 HPCS-4 1"HPCS(8)-4-2 E22-F006 3/4"HPCS(60)-1-4 HPCS-RV-35 HPCS-V-19 HPCS-V-75(V)
E22-F019 L.C.
HPCS-V-25 E22-F025 "HPCS(53)-1-1 (FLUSH-OUT CONNECTION) 3"RHR(9)-1-8 TO RHR SYSTEM M521-2 (B/8)
HPCS-1 RHR-1 3"HPCS(6)-1-1 HPCS-V-16 E22-F016 24"HPCS(2)-1-1 HPCS-V-15 HPCS-V-58 E22-F015 TEST CONN.
18" "HPCS(55)-1-4 C
O T
HPCS-V-85 X-31 3/4"HPCS(55)-1-6 "HPCS(55)-1-6 HPCS-V-17 "HPCS(55)-1-5 E22-F017 24"HPCS(2)-1-1 HPCS-ST-3 HPCS-ST-2 SEE NOTE 12 SEE NOTE 2b SEE NOTE 12 STRAINERS TO HPCS-PS-3A M527-1 (K/3)
TO HPCS-PS-3B M527-1 (J/3)
TO HPCS-V-10 TO HPCS-LS-1A & 1B TO HPCS-V-11 TO HPCS-LS-2A M543-1 (B/14)
TO HPCS-LS-2B M543-1 (B/5)
HPCS-1 HPCS-4 HPCS-V-53 HPCS-4 HPCS-4 HPCS-1 HPCS-4S RO 1
HPCS E22-D001 PIS 13 HPCS HPCS-V-708 HPCS-V-904(V)
HPCS-V-73 HPCS-V-72 "HPCS(55)-4-7 HPCS-V-26 E22-F026 3"HPCS(1)-4-2 HPCS-V-12 4"HPCS(4)-4-1 HPCS-V-24 E22-F024 HPCS-V-62 HPCS-V-70 3/4"HPCS(55)-4-6 "PI(1)-ST-(H22-P024)-A1 HPCS-V-709 HPCS-V-901(V)
FT 5
HPCS E22-N005 FI 603 HPCS E22-N006 HPCS-V-710 HPCS-V-902(V)
E22-R603 "PI(1)-ST-(H22-P024)-A2 "HPCS(60)-4-3 T
T C
O C
O C
T 6"HPCS(4)-4-1 "PI(1)-ST-(H22-P024)-A6 "HPCS(60)-4-1 FE 7
HPCS E22-N007 "HPCS(60)-4-5 "HPCS(60)-4-6 HPCS-V-63 HPCS-V-71 "HPCS(55)-4-5 T
RMS MO 12 RMS HPCS E22-F012 16"HPCS(1)-4-1 12" HPCS-V-706 HPCS-V-705 PX 3
PT 4
HPCS E22-N004 E22-N012 PI 601 HPCS E22-R601 "PI(1)-ST-(H22-P024)-45 SEE NOTE 15 "HPCS(60)-4-4 HIGH PRESSURE CORE SPRAY PUMP E22-C001 HPCS-P-1 M
HPCS-V-40 HPCS-V-82 "HPCS (52)-4-1 1/2" P
BA EA N
HPCS-V-42 E22-F029 PX 2
HPCS-V-704
'HPCS(52)-1-1 HPCS-V-39 E22-F037
'HPCS (52)-1 "HPCS(52)-1 "HPCS(60)-1-3 PUMP PIT SCUPPER DRAIN HPCS-V-18 HPCS-V-41 E22-F036 E22-F018
'HPCS(53)-4 SEAL VENT HPCS-V-81 HPCS-V-80 "HPCS(56)-4 "HPCS(53)-4-1 SEAL DRAIN "HPCS(56)-4 PORTABLE COLLECTOR "HPCS(52)-1-2 "HPCS(60)-1-2 PX 1
HPCS-V-703 TX 1
HPCS PIS 3
HPCS-V-701 AH/L E22-N003 "HPCS(60)-1-1 "PI(1)-ST-HPCS-PIS-3 HPCS-V-2 E22-F002 HPCS-V-717 "HPCS(55)-1-3 20"HPCS(2)-1-2 HPCS-V-1 COND-1 HPCS-1 14" 14"COND(154)-1 FROM CONDENSATE STORAGE TANK SEE M527-1 (B/6)
MO 1
HPCS C
O E22-F001 RMS 1
FA TO HPCS-V-15 2"
24"HPCS(2)-1-1 "PI(1)-4S-X73a E22-F035 SP 20 LAST VALVE LPCS-1 LPCS-*
E.D.
- 4. DELETED
- 5. DELETED ALL PIPING SYSTEMS IDENTIFIED BY THE PREFIX "PI" SHALL BE SUPPLIED AND INSTALLED BY CONTRACT #220.
- 7. DELETED ALLOWED ADEQUATE PIPING SURFACE AREA FOR COOLING OF PUMP LPCS-P-2.
- 9. DELETED
- 10. DELETED
- 11. DELETED PIPING, VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWING SHALL BE CLASSIFIED AS FOLLOWS (BREAK POINTS ARE INDICATED ON THIS DIAGRAM)
SIESMIC CATEGORY I QUALITY CALSS I CODE GROUP B*
- ASME III/2 WITH EXCEPTIONS. SEE PROCUREMENT SPECIFICATION 12023.
ALL PIPING DOWNSTREAM OF THE LAST ISOLATION VALVE AND OPEN TO THE ATMOSPHERE WITH THE SUBSYSTEM DESIGNATION SYSTEM (50) THROUGH (59) SHALL BE CLASSIFIED AS CODE GROUP D WITH QUALITY CLASS AND SEISMIC CATEGORY PROVIDED BY THE APPLICABLE NOTES ON THIS DRAWING.
ALL INSTRUMENT LINES ARE DESIGNATED BY CODE AND LINE NUMBER, EXAMPLES; A. LINE ORIGINATING OUTSIDE CONTAINMENT.
1/2"PI(1)-4S-(H22-P021)-A6 CODE DESIGNATION LINE NO.
B. LINES ORIGINATING INSIDE CONTAINMENT.
1/2"PI(1)-4S-X106 CODE DESIGNATION LINE NO.
C. CONTINUATION OF THE ABOVE LINE OUTSIDE CONTAINMENT IS DESIGNATED AS FOLLOWS W/LINE NUMBERS NOT SHOWN.
1/2"PI(1)-ST-X106-(H22-P021)
LINE DESIGNATION LINE NO.
FOR DETAILED WIRING SEE EWD-7E-0023.
FOR DETAILED WIRING SEE EWD-8E-0008.
X-78b PI-V-X78b PI-EFC-X78b SEE NOTE SEE NOTE 2a 2b LPCS-V-37 LPCS-V-38 TEST CONN.
3/4"LPCS(55)-4-2 10" LPCS-V-51 L.O.
LPCS-V-6 T
DEACTIVATED AO 6
LPCS E21-F006 LPCS-V-66 L.C.
LPCS-V-68 LPCS-V-67 L.C.
NOTE NOTE 2c 2d LPCS-SPV-6 FROM M510-2 (H/6)
(CAS-V-98/96 VIA E-IR-66)
X-78d 3/4"PI(1)-1-X78d CHEM.
CLEANING 4"LPCS(1)-4-2 X-8 12"LPCS(1)-4-1 LPCS-V-13 LPCS-V-5 "LPCS(1)-4-1 MO 5
RMS LPCS LPCS-4 LPCS-2 E21-F005 "PI(1)-4S-x78b LPCS-V-84 LPCS RHR TO RHR-DPIS-29A SEE M521-1 (H/6)
C O
C O
LPCS(1)-4-X8 LPCS-V-14 3/4"LPCS(55)-4-1 E21-F013 E21-F014 A
T C
O 12"LPCS(1)-4-1 3/4"LPCS(55)-2-4 TEST CONN.
LPCS-V-79(V)
LPCS-V-25 E21-F025 LPCS-2 COND-1 NOTE 2d NOTE 2b 3/4"LPCS(53)-2-2 3"COND(49)-1 REMOVABLE SPOOL PIECE CONDENSATE FLUSHING SUPPLY SEE M527-1 (G/7) 2"LPCS(54)-1-2 LPCS-RV-18 E21-F018 3"LPCS(11)-2-1 1 1/2"LPCS(54)-2-1 LPCS-2 LPCS-1 16"LPCS(1)-2-1 16"LPCS(1)-2-1 RO 2
LPCS LPCS LPCS-LPCS-2
-2 2S 12'LPCS(3)-2-1 LPCS-V-55 TEST CONN.
3/4"LPCS(55)-2-3 LPCS-V-12 LPCS-V-58 TEST CONN.
3/4"LPCS(55)-1-2 LPCS-V-60 MO 12 LPCS RMS C
O T
LPCS-1 LPCS-2 12"LPCS(3)-1-1 (TEST LINE)
LPCS-V-36 3/4"LPCS(55)-1-1 12"LPCS(3)-1-1 X-63 E21-F031 2"
LPCS-P-2 LPCS-V-32 RMS LPCS-V-33 E21-F034 6"LPCS(4)-1-1 (MINIMUM PUMP FLOW)
RO 3
LPCS LPCS-V-8 L.C.
LPCS-V-9 (FLUSH-OUT CONNECTION)
LPCS-1 RHR-1 3"LPCS(9)-1-1 T
MO 1
LPCS RMS X-34 24"LPCS(2)-1-1 LPCS-ST-2 LPCS-ST-3 SEE NOTE 12 SEE NOTE 2b SEE NOTE 12 STRAINERS LPCS-1 LPCS-2 E21-F011 LPCS-V-3 E21-F004 FE 2
LPCS-V-40 1/2" P
BA BA N
LPCS-V-27 PX 2
LPCS-V-703 "LPCS(52)-1-1 LPCS-V-39 "LPCS(53)-2 PUMP PIT SCUPPER DRAIN LPCS-V-29 E21-F029
'LPCS(53)-1 LPCS-V-41 "LPCS(53)-2-3 "LPCS(56)-1 PORTABLE COLLECTOR "LPCS(60)-1-2 PI 1
LPCS LPCS-V-701 FROM RHR PUMP RHR-P-2A SUCTION HDR.
SEE M521-1 (B/10)
VENT STRAINER LPCS-ST-5 SEE NOTE 12 LPCS-V-1 E21-F001 KEYLOCK C
O LPCS-V-59 3/4"LPCS(55)-1-3 LPCS-V-73(V) 3/4"LPCS(53)-1-2 E21-F008 E21-F009 24"LPCS(2)-1-1 20"RHR(8)-2-1 LPCS SYSTEM CROSS TIE LPCS-1 RHR-2 20"LPCS(10)-1-1 REMOVABLE SPOOL PIECE TX 1
LPCS PX 1
LPCS-V-702 E21-F027
'LPCS(52)-1 "LPCS(52)-2 "LPCS(52)-2-1 SEE NOTE 16 AUTO DEPRESSURIZATION SYSTEM & ALARM LPCS-V-705 PS 1
LPCS PS 9
LPCS "LPCS(60)-2-6 LPCS-V-4 3"LPCS(1)-2-2 PIS 5
LPCS LPCS-V-708 LPCS-V-901(V)
LPCS-V-707 LPCS-V-902 FT 3
LPCS FIS 4
LPCS FI 600 LPCS RMS MO 11 LPCS T
LPCS-V-709 1/2"LPCS(60)-2-4 1/2"LPCS(60)-2-5 1/2"PI(1)-ST-(H22-P001)-A6 E21-N004 E21-N003 E21-R600 A
LPCS-V-903(V)
'PI(1)-ST-(H22-P001)-A3 E21-N005 E21-R002 1/2"PI(1)-ST-(H22-P001)-A7 SP 21 1/4"PSR(21)-4S CONT ON M607-2 (D/13-14)
RO 1
LPCS LPCS-2 LPCS-2S LPCS-2 E21-D001 DETAIL "A" (B/13)
PX 3
LPCS-V-704 LPCS-FCV-11 SEE DET. A (A/15)
LPCS-V-56 TEST CONN.
"LPCS(55)-2-2 6"LPCS(4)-2-1 LPCS-V-57 CONN.
"LPCS(55)-2-1 3"
3" C
O T
LPCS-V-69 "LPCS(55)-2-5 LPCS-V-52 L.O.
TEST E21-F052 RO 5
LPCS LPCS-1 LPCS-2 LPCS-V-78 PI 1G LPCS LPCS-V-706 1"LPCS(6)-1-1 "LPCS(60)-2-7 1"LPCS(8)-1-1 1"
1"LPCS(7)-1-1 (NOTE 8)
M 1"LPCS(54)-1-1 "LPCS(60)-1-4 1"LPCS(5)-1-2 E21-F032 LPCS-V-601(V)
WATER LEG PUMP E21-C002 "LPCS(53)-1-3 2"LPCS(5)-1-1 E21-R001 "PI(1)-ST-LPCS-PI-1 C
O T
E21 1"SW M524-1 (B/10) 1"LPCS(6)-1-1 TO RHR PUMP RHR-P-2A DISCHARGE SEE M521-1 (D/14)
RHR-V-84A(REF)
LOW PRESSURE CORE SPRAY PUMP E21-C001 LPCS-P-1 "LPCS(53)-2 "LPCS(56)-2 SUPPRESSION CHAMBER WATER LEVEL ELEV. 466'-4 3/4" (MAX)
ELEV. 466'-0 3/4" (MIN)
SUPPRESSION POOL REACTOR VESSEL NOTES LEGEND
- 1. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE EXCEPT AS NOTED.
- 2. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.
- 3. ALL VALVES SUFFIXED WITH A (TH) DENOTE A THROTTLED VALVE.
C O
N5 SEE NOTE 2a SEE NOTE 2b LPCS-V-53 LPCS-V-54 TEST TEST CONN.
3"RHR(9)-1-9 TO RHR SYSTEM M521-2 (B/8)
E21-F012 PSR-4S LPCS-2 1"LPCS(8)-2-1 E21-N057 E21-N002 E21-N009 1/2"PI(1)-ST E21-F033 LPCS-RV-31 RHR LPCS "LPCS(60)-1-3 "LPCS(60)-1-1 ELEV. 521'-0 1/4" (RPV INVERT)
E22-N013 HPCS-RV-14 E22-F023 PRIMARY CONTAINMENT PS 12 HPCS FIS 6
HPCS 6.
8.
12.
13.
14.
15.
16.
1"SW 1"SW E21-N001 RO X78b PI RO X73a PI LPCS-V-34(TH)
HPCS-V-6 (V)
SCOTT PAYNE 11-10-99 MH SCHMITZ 11-15-99 SAMPLE POINT IS NO LONGER FUNCTIONAL. ALTERNATE METHOD OF 17.
1/2" HPCS(4)-4-1 SAMPLING IS DONE PER THE APPLICABLE PPM.
L.C.
DEACTIVATED AND SPARED IN PLACE SEE NOTE 17.
DEACTIVATED AND SPARED IN PLACE SEE NOTE 17.
L.C.
LPCS-V-710 AIR OPERATOR AND AIR SUPPLY FOR TESTABLE CHECK VALVES 18.
HPCS-V-5 AND LPCS-V-6 ARE DEACTIVATED AND SPARED IN PLACE.
THESE VALVES ARE TESTED PER THE IST PROGRAM. PENETRATION AND ISOLATION/TEST VALVES ARE STILL ACTIVE.
SEE NOTE 18 SEE NOTE 18 ZONE E/6 ZONE F/4 M527-1 (K/15)
ZONE F/3 TO HPCS-V-1 ZONE C/7 ZONE E/6 ZONE E/6 92 9-1-05 REV PER 04095-300 (D-E/4)
H.AL BLS DRJ