ML053270093

From kanterella
Jump to navigation Jump to search
Drawing M510-3, Rev 19, Flow Diagram Control, Service and Breathing Air Systems.
ML053270093
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/20/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M510-3, Rev 19
Download: ML053270093 (1)


Text

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 TO FUEL PREP SA-V-140 SA-V-141 TO FUEL PREP TO FPC-FIC-21 3/4" 3/4" THREADED PLUGGED CONNECTION (TYP) NOTES:

MACHINE MACHINE DWG M526 (K/10)

FL EL 606'-10 1/2" 1 1/2" SA(1)-1 SA-V-99/36 SA-V-99/37

1. FOR NOTES AND LEGEND SEE DWG M510-1 P N M L K J H G F E D Q C B A SA-V-115/1 SA-V-114/15 SA-V-114/14 SA-V-115/2 SA-V-114/13 SA-V-114/12 SA-V-114/11 SA-V-114/10 SA-V-114/9 SA-V-114/8 SA-V-114/7 SA-V-114/5 SA-V-114/4 SA-V-114/3 SA-V-114/2 SA-V-114/1 SA-V-101/36 SA-V-101/37 SA-V-112/13 SA-V-112/12 SA-V-112/11 SA-V-112/10 SERVICE BOX (TYP)

SA-V-112/15 SA-V-112/14 SA-V-113/2 SA-V-112/9 SA-V-112/8 SA-V-112/7 SA-V-112/6 SA-V-112/5 SA-V-112/4 SA-V-112/3 SA-V-113/1 SA-V-112/2 SA-V-112/1 K COL 3.9/E COL 3.9/F K

FL EL 456'-0" COL COL COL COL COL 3" SA(1)-1 3.1/M.5 3.1/L.2 1/K.2 1/L.2 1/M.5 1 1/2" 1 1/2" 2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" SA-V-101/35 SA-V-101/33 SA-V-101/32 SA-V-101/31 SA-V-101/38 2" 3" SA(1)-1 3" SA(1)-1 SA-V-602(D)

SA-V-99/35 SA-V-99/33 SA-V-99/32 SA-V-99/31 SA-V-99/38 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" FL EL 441'-0" SA-V-100/4 SA-V-100/3 SA-V-100/2 SA-V-100/1 3" SA(1)-1 SA-V-102/4 2" SA(1)-1 2" SA(1)-1 SA-V-102/3 SA-V-102/2 SA-V-102/1 COL 4.1/J SA-V-144 COL COL COL 6.8/K 7/M.7 4.1/N FL EL 572'-0" 2" SA(1)-1 1 1/2" 1 1/2" SA(1)-1 SA-V-99/30 SA-V-99/29 SA-V-99/28 SA-V-99/27 SA-V-100/13 SA-V-100/14 J J SA-V-101/30 SA-V-101/29 SA-V-101/28 SA-V-101/27 SA-V-265(D) 3" SA(1)-1 SA-V-102/13 SA-V-102/14 SA-1 SA-1 BAS-1S CONTINUED FROM ZONE H/8 SA-V-100/9 SA-V-100/5 1" SA(1)-1 TO DEMIN AIR PIPING SA-V-103 SEE DWG M516 (H/4)

SLC-1S SA-V-102/9 SA-V-102/5 1 1/2" SA(1)-1 1" 1" BAS(1)-1S LO COL COL COL COL 3/4" 3/4" SA-V-917 BAS-V-1 COL 2/G COL 3/G COL 3/E COL 2/E 1" SLC(6)-1S 2" SA(1)-1 BAS-FU-1 4.3/K 4.1/N 7.7/K 7.7/M FL EL 548'-0" DWG M522 (K/6)

FL EL 420'-0" SA-V-100/18 SA-V-100/19 1/4" CHECK UNIT 1 1/2" SA(1)-1 1 1/2" FOR PORTABLE SERVICE BUILDING SA-V-102/18 SA-V-102/19 3/4" LOW PRESSURE ALARM SA-V-100/15 SA-V-100/16 SA-V-100/10 SA-V-100/6 TEST VENT NOTE SA-V-102/15 SA-V-102/16 SA-V-102/10 SA-V-250(D) 3" SA(1)-1 (RISER) COL 3.4/K 3" SA(1)-1 (RISER) COL 9.4/M SA-V-266 SA-V-267 5a SA-V-102/6 2" SA(1)-1-1 SA-V-109 3" SA(1)-1 NOTE 5d 1" x 1/4" LC COL COL 1" 1/2" 4.1/N 4.1/N TEST 1" COL COL COL COL CRD REPAIR ROOM X93 CONN 3.4/K 4.1/N 8.3/H.3 FL EL 522'-0" SA-V-200 9.4/M AL C

AL PRIMARY CONTAINMENT PI 1 1/2" SA(1)-1 1 1/2" SA(1)-1 C1043 3/4" SA(55)-1-1 H 1/2" 1/2" AIR HOSE H SA-V-100/17 1 SA-V-170 C

RMS SA-V-102/17 SA SA-BT-1 C0162 BD A SA-V-100/11 SA-V-100/7 1/2" AIR HOSE PI CONTINUED ZONE J/4 A 1A PI PS PT SA-V-102/11 SA-V-102/7 BAS PS 1G 1 1 2

SA SA SA COL COL COL PI CAS 2A BAS-PCV-1 3.4/K 8.3/H.7 9.4/M CAS-V-711 SA-SPV-2 FL EL 501'-0" BAS CLOSES PCV SA-V-701 PI 1 1/2" SA(1)-1 1 1/2" SA(1)-1 ON LOW PRESS 1B 2 1/2" MANIFOLD 3" BAS CONTINUED FROM M510-4 (G/5) 4" SA(1)-1 1/4" 1/4" 1/4" 1/4" 1/4" 1/4" SA-PCV-2 SA-V-100/20 SA-V-100/21 SA-V-100/12 SA-V-100/8 2 1/2" MANIFOLD SA-V-104 CAS-1 SA-1 SA-V-102/20 SA-V-102/21 SA-V-102/12 SA-V-102/8 LO SEE NOTE 5 SEE NOTE 5 1/4" 1/4" PI PI PI PI PI PI 1/4" COL COL COL COL DWG M510-1 DWG M510-1 BAS-PCV-7 BAS-PCV-6 BAS-PCV-5 BAS-PCV-4 BAS-PCV-3 BAS-PCV-2 7B 6B 5B 4B 3B 2B 4.1/J 4.1/N 8.3/H.7 9.4/M FL EL 471'-0" BAS BAS BAS BAS BAS BAS BAS-QDC-5 BAS-QDC-7 G 2" SA(1)-1 BAS-QDC-6 G LO 3" SA(1)-1 BAS-CP-1 SA-V-100/38 SA-V-100/37 SA-V-100/36 SA-V-105 4" SA(1)-1 BAS-QDC-13 BAS-QDC-12 BAS-QDC-11 BAS-QDC-10 BAS-QDC-9 BAS-QDC-8 3" SA(1)-1 SA-V-100/27 SA-V-100/26 SA-V-100/25 SA-V-100/24 SA-V-100/23 SA-V-100/22 SA-V-102/38 SA-V-102/37 SA-V-102/36 BAS-CP-2 4" SA(1)-1 SA-V-102/27 SA-V-102/26 SA-V-102/25 SA-V-102/24 SA-V-102/23 SA-V-102/22 3/4"SA(1)-1 1 1/2" 2" 1 1/2" FOR CONT. SEE DETAIL B ZONE E/2 COL COL COL 3"

1 1/2" PLATF EL 444'-0" 8.4/Q 6.6/Q 4.6/Q 3" 1 1/2" 1 1/2" SA-V-174 4" SA(1)-1 3" 2" SA(1)-1 SA-V-98/10 SA-V-98/11 SA-V-98/12 SA-V-601 SA-V-100/35 SA-V-100/34 SA-V-100/33 SA-V-100/32 SA-V-100/31 SA-V-98/7 SA-V-98/8 SA-V-98/9 SW-V-100/29 SA-V-100/41 SA-V-102/29 SA-V-99/21 SA-V-99/22 SA-V-99/23 SA-V-99/24 SA-V-100/30 SA-V-100/28 SA-V-108/10 SA-V-108/11 SA-V-108/12 SA-V-102/39 SA-V-108/7 SA-V-108/8 SA-V-108/9 SA-V-102/35 SA-V-102/34 SA-V-102/33 SA-V-102/32 SA-V-102/31 SA-V-605(D)

SA-V-101/21 SA-V-101/22 SA-V-101/23 SA-V-101/24 COL SA-V-102/30 2" SA(1)-1 1/Y F SA-V-102/28 F 4" SA(1)-1 SA-V-102/41 SA-V-100/39 COL COL COL COL RHR PUMP LPCS PUMP HPCS PUMP RCIC PUMP RHR PUMP RHR PUMP 7/A 8/A 9/A 13/A COL 7/N COL 4.1/N SA-V-102/40 ROOM "C" ROOM ROOM ROOM ROOM "A" ROOM "B" BASEMENT PUMP ROOM COL COL COL COL COL COL COL FL EL 422'-3" 9/B 9/B 10/B 10/B 12/B 12/B 1/W REACTOR BUILDING DIESEL GENERATOR BLDG SA-V-100/40 2" SA(1)-1 1 1/2" SA-V-102/42 COL 1 1/2" COL 4/Z 4/V 2 1/2" SA(1)-1 3" SA(1)-1 (RISER) COL 17/A CONTROL BLDG SA-V-100/47 SA-V-100/42 3" SA(1)-1 (RISER) COL 4/B 3" SA(1)-1 (RISER) COL 9/A SA-V-99/19 SA-V-98/13 1 1/2" SA-V-99/25 SA-V-100/49 SA-V-100/48 SA-V-99/40 SA-V-99/20 SA-V-98/14 2"

SEE NOTE 5 DWG M510-1 SA-V-102/47 CIRC WATER PUMPHOUSE SA-V-99/18 SA-V-99/17 SA-V-99/16 SA-V-99/15 SA-V-99/14 SA-V-102/49 SA-V-102/48 SA-V-101/40 SA-V-101/25 SA-V-98/16 SA-V-98/17 SA-V-101/19 SA-V-108/13 COL COL COL COL SA-V-101/20 SA-V-108/14 SA-V-101/18 SA-V-101/17 SA-V-101/16 SA-V-101/15 SA-V-101/14 11.1/H.3 12.5/K.1 13.6/L.9 11.1/L.9 COL 17/F 3" SA(1)-1 SA-V-108/16 SA-V-108/17 INSTRUMENT SHOP FL EL 525'-0" SA-V-99/26 3" SA(1)-1 1 1/2" 1 1/2" COL 6/N.8 COL 6/N.8 SA-V-249(D)

SA-V-101/26 SEE NOTE 4 SA-V-100/52 SA-V-100/51 SA-V-100/50 DWG M510-1 E E SA-V-100/43 COL COL COL COL COL COL COL COL COL SA-V-102/51 FLOOR EL. 441'-0" SA-V-102/52 SA-V-102/50 8/F 9/H 11/H 13/E 13/H 6/F 4/C 17/C.4 17/B.3 COL 16/A FL EL 501'-0" SA-V-100/44 SA-V-102/43 SA-V-102/44 COL COL COL 2 1/2" SA(1)-1 3" 2" 1 1/2" FL EL 507'-0" 11.1/L.9 12.2/N.9 12.2/R.2 1 1/2" 1 1/2" 2" 3" SA(1)-1 3/4" SA(1)-1 SA-V-99/8 SA-V-99/7 SA-V-99/6 SA-V-99/5 SA-V-99/11 SA-V-99/10 COL COL SA-V-99/12 SA-V-100/54 2" 3/B 3/D CONTINUED FROM ZONE F/7 SA-V-99/41 2"

SA-V-100/63 SA-V-99/4 2"

SA-V-100/62 SA-V-100/60 SA-V-100/59 SA-V-100/58 SA-V-100/56 SA-V-100/55 SA-V-99/9 1 1/2" STANDBY SERVICE WATER PUMPHOUSE #1A SA-V-101/12 SA-V-101/11 SA-V-101/10 SA-V-101/41 SA-V-101/8 SA-V-101/7 SA-V-101/6 SA-V-101/5 SA-V-99/42 SA-V-102/54 SA-V-99/13 DETAIL "B" SA-V-101/4 SA-V-102/60 SA-V-102/59 SA-V-102/58 SA-V-102/56 SA-V-102/55 SA-V-100/65 SA-V-100/64 SA-V-102/63 SA-V-102/62 SA-V-101/9 SA-V-100/61 SERVICE AIR CONNECTIONS SA-V-101/13 SA-V-102/65 SA-V-102/64 TO REACTOR BUILDING EL. 441'-0" SA-V-102/61 3" SA(1)-1 COL EQUIPMENT ACCESS AREA (R105)

COL COL COL COL 4/C COL COL COL COL COL COL COL COL COL 13.9/N.1 COL 1 1/2" 1 1/2" 5/H 7/H 9/H 11/H COL COL COL COL 11.2/R.2 11.2/P.4 COL COL 13.2/R.2 13.9/S 13/H 7/B 10/A 12/A COL TO FUME HOOD 15.9/N.1 15.9/Q.1 13.2/N.9 13.2/R.2 SA-V-100/45 16/A COL 10.7/N.1 15.1/K.1 13.2/R.2 SAMPLING RM FL EL 471'-0" FL EL 487'-0" 13.9/L.9 HOT INSTRUMENT SHOP D 4" SA(1)-1 2" 2" BA(10)-1 COL 12.2/Q.4 FOR CONTINUATION SEE 3" SA(1)-1 3" SA(1)-1 3"

TO RWCU F/D D

DETAIL "A" ZONE B/2 SA-V-102/73 COL 3" SA-V-100/46 SA-V-100/66 CONT'D ON DWG M534 (G/14) 3"SA(3)-1 SEE DWG SA-V-100/96 SA-V-100/97 SA-V-100/98 SA-V-100/99 SA-V-99/39 SA-V-102/45 12.2/N.9 COL COL COL SA-V-100/73 SA-V-99/1 SA-V-99/2 SA-V-99/3 COL FROM DWG M523-3 (F/14) 3" SA(1)-1 (RISER) COL 13.2/S SA-V-102/66 COL 10/Q.4 COL 10/N.9 15.1/N.9 14.7/Q 13.2/N.9 13.9/R.2 2" M510-4 (D/3) 1 1/2" SA-V-99/43 SA-V-102/46 SA-V-102/71 SA-V-102/70 3" SA(1)-1 (RISER) COL 11/H SA-V-253 SA-V-102/69 SA-V-102/72 SA-V-102/96 SA-V-102/97 SA-V-102/98 SA-V-102/99 SA-V-101/39 SA-V-101/1 SA-V-100/71 SA-V-100/70 SA-V-100/68 SA-V-252 SA-V-101/2 SA-V-101/3 SA-V-100/69 SA-V-100/67 SA-V-102/75 SA-V-102/74 SA-V-102/68 SA-V-100/72 COL COL SA-V-102/67 SA-V-100/75 SA-V-100/74 COL 3/B 3/D 1 1/2" 13.2/R.5 STANDBY SERVICE WATER PUMPHOUSE #1B COL 1" 2" COL COL COL COL COL COL COL COL 1 1/2" 2" 15.9/N.9 7/E 5/C 6/B 8/B 11/A 15/B 15/D 16/F FL EL 467'-0" COL 17/K.1 1 1/2" SA(1)-1 MWR-1S SA-1 LO STOR RM 3/4" SA(2)-1 M986-1 (C/11)

HWC-IR-P73/P200 SA-V-100/78 SA-V-100/77 SA-V-100/76 TO POLISHING DEMINERALIZER 2" MWR(23)-1S 2" SA(1)-1 SA-V-100/95 DWG M533-2 (G/3)

SA-V-102/78 SA-V-102/77 SA-V-102/76 SA-V-270 SA-V-102/95 COL COL COL 1"

C 2" CONT'D ON DWG 15.9/H.3 14.7/L.9 15.1/N.1 2"

C 1" SA(1)-1 TO FD FILTER COL M535-1 (K/15)

SA-PCV-21 SA-V-5 FL EL 452'-0" DWG M531 (H/14) 7/G TO FD DEMINERALIZER 2" SA(1)-1 COL COL SA-V-119 DWG M531 (H/3) 3" SA(1)-1 TO COND 12.2/K.1 13.2/N.1 2" SA(1)-1 TO WASTE DEMINERALIZER 1 1/2" SA(1)-1 FILTER DEMINERALIZER SA-V-115 DWG M532 (H/8)

SA-V-100/93 SA-V-100/92 1" SA(1)-1 TO AUX SEE DWG M534 (D/12) SA-V-100/81 2" SA(2)-1 1" SA(1)-1 SA-V-114 BOILER-BURNER 1 1/2" SA-V-707 SA-V-102/85 SA-V-102/84 SA-V-100/83 1" SA(1)-1 TO WASTE COLLECTOR FILTER 4" SA(1)-1 (RISER) COL 4/B SEE DWG M513 (F/11) SA-V-560 SA-V-102/81 DWG M532 (F/13)

SA-V-102/93 SA-V-102/92 SA-V-100/85 SA-V-100/84 TO FUEL POOL FD 1" SA(1)-1 SA-V-102/83 SA-V-120 2 1/2" DWG M526-2 (K/11)

SA HEADER 1" SA(1)-1 COL SA-V-116 COL COL LO COL 12.2/N.1 3" SA(1)-1 15.1/Q.1 11/E 13/G SA-V-118 3" SA(1)-1 SA-V-246(D) 1 1/2" SA-V-106 2" SA(1)-1 CONT'D FROM ZONE D/7 SA-V-100/80 SA-V-100/79 SA-V-100/88 1 1/2" DETAIL "A" SA-V-100/86 SA-V-100/87 SA-V-102/88 3/4" SA-V- SERVICE AIR CONNECTIONS FOR SUB-DESIGNATION SA-V-102/80 SA-V-102/79 TO DEMINERALIZER SYSTEM SA-V-100/94 SEE BODY OF DRAWING COL 3" SA(1)-1 B 3/4" SA-V- B SA-V-102/86 SA-V-102/87 12.5/K.1 3" SA(1)-1 3/4" 2" SA-V-102/94 SA-V-247(D)

COL 15.9/H.3 COL 15.9/J.6 SA-QDC-100 COL COL COL (UNLESS OTHERWISE NOTED) 15.1/S 3.2/Q.1 SA-V-100/89 SA-V-100/82 9/G SA-V-102/91 SA-V-102/90 COL COL 4" SA(1)-1 12.2/Q.4 10.7/S TYPICAL SA HOSE STATION 3" SA-V-100/91 SA-V-100/90 SA-V-102/89 SA-V-102/82 3" SA(1)-1 LO 2"

COL COL FSAR FIG 14.7/K.7 15.1/L.9 SA-V-107 FL EL 441'-0" FL EL 437'-0" CORRIDOR TURBINE GENERATOR BUILDING RADWASTE BUILDING COLUMBIA GENERATING STATION REV DATE DESCRIPTION DWN CHK APVD SIGNED DATE TITLE A 16 04-19-02 REV PER 01485-008 (C/3), 01553-007 (D/5) JFT KL DRJ A APPROVED M R GRINDEL 5-10-90 FLOW DIAGRAM 17 7-26-02 REV PER 01728-002 (D,H/8) NT KB DRJ ENGINEER CONTROL, SERVICE AND 18 02-03-05 REV PER 01749-328 (C-D/11-12) DC HL SRP BREATHING AIR SYSTEMS 19 10-20-05 CORRECTED INCORPORATION OF 01749-328 (C/11) KB HL DRJ DESIGNER JEFFERY R MILLER 5-10-90 DRAWING # M510-3 CHECKED RB CLEAVENGER 5-10-90 SCALE REV.

DRAWN DR JACOBSEN 12-1-88 N/A 19 15 14 13 12 11 10 9 8 7 6 5 4 3 2