|
---|
Category:Drawing
MONTHYEARML18191A2052018-06-19019 June 2018 Forwards Response to NRC Comments of July 7, 1977 and February 23, 1978 on Caorso Test Plan ML16244A8332016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-1-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. GO2-16-112, License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg.2015-06-17017 June 2015 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. ML1024404282010-08-19019 August 2010 Drawing 15, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System Reactor Building Diesel Generator Building and Radwaste Building ML1024404302010-08-19019 August 2010 Drawing 17, LR-M573-2, Rev. 1, License Renewal Boundary Drawing Potable Water Cold & Fire Protection System Pumphouses ML1024403772010-08-19019 August 2010 Drawing 10, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024403782010-08-19019 August 2010 Drawing 1, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403792010-08-19019 August 2010 Drawing 2, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403802010-08-19019 August 2010 Drawing 3, LR-M515-1, Rev. 2, License Renewal Boundary Drawing Fire Protection System ML1024403812010-08-19019 August 2010 Drawing 4, LR-M515-1, Rev. 1, License Renewal Boundary Drawing Fire Protection System ML1024403822010-08-19019 August 2010 Drawing 5, LR-M515-2, Rev. 1, License Renewal Boundary Drawing Fire Protection System Details ML1024403832010-08-19019 August 2010 Drawing 6, LR-M515-2, Rev. 1, License Renewal Boundary Drawing Fire Protection System ML1024404242010-08-19019 August 2010 Drawing 11, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024404252010-08-19019 August 2010 Drawing 12, LR-M515-4, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Turbine Generator Building ML1024404262010-08-19019 August 2010 Drawing 13, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System General Services Building and Diesel Generator Building and Radwaste Building ML1024404272010-08-19019 August 2010 Drawing 14, LR-M515-5, Rev. 2, License Renewal Boundary Drawing Fire Protection System Reactor Building Diesel Generator Building and Radwaste Building ML1024404292010-08-19019 August 2010 Drawing 16, LR-M573-2, Rev. 1, License Renewal Boundary Drawing Potable Water Cold & Fire Protection System Pumphouses ML1024403842009-08-27027 August 2009 Drawing 7, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution ML1024403852009-08-27027 August 2009 Drawing 8, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution ML0532700932005-10-20020 October 2005 Drawing M510-3, Rev 19, Flow Diagram Control, Service and Breathing Air Systems. ML0532701282005-10-20020 October 2005 Drawing M526-2, Rev 1, Flow Diagram Fuel Pool Cooling and Clean-up System. ML0532701132005-10-14014 October 2005 Drawing M523-1, Rev 104, Flow Diagram Reactor Water Clean-Up System Reactor Bldg. ML0532701152005-10-14014 October 2005 Drawing M523-2, Rev 6, Flow Diagram Reactor Water Clean Up System. Sheet 2 of 2 ML0532701412005-09-19019 September 2005 Drawing M539, Rev 78, Flow Diagram Floor Drain System Reactor Building. ML0532701472005-09-0101 September 2005 Drawing M544, Rev 69, Flow Diagram HVAC - Standby Gas Treatment Reactor Building. ML0532701062005-09-0101 September 2005 Drawing M520, Rev 92, Flow Diagram HPCS and LPCS Systems Reactor Building ML0532701512005-08-11011 August 2005 Drawing M554, Rev 59, Flow Diagram - H. & V. Containment Atmospheric Control System Reactor Bldg. ML0532700912005-08-11011 August 2005 Drawing M510-2, Rev 31, Flow Diagram Control and Service Air Systems ML0532701182005-08-10010 August 2005 Drawing M524-1, Rev 105, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S and Yard. ML0532701212005-08-0808 August 2005 Drawing M524-3, Rev 11, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S and Yard. GO2-10-117, Drawing 24, 133D9133, Rev. 9, Rev Per 03372-208 (D-G/9-11), Scanned Drawing2005-08-0404 August 2005 Drawing 24, 133D9133, Rev. 9, Rev Per 03372-208 (D-G/9-11), Scanned Drawing ML0532701202005-08-0404 August 2005 Drawing M524-2, Rev 98, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S, and Yard. ML0532701082005-08-0404 August 2005 Drawing M521-1, Rev 99, Flow Diagram Residual Heat Removal System Loop 'A' . ML0532701092005-08-0404 August 2005 Drawing M521-2, Rev 100, Flow Diagram Residual Heat Removal Loop 'B'. ML0532700842005-07-0808 July 2005 Drawing M502, Rev 29, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 1 of 3 ML0532701402005-06-24024 June 2005 Drawing M537, Rev 70, Flow Diagram Equipment Drain System Reactor Building. ML0532701522005-06-16016 June 2005 Drawing M556, Rev 49, Flow Diagram Containment Instrument Air System Sheet 1 of 2 ML0532700922005-02-10010 February 2005 Drawing M510-2A, Rev 11, Flow Diagram Control and Service Air Systems CAS Tables and Details. ML0532700892005-02-10010 February 2005 Drawing M510-1, Rev 77, Flow Diagram Control and Service Air System ML0532700942005-02-10010 February 2005 Drawing M510-4, Rev 7, Flow Diagram Control and Service Air Systems ML0532700982005-01-25025 January 2005 Drawing M512-2, Rev 29, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532700992005-01-25025 January 2005 Drawing M512-3, Rev 31, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building ML0532701102004-12-29029 December 2004 Drawing M521-3, Rev 1, Flow Diagram Residual Heat Removal Loop 'C'. ML0532701422004-12-16016 December 2004 Drawing M543-1, Rev 81, Flow Diagram - Reactor Bldg. Primary Containment Cooling and Purging System. GO2-04-204, Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval2004-12-0606 December 2004 Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval ML0532701002004-09-16016 September 2004 Drawing M512-4, Rev 8, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532701162004-07-22022 July 2004 Drawing M523-3, Rev 1, Flow Diagram Reactor Water Clean-Up System Radwaste Bldg. ML0532701292004-07-0909 July 2004 Drawing M528-1, Rev 73, Flow Diagram Control Rod Drive System. ML0532700962004-03-0404 March 2004 Drawing M512-1, Rev 37, Flow Diagram Diesel Oil & Miscellaneous Systems Diesel Generator Building. ML0532700882003-11-14014 November 2003 Drawing M502, Rev 16, Flow Diagram Main & Exhaust Steam System Turbine Generator Building Sheet 3 of 3 2018-06-19
[Table view] |
Text
11 10 9 8 7 6 5 4 3 2 1 TABLE 1 NOTES:
DPIS EPN DO-V-629(V)
FILTER EPN 1. FOR GENERAL NOTES AND LEGEND SEE DRAWING M512-1.
1/4" 1/4" "A" "B" "C" "D" "E" "F" 1 1/2"DO(1)-1-4 FOR CONT. SEE DWG. M512-3 (A-B/11)
- 2. ALL INSTRUMENTATION ON THIS DRAWING TO BE IDENTIFIED 1 1/2"DO(1)-1-2 3/4"DO(57)-1-22 BY PREFIX "DO" UNLESS SPECIFICALLY NOTED OTHERWISE.
DO-V-604(V) 1"DO(2)-1-8 DO-F-5 DO-V-725 DO-V-726 DO-V-737 DO-V-738 DO-V-727 DO-V-728 DO-V-4B DO-V-718B K DO-V-9B K PLUG & NOZZLE FOR DO-V-601(V) 3/4"DO(57)-1-20 1"DO(2)-1-6 (D) 1/2" 1/2" DO-F-6 DO-V-739 DO-V-729 DO-V-740 DO-V-741 DO-V-730 DO-V-731 EXAMPLE:
STICK MEASUREMENT DO-V-8B DO-V-608(V) 3/4"DO(57)-1-14 3/4"DO(3)-1-8 (D) "C" "E" DO-F-7 DO-V-742 DO-V-732 DO-V-743 DO-V-744 DO-V-733 DO-V-734 FO 3"DO(56)-1-2 2" "D" "B"
DO-V-605(V) 3/4"DO(57)-1-12 3/4"DO(3)-1-6 (D) 3. DIESEL OIL STORAGE AND DAY TANK VENTS TO BE PIPED OUTSIDE OF BUILDING.
NOTE 4 (THIS DWG)
(M512-1) (M512-1)
DO-FA-1B 3/4"DO(57)-1-18 (D)
NOTE 11 DO-V-607(V) 1"DO(2)-1-4 SP 1/4" 1/4" SP
- 4. THIS DIESEL FUEL OIL VALVE IS NO LONGER FUNCTIONAL. INTERNAL PARTS DO-V-40B DO-V-7B 3/4"DO(57)-1-16 (D) "A" 1/4" "F" HAVE BEEN REMOVED.
DO-V-603(V) 1"DO(2)-1-2 1/4" DO-V-6B 5. 2 1/2" DROP PIPE INSTALLED INSIDE 4" PIPE, SEE DRAWING DO-V-606(V) 3/4"DO(57)-1-10 3/4"DO(3)-1-4 (D)
NOTE 2 D-SPL-013 FOR DETAIL.
DO-V-602(V) 3/4"DO(57)-1-8 3/4"DO(3)-1-2 (D)
VENT (D) DETAIL-1 2"DO(57)-1-4 (SEE TABLE 1 FOR EPN #)
J (H) J LS AL 11B H
LS
LS
- 10B 3" 3" 3" 12B (L) 1/4" 3"
PI PI PS DO-V-73 DO-V-78 DPIS PI DO-V-70 DO-V-82 DO-V-702B DPIS DPIS 1/4" 5 7 7 7 6 5 6 3/4"DO(56)-1-2 1/2" 3/4" DIESEL OIL DAY TANK DO-V-41B 1/2" DO-V-723 DO-V-724 DO-V-745 DO-V-735 DO-V-736 (L.C.)
DO-AV-1 DO-AV-2 DO-AV-3 3"
(DO-TK-3B)
DO-V-746 1/4" DO-V-56B 3" 3" (L.C.) DO-V-83 L.C.
1/2" DO-RV-57 3/4" 3/4" 1/2" 1/4" 3/4" 1/4" 1/4" 3/4" 1/4" 3/4" 2"DO(56)-1-2 3/4" 1/2" DO-V-74 3" DO-V-77 DO-V-79 DO-V-81 4" 3" 3" 2" 3" H D0-V-71(TH) H (M512-1) (M512-1)
DO-V-69 DO-P-7 DO-V-72 3"DO(56)-1-2 DO-F-6 3/4" DO-FI-1 (M512-1) (M512-1)
DO-F-7 DO-V-722 DO-FA-3B NOTE 11 DO-F-5 PI 3/4" (L) (H)
NOTE 11 RMS SEE DETAIL-1 SEE DETAIL-1 SEE DETAIL-1 3" DO(5)-1 M
11B 3/4" (J-K/6-7) LS LS (J-K/6-7)
DO-V-2B (J-K/6-7) 2" DO-V-748 16 15 DO-V-747 DO-V-633 DO-V-631 NOTE 2 1 1/2"DO(1)-1-6 NOTE 2 M
EMERG. STOP EMERG. STOP PT 3"DO(57)-1-2 DO-V-632 RMS RMS RMS DO-V-1B 11B DO-P-1B DO-SV-600 FP/2 FP/1 P/7 (VENT) 1" 1" 3/4" DO-V-701B CAP & NOZZLE FOR 3"DO(9)-1-2 STICK MEASUREMENT AH AH AH AH 3/4"DO(60)-1-10 4"DO(9)-1-6 ED ED ED 3"DO(9)-1 1 1/2"DO(1)-1-2 2" DRAIN LINE DO-V-5 2" 2" RMS LI LI LI 1" ANTI-SIPHON LINE NOTE 2 NOTE 22 LS P/8 FILTER POLISHER SKID 11A 11B 16 G RO (M512-1) (M512-1) 8 AL
- G 2 1/2" DROP PIPE DO-V-84 (DO-FP-1) 1B NOTE 5 (THIS DWG) M 1/2"DO(6)-1-2 FD-V-38 NOTE 22 NOTE 2 DO-P-8 DO-V-65 FD FD FROM DO-LITS-10A FROM DO-LITS-10B FROM DO-LITS-15 3"DO(9)-1 (M512-1) (M512-1) MO 65 TO M.H. S4 NO (ZN. A/11) (ZN. F/11) (ZN. B/3)
OIL SUMP M741-1 (B/3) 3"DO(5)-1 LE 10B AL AH 4" YARD PIPING NOTE 22 NOTE 11 LITS (M512-1) (M512-1) 1 1/2" 1" 3/4" 3"DO(5)-1 10B DO(9) DO(5)
A SYS FAULT DIESEL OIL STORAGE TANK NC LI 10B (DO-TK-1B) DO-V-61 3"DO(5)-1 TO DO-LI-11B F (ZN G/1-2) F FOR CONT. SEE DWG.
DO(9) DO(5) 1"DO(5)-1-2 3/4"DO(57)-1-24 DO-V-627(V)
M512-1 (C/5)
NC (D) (D) 1"DO(4)-1-1 3/4"DO(57)-1-25 DO-V-618(V)
DO-V-62 (M512-1) (M512-1) (M512-1) (M512-1)
NOTE 11 NOTE 11 DO-V-14 (D) (D) 1"DO(4)-1-2 3/4"DO(57)-1-26 DO-V-617(V) 1 1/2"DO(5)-1-1 DO(9) DO(5)
DO-V-12 DO-V-13 NC (D)
DO-V-59 DO-V-57 PLUG & NOZZLE FOR 1 1/2"DO(1)-1-5 STICK MEASUREMENT NC NOTE 2 NOTE 2 DO-V-63 NC DO-V-44 DO-V-628(V)
NOTE 4 (THIS DWG)
(M512-1) (M512-1)
DO-FA-4 NOTE 11 1 1/2"DO(1)-1-3 DO-V-43 3/4"DO(5)-1-2 DO-V-64 1 1/2"DO(1)-1-1 FOR CONT. SEE DWG. M512-2 (B/8,11)
DO-V-614(V) 3/4"DO(57)-1-21 1"DO(2)-1-7 3"FO(1)-1 DO-V-4A DO-V-718A CONT FROM NC DO-V-9A 3/4"DO(57)-1-19 (D) M513 (E/11) 3"DO(5)-1-3 PLUG & NOZZLE FOR DO-V-611(V) 1"DO(2)-1-5 NOTE 2 2"DO(57)-1-6 STICK MEASUREMENT DO-V-8A FO(1) DO(5)
E DO-V-612(V) 3/4"DO(57)-1-13 3/4"DO(3)-1-7 (D) E 3"DO(56)-1-1 2" 3"DO(5)-1-3 DO-V-613(V) 3/4"DO(57)-1-11 3/4"DO(3)-1-5 (D) 3/4"DO(57)-1-23 NOTE 4 (THIS DWG)
DO-V-630 (M512-1) (M512-1)
DO-FA-1A 3/4"DO(57)-1-17 (D)
NOTE 11 DO-V-610(V) 1"DO(2)-1-3 DO-V-40A DO-V-7A DO-V-609(V) 3/4"DO(57)-1-15 1"DO(2)-1-1 (D) 3/8"PI(1)-ST-DO-LS-13 2"DO(56)-1-3 DO-V-6A * (H)
DO-V-615(V) 3/4"DO(57)-1-9 3/4"DO(3)-1-3 (D) LS NOTE 2 13 3"DO(5)-1-3 NC
FILLING CONNECTION DO-V-616(V) 3/4"DO(57)-1-7 3/4"DO(3)-1-1 (D)
PLUG & NOZZLE 21 LS DO-V-58 14 VENT (D) DO-ST-5 3/4" (L) 2"DO(57)-1-3 (M512-1) (M512-1)
DO-V-60 NOTE 2 DO(5) DO(5) DO(5) DO(5)
DO-V-85 DO-V-86 DO-V-87 DO-V-712 (H)
- NC NC NC NC LS 3/4"DO(56)-1-3 DO-V-11 DIESEL OIL DAY TANK DO(9) DO(9) DO(9) 11A NOTE 11 H
D LS D A
(DO-TK-3C)
L LS 10A DO-V-56C 12A (L.C.)
(L) 1/4" 3"DO(9)-1-1 3"DO(9)-1-2 3"DO(9)-1-7 DO-V-702A 2"DO(56)-1-3 DO-V-10 3"FO(1)-1 CONT ON 3/4"DO(56)-1-1 M513 (E/10) DO-FA-2 DIESEL OIL DAY TANK DO-V-41A (M512-1) (M512-1)
NOTE 11 RMS PI (L.C.)
(M512-1) (M512-1)
(DO-TK-3A)
NOTE 11 16 DO-V-56A 2"DO(56)-1-3 (L.C.)
2" NOTE 2 2"DO(56)-1-1 NOTE 2 M
PT 3"DO(57)-1-5 (M512-1) (M512-1) 3"DO(9)-1-7 NOTE 11 16 DO-P-2 DO-FA-3A (M512-1) (M512-1)
(VENT)
PI NOTE 11 RMS CAP & NOZZLE FOR 2"
3"DO(56)-1-1 11A STICK MEASUREMENT DO-V-2A C DO-V-711 C 3"DO(9)-1 NOTE 2 4"DO(9)-1-9 1 1/2"DO(5)-1-1 NOTE 2 M
PT
11A DO-V-1A (M512-1) (M512-1) 3"DO(9)-1-1 NOTE 22 DO-P-1A (VENT)
DO-V-701A 2 1/2" DROP PIPE RO CAP & NOZZLE FOR STICK MEASUREMENT NOTE 5 (THIS DWG) 2 3/4"DO(60)-1-5 4"DO(9)-1-5 NOTE 2 (M512-1) 1/2"DO(6)-1-3 3"DO(9)-1 NOTE 2 1 1/2"DO(1)-1-1 NOTE 22 (M512-1) 2"
- 2" LE 3"DO(9)-1 NOTE 2 NOTE 22 15 (M512-1) (M512-1) ALH RO 1A LITS 2 1/2" DROP PIPE B 1/2"DO(6)-1-1 15 B NOTE 5 (THIS DWG) NOTE 22 NOTE 2 A 3/4" 1" 1 1/2" 3"DO(9)-1 (M512-1) (M512-1)
SYS FAULT LI LE 15 10A TO DO-LI-16 DIESEL OIL STORAGE TANK AL AH (ZN G/1)
(DO-TK-2)
LITS 10A 1 1/2" 1" 3/4" SYS FAULT A
LI DIESEL OIL STORAGE TANK FSAR FIG.
COLUMBIA 10A TO DO-LI-11A (DO-TK-1A) GENERATING (ZN G/2)
STATION REV DATE DESCRIPTION DWN CHK APVD REV DATE DESCRIPTION DWN CHK APVD REV DATE DESCRIPTION DWN CHK APVD REV DATE DESCRIPTION DWN CHK APVD SIGNATURE DATE TITLE A A APPROVED 5 4-14-94 REDRAWN AND REVISED PER 83-0107-1A-237, 83-0107-1A-A51, SRP JRM RLP 83-0107-1B-210, 83-0107-1B-A61, 83-0107-1C-200, 93-09-044-0027, PAA HL R.L. PETERSON 4-14-94 FLOW DIAGRAM DESIGN 88-048-0A-370, 88-0048-0A-371 & 88-0048-0A-372.
ROBY CLEAVENGER 4-14-94 DIESEL OIL &
6 5-4-95 REVISED PER 95-04-014-0003 (G/5-6). MJH HL RC MISCELLANEOUS SYSTEMS CHECKED JEFFREY R. MILLER 2-12-91 7 12-3-99 REVISED PER 99-03-011-0002 (C/2), 99-03-011-0003 (C,H/10). KL HL SRP DRAWN DIESEL GENERATOR BUILDING 8 9-16-04 CORRECTED INCORPORATION OF 83-0107-1A-237 (B-C/1). JFT DMS SRP S.R. PAYNE 1-23-91 SCALE DWG NO. REV.
N.T.S. M512-4 8 11 10 9 8 7 6 5 4 3 2 SERVER84\00\DWG TOP 1
TIER