ML053270140

From kanterella
Jump to navigation Jump to search
Drawing M537, Rev 70, Flow Diagram Equipment Drain System Reactor Building
ML053270140
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/24/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M537, Rev 70
Download: ML053270140 (1)


Text

2 1

3 15 14 13 12 11 10 9

8 7

6 5

4 F

E D

C B

F E

D C

B K

J H

G K

J H

G 13 14 15 A

PDS2-E1 R0 (9/94)

DWN CHK APVD 4

DESCRIPTION 5

6 DATE REV 7

8 9

10 11 12 COLUMBIA GENERATING STATION TITLE DATE SIGNATURE REV.

APPROVED CHECKED SCALE DRAWN 3

1 2

DWG NO.

A FLOW DIAGRAM EQUIPMENT DRAIN SYSTEM REACTOR BUILDING M537 70 NTS 4WARDTECH 6-17-99 H. LE 12-21-00 D. THIEDERMAN 1-8-01

\\SERVER84\\00\\g 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" RHR VALVE RM. "A" DRAIN RHR VALVE DRAIN COL. L & 4.3 RCIC VALVE DRAIN COL. M & 5 FROM GATE DRAIN SEE DWG. M526-1 (F/10)

FROM INSTR. DRAINS SEE DWG. M526-1 (F/7) 2"FPC(50)-1 FROM DRYER SEPARATOR POOL SEE DWG M526-1 (E/7)

M545-3 (K/11)

M545-3 (K/9) 4" 4"

CRD MODULES 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 4"

4" RHR HEAT EXCH.

RM "A" DRAIN FUEL POOL MANIFOLD DRAIN FUEL POOL HEAT EXCH. DRAIN "1A" FUEL POOL HEAT EXCH. DRAIN "1B" FUEL POOL CIRC.

PUMP DRAINS AND CASING VENT DRAINS 1A 1B RHR HEAT EXCH.

RM. "B" DRAIN RHR HEAT EXCH.

RM. "B" DRAIN COL. M.7 & 7.7 RHR VALE RM.

"B" DRAIN CRD MODULES FROM FUEL POOL LINER DRAINS DWG M526-1 (G/11)

NON REGENERATIVE HEAT EXCH. DRAIN REGENERATIVE HEAT EXCH. DRAIN INSTR. RACK H22-P011 SR-7 1 1/2"MWR(50)-1S CONTR. 215 SR-6 SAMPLING & ANALYZER RM. 1A ANALYZER ROOM 1B 1" MWR(50)-1S CONTR. 215 MAIN STEAM TUNNEL 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" R0 1A EDR R0 2A EDR R0 1B EDR SCRAM INSTR. VOLUME TK A & B, M528-1 (E/6)

VENT & DRAIN FOR DW-LG-2B M517 (E/2)

INSTR. RACK H22-P004 VENT & DRAIN FOR DW-LG-2A M517 (C/2)

INSTR. RACK H22-P027 &

H22-P039 HPCS VALVE DRAIN COL. M.7 & 7 VALVE ROOM "A" DRAIN INSTR. RACK H22-P026 R0 2B EDR CRD MASTER CONTROL AREA DRAIN INSTR. RACK H22-P040 LPCS VALVE DRAIN RWCU-HX-3A DWG M523-2 (F/11)

RWCU-HX-3B DWG M523-2 (A/11)

INSTR. RACK H22-P002 INSTR. RACK H22-P005 VALVE RM. "B" DRAIN RWCU PUMP RM. "A" RWCU PUMP RM. "B" RWCU VALVE DRAIN PLUGGED CONN.

4"EDR-1 4"EDR-1 3"EDR-1 3"EDR-1 4"EDR-1 PLUGGED CONN.

EL. 535'-0" 3" EDR-1 3/4"RRC(51)-1 VENT FROM PUMP SEAL PURGE DWG. M530 (B/12) 1 1/2"RRC(51)-1 FROM SEAL LEAK DETECTION & SEAL STAGING DWG. M530 (B/11) 3/4"RRC(50)-1 VALVE LEAKOFF VENT & DRAIN FROM RCC-V-60A DWG. M530 (C/10)

REFUELING BELLOWS ASS'Y BULKHEAD PLATE 3" EDR (47)-1 1 1/2"EDR(47)-1 3/4" RRC (51)-1 VENT FROM RRC-V-23B, SEE DWG M530 (D/5)

PRIMARY CONTAINMENT PLUGGED CONN.

1 1/2"RRC(51)-1 DWG. M530 (B/6)

FROM SEAL LEAK DETECTION & SEAL STAGING 3/4"RRC(50)-1 DWG. M530 (D/8)

DRAIN FROM RRC-V-67B 3/4"RRC(51)-1 DWG. M530 (B/6)

VENT FROM PUMP SEAL PURGE 1 1/2"RRC(51)-1 DWG. M530 (D/10)

VENT. FROM RRC-V-67A 3/4"RRC(50-1) DWG. M530 (D/11)

DRAIN FROM RRC-V-67A 3/4"RRC(51)-1 DWG M530 (D/12)

VENT FROM RRC-V-23A 3"

3" 3"

3" 3"

3" 3"

3" 3"

3" 3"

EDR-V-17 RHR VALVE DRAIN COL. L & 8.3 EXCEPT AS NOTED IN NOTES 6, 14 & 15; ALL PIPING, VALVES, & ASSOCIATED COMPONENTS ON THIS DRAWING INCLUDED IN CONTRACTS 205, 206, & 215 ARE CLASSIFIED AS FOLLOWS:

QUALITY CLASS-II+

SEISMIC CATEGORY IM CODE GROUP D SUMP PUMP EDR-P-5 AND DISCHARGE PIPING FROM PUMP, REACTOR BUILDING EQUIPMENT DRAIN HEAT EXCHANGER, CONDENSER, AND ASSOCIATED PIPING ARE IN SCOPE OF CONTRACT 215.

ALL PIPING INSIDE PRIMARY CONTAINMENT, EXCEPT AS NOTED, IS IN CONTRACT 215.

ALL PIPING & ASSOCIATED COMPONENTS ON THIS DRAWING ARE INCLUDED IN CONTRACT 206 EXCEPT WHERE CONTRACT INTERFACES ARE DENOTED BY:

(DELETED)

PIPING AND ASSOCIATED COMPONENTS IN SUBSYSTEM EDR(48)

UPSTREAM OF VALVE EDR-V-20 ARE CLASSIFIED AS FOLLOWS:

QUALITY CLASS I SEISMIC CATEGORY I CODE GROUP B (DELETED)

ALL INSTRUMENT ROOT VALVES NOT LABELED WILL BE 3/4" GLOBE VALVES UNLESS SPECIFICALLY NOTED OTHERWISE.

ALL WORK ON THIS DRAWING BY CONTRACT 206A IS SO NOTED.

PERMANENT MATERIAL WILL BE FURNISHED TO CONTRACTOR, SEE SPECIFICATIONS.

VALVES EDR-V-601 & 602 ARE CLOSED AND TO BE OPENED ONLY WHEN ACCOMMODATING REFUELING OPERATIONS.

ALL ITEMS MARKED

  • ARE FURNISHED WITH ASSOCIATED EQUIPMENT.

ALL INSTR. LINES ARE DESIGNATED BY CODE & LINE #

A. EXAMPLE: LINES ORIGINATING OUTSIDE CONTAINMENT.

1/2" PI(1)-ST - (H22-PO21)-A6 CODE DESIGNATION LINE NUMBER THIS EQUIP. DRAIN IS MODIFIED TO FUNCTION AS A FLOOR DRAIN.

PIPING IS ROUTED TO 6" FDR(44)-1 TO FDR SUMP R4 IN RHR PUMP ROOM "C."

ALL VALVES SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE.

ALL VALVES SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.

ALL VALVES SUFFIXED WITH A (TH) DENOTE A THROTTLED VALVE.

NOTES:

LEGEND RADWASTE BLDG.

AUX. COND. PUMP COND. F.D BACKWASH REACTOR BLDG AUX. COND. PUMP CRD PUMP 1A CRD PUMP 1B 1 1/2"EDR(51)-1 1"EDR(50)-1 INSTRUMENT RACK H22-P021 COL. J & 9.4 INSTR. RACK H22-P015 COL. J & 7.7 RHR VALVE DRAIN COL. N & 7.7 REACTOR DRYWELL EDR-V-601 EDR-V-602 1"MS(50)-1 FROM RPV FLG. LEAKOFF N-17 DWG. M529 (J/9) 2"MS(50)-1 FROM RPV HEAD NOZZLE N-8 DWG. M529 (J/10) 4"EDR(47)-1 4"EDR(47)-1 PLUGGED WITH GROUT COL. K & 8.3 PLUGGED WITH GROUT COL. L & 8.3 PLUGGED CONN.

4"EDR-1 3"EDR-1 4"EDR-1 4"EDR-1 RHR VALVE COL. L & 4.1 1 1/2"RHR(51)-1 DWG. M530 (C/8)

VENT FROM RRC-V-67B 3/4"RRC(50)-1 DWG M530 (D/8) VALVE VENT, LEAK-OFF & DRAIN FROM RRC-V-60B 3" CLEANOUT 3"EDR 4"EDR-1 3" EDR-1 3"EDR-1 3"

3" 3"

3" 3"

RHR VALVE AREA COL. N & 7.7 VALVE ROOM "B" INSTR RACK H22-P017 COL. L & 8.3 VALVE RM "A" VALVE ROOM "A" 1 1/2" MSLC(50)-1 SEE DWG M557 (H/4)

COL. H.3 & 6.8 COL. H.3 & 6 COL. H.3 & 6 COL. H.3 & 5.2 NOTE 13 3"

3" 3"

3" 3"

3" 3"

3"EDR-1 COL. L & 4.1 COL. M & 4.1 INSTR. RACK H22-P025 COL. K & 3.4 INSTR. RACK H22-P018 4"EDR(46)-1 COL. M & 3.4 4"EDR-1 3"EDR(46)-1 1"PLUGGED CONN.

3" 3"

SPARE SPARE EDR-V-603 EDR-V-660(D)

FS 1

AH 3"

3" 3"

3" 6"EDR(50)-1 4"

PLUGGED CONN.

3/8"PI(1)-ST-IR-63-7 RADWASTE BLDG REACTOR BLDG TO SUMP PUMP EDR-P-5 RHR PUMP "B" RM COL. L & 8.3 RHR PUMP "B" RM COL. N & 9.4 RHR PUMP "A" RM COL. L & 8.3 6"FDR(42)-1 DWG M539 (C/12) 3"EDR(49)-1 4"EDR(45)-1 3"EDR-1 SEE DWG M539 (D/13) 6"FDR(44)-1 DWG M539 (C/9) 3"EDR-1 TO LPCS PUMP PIT DWG M539 (C/9)

INSTR. RACK H22-P022 COL. N. & 8.3 TO 6"FDR(44)-1 M539 (D/9-10) 1 1/2"MSLC(50)-1 SEE DWG. M557 (B/4)

INST. RACK H22-P001 INST. RACK H22-P024 INST. RACK H22-P006 INST. RACK H22-P010 3"EDR-1 RHR PUMP "C" RM COL.

H.3 & 5.2 COL.

J & 4.3 LPCS PUMP RM COL.

K & 4.1 HPCS PUMP RM COL.

M & 4.1 VALVE DRAINS 3"EDR-1 3"EDR-1 3"

3" 3"

RMS LS 14B LS 14A TE 15 AHH MV/I 602 TIS 601 AH TM 602 TM 603 A

EDR-V-22 EDR-V-21 EDR-V-23A FT 37 EDR-V-16 EDR-V-15 RMS FRS 623 AH EDR-SPV-21 A0 21 FQ 38 V/F 37 A0 17 PI 5A PI 5B RO 2

RO 3B REACTOR BUILDING EQUIPMENT DRAIN HEAT EXCHANGER G11-B002 EDR-HX-2 EDR-V-742 EDR-V-741 AO 20 AO 19 RMS RMS 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

1.

2.

3.

4" 4"

INSTR.

RACK H22-P009 COL. H.7 &

8.3 MCC ROOM FAN COIL UNIT 4"EDR-1 3"EDR-1 RHR PUMP "A" RM COL. K & 9.4 RCIC PUMP ROOM COL. J & 6.8 EDR-V-661 EDR-V-619 EDR-V-20 EDR-V-625(V) 3/4" FILL. VENT & TEST CONNECTION 3/4"EDR(55)1-2 SUMP PUMP EDR-P-5A EDR-V-704A DIFFUSER EDR-P-5B EDR-V-24B EDR-V-704B 1 1/2"EDR(47)-1 E31-R603 1 1/2"EDR(47)-1 1"EDR(50)-1 WATER LEVEL EL.466'-4 3/4" MAX.

INSTALLED BY CONTR. 213A FABRICATED AND CONTR.

215 CONTR.

206 WATER LEVEL EL.492'-4 1/4" 4"EDR(47)-1 4"EDR(47)-1 EL.501'-0" CRD REPAIR ROOM 6"FDR(43)-1 DWG M539 (C/11) 3"EDR-1 3"EDR-1 4"X 3"RED RO 3A EDR TO WASTE COLLECTOR TANK SEE DWG M532 (E/14)

EL. 471'-0" EL. 501'-0" EDR-V-395 EDR-V-394 3"

3" 3"

3" 3"EDR-1 RCIC ROOM EQUIPMENT DRAINS EL. 422'-3" CONTRACT 205 CONTRACT 206 (EXCEPT PER NOTE 2)

EDR-1S EDR-1 RCCW COOLING DWG. M525 (B/6)

G11-B002 3/4"EDR(50)-1 EDR-V-616 1 1/2" EDR(51)-1 EDR-V-615 3"EDR TO 6"EDR(45)-1 DWG M539 (C/6) 4"EDR(46)-1 3"EDR(46)-1 1"PLUGGED CONN.

PLUGGED CONN.

EDR G11-D002 3"

EL. 541'-3 3/4" EL. 499'-6" EL. 501'-0" DRYWELL EQUIPMENT DRAIN SUMP CONTR.

6426 CONTR. 6426 CONTR. 206A CONTR. 6426 3/4"EDR(55)-1 TEST CONN.

3/8"PI(1)-ST-(IR-65)-3 EDR-V-659(V) 2"EDR(51)-1 3/4"EDR(53)-1-1 CONTR. 6426 CONTR. 206A CONTR. 206A CONTR. 6426 DRAIN CAP 3/4"EDR(50)1-1 EL 437'-1 3/4" 1"

LOOP SEAL 3/4" THD CAP CALIBRATION CONN (TYP) 4"EDR(47)-1 3"EDR-1 VALVE DRAINS RRA-FC-12 DRAIN 3/8"PI(1)-ST-IR-62-13 O

C O

C EDR-SPV-395 EDR-SPV-394 EL. 444'-0" CONTR. 6426 CONTR. 206A CONTR 206A CONTR 6426 CONTR. 215 CONTR. 206A CONTR. 6426 CONTR. 206A CONTR. 6426 CONTR. 206A CONTR.

6426 4"EDR-1 6"EDR(46)-1 4"X 3"RED FDR-1 EDR-1 3"EDR-1 EDR EDR-CONV

-37 EDR EDR E31 N037 EDR EDR O

C P001 1"X 3/4"RED.

(TYP.2) 1" 3"

P001 FDR 3"EDR(48)-1 EDR EDR E31-R602 EL. 522'-0" EL. 548'-0" EL. 572'-0" EL. 606'-10 1/2" EL. 510'-6" CONTR 6426 CONTR 206A EDR G11-F021 3"EDR(49)-1 EDR-V-24A EDR EDR-V-23B G11-F022 3"

EDR 3/4"EDR(55)-1-1 EDR-V-617 EDR-SPV-20 EDR-SPV-19 ISOLATION SIGNAL A,F ISOLATION SIGNAL A,F G11-F020 EDR-V-618 215 213 EDR EDR G11-N014B G11-N014A SEE NOTE 6 O

C EDR 3"EDR(48)-1-1 EDR-SPV-17 REACTOR BLDG. EQUIPMENT DRAIN SUMP EDR-SUMP-R5 2"RRC(51)-1 DWG. M530 (B/5)

L.P. DRAIN FROM 4" RRC(4)-4S &

VALVE DRAIN FROM RRC-V-23B 2"RRC(51)-1 CUT & CAPPED EQUIP. DRAIN CONDENSER EDR-HX-1 G11-B003 2"RRC(51)-1 DWG. M530 (B/12)

L.P. DRAIN FROM 4" RRC(4)-4S &

VALVE DRAIN FROM RRC-V-23A G11-F017 2"L.P. DRAIN CONN. (SPARE)

' REACTOR 2"

L.P. DRAIN CONN (SPARE) 4"X 3" RED SEE NOTE 10 EDR-1 (TYP.)

1" 1"

1 1/2" 1 1/2"EDR(47)-1 4"X 1 1/2" RED 2"

L.P. DRAIN CONN (SPARE)

CONTRACT 206 (6426)

CONTRACT 205, 215 OR 216, 206A

& 213A G11-B003 1"EDR(51)-1 4"EDR(47)-1 1"EDR(51)-1S S.S. SUMP LINER S.S. SUMP COVER EL. 492'-8 1/4" 4"EDR(57)-1S MANHOLE RCCW COOLING DWG. M525 (B/15)

EL. 487'-8 1/4" SEE NOTE 6 1S 1 EDR-V-175 6"EDR(47)-1 2"EDR(68)-1 EDR EDR CR G11-N601 EDR G11-N015 G11-R602 4"

C O

1 1/2" C

O EDR EDR COL. M & 7.7 4" EDR-1 4" EDR-1 4"EDR(45)-1 G11-FO19 EDR-V-19 FABRICATED & INSTALLED BY 213A C

O 1 1/2" 3" CLEANOUT EDR AO AO F.A.Z.

SIGNAL T

T T

RCIC ROOM RHR PUMP "A" ROOM RHR PUMP "B" ROOM AO 22 67 1-8-01 REDRAWN PER 0613-002.

4WT/BLS HL DBT FSAR FIG.

X-23 4"EDR(48)-1S-1 4"EDR(47)-1S DIFFUSER (CONTR 215) 3/8"PI(1)-ST-(IR-61)-6 RMS RMS RMS 7-20-00 B.L. STAFFORD REFERENCES TO CONTRACT NUMBERS, SUCH AS 215, 206, 220, FOUND IN THE NOTES ON THIS DRAWING REFER TO ORIGINAL CONSTRUCTION DESIGN REQUIREMENTS.

CURRENT DESIGN REQUIREMENTS ARE DOCUMENTED IN THE STATION DESIGN SPECIFICATIONS AND ACTIVE CONTRACT SPECIFICATIONS WHICH STILL APPLY.

68 4-19-02 REVISED PER 01553-020 (G/9-10), 01485-021 (J/12) & 01485-014 (J/13)

DMS BLS DRJ SEE DETAIL "A" (ZONE A/12)

EDR-V-394 EDR-V-395 (SEE NOTE 14)

(SEE NOTE 14)

(SEE NOTE 15)

DETAIL "A" (ZONE C/15)

SECONDARY CONTAINMENT ISOLATION VALVES EDR-V-394 & EDR-V-395 ARE CLASSIFIED AS FOLLOWS (ALSO SEE NOTE 15 AND DETAIL "A" - ZONE A/12):

14.

QUALITY CLASS-Ø SEISMIC CATEGORY Ø CODE GROUP C 3" EDR (49)-1 PIPING BETWEEN EDR-V-394 & EDR-V-395 IS CLASSIFIED AS FOLLOWS (ALSO SEE NOTE 14 AND DETAIL "A" - ZONE A/12):

15.

QUALITY CLASS-+

SEISMIC CATEGORY Ø CODE GROUP D THE ATTACHED PIPING AND SUPPORTS HAVE BEEN ANALYZED TO SEISMIC CATEGORY I CRITERIA TO AN ANCHOR OR THROUGH AN OVERLAP REGION AS REQUIRED IN MES-3.

16.

(SEE DETAIL "A" - ZONE A/12).

(SEE NOTE 16)

(SEE NOTE 16)

SUPPRESSION POOL 69 12-29-04 CORRECTED INCORPORATION OF TYPO FROM 00613-002 (C/4-5).

RAK HL SRP EDR-V-18 AND ITS MATING FLANGES ARE STAINLESS STEEL.

17.

L.O.

EDR-V-18 (SEE NOTE #17) 70 6-24-05 REV PER 02795-200 (A/12-13, C-D/15, F-G/1-3, K/1-2), 02968-200 (C-D/8-9, F/1-3)

H.AL HL DRJ