ML053270118

From kanterella
Jump to navigation Jump to search
Drawing M524-1, Rev 105, Flow Diagram Standby Service Water System Reactor, Radwaste, D.G. Bldg'S and Yard.
ML053270118
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/10/2005
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M524-1, Rev 105
Download: ML053270118 (1)


Text

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 CONTR. CONTR. NOTES REACTOR D.G. BLD'G YARD D.G. LOCAL ONLY 220 215 PI PS 2"PI(1)-ST-(SW-SR-42)-A BLD'G BLD'G AL SEE NOTE 38

1. ALL INSTRUMENT ROOT VALVES NOT LABELED WILL 43A 43A L.O.

SW-V-762A M524-3 BE 3/4" GLOBE VALVES UNLESS SPECIFICALLY SW-V-753A NOTED OTHERWISE.

1"SW(21)-2-4 PI-V-918 INDICATES LOSS OF PUMP PI "SW(21)-2-3 SW-V-754A SAMPLE PROBE 2. VALVES SW-V-2A & B MUST BE CLOSED PRIOR TO 1"SW(100)-2-1 PUMP START, AND ARE INTERLOCKED WITH PUMPS SW-V-926 K SW "PI(1)-ST-(SW-SR-42)-B 1"X1" RED. COUPLING TO PREVENT PUMP START UNLESS VALVE IS CLOSED.

K 2" 2"SW(21)-2-1 SW-P-2A 1"SW(100)-2 VALVE SW-V-29 MUST BE CLOSED PRIOR TO PUMP SW-V-932A 18"SW(21)-2-1 LOOP RETURN (SEE NOTE 38 MANUAL START, AND IS INTERLOCKED WITH PUMP TO M524-3) 1"X"RED. INSERT SW-V-178A PREVENT MANUAL PUMP START UNLESS VALVE IS 2"SW(27)-2-2 2"SW(27)-2-1 SW-V-613(V) 1"SW(65)-2-1 3"SW(77)-1-1 8"SW(72)-1-1 SW-V-80 1"SW(100)-2 CLOSED.

1"x"RED.

1"SW(100)-2-1 SW-V-931A LC "SW(53)-2-12 NOTE 39 4"SW(29)-2-1 L.O. INSERT M524-3 3. SW-RO-2A & 2B, AND SW-V-892A & B ARE "SW(53)-1-3 "SW(53)-1-2 "SW(100)-2 NOTE NOTE 8"SW(72)-1-1 SW-V-154S SW-PCV-43A PROVIDED TO MAINTAIN SYSTEM PRESSURE ABOVE 3"SW(79)-2-1 REACTOR SW-V-610(V) 18 6 "SW(56)-2-12 TE BLDG.

NOTE 30 SW-V-681(V) RHR SYSTEM PRESSURE DURING COOLDOWN 3J CONDITIONS.

SW-V-692(D)

RMS FI SQRT RADWASTE O 2"SW(75)-1-1 SW-V-89 32"TMU(4)-1 FROM CIRC.

BLDG. 9A 1A WATER MAKE-UP 3"SW(77)-1-2 C

2"SW(79)-2-1

4. ALL ITEMS MARKED
  • ARE FURNISHED WITH 1"SW(72)-1-2 SW-V-892A DWG. M507-1 (F/5)

"SW(53)-2-8 MO LO "SW(60)-1-13 SW-V-222 T DEACTIVATED ASSOCIATED EQUIPMENT.

SW-V-636(V) FT "PI(1)CU-(IR-21)-2 (SEE NOTE 37 SW-V-601(V) SW-V-24A SW-V-708 TO L.O.

M524-3)

M512-1 PX "SW(53)-2-9 DCW-TK-1C RO 8A 5. ALL INSTRUMENTS ON THIS DWG. TO BE IDENTIFIED 2"SW(83)-2-1 NOTE 13 SW-V-820A (G,H/15) TYP.

SW-V-821A 2"SW(31)-2-1 2"SW(25)-2-3 9A M512-1 (J/13) 10" 2A BY PREFIX "SW" UNLESS SPECIFICALLY NOTED C 2" "SW(53)-2-7 "SW(60)-2-123 "SW(60)-2-121 POS SW (E.G.-SW-PS-40)

"SW(56)-1-4 TS SW-SPV-38A LO A/H 3" 2" 18"SW(21)-2-1(UG)

SW-V-650(V)

REFER 2" 23A CONN. 6. ALL PIPING, VALVES, AND ASSOCIATED COMPONENTS 12" 12" SW-V-17A(L.T.) CONTR. CONTR.

SW-PCV-38A NOTE 13 TYP. 2" J SW-V-812A L.C.

PX IN THE SW SYSTEM ON THIS DWG. (EXCEPT AS J SW-V-66A(L.T.)

215 2"SW(25)-2-3 SW-FLX-3 FE TS 3"

42A STATED IN NOTE 17) SHALL BE CLASSIFIED AS H2 RECOMBINER C

"SW(60)-2-87 2"SW(56)-2-5 COIL FOLLOWS:

1A "SW(60)-2-115 BANK RRA-CC-13 37A L.C.

SW-V-705A ROOM SW-V-775B SEE DETAIL "A" SEISMIC CATEGORY I 6"SW(121)-2-1 2"SW(31)-2-1 SW-V-851A SW-V-875(D)

TI DMA-CC-31 COIL AH 2 M524-2 QUALITY CLASS I "SW(60)-1-25 COOLING DMA-CC-32 H

SW-V-619(D) 2"X "RED. LI A "SW(56)-1-5 COOLERS L COIL SEE CODE GROUP C SW-2 42A MCC FIS "SW(60)-2-63 SEE DETAIL "A" SEE DETAIL "A" HPCS DIESEL 1A M524-2 M524-2 DET. SW-V-683 C "SW(56)-2-9 (EXCEPT AS NOTED ON M619 INSTRUMENT 1"SW(64)-2-1 COOLING RMS MO ENGINE 6"RCC(4)-1 SW-V-876(V)

SW-V-727A "B" 23A CONNECTION DIAGRAMS).

6"SW(121)-2-2 COOLING PX "SW(53)-2-4 GENERATOR 3" M507-1 CONT. FROM "SW(56)-2-45 SW-V-662(V)

LT LS RCC-2 1"SW(100)-2 2"SW(68)-2-1 TMU-P-1A DCW-HX-1C COOLING COIL DWG. M525-2 (J/6) SW-V-188A 37A 2"SW(68)-2-1 18"SW(21)-2-1(UG) 1A 1A1 2"

SW-V-791B STARTS 2"CONN. (TYP.)

SW-V-775A E22-S001 PRA-CC-1A 7. ALL PIPING, VALVES, AND ASSOCIATED COMPONENTS "SW(60)-2-117 SW-V-63A(L.T.)

(D/6)

SW-V-791A LS CONTR. CONTR.

"SW(60)-2-85 SEE NOTE 19 FIC IN THE CW AND TMU SYSTEMS AS INDICATED SHOWN "SW(60)-2-61 "SW(60)-2-119 FIS 2"SW(48)-2-1 1A5 1"SW(80)-2-1 2 ON THIS DWG. SHALL BE CLASSIFIED AS FOLLOWS:

DWG.

RO 1A 1"PI(1)-ST-(IR-24)-2 SW-V-785B PX AL 2"SW(83)-2-1 42A SEISMIC CATEGORY II FPC-HX-1A "SW(60)-1-23 11A SW-V-765A SW "SW(60)-2-33 23A SW-V-719A SEE DET.

T QUALITY CLASS II "SW(60)-1-19 215 "SW(56)-2-44 SW-V-187A SW-V-795A SEE FIS "B" CODE GROUP D "SW(60)-2-83 RCC-2 SW-FLX-4 PI PS SEE 2"SW(11)-2-1 SW-V-649(D)

NOTE 25 DET. SW-V-766A H SW-V-155S FIS A 3"SW(78)-1-2 2"SW(76)-1-1 6"RCC(5)-1 A L 1"SW(27)-2-2 SW-V-192 37A DET. 40 40A 30" M524-2 "B" "PI(1)-ST-(IR-21)-1 8. ALL PIPING SHALL BE SUPPLIED AND ERECTED BY SEE TS TI 2"SW(56)-2-3 SW-V-82(L.T.)

2"SW(5)-2-2 CONT. ON FIS 8A "B" H LO A A RMS MO DWG. M525-2 (H/6)

DET. SEE FIS TI O

L 1A 1A THE 215 CONTRACT (EXCEPT AS NOTED OTHERWISE).

TMU-V-10A C

SW-2 60 DET. SW-V-709 1"SW(121)-2-2 "B" SW-V-785A PX PX PS PI H 8B 9 NOTE 30 C A FIC LT LI LS H H L

"SW(60)-2-59 SW-V-765B "B" 9B M524-2 1A 1A 1AG RMS

9. FOR ALL PIPING ARRANGEMENTS AT COOLING COILS 8"SW(121)-2-1 PT PI 1D 1D 1D C 1D1 SW-V-795B 2" CONN. RMS MO SEE DETAIL A.

SW-V-702A 6"SW(101)-2-2 SW-V-766B "SW(60)-1-11 40 40G TS "SW(60)-2-31 8"SW(73)-1-2 SW-V-88(L.T.) "SW(60)-2-113 SW-V-701A A 1D TI "SW(60)-1-17 TE "SW(60)-2-111 A 10. THIS EQUIPMENT IS NORMALLY CONTROLLED FROM 2" CONN. (TYP.) TI SW-V-87(L.T.)

"SW(60)-1-29 SW-V-1A 1D SW-V-184A(L.T.) NC SW-V-115(L.T.)

2"x 1"RED. (TYP.) 20"SW(1)-2-1(UG) 3/4"SW(53)-2-10 THE MAIN CONTROL ROOM. IF THE MAIN CONTROL 2"SW(11)-2-2 SW-V-648(V) 3K T 8A PX SW-V-711 20"SW(1)-2-1(UG) RMS ROOM MUST BE VACATED THIS CONTROL POINT MAY 3" 1"SW(121)-2-2 2"SW(31)-2-2 SW-V-2A A RMS 20" C

O PX "PI(1)-ST-(IR-24)-1 START 18"SW(61)-2-1 BE ISOLATED AND CONTROL TRANSFERRED TO THE 3/4"SW(53)-2-15 RMS 2"CONN. (TYP.) 8B SW-V-707 RHR PUMP ROOM SW-V-764A TMU-LCV-1A STOP AO SCL SCL C REMOTE SHUTDOWN PANEL C61-P001.

SEE DETAIL "A" SW-V-872(V)

M524-2 60 PX RRA-FC-20 SW-V-729 RRA-CC-2 3/4"SW "SW(60)-2-3 PS PI "SW(60)-1-15 SW-V-907A "SW(60)-2-1 SW-2 CW-1 SW-V-799A 1D 1A "SW(60)-2-5 SW-V-799B COIL SW-ST-3A 3/4"SW(56)-1 MO RRA-CC-20 6"SW(101)-2-1 COOLING COIL O MO (60)-1-31 2"SW(7)-2-2 8A TS "SW(60)-2-29 40B 3 11. ELECT. HEAT TRACING: 20 WATTS/LIN. FT., CHEMELEX SW-V-710 NOTE 6 NOTE 7 FOR RRA-FC-2 C 2"SW(27)-2-1 1"SW(7)-2-2 "SW(60)-1-9 SW-V-703 TYPE 8 ATVI, WITH 34 AWG SS OVERSHIELD OR SW-V-629(V)

TMU-LSPV-1A 38A 2"SW(80)-2-1 HPCS-V-28 E22 30" "SW(60)-1-21 COOLING FIS C SW-V-29 TI "SW(53)-1-1 AO EQUAL PRIMARY FREEZE PROTECTION TO BE 8"SW(72)-1-1 TI 3" RMS 71A TT TT SW-V-69A ACCOMPLISHED PER SYSTEM OPERATING PROCEDURE TI PX CRITICAL SWITCH "SW(60)-1-27 8"SW(70)-1-1 SW-1A SW-V-12A 8"SW(70)-1-1 HPCS LOOP SUPPLY 8B AH 3" C SW-V-682(V) START 1D SEE NOTE 36 PPM 2.4.5.

FOR 17A 1A SW-V-813A SEE DET. GEAR AIR HANDLING SEE SW-V-943 3" SW-V-704 SW-EJ-2 2"SW(76)-1-1 70A 65 STOP M524-3 TS NOTE 30 SW-V-745 "B" COOLING COIL BANK NOTE 14 LO AH FT "SW(60)-2-109 L.C. L.C.

2"SW(80)-2-1 M524-2 TE TE 12"x8"RED 3"SW(80)-2-1 WMA-CC-53A1 17A 8" ELECT. 12. DELETED SW-V-706A T 36 M524-3 SW-V-70A SW-V-191 1"SW(101)-2-1 9 PX

  • " SEAL 1D 1A HEAT 4"SW(29)-2-1 SEE DETAIL "A" SW-V-23A(L.T.)

PX SW-V-942 SW-EJ-1A PI WATER SUPPLY TRACE 13. THESE COMPUTER INPUT POINTS ARE NOT USED.

SUPPLY 2 6" NOTE SW M524-2 MO MO

" COOLING HPCS O 20"SW(1)-2-1(UG)

SW-V-678(D)

SEE DETAIL "A" 17A 1"SW(83)-2-2 SW-V-721A SW-V-127A "SW(56)-2-18 32AG SERVICE 233 215 SW-V-126A RO FE FIS C G M524-2 14. SW-V-12A & B ARE NORMALLY CLOSED WHEN THE G 2"SW(83)-2-1 "SW(60)-2-81 "SW(56)-2-8 AL "SW(56)-2-7 PT WATER PUMP SW-V-602(D) "PI(1)-ST-(IR-21)-3 "SW(57)-2-2 (VENT)

PUMP 8"SW(101)-2-1 "SW(56)-2-43 SW-V-631(D) SW-V-630(D) 10A SEE 3"SW(78)-1-1 9 9 O E-22-C002 OVERFLOW SW PUMP IS NOT RUNNING. ON PUMP START L.C.

32A L.C. CONTR. CONTR. HOUSE SW-V-744 WATER "SW(60)-2-79 WEIR SUMP C C SIGNAL, THE RESPECTIVE VALVE (SW-V-12A OR B)

PUMP HOUSE "A" WALL NOTE 13 C PI HPCS-P-2 17 "SW(53)-2-6 TS FUEL POOL HX & PUMP ROOM SW-V-771B NOTE 39 C TO OPENS AUTOMATICALLY AND RECLOSES ON PUMP 36A 32AR 6"SW(15)-2-1 STAND-BY NOTE M524-3 PI SHUTDOWN.

SERVICE "SW(56)-2 NOTE 29 6 SEE NOTE AH TRACE HEAT 3" SEE 32A SW-V-71A WATER-PUMP "SW(56)-2-13 FIS RMS MO O 23 M524-2 M524-2 NOTE DET.

"SW(60)-1-7 C LC SW-P-1A 6

15. THE 3/8" DRAIN THREAD-O-LET ON THE INLET SW-V-218 RE RT "B" 17A2 NOZZLES OF PRA-FC-1A AND 1B ARE TO BE 2"SW(33)-2-1 SW-V-71B "SW(60)-2-57 2"SW(56)-2-4 16"SW(23)-2-1 2"SW(13)-2-1 NOTE SW-V-811A SW-V-810A 4 1 RR SEE M554 PLUGGED. COILS PRA-CC-1A AND 1B MAY BE 18 D17-K001 PX SW-V-771A 8"SW(73)-1-1 SW-V-4C L.O. PUMP HOUSE A SPRAY POND A DRAINED BY USING VALVES SW-V-154F & G D17-N004 1 (D/11)

SW-V-603(V) 8"SW(37)-2-1 "SW(60)-2-77 RESPECTIVELY.

NOTE 36A 18"CW(5)-1 "SW(56)-2-17 M554 (F/15) CONTR.

RIS DISABLED SW-V-726A SEE DETAIL "D" TO COOLING H2 RECOMBINER SW-V-22A COOLER REACTOR BLDG. D.G.

215 CAC-AW-1A CAC-HR-1A NOTE 41, M524-3 CAC-EV-1A 604 71 TOWERS CONT. 16. SW-V-70B IS MECHANICALLY LOCKED CLOSED AND SCRUBBER BLD'G 8"SW(71)-1-1 HPCS LOOP RETURN ON DWG.

1"SW(56)-2-46 D17-K604 ITS MOTOR CONTROL CENTER COMPARTMENT LOCKED 2"SW(70)-1-1 NOTE 39 SEE 2"SW(71)-1-1 CONTR.

SW-V-816 SW-V-60A(L.T.) M524-3 M507-1 (F/6) IN THE "OFF" POSITION TO MAINTAIN PROPER WATER SW-V-814 1"SW(27)-2-2 CONTR. 206 2"SW(56)-1-1 2"SW(56)-1-2 1"x 3/4" L.C.

A'S AFTER CHEMISTRY & SPRAY POND INVENTORY.

HT 6"SW(15)-2 CROSSOVER 4"SW(9)-2-1 4"SW(9)-2-1 CONTR.

"SW(60)-2-55 3"SW(80)-2-1 RED. (TYP.)

2"SW(56)-1 L.C.

233 RMS TE SW-V-783B RHR-HX-2A O 32"TMU(4)-1 FROM CIRC. 17. ALL PIPING DOWNSTREAM OF THE LAST ISOLATION "PI(1)-ST-(SW-SR-42)-A PI-V-914 SEE DET. "B" SW71/1 HT WATER MAKE-UP DWG.

SERVICE WATER C VALVE AND OPEN TO THE ATMOSPHERE WITH THE SW-V-817 FE "SW(56)-2-6 TI F SEE M554 HT M507-1 (F/7) SW-V-694A F

SW-V-815 4

FIS SEAL COOLER NOTE 39 MO TE SUBSYSTEM DESIGNATION "SYSTEM" (50) THRU (53)

(E/11) M524-3 L.O. SW71/2 AND (55) THRU (59) SHALL BE CLASSIFIED AS 36A RHR PUMP NOTE 13 SW71/2 HT HT "SW(57)-2-3 1"SW(65)-2-1 SW-V-54 NOTE 17 NOTE 6 FOLLOWS:

M524-2 LOW TEMP.

2"PI(1)-ST-(SW-SR-42)-A RHR-P-2A FROM TT TS FT C SEISMIC CATEGORY II SW-V-651(D)

SW-V-633(D)

SW-V-783A E12-C002A SW71/2 SW71/2 QUALITY CLASS II SW-V-761(V)

(E/6) 4 RMS TS "SW(60)-2-27 O SW-V-44 2"SW(84)-2-1 2"SW(56)-1 "SW(60)-2-53 2"SW(56)-1 AH 3" M521-1 (B/11) AL CODE GROUP D CONT.

SW-V-614(V)

C 27 HT HT SW-V-797A SW-V-652(V) 8"SW(121)-2-1 HANGERS TO BE DESIGNED TO SEISMIC CATEGORY DWG.

PI-V-917 "PI(1)-ST-(SW-SR-42)-A "SW(60)-1-5 TT TS MO I LOADS.

SEE SW-V-779B 2"SW(71)-1-1 SW71/1 SW71/1 FIS DET. "SW(53)-2-11 L.O. HT TEMPORARY PI 18"SW(21)-2-1(UG) 2"SW(28)-2-1 SW-V-47(L.T.) 18. PIPING REFERRING TO THIS NOTE DOWNSTREAM OF 30" TMU-V-10B 69A "B" SEE DETAIL "A" NOTE 13 SEE TI MAINTENANCE FIS THE LAST ISOLATION VALVE AND OPEN TO THE SW-V-924 DET. CROSS CONNECTION SW M524-2 SW71/1 ATMOSPHERE SHALL BE CLASSIFIED AS FOLLOWS:

C 2" "B" 27 FROM LOOP "B" SW-V-128A SW-V-797B RMS SEISMIC CATEGORY II 2"SW(23)-2 (NOTE 30) L.C. SEE M524-2 (K/3),

4"SW(29)-2-1 TS NOTE 39 TO QUALITY CLASS II "SW(60)-2-23 18" "SW(53)-2-13 M524-2 AH 3" (REFER TO L.C.

M524-3 SW-V-779A STORM 25 CODE GROUP D 3"

RMS "SW(60)-1-3 SEWER A NOTE 27) 16"SW(23)-2-1 PX PX SW-V-933A HANGERS TO BE DESIGNED TO SEISMIC CATEGORY O

2"SW(28)-2-1 MANHOLE I LOADS.

68A RMS SW-V-728A CABLE ROOM 27 SW-V-716 RHR C SW-V-37(L.T.) SEE DETAIL "A" 18 AIR HANDLING RHR-V-68A MO "SW(60)-1-1 20"SW(1)-2-1(UG)

CONT. FROM SEE NOTE 26 "SW(60)-2-23 COOLING COIL M524-2 SW RO 19. THE HPCS DIESEL GENERATOR HEAT EXCHANGER, NOTE 20" 1"SW(56)-2-2 E E 1"SW(88)-2-1 DWG. M517 (H/9) M524-2 68A WMA-CC-52A1 TMU-LSPV-1B DCW-HX-1C, IS GE SUPPLIED EQUIPMENT AND IN AO 13A F.O.

E12-F068A TI FROM "SW(60)-2-75 O MO 2" CONN. (TYP.) ACCORDANCE WITH THEIR CONTRACT, COMPLIES WITH SW-2 DW-1S CCH-CU-1A SW-V-778B TMU-LCV-1B SP "SW(58)-2-1 67A TO C 6 SECTION 8, DIVISION 1 OF ASME B & PV CODE, WMA-CC-51A1 SW-V-803A(V) 1968 EDITION, SUMMER 1970 ADDENDA.

3"SW(84)-2-1 1"SW(89)-2-1 NOTE CCH-CU-1A 2"SW(84)-2-1 63A TO RHR-TRS-601 M775 HPCS PUMP ROOM SW-V-756A SEE DCW-HX-1C WORKING PRESSURE IS 75 PSI, SEE 30" T WMA-CC-51A1 FIS LO SW-V-171A LC E-12-R601 "SW(53)-2-14 (J/4) DET.

RRA-CC-4 SW-V-175A M775 (J/4) COOLING COIL 18"SW(21)-2-2 JUSTIFICATION DOCUMENTED BY IOM SW-V-644(V)

PT DWG. M521-1 SW-V-632(V) "B" 25 SW-V-4A FOR RRA-FC-4 3"SW(39)-2-1 "SW(53)-2-1 SS2-PE-94-0420.

EXCHANGER "SW(55)-2-1 (H/9) SW-V-165A SW-V-176A 38A 8"SW(37)-2-1 2"SW(63)-2-1 "SW(53)-2-2 20"SW(21)-2-1(UG) SEE NOTE 31 SW-V-177A "PI(1)-ST-(IR-71)-9 T TI SW-V-778A TI (NOTES CONTINUED ON DWG. M524-2) 3" "SW(60)-2-107 RING HEADER M524-2 RHR-HX-1A B001A E12A-N034 40 "SW(60)-2-73 12 TI "SW(60)-2-95 2"SW(56)-2-1 1"SW(64)-2-1 TT "SW(53)-2-16 1"SW(89)-2-1 PX TI SW-V-680(V) 11A REFERENCES TO CONTRACT NUMBERS, SUCH AS 215, SW-V-96(L.T.)

3" SW-V-735A SW-V-166 SW-V-912 34E PX "SW(60)-2-45 PX SW-V-717 12B 11B SW-V-712A 206, 220, FOUND IN THE NOTES ON THIS DRAWING 18"SW(21)-2-1(UG)

HEAT SW-V-714A SW-V-713A 1"SW(36)-2-1 PX E12 40 25 PX SW-V-167 REFER TO ORIGINAL CONSTRUCTION DESIGN SW-V-723 "SW(60)-2-105 SW-V-11A(L.T.)

RHR 11B REQUIREMENTS.

3"SW(39)-2-1 TE "SW(60)-2-9 TI (DRAIN)

"SW(60)-2-43 "SW(60)-2-71 "SW(57)-2-1 3"SW(39)-2-2 11A SW-V-747 30"SW(35)-2-1 RHR PX 5A 3" AL C "SW(60)-2-101 2"SW(56)-2 45 SW-V-789B "SW(60)-2-93 OVERFLOW CURRENT DESIGN REQUIREMENTS ARE DOCUMENTED 1"SW(27)-2-1 5A E12-N005A FE FIS "SW(60)-2-99 SW-V-10A(L.T.) (SYPHON) IN THE STATION DESIGN SPECIFICATIONS AND ACTIVE DCW-TK-1A2 DCW-TK-1A1 WEIR 2"SW(7)-2-2 2"SW(5)-2-1 2" CONN.

SW-V-767B STAND-BY "SW(60)-2-21 M512-2 (J/14) 12 12 SW-V-768B CONTRACT SPECIFICATIONS WHICH STILL APPLY.

1"SW(65)-2-1 SEE M512-2 (J/2)

SW-V-733A FIS SERVICE WATER SW-V-793B DET. SW-V-746 LEGEND:

SW-V-133(L.T.) SEE PUMP SEE DET. "B" D 3/4"SW(60)-2-11 "B" 40 "SW(60)-2-103 FIS SEE FIS SW-P-1B D 20" 20" 16"SW(23)-2-1 DET. DET. 1. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES OR AS NOTED)

SW-V-5A(L.T.) 11A "B" M524-2 (F/5)

FIS 11B "B" SUFFIXED WITH A (V) DENOTE A 3/4" VENT VALVE.

DETAIL "A" SW-RV-001A "SW(60)-2-7 SW-V-170A 1 1/2"SW(88)-2-1 SW-V-789A 6"SW(37)-2-2 SW-V-221A2 1"x "RED.

SW-V-221A1

  • 43 SEE NOTE 31 M524-2 C.G. "C" TO TO SW-V-767A PUMP HOUSE B SPRAY POND B SW-V-155W "SW(60)-2-41 "SW(54)-2-1 TX SW-V-734A SW-V-768A M524-2 2. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) SUFFIXED WITH A SW-2 DCW-1 1" 1" C.G. "D" "SW(60)-2-91 5A SW-V-793A SEE "SW(60)-2-97 (D) DENOTE A 3/4" DRAIN VALVE.

1"SW(54)-1 PX DETAIL "A" 6"SW(37)-2-1 1"SW(17)-2-4 2"

SW-V-911 "

ALL VALVES SUFFIXED WITH A (TH) DENOTE A THROTTLED VALVE.

M524-2 3.

"SW(60)-2-17 55 SW-V-752 BANK 1"SW(89)-2-1 1" 1" 2" 2" RMS "SW(60)-2-19 PX LPCS PUMP ROOM SEE COIL SW-V-936 FE FT ALL VALVES SUFFIXED WITH A (L.T.) DENOTE A LOCKED THROTTLED DMA-CC-11 4.

DMA-CC-12 EDR RRA-CC-5 6A SW-V-880(V) 8"SW(101)-2-1 COIL VALVE.

2"SW(7)-2-1 1"x "RED.

COOLING COIL 3"SW(79)-2-1 3D 3D 1"SW(92)-2-1 SW-V-937 SW-V-78A 2"

TE TE TE TE "SW(53)-2-42 COOLING SW-V-76A SEE DETAIL "A" FOR RRA-FC-5 M524-2 1"SW(7)-2-1 L.C. L.C. O 2" TI 1"SW(17)-2-5 RRA-CC-11 2A 2B 2C 2D 1"SW(50)-2-1 SW LOOP A (C/11)

COOLING 1"SW(50)-2-2 3" SW-V-860(D)

SW-V-934 1"SW(17)-2-3 TI FT FE C 18"SW(3)-2-1 COOLING COIL MCC RM. 41 C RMS SW-V-839 SW-V-79A SW-V-77A 19 3B SW-V-935 3B "SW(56)-2-47 TS 3" TE TE "SW(56)-2-16 SW-V-881(D)

DETAIL "A" AH SW-V-840 PX SW-V-724 19 O TO 3B 3D M524-2

" SW-FLX-2A2 2" 1"SW(93)-2-1 SW-V-839 C 41 SW-FLX-2A1 SW LOOP B DWG.

1"SW(50)-2 SEE DET. "C" PX SEE SAMPLING AND CONT. FROM "SW(56)-2 "SW(60)-2-39 (LEV. 1) TI DCW-HX-1A1 M896 (E/10)

(C/3)

DCW-HX-1A2 C ANALYZER RM. 1A 19 DWG. M524-2 (B/11) SW-V-841 C

"SW(56)-2 SW-V-720 "SW(56)-2-10 SW-V-842 4"SW(9)-2-1 2" CONN. (TYP.)

"SW(56)-2-11 2A "PI(1)-ST-(H22-P018)-A11 (LEV. 2)

FROM RRA-CC-15 FROM SW-V-843 "SW(60)-2-69 SW-V-688 RHR-V-14A(L.T.)

SW-V-847 (LEV. 3) SW-V-878(V) O 2"SW(19)-2-2 COOLING COIL SEE DET. "C" SW-V-49(L.T.)

3"SW(19)-2-1 SW-V-194 SW-V-195 "SW(53)-2-41 "SW(56)-2-48 SEE NOTE 26 FOR RRA-FC-15 C "SW(41)-2-3 (C-3) "SW(60)-2-67 (LEV. 4) SW-V-843 M524-2 SPRAY POND "A" CONT.

SW-V-848 SW-V-774B SW LOOP A (C/10)

SW-V-859 SW-V-98(L.T.)

1"SW(45)-2-1 DETAIL "D" "SW(56)-2-45 O SW-V-844 "SW(56)-2-46 CONTR.

FIS 6"SW(17)-2-1 SW-V-877(D) SW-V-879(D) C 215 RO "SW(60)-2-37 19 ED ED "SW(60)-2-13 2"SW(3)-2-2 SW-V-137 SW-V-790B SPACER 1"SW(27)-2-1 SW-V-138 12A SEE DET. "B" 2"SW(43)-2-1 TE SEE NOTE 13 SW-V-845 SW-V-846 SW-FLX-1A1 C FROM RHR-E/S-603A CONTR.

SW-V-155R SW-FLX-1A2 SW-V-732A E12-K603A SW-V-774A 3A FI TE 220 FIS 1"PI(1)-ST-(CMS-SR-13)-C1 "SW(60)-2-65 1"PI(1)-ST-(CMS-SR-13)-C2 41 "SW(64)-2-3 SW-V-220A SW-V-612(V) 3C XXX SW LOOP B SW PSR CONT. ON DWG.

" 6"SW(17)-2-2 AL CONTR. CONTR.

"SW(53)-2-3 M524-2 (K/11) 215 220 FS

" T SW-V-790A M PX DETAIL "C" 1"SW(41)-2-1 FE FT FI "SW(60)-2-35 1"SW(64)-2-1 SW-V-48 XXX SPARE "SW(56)-2-15 SW-V-40A SW-V-736A 12A 6A 7A 602A E12-R602A "SW(60)-2-15

" 8"SW(17)-2-1 "SW(60)-2-89 SW-V-731A E12-N006A E12-N007A 2" 2" SW-V-667(D) 3"SW(19)-2-1 "A" VALVE "B" VALVE 8"SW(17)-2-1 B 215 SW-V-3A B 1"SW(1)-2-2 "PI(1)-ST-(H22-P018)-A12 2 HEAT EXCHANGERS UPSTREAM DOWNSTREAM SEE CONTR. CONTR.

CONTR. CONTR.

DETAIL "A" LPCS PUMP 2 215 DIESEL ENGINE 1A RRA-CC-12 M524-2 LPCS-P-1 E22-C001 NOTE: THIS IS A COOLING COIL MCC RM.

8"SW(101)-2-1 TYPICAL INSTALLATION 18"SW(3)-2-1 20"SW(1)-2-1~LOOP A SUPPLY FOR ALL FLOW ORIFICES FE INDICATED BY MO RMS "SW(56)-2-14 REACTOR D.G. D.G. BLD'G YARD XXX SW-V-75AA FIS BLDG. BLDG.

FSAR FIG.

SW-V-75A XXX 2"SW(87)-2-1 2"SW(87)-2-1 SW-V-693(D)

SW-V-874(V) CONT. ON DWG. DETAIL "B" THAT REFERENCE M524-2 (A/14) TYPICAL FIS DETAIL THIS DETAIL SW-2 FPC-1 COLUMBIA GENERATING 2"FPC(25)-1 STATION M526-1 (D/4)

REV DATE DESCRIPTION DWN CHK APVD SIGNATURE DATE TITLE APPROVED A 102 4-29-02 REDRAWN AND REVISED PER 01424-009, 01485-012 & 01486-017 AF/BS KL DRJ A

D.R. JACOBSEN 4-29-02 FLOW DIAGRAM 103 09-05-03 REV PER 02515-009 (C/9-11 & 15, D/7-8 & 10, D-E/12, E/9, F/7 &11, G/9, H/7-8 & 11-14, J/5 & 9), 02515-012 (C-D/1-3) LS HL SRP CHECKED STANDBY SERVICE WATER SYSTEM 104 12/23/03 REV PER 002269-282 (B/12) JL HL SRP REACTOR, RADWASTE, K. LUCAS 2-21-02 105 06/08/05 REV PER 03775 (K/1-2). BMS KB DGW D.G. BLDG'S AND YARD 08/10/05 REV PER 03539 (E-G/12-13). PL BLS DRJ DRAWN B. L. STAFFORD 8-30-00 AR FULLER 11/15/99 SCALE DWG NO. REV.

NTS M524-1 105 PDS2-E1 SERVER84\00\dwg 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1