ML053270110

From kanterella
Jump to navigation Jump to search
Drawing M521-3, Rev 1, Flow Diagram Residual Heat Removal Loop 'C'.
ML053270110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/29/2004
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M521-3, Rev 1
Download: ML053270110 (1)


Text

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 NOTES:

FOR NOTES SEE M521-1.

LEGEND:

1. ALL VALVES (EXCEPT THOSE ON K INSTRUMENT LINES AND AS NOTED ON K DIAGRAM) SUFFIXED WITH A (V)

DENOTE A 3/4" VENT VALVE.

2. ALL VALVES (EXCEPT THOSE ON INSTRUMENT LINES) SUFFIXED WITH A (D) DENOTE A 3/4" DRAIN VALVE.
3. ALL VALVES SUFFIXED WITH A (TH)

DENOTE A THROTTLED VALVE.

J J H H REACTOR VESSEL G G FI T

603C RHR-V-912(V) E12-R603 RHR-V-911(V)

FT 1/2"PI(1)-ST-(H22-P021)-B5 15C E12-N015 1/2"PI(1)ST-(H22-P021)-B6 FIS 10C F RHR-V-729C RHR-V-728C F E12-N010 3/4"RHR(60)-2-52 1/2" 3/4"RHR(60)-2-49 RHR-V-707C RHR-V-706C 18"RHR(1)-2-7 (LOOP "C" RETURN TO RPV) 3/4"RHR(60)-2-51 3/4"RHR(60)-2-47 RHR-4 RHR-2 O

RHR-V-56C RHR-RV-25C 3/4"RHR(60)-2-54 RHR-V-194 E12-F056 NOTE 3A NOTE 3B C 1"RHR(1)-2-8 E12-F025 TEST RHR-V-155C 2"RHR(27)-1-3 MO RMS RHR-V-705C CONN 21 T RHR-V-57C 3/4"RHR(55)-4-5 3/4"RHR(55)-1-3 PI PT E12-F057 3/4"RHR(55)-2-2 RHR-2 RHR-1 T RHR-V-21 FE 14"RHR(1)-2-7 RHR-V-174 E12-F021 612C 37C RHR-V-909(V) 18"RHR(4)-2-3 14C E12-R612 E12-N037 3/4"RHR(60)-4-3 3/4"RHR(60)-2-45 RHR-V-42C E12-N014 N6 RHR-V-148 3/4"RHR(55)-2-10 PS 1/2"RHR(1)-4-7 E12-F042 RHR-V-211(V) TEST RHR-1 RHR-2 C 1/2"PI(1)-ST-(H22-P021)-B3 AL RHR-V-149 39C CONN TEST 12"RHR(1)-4-7 RMS MO RMS MO PIS E12-N039 3/4"RHR(55)-1-4 CONN T AH T 6"RHR(7)-2-3 64C 22C E 42C 3/4"RHR(55)-2-4 RHR-V-196 RHR-1 RHR-2S RHR-2 E 14"RHR(1)-4-7 RHR-V-195 O CONT. ON DWG.

RHR-V-199 RHR-V-18C RHR-V-46C E12-N022 M521-2 (E/13) 3/4"RHR(55)-1-6 3/4"RHR(55)-1-5 C 18"RHR(1)-2-7 O E12-F018 E12-F046 3" 3" C

RHR-V-198 RHR-V-708C L.O. DISK REMOVED RHR-FCV-64C 3/4"RHR(55)-1-7 E12-F064 RPV INVERT O 3/4"RHR(55)-4-6 RHR-V-197 6"RHR(7)-1-3 RHR-V-145C RHR-V-144C EL. 521'-0 1/4" C RHR-V-41C RO RO TEST RO L.O. E12-F041 3/4"RHR(52)-1-2 7C 6C CONN 14"RHR(1)-4-7 1C 3/4"RHR(55)-2-20 3/4"RHR(55)-2-19 18"RHR(1)-2-7 SEE NOTE 27, M521-1 COND-1 RHR-2 X-12c E12-D001 RHR-V-111C C.G.D C.G.B 3/4"RHR(53)-2-4 RHR-V-740(D)

RHR-4S RHR-4 BLIND FLANGE 1/2"RHR(1)-2-12 6"RHR(7)-2-3 3/4"RHR(55)-4-7 3"COND(48)-1 L.C. M RHR-V-132C FLUSH SUPPLY RHR-HX-2C RHR-V-157C 1"PI(1)-1-X62f DWG. M527-1 RHR-V-63C PI PX PX RHR-V-13C BA EA (M524-2)

(SEE NOTE 24) PI-VX-62F PI-VX-220 RHR-SPV-41C (G/8) 3"RHR(17)-2-3 1"RHR(26)-1-3 AO 2C 11 12 RHR-V-158C RHR-V-12C X-62f RHR-FLX-2C (SEE NOTE 24) 41C E12 R002 PORTABLE 3/4"RHR(56)-2 L.C. L.C.

3/4" RHR-V-701C RHR-V-702C RHR-V-703C 1/2"RHR(1)-2 COLLECTOR 3/4"RHR(55)-4S-7 SEE SEE BLEED 3/4"RHR(60)-1-2 3/4"RHR(60)-1-4 D PI-VX-228 NOTE 3C NOTE 3D A RHR-V-44C SEPARATOR D

3/4"RHR(60)-1-3 24"RHR(3)-1-3 3/4"RHR(60)-2-53 1" FLUSH LINE RHR-V-133C RHR-V-82 RHR-V-45C 2"RHR(22)-1-1 N TO ADS NUCLEAR 18"RHR(4)-1-3 1/2"RHR(60)-2 1/2"PI(1)-ST CONT. ON DWG BOILER INTERLOCK E12-F082 WATER LEG PUMP RHR-P-2C 1 1/2"RHR(12)-1-2 M521-2 (B/6) 3/4"RHR(53)-1-6 PX RHR-P-3 14" O RMS 16 RHR-V-246 RHR-RV-88C C E12-C003 3"RHR(9)-1-6 E12-C002 E12-F088 RHR-V-71C L.C. RHR PUMP PS 3/4"RHR(21)-1-2 24"RHR(3)-1-3 3/4" 19C 3/4"RHR(3)-1-5 RHR-V-607(D) 3/4"RHR(53)-1-1 E12-N019 3/4"RHR(52)-1-1 RHR-V-704C PS RHR-V-640(V) RO 16C RHR-V-109 18"COND(79)-1 5C E12-N016 DWG. M527-1 (B/6) 3/4"RHR(53)-1 RHR-V-31C 24"RHR(3)-1-3 RHR-V-108 3/4"RHR(53)-2 RHR-1 COND-1 BLIND 3/4"RHR(52)-1 3/4"RHR(56)-2 RHR-V-131C RHR-V-736(D) RHR-V-748C C 18"RHR(21)-1-2 PUMP PIT C

SUPPRESSION CHAMBER 3/4"RHR(32)-2-6 18"RHR(1)-2-7 SCUPPER DRAIN 18"RHR(21)-1-1 CONT. ON DWG. RHR-V-84C 3/4"RHR(60)-2-57 RHR-V-85C RO RO M521-1 (B/7) E12-F084 E12-F085 (LOOP "C" CROSSTIE & COND. FILL) 1 1/2"RHR(12)-1-2 1 1/2"RHR(12)-2-2 8C 9C S.C.

RHR-1 RHR-2 18" 18"RHR(4)-1-3 (TEST LINE "C") RHR-V-210 X-26 1 1/2"RHR(13)-1-1 RHR-V-110C WATER LEVEL EL. 466'-4 3/4" MAX E12-F098 E12-D002 3/4"RHR(55)-1-25 RHR-V-203(V) RO L.O.

RHR-V-167C 2 TEST 1 1/2"RHR(12)-1-1 CONN. CONT. ON DWG.

SEE 3/4"RHR(53)-1-2 NOTE 15 24"RHR(3)-1-3 RHR-V-4C 24"RHR(3)-1-3 (SUPPRESSION POOL SUPPLY LOOP "C") M521-2 (B/5) FLUSHING X-36 WATER LEG TO LOOP "B" VENT OUT CONN.

REFERENCES TO CONTRACT NUMBERS, E12-F004 3"RHR(9)-2-3 STRAINER KEYLOCK 3"RHR(17)-1-1 CONT. ON DWG SUCH AS 215, 206, 220, FOUND IN THE NOTES ON THIS DRAWING REFER TO M521-2 (B/5) RHR-V-114 O MO RMS RHR-V-106 3"COND(77)-1 ORIGINAL CONSTRUCTION DESIGN FLUSH SUPPLY (REF.)

B RHR-ST-4B RHR-ST-4A C 4C L.C.

REQUIREMENTS. B SUPPRESSION POOL DWG. M527-1 (D/6)

T CURRENT DESIGN REQUIREMENTS ARE SEE SEE SEE RHR-1 COND-1 NOTE 15 NOTE 3B NOTE 15 DOCUMENTED IN THE STATION DESIGN SPECIFICATIONS AND ACTIVE CONTRACT SPECIFICATIONS WHICH STILL APPLY.

CONTR. CONTR.

213 215 COLUMBIA GENERATING STATION REV DATE DESCRIPTION DWN CHK APVD SIGNATURE DATE TITLE APPROVED A 0 4-29-02 NEW DRAWING PER 01422-015, 01476-010. LWC BLS DRJ A

D. R. JACOBSEN 4-29-02 1 12-29-04 REV PER 02542-302 (D/4, 6-7). RAK HL SRP CHECKED FLOW DIAGRAM RESIDUAL HEAT REMOVAL B. L. STAFFORD 1-23-02 LOOP "C" DRAWN L.W.CONLEY 08-31-00 SCALE DWG NO. REV.

NONE M521-3 1 PDS2-E1 15 14 13 12 11 10 9 8 7 6 5 4 3 TOP TIER SERVER84\00\dwg 2 1