Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0430804962004-11-0505 November 2004 Memorandum, Facsimile Transmission of Draft Request for Additional Information. TAC Nos. MC3615 and MC3616 Project stage: Draft RAI ML0432806552004-11-22022 November 2004 Technical Specifications, Amendment Re Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC No MC3615 and MC3616 Project stage: Other ML0431305552004-11-22022 November 2004 License Amendment, Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC Nos. MC3615 and MC3616 Project stage: Other 2004-11-22
[Table View] |
Similar Documents at Hatch |
---|
Category:Memoranda
MONTHYEARML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML16071A3132016-03-14014 March 2016 Notice of Forthcoming Closed Meeting with Southern Nuclear Operating Company to Discuss the Replacement of Security Computer System at Edwin I. Hatch, Units 1 and 2 ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13277A3822013-11-0404 November 2013 Notice of Forthcoming Meeting with Southern Nuclear on Polyethylene Pipe for Hatch Service Water Systems ML12003A2272011-12-21021 December 2011 G20110883/EDATS: OEDO-2011-0800 - R. W. Borchardt Memo Re Backfit Appeal Associated with Component Design Bases Inspection at Edwin I. Hatch Nuclear Plant ML11349A0972011-12-15015 December 2011 Verbal Authorization of Inservice Inspection Program Alternative HNP-ISI-ALT-15, Version 2, Associated with Safety Relief Valve Testing ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0722200462007-08-0909 August 2007 Emergency Exercise (August 22, 2007) ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 ML0703002272007-02-0606 February 2007 Facsimile Transmission of Draft Request for Additional Information on Emergency Action Level Revision ML0611505402006-04-25025 April 2006 Errata for Edwin I. Hatch Nuclear Power Plant Public Annual Assessment Meeting ML0602700762006-02-0202 February 2006 RAI Relief from Various Inservice Testing Requirements ML0531401152005-11-23023 November 2005 Letter MC9810, Staff Decision Regarding GL2003-01 ML0531903342005-11-14014 November 2005 Notice of Meeting with Southern Nuclear Operating Co, Inc., Regarding Control Room In-leakage Testing at Hatch, Units 1 and 2 ML0524903452005-09-0101 September 2005 Memo MC7543, ISI Summary Reports ML0511602262005-04-27027 April 2005 Memo, Facsimile Transmission of Draft RAI MC3875 ML0511602702005-04-27027 April 2005 Memo, Facsimile Transmission of Draft Request for Additional Information ML0511602532005-04-27027 April 2005 Memo, Facsimile Transmission of Draft RAI (TAC MC4227 & MC4228) ML0511604202005-04-26026 April 2005 Task Interface Agreement (TIA 2005-003) Related to the Operability and Validity of the Local Leak Rate Testing of the Main Steam Isolation Valves - Plant Edwin I. Hatch ML0505900312005-03-0202 March 2005 Facsimile Transmission of Draft Request for Additional Information (Tac No. MC3875, MC3876) ML0505900192005-03-0202 March 2005 Facsimile Transmission of Draft Request for Additional Information ML0434802572004-12-15015 December 2004 Updated Analysis of Core Shroud Vertical Welds ML0430804962004-11-0505 November 2004 Memorandum, Facsimile Transmission of Draft Request for Additional Information. TAC Nos. MC3615 and MC3616 ML0415302092004-06-0101 June 2004 Docketing of Questions and Responses Transmitted Electronically or by Facsimile ML0411700102004-04-22022 April 2004 4/22/04, Hatch, Units 1 & 2, Memo, Bases Revisions for 2003 ML0405606052004-02-20020 February 2004 Memo, Correction of License Authority Files, Amendment Nos. 228, 170 and 174 ML0331604772003-11-12012 November 2003 Email on EOF Relocation ML0327205272003-10-21021 October 2003 Plan and Schedule for Implementation of Staff Position on the Station Blackout (SBO) Issue ML0311800572003-04-25025 April 2003 Results of the Edwin I. Hatch Generating Station Units 1 and 2 SDP Phase 2 Notebook Benchmarking Visit ML0300802552003-01-0808 January 2003 Report on Status of Open TIAs Assigned to NRR ML0231700712002-11-13013 November 2002 Report on the Status of Open TIAs Assigned to NRR NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy 2024-05-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24208A1742024-07-26026 July 2024 Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv Setpoints ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 – Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 An NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) IR 05000321/20210102021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch 2024-07-26
[Table view] |
Text
November 5, 2004 MEMORANDUM TO: Mary Jane Ross-Lee, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Christopher Gratton, Sr. Project Manager, Section 1 /RA/
Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
HATCH NUCLEAR PLANT, UNITS 1 AND 2 - FACSIMILE TRANSMISSION OF DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC3615 AND MC3616)
Facsimiles containing questions were transmitted on August 30, 2004, to Mr. Ray Baker of the Southern Nuclear Operating Company. The questions supported a conference call with the licensee held on September 2, 2004, regarding the licensees submittal dated June 22, 2004. The licensees application proposed to revise the frequency for Surveillance Requirement 3.3.8.1.4, the logic system functional test. This memorandum and the attached questions do not convey or represent an NRC staff position regarding the licensees request.
Docket Nos. 50-321 and 50-366
Attachment:
Request for Additional Information sent 8/30/04
November 5, 2004 MEMORANDUM TO: Mary Jane Ross-Lee, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Christopher Gratton, Sr. Project Manager, Section 1 /RA/
Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
HATCH NUCLEAR PLANT, UNITS 1 AND 2 - FACSIMILE TRANSMISSION OF DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC3615 AND MC3616)
Facsimiles containing questions were transmitted on August 30, 2004, to Mr. Ray Baker of the Southern Nuclear Operating Company. The questions supported a conference call with the licensee held on September 2, 2004, regarding the licensees submittal dated June 22, 2004. The licensees application proposed to revise the frequency for Surveillance Requirement 3.3.8.1.4, the logic system functional test. This memorandum and the attached questions do not convey or represent an NRC staff position regarding the licensees request.
Docket Nos. 50-321 and 50-366
Attachment:
Request for Additional Information sent 8/30/04 DISTRIBUTION:
PUBLIC PDII-1 R/F EHackett MRoss-Lee CGratton DClarke ADAMS Accession Number: ML043080496 NRR-106 OFFICE PM/PDII-1 LA/PDII-1 (A)
NAME CGratton DClarke DATE 11/05/04 11/05/04 OFFICIAL RECORD COPY
DRAFT REQUESTS FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST LOGIC SYSTEM FUNCTIONAL TEST SOUTHERN NUCLEAR OPERATING COMPANY HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NUMBERS: 50-321 AND 50-366
- 1. Discuss the industry operating experience that supports the performance of the Logic System Functional Test using a 24-month interval?
Attachment