Letter Sequence Other |
---|
|
|
MONTHYEARML0430804962004-11-0505 November 2004 Memorandum, Facsimile Transmission of Draft Request for Additional Information. TAC Nos. MC3615 and MC3616 Project stage: Draft RAI ML0432806552004-11-22022 November 2004 Technical Specifications, Amendment Re Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC No MC3615 and MC3616 Project stage: Other ML0431305552004-11-22022 November 2004 License Amendment, Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC Nos. MC3615 and MC3616 Project stage: Other 2004-11-22
[Table View] |
Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML23018A0042023-01-24024 January 2023 Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22325A3472022-11-23023 November 2022 Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297 ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21159A1782021-06-15015 June 2021 Correction of Amendment Nos. 277 and 221 Application to Relocate the Pressure-Temperature Limit Curves Following TSTF-419 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML21028A3882021-02-0101 February 2021 Revised Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21014A3752021-01-26026 January 2021 Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0572020-09-18018 September 2020 Issuance of Amendments Nos. 307 and 252, Regarding License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC (Alternating Current) Sources - Operating, ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20167A0132020-06-17017 June 2020 Correction of Amendments Nos. 304 & 249 License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EPID L-2018-LLA-0107 ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML18302A2562018-11-0202 November 2018 Correction of Amendment No. 227 Adoption of TSTF-65-A, Revision 1 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1472017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Company Fleet Emergency Plan ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) 2023-03-03
[Table view] Category:Safety Evaluation
MONTHYEARML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0752020-09-18018 September 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 307 to Facility Operating License No. DPR-57 and Amendment No. 252 to Facility Operating License No. NPF-5 ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19044A5552019-04-0303 April 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19064A0872019-03-0808 March 2019 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-08 ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19035A5502019-02-0606 February 2019 Relief Request HNP ISI RR 05-02 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19011A0102019-01-22022 January 2019 Proposed Alternative HNP-ISI-ALT-05-04 for the Implementation of BWRVIP Guidelines ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure ML18289A6192018-10-18018 October 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-07 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18163A1602018-06-15015 June 2018 Proposed Alternative RR-V-11, Extension of Main Steam Safety Relief Valve Test Interval ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML18102B0162018-04-16016 April 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-05 (CAC Nos. MF9812 and MF9813; EPID L-2017-LLR-0053) ML18022A1072018-01-25025 January 2018 Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 2023-08-02
[Table view] |
Text
November 22, 2004 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2, ISSUANCE OF AMENDMENTS RE: LOSS OF OFFSITE POWER INSTRUMENTATION LOGIC SYSTEM FUNCTIONAL TEST SURVEILLANCE (TAC NOS. MC3615 AND MC3616)
Dear Mr. Sumner:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 243 to Renewed Facility Operating License DPR-57 and Amendment No. 186 to Renewed Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2. The amendments consist of changes to the Technical Specifications in response to your application dated June 22, 2004, as supplemented on September 27, 2004.
The amendments revise the frequency associated with Surveillance Requirement (SR) 3.3.8.1.4, which directs the performance of the logic system functional test, from once every 18 months to once every 24 months. The amendments change the SRs in Hatch, Units 1 and 2 Technical Specifications.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosures:
- 1. Amendment No. 243 to DPR-57
- 2. Amendment No. 186 to NPF-5
- 3. Safety Evaluation cc w/encls: See next page
November 22, 2004 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2, ISSUANCE OF AMENDMENTS RE: LOSS OF OFFSITE POWER INSTRUMENTATION LOGIC SYSTEM FUNCTIONAL TEST SURVEILLANCE (TAC NOS. MC3615 AND MC3616)
Dear Mr. Sumner:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 243 to Renewed Facility Operating License DPR-57 and Amendment No. 186 to Renewed Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2. The amendments consist of changes to the Technical Specifications in response to your application dated June 22, 2004, as supplemented on September 27, 2004.
The amendments revise the frequency associated with Surveillance Requirement (SR) 3.3.8.1.4, which directs the performance of the logic system functional test, from once every 18 months to once every 24 months. The amendments change the SRs in Hatch, Units 1 and 2 Technical Specifications.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosures:
- 1. Amendment No. 243 to DPR-57
- 2. Amendment No. 186 to NPF-5
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC PDII-1 R/F EHackett MRoss-Lee CGratton DClarke OGC ACRS GHill (4) TBoyce JCalvo RJenkins MMcConnell BBonser, RII DLPMDPR ADAMS Accession Number: ML043130556 (Package)
ADAMS Accession Number: ML043130555 (Amendment)
ADAMS Accession Number: ML043280655 (Technical Specifications) *SE dated 10/30/04 OFFICE PDII-1/PM PDII-1/LA (A) EEIB/SC OGC NLO w/comments PDII-1/SC (A)
NAME CGratton DClarke RJenkins* DReddick MJRoss-Lee DATE 11/09/04 11/19/04 10/30/04 11/15/04 11/19/04 OFFICIAL RECORD COPY
Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:
Laurence Bergen Chairman Oglethorpe Power Corporation Appling County Commissioners 2100 E. Exchange Place County Courthouse P.O. Box 1349 Baxley, GA 31513 Tucker, GA 30085-1349 Mr. Jeffrey T. Gasser Mr. R.D. Baker Executive Vice President Manager - Licensing Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. P.O. Box 1295 P.O. Box 1295 Birmingham, AL 35201-1295 Birmingham, AL 35201-1295 Mr. G. R. Frederick, General Manager Resident Inspector Edwin I. Hatch Nuclear Plant Plant Hatch Southern Nuclear Operating Company, Inc.
11030 Hatch Parkway N. U.S. Highway 1 North Baxley, GA 31531 P.O. Box 2010 Baxley, GA 31515 Harold Reheis, Director Department of Natural Resources Mr. K. Rosanski 205 Butler Street, SE., Suite 1252 Resident Manager Atlanta, GA 30334 Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Steven M. Jackson P.O. Box 2010 Senior Engineer - Power Supply Baxley, GA 31515 Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN I. HATCH NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 243 Renewed License No. DPR-57
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility) Renewed Facility Operating License No. DPR-57 filed by Southern Nuclear Operating Company, Inc. (the licensee), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the owners), dated June 22, 2004, as supplemented on September 27, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-57 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 243, are hereby incorporated in the license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Mary Jane Ross-Lee, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: November 22, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 243 RENEWED FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3.3-65 3.3-65 B 3.3-192 B 3.3-192
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 186 Renewed License No. NPF-5
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 (the facility) Renewed Facility Operating License No. NPF-5 filed by Southern Nuclear Operating Company, Inc. (the licensee), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the owners), dated June 22, 2004, as supplemented on September 27, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-5 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 186, are hereby incorporated in the license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Mary Jane Ross-Lee, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: November 22, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 186 RENEWED FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3.3-65 3.3-65 B 3.3-193 B 3.3-193
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 243 TO RENEWED FACILITY OPERATING LICENSE DPR-57 AND AMENDMENT NO. 186 TO RENEWED FACILITY OPERATING LICENSE NPF-5 SOUTHERN NUCLEAR OPERATING COMPANY, INC., ET AL.
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-321 AND 50-366
1.0 INTRODUCTION
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated June 22, 2004, as supplemented by letter dated September 27, 2004, Southern Nuclear Operating Company, the licensee for Edwin I. Hatch (Hatch), Units 1 and 2, submitted a request for license amendments to the Technical Specifications (TSs). The proposed change would revise Surveillance Requirement (SR) 3.3.8.1, LOP [Loss of Power] Instrumentation. Specifically, the proposed change would decrease the surveillance frequency of SR 3.3.8.1.4, Perform LOGIC SYSTEM FUNCTIONAL TEST [LSFT], for LOP instrumentation from once every 18 months to once every 24 months. This proposed change is part of Hatch, Units 1 and 2, conversion to 24-month operating cycles from the previous 18-month operating cycles. The supplemental letter dated September 27, 2004, provided clarifying information that did not change the scope of the June 22, 2004, application nor the initial proposed no significant hazards consideration determination.
2.0 REGULATORY EVALUATION
The NRC staff applied the following regulatory requirements in its review of the application:
General Design Criterion (GDC) 17, Electric power systems, of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix A, General Design Criteria for Nuclear Power Plants, requires, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system is required to be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions
to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
GDC-18, Inspection and testing of electric power systems, requires that electric power systems that are important to safety must be designed to permit appropriate periodic inspection and testing. Section 50.36 of 10 CFR, Technical Specifications, requires a licensees TSs to establish SRs relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that the facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
The Hatch emergency power system for each unit consists of three emergency power distribution centers (or buses) that energize various emergency systems necessary for the mitigation of design-basis events, such as a loss-of-coolant accident (LOCA). Among the loads powered by these buses are the four low-pressure coolant injection pumps and the two core spray pumps that provide cooling water to the reactor pressure vessel in the event of a LOCA.
Also powered are service water pumps that function to remove heat from the primary system during a LOCA.
At Hatch, the emergency buses are normally energized from the offsite power system. If offsite power is lost, power must be transferred to onsite emergency power, which consists of a diesel generator (DG) for each emergency bus. One of the emergency buses for each unit shares a DG. Therefore, each unit has two dedicated DGs and one shared DG. The function of the LOP instrumentation is to monitor the voltage on the emergency buses, and if necessary, initiate a transfer of the source of power for these buses from the offsite power supply to the onsite DGs. This is accomplished by either the loss of voltage or the degraded voltage function. The annunciation relays provide control room alarms to the operators of the low voltage condition.
If a LOCA were to occur concurrent with a loss-of-offsite power (LOOP) event, certain loads would be shed from the emergency buses. The DGs would then re-energize the buses and the cooling water pumps would be loaded onto the emergency buses to provide the necessary core and containment cooling in order to maintain the plant in a safe shutdown condition. The logic for the re-energization of the buses and the sequencing of the loads onto the re-energized buses is tested once per refueling cycle by a series of overlapping surveillances.
The purpose of SR 3.3.8.1.4, is to test the ability of the LOP relays to separate the buses from the lost offsite power supply and then connect the de-energized buses to the onsite DGs. The NRC staff previously approved changes to Hatch TS SR 3.8.1.9, which demonstrates the as-designed operation of the standby power sources during LOOP, and SR 3.8.1.17, which demonstrates the as-designed DG operation during a loss of offsite power actuation test signal in conjunction with an emergency core cooling system initiation signal, to allow testing frequencies of once every 24 months. The licensee stated that a change in testing frequency for SR 3.3.8.1.4 was not requested at that time because the results of its initial feasibility reviews for 24-month refueling cycles of the as-found test data for Westinghouse CV-7 relays, which are used for the LOP application, did not support decreasing the surveillance frequency.
The licensee stated that the problems were attributed to relay setpoint drift. Consequently, the
licensee decided to maintain the once every 18 months testing frequency for SRs 3.3.8.1.3 and 3.3.8.1.4. Upon further evaluation, the licensee was able to determine that setpoint drifts do not affect the logic test (SR 3.3.8.1.4). The licensee stated that they are addressing the setpoint drift issue by performing the channel calibration (SR 3.3.8.1.3) every 12 months, which is more frequently than that required (18-month frequency).
As part of its June 22, 2004 submittal, the licensee provided a review of the test history for SR 3.3.8.1.4 at Hatch. The licensees review of 23 previous tests identified that there were no failures of the LOP instrumentation to disconnect from the offsite sources and reconnect the bus to the onsite AC sources. The licensee did note that during three separate tests, the LOOP annunciator failed to initiate. The annunciator failure does not prevent the LOP relays from performing their safety functions.
In a facsimile dated August 30, 2004, the NRC staff requested additional information (RAI) from the licensee. In the RAI, the NRC staff requested that the licensee provide industry experience with respect to the performance of the LOP LSFT utilizing a 24-month testing frequency. In a letter dated September 27, 2004, the licensee stated that it had completed a survey of several nuclear units that have a 24-month LOP LSFT frequency and discovered no significant industry problems.
Since relay setpoint drift is not an issue with the performance of the LOP LSFT at Hatch and the results of the licensees survey of industry operating experience discovered no significant safety issues, the NRC staff finds decreasing the surveillance frequency of the LSFT for LOP instrumentation (i.e., SR 3.3.8.1.4) from once every 18 months to once every 24 months is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Georgia State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (69 FR 46592). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: M. McConnell Date: November 22, 2004