January 8, 2003 MEMORANDUM TO: John Zwolinski, Director Division of Licensing Project Management THRU: Stuart A. Richards, Director /RA/

Project Directorate I Division of Licensing Project Management FROM: Robert M. Pulsifer, Project Manager, Section 2 /RA/

Project Directorate I Division of Licensing Project Management

SUBJECT:

REPORT ON THE STATUS OF OPEN TIAs ASSIGNED TO NRR The attached graph and tables give the status of open TIAs assigned to NRR as of December 31, 2002.

Since the last status report, one draft TIA was sent to a region, two draft TIAs were returned from a region, two TIAs were completed and no TIAs were opened. Of the five open TIAs, the following divisions are the current action holder: DE - 1 and DLPM - 4.

There are no TIA draft responses that are presently late that affect TIA goals.

There are no TIA draft responses due within the next two months (up to 02/28/03) that affect TIA goals.

TIAs 2001-13 for Dresden and 2001-15 for DC Cook final responses have slipped from their targeted issuance dates. TIA 2001-13 is with the PM for final response and 2001-15 is with the Section Chief for concurrence. Also the final response for TIA 2002-04 on Hatch is due 1/31/03 and the final response for TIA 2001-10 on Prairie Island is due 3/01/03.

The TIA Office Instruction (COM-106, Rev. 1) was revised on December 24, 2002, to improve the timeliness for meeting the NRR goal by increasing management oversight.

Attachments: 1. Graph of TIA Status

2. Table 1 - Summary Data
3. Table 2 - Open TIAs Assigned to NRR (by plant name)
4. Table 3 - Closed TIAs Assigned to NRR - FY03 YTD (by TIA Number) cc w/atts: See next page

MEMORANDUM TO: John Zwolinski, Director Division of Licensing Project Management THRU: Stuart A. Richards, Director Project Directorate I Division of Licensing Project Management FROM: Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management

SUBJECT:

REPORT ON THE STATUS OF OPEN TIAs ASSIGNED TO NRR The attached graph and tables give the status of open TIAs assigned to NRR as of December 31, 2002.

Since the last status report, one draft TIA was sent to a region, two draft TIAs were returned from a region, two TIAs were completed and no TIAs were opened. Of the five open TIAs, the following divisions are the current action holder: DE - 1 and DLPM - 4.

There are no TIA draft responses that are presently late that affect TIA goals.

There are no TIA draft responses due within the next two months (up to 02/28/03) that affect TIA goals.

TIAs 2001-13 for Dresden and 2001-15 for DC Cook final responses have slipped from their targeted issuance dates. TIA 2001-13 is with the PM for final response and 2001-15 is with the Section Chief for concurrence. Also the final response for TIA 2002-04 on Hatch is due 1/31/03 and the final response for TIA 2001-10 on Prairie Island is due 3/01/03.

The TIA Office Instruction (COM-106, Rev. 1) was revised on December 24, 2002, to improve the timeliness for meeting the NRR goal by increasing management oversight.

Attachments: 1. Graph of TIA Status

2. Table 1 - Summary Data
3. Table 2 - Open TIAs Assigned to NRR (by plant name)
4. Table 3 - Closed TIAs Assigned to NRR - FY03 YTD (by TIA Number) cc w/atts: See next page Accession Number: ML030080255 OFFICE PDI-2/PM PD/PDI NAME RPulsifer SRichards DATE 1/6/03 1/6/03 OFFICIAL RECORD COPY

Date: January 8, 2003

SUBJECT:

REPORT ON THE STATUS OF OPEN TIAs ASSIGNED TO NRR DISTRIBUTION:

PDI-2 R/F J. Wiggins, RI B. Platchek, RI R. Blough, RI W. Lanning, RI B. Mallett, RII J. Barnes, RII V. McCree, RII L. Plisco, RII J. Caldwell, RIII R. Lanksbury, RIII G. Grant, RIII J. Grobe, RIII C. Pederson, RIII D. Chamberlain, RIV T.P. Gwynn, RIV A. Howell, RIV NRR BCs, SCs and PDs (by e-mail)

G. Holahan B. Boger D. Matthews C. Casto S. Black T. Marsh R. Perch J. Andersen R. Pulsifer B. Sheron S. Richards J. Hopkins L. Rossbach R. Clark M. Thadani J. Lamb J. Stang J. Colaccino

TABLE 1 -

SUMMARY

DATA FY2003 New TIAs Draft TIAs sent to Draft TIAs Closed TIAs Open Draft Late* Percent Region for review returned from (Final response TIAs By TIAs by Region issued) Original FY-03 Original Due (B) Due Dec 02 FY-03 Dec 02 FY-03 Dec 02 FY-03 Dec 02 FY-03 Date Date (A)** (A/A+B)

Region I 0 0 1 1 1 1 1 1 0 1 0 Region II 0 0 0 2 1 2 0 1 1 2 0 Region III 0 0 0 0 0 1 1 1 3 1 0 Region IV 0 0 0 0 0 0 0 0 1 0 0 Total 0 0 1 3 2 4 2 3 5 4 0 100%*

  • An NRR goal is to complete 80% by latest scheduled due date. TIA Office Instruction COM-106, Rev. 1, issued December 24, 2002 states, The TIA response date or scheduled due date is considered to be the date when the draft TIA response is provided to the requesting organization.
    • (A) is TIAs closed or draft sent by initial requested completion date.

OPEN TIAs ASSIGNED TO NRR (by Plant Name) Table 2 PLANT TIA # - TAC#/TITLE INITIAL CURRENT ACTION AGE SE STATUS/ BILLED MEMO AGREED AGREED HOLDER (mos) EVAL. OTHER REMARKS TO DATE COMPL. COMPL INPUT DATE DATE DATE* (HRS)

COOPER 2002-03 MB5768 - Potential 06/25/03** 06/25/03T EEIB 6 EEIB Working 5 06/26/02 USQ off-site power DC COOK 2001-15 MB3603/4 - 03/31/02 Draft sent DLPM 10 EMEB Working - Complex issue. 763.1 Units 1 & 2 12/12/01 Containment 05/01/02 New draft sent to region structural issues Returned on 11/26/02. Response 05/28/02 received 12/20/02. Final Final TIA response for 12/30/02T concurrence with Section 01/15/03T Chief.

DRESDEN 2001-13 MB3023/4 - 10/31/01 Draft sent DLPM 15 EMEB Working - Licensee 688.8 Units 2 & 3 09/28/01 Backfitting 12/05/01 SPLB responded to draft TIA .

requirements for Returned RGEB Final response is being reactor building 12/12/01 completed by PM and will crane Final be in concurrence soon.

12/31/02T Target TIA closure is 01/31/03T 1/31/03.

HATCH 1 & 2 2002-04 MB6248/9 - SRV 12/01/02 Draft sent DLPM 4 EMEB Working - Information 84.5 09/06/02 Operability 11/29/02 Notice (IN) being Returned prepared. TIA will close 12/09/02 after IN issued. Target Final TIA closure is 1/31/03.

01/31/03T PRAIRIE 2001-10 MB2953 - Design 08/30/02 Draft sent DLPM 15 DLPM Working - Preliminary 123 ISLAND Unit 2 09/07/01 basis assumptions 08/30/02 response sent to licensee for EDG #6 Returned for comment.

10/04/02 Final 03/01/03T Average 10 Average Hours 332.88 Age Billed (Months)

  • An NRR goal is to complete 80% by latest scheduled due date. TIA Office Instruction COM-106, Rev. 1, issued December 24, 2002 states, The TIA response date or scheduled due date is considered to be the date when the draft TIA response is provided to the requesting organization.
    • No due date requested by TIA.

TABLE 3 CLOSED TIAs ASSIGNED TO NRR - FY03 YTD (By TIA Number)

DATE OF DATE

  • INITIAL COMPLETED AGE HOURS TIA NO. TAC NO. REQUEST (w/i, due date) (Months) PLANT BILLED 2002-05 MB6252/3/4 09/10/02 Draft sent 2 Oconee 1, 2, 3 60.5 10/15/02 Returned 10/16/02 10/29/02C 2002-01 MB5061 05/03/02 12/06/02C 7 Davis Besse 707.4 2002-02 MB5460 06/19/02 Draft sent 6 Ginna 242.2 12/12/02 Returned 12/17/02 12/30/02C Average Age 5 Average Hours Billed 336.70 (Months)

Note: Completion dates are within the original agreed-upon date unless otherwise noted.

  • An NRR goal is to complete 80% by latest scheduled due date. TIA Office Instruction COM-106, Rev.

1, issued December 24, 2002 states, The TIA response date or scheduled due date is considered to be the date when the draft TIA response is provided to the requesting organization.