Nu Committed to Nuclear Excelln Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC August 12, 2004 NRC 2004-0080 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for July 2004 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 2_,

Document Control Desk Page 2 bcc: D. L. Koehl D. E. Cooper F. D. Kuester (P460)

J. G. Schweitzer K. K. Meyer M. E. Holzmann D. A. Weaver (P346) T. E. Ruiz E. J. Weinkam III (NMC)

B. T. Dungan J. Rogoff K. Kretzer (WE)

C. S. Smoker (NMC) C. D. Hill J. D. Shaw C. B. Jilek W. F. Smith K. M. Locke J. H. McCarthy File

ENCLOSURE 1 MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,551.2 243,697.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,513.7 240,110.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 378,638.0 1,752,699.5 111,647,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/12/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Julv 2004 (Month/Year)

TYPE DUAINMETHOD OF CAUSE/CORRECTIVE.

NO. DATE F: FORCED DURATON REASON (1) STTING ACTIONS S: SCHEDULED (H ) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/AN/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit I average daily power for the month of July was 508.9 MWe.

There were no LERs issued in July for unit 1.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 08/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,035.9 238,383.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 5,000.9 235,237.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 380,707.0 2,589,451.5 111,090,533.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

C UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 08/12/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Julv 2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of July was 511.7 MWe.

There was one LER issued in July for unit 2: LER 301/2004-002, "Manual RX Trip Due to Diver Safety Concerns".