Lessons Learned Task Force Recommendations, Barrier Integrity
ML031560333
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/04/2003
From: Cayetano Santos
Office of Nuclear Regulatory Research
To:
Moroney B, NRR/DLPM, 415-3974
References
Download: ML031560333 (5)


Text

ML031560333 June 5, 2003 3/$16)25$5(66,1*7+(

'$9,6%(66(/(66216/($51('

7$6.)25&(5(&200(1'$7,216

%$55,(5,17(*5,7<

&D\HWDQR6DQWRV5(6

-XQH

%$55,(5,17(*5,7<$&7,21 3/$1 3DUW, /HDNDJH'HWHFWLRQDQG 0RQLWRULQJ5HTXLUHPHQWV 3DUW,, ,PSURYHG3HUIRUPDQFH

,QGLFDWRUV



%$55,(5,17(*5,7<$&7,21 3/$1 3DUW,/HDNDJH D 'HYHORSEDVLVIRUQHZ5&6OHDNDJHUHTXLUHPHQWV

 5HYLHZEDVHVIRUFXUUHQWOHDNDJHOLPLW

 5HYLHZH[SHULHQFHFDSDELOLWLHVRIFXUUHQWO\

XVHGOHDNGHWHFWLRQV\VWHPV

 (YDOXDWHFDSDELOLWLHVRIVWDWHRIWKHDUWOHDN GHWHFWLRQV\VWHPV D 6FRSHRI$FWLRQ3ODQLQFUHDVHGWRLQFOXGH PHWKRGVZKLFKPD\EHFDSDEOHRI GHWHFWLQJGHJUDGDWLRQEHIRUHOHDNDJH

 (YDOXDWHOHDNUDWHVWKDWOHDGWRGHJUDGDWLRQ



%$55,(5,17(*5,7<$&7,21 3/$1 3DUW,/HDNDJH &RQWLQXHG E 'HYHORSUHFRPPHQGDWLRQVIRULPSURYHGOHDNDJH UHTXLUHPHQWV

 76

 ,QVSHFWLRQ*XLGDQFH

 5*

F ,QFRUSRUDWHUHFRPPHQGDWLRQVDVDSSURSULDWHLQWR UHTXLUHPHQWV G ([DPLQHLPSURYHPHQWVWREDUULHULQWHJULW\

UHTXLUHPHQWVLQDGGLWLRQWRWKRVHZKLFKUHO\RQ OHDNDJHPRQLWRULQJ



%$55,(5,17(*5,7<$&7,21 3/$1 3DUW3HUIRUPDQFH,QGLFDWRUV L ,PSOHPHQWLPSURYHG3,EDVHGRQFXUUHQW UHTXLUHPHQWVDQGFDSDELOLWLHV LL 'HYHORSDQGLPSOHPHQWDQDGYDQFHG3,

LLL 5HHYDOXDWH3,EDVHGRQFKDQJHVWR5&6OHDNDJH UHTXLUHPHQWV



LLTF Report Recommendations Included in Barrier Integrity Action Plan High Priority RECOMMENDATION RECOMMENDATION NUMBER The NRC should determine whether PWR plants should install on-line enhanced leakage 3.1.5(1) detection systems on critical plant components, which would be capable of detecting leakage rates of significantly less than 1 gpm.

The NRC should improve the requirements pertaining to RCS unidentified leakage and RCPB leakage to ensure that they are sufficient to: (1) provide the ability to discriminate between RCS 3.2.1(1) unidentified leakage and RCPB leakage; and (2) provide reasonable assurance that plants are not operated at power with RCPB leakage.

The NRC should develop inspection guidance pertaining to RCS unidentified leakage that includes action levels to trigger increasing levels of NRC interaction with licensees in order to 3.2.1(2) assess licensee actions in response to increasing levels of unidentified RCS leakage. The action level criteria should identify adverse trends in RCS unidentified leakage that could indicate RCPB degradation.

The NRC should inspect plant alarm response procedure requirements for leakage monitoring 3.2.1(3) systems to assess whether they provide adequate guidance for the identification of RCPB leakage.

The NRC should continue ongoing efforts to review and improve the usefulness of the barrier integrity PIs. These review efforts should evaluate the feasibility of establishing a PI which tracks 3.3.3(3) the number, duration, and rate of primary system leaks that have been identified but not corrected.

The NRC should review PWR plant TS to identify plants that have non-standard RCPB leakage 3.3.4(9) requirements and should pursue changes to those TS to make them consistent among all plants.



Medium Priority Item To Be Added To Action Plan RECOMMENDATION RECOMMENDATION NUMBER 3.3.7(3) Evaluate the adequacy of analysis methods involving the assessment of risk associated with passive component degradation, including the integration of the results of such analyses into the regulatory decision making process.