Apr. 17, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-19569 USER INFORMATION:

GERLACH EMPL#:28401 CA#: 0363 Address: N 2 Phone#: 2 4-3194 TRANSMITTAL INFORMATION:

TO: GERnlAHnnROSE II 04/17/2 003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER

{NUCSA-2) I

'-'THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

130 - 130 - HP II DOSE CALCULATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 03/06/2003 ADD MANUAL TABLE OF CONTENTS DATE: 04/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-130 REMOVE: REV:15 ADD: REV: 16 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

m4

'PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC I NUCLEAR DEPARTMENT PROCEDURE HP II DOSE CALCULATOR: EP-PS-130 Revision 16 Emergency Plan Position Specific Instruction Page 1 of 3 QUALITY CLASSIFICATION: APPROVAL CLASSIFICATION:

( ) QA Program (X) Non-QA Program ( ) Plante ,' ( ) Non-Plant (X) Instruction '

EFFECTIVE DATE: i-"fr/ JOf2)

PERIODIC REVIEW FREQUENCY: ,,, , 2 Years PERIODIC REVIEWDUEPDATE: ____________

RECOMMENDED REVIEWS: / >

All 9 A Procedure Owner: Nuclear Emergency Planning (f,

R sponible Supervisor: Radiation Protection Manager Responsible FUM: Supervisor-Nuclear Emergency Planning Responsible Approver: Vice President-Nuclear Operations FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1

EP-PS-1 30 Revision 16 Page 2 of 3 HP II DOSE CALCULATOR: Emergency Plan-Position Specific Instruction WHEN: At request of Shift Manager HOW NOTIFIED: Working hours - telephone call or plant page REPORT TO: Shift Manager until TSC is activated, then TSC Dose Calculator WHERE TO REPORT: Control Room initiaIly.

OVERALL DUTY:

Perform, validate, and report dose calculations.

MAJOR TASKS: TAB: REVISION:

Report to the Control Room. TABA 6 Obtain briefing from Control Room personnel. TAB B 2 Obtain meteorological data. TAB C 4 Withdraw vent monitor data from SPING console. TAB D 7 Perform dose calculations, then report results to TAB E 8 those who request them.

Initiate radio communications with and direct OSCAR TAB F 7 until relieved by the Health Physics Radioman.

Validate dose calculations with field reading from TAB G 7 OSCAR and report.

Once TSC is activated, maintain dose calculations TAB H 3 and direct clerk.

EP-PS-1 30 Revision 16 Page 3 of 3 SUPPORTING INFORMATION: TAB:

Emergency Telephone Instructions TAB 1 Emergency Organization TAB 2 Intentionally Blank TAB 3 Onsite Emergency Monitoring Locations TAB 4 Emergency Facility Form Flow TAB 5 Emergency Classification TAB 6 Public Protective Action Recommendation Guide TAB 7 PPL Emergency Personnel Dose Assessment and TAB 8 Protective Action Recommendation (PAR) Guide Meteorological Data Acquisition TAB 9 Vent Monitor Data Acquisition TAB 10 MIDAS Dose Projection Computer Model Instructions TAB 11 PAVSS Instructions TAB 12 1-131 Frisker Measurement: Conversion Factors TAB 13 Intentionally Blank TAB 14 Remote Monitoring System Base Station Instructions TAB 15 TSC Dose Assessment Flowchart TAB 16

REFERENCES:

SSES Emergency Plan NUREG-0654, Planning Standards and Evaluation Criteria NUREG-0731, Guidelines for Utility Management Structure and Technical Resources, September 1980

TABA EP-PS-1 30-A Revision 6 Page 1 of 1 MAJOR TASK:

Report to the Control Room.

SPECIFIC TASKS: HOW: -

1. Obtain RO-2/2A and master keys for 1a. Go to the Health Physics office. Obtain locked doors/gates. the following:

(1) High Radiation Area master keys.

(2) Source checked RO-2/2A.

2. Proceed to Control Room. 2a. Proceed to the Control Room when:

(1) Paged.

(2) Notified by phone.

(3) As directed by Supervision.

TAB B EP-PS-1 30-B Revision 2 Page 1 of 1 MAJOR TASK:

Obtain briefing from Control Room personnel.

SPECIFIC TASKS: HOW:

1. Inform Shift Manager/Unit Supervision 1a. Identify yourself as the "Dose of your arrival. Calculator."
2. Obtain briefing from person holding 2a. Ask key questions, including:

the briefing.

(1) Is there a release in progress or is one imminent?

(2) Should I prepare for dose calculations?

(3) What is the cause or source of the release?

3. Support Control Room personnel, if 3a. Provide Inplant Team coverage upon not used for dose calculations. request.

TAB E EP-PS-1 30-E Revision 8 Page 1 of 2 MAJOR TASK:

Perform dose calculations, then report results to those who request them.

SPECIFIC TASKS: HOW:

1. Log on and start up MIDAS. HELP MIDAS Operation See TAB 11
2. Report results to those who request 2a. Compare release rates and EPB them. projected dose/dose rates to EAL 15 limits.

HELP Emergency Classification See TAB 6 HELP TSC Dose Assessment Flowchart See TAB 16 Page 2 2b. Report results after each calculation to the Shift Manager, TSC Dose Calculator, or RPC.

2c. Report change in classification due to releases.

3. Notify the Shift Manager/ED if doses NOTE:

are projected to exceed 1 rem TEDE The Control Room needs radiological or 5 rem Thyroid CDE. data to evaluate entry conditions and action levels for EOP procedures. These procedures require operator actions such as rapid depressurization based on projected doses.

These procedures also require that projected doses be determined when containment venting is needed.

3a. Discuss projection time with the Shift Manager/ED if unavailable from RPC or TSC Dose Calculator.

TAB E EP-PS-1 30-E Revision 8 Page 2 of 2 SPECIFIC TASKS: HOW:

NOTE:

This may differ from the default projection time being used in the dose projection model.

3b. Consider the following:

(1) Prognosis of event (2) Time to cooldown to <200 deg.

(3) Duration & type of release (4) Weather forecasts (5) Protective measures already implemented (6) Release pathway - possible filtration and/or monitoring

TAB G EP-PS-1 30-G Revision 7 Page 1 of 1 MAJOR TASK:

Validate dose calculations with field team readings from OSCAR and report.

SPECIFIC TASKS: HOW:

1. Compare the peak field 1a. Periodically determine the following measurements obtained by OSCAR ratios:

during their traverse through the plume to the OSCAR EDE and thyroid OSCAR 3" closed window reading CDE dose rates projected by MIDAS. or RMS EDE dose rate MIDAS OSCAR EDE dose rate and OSCAR air sample NET CPM X 0.7 or RMS Thyroid CDE dose rate MIDAS OSCAR Thyroid CDE dose rate 1b. If field readings are low (ratio < 0.1), the peak conditions may exist elsewhere.

Continue search for higher field conditions.

1c. If field readings are higher than the MIDAS projected dose rates (ratio > 1),

initiate a Back Calculation and utilize the more conservative-of the results.

1d. If field results are considerably higher than the MIDAS projections (ratio > 5),

an unmonitored release pattern may exist.

2. Report findings to Shift Manager/ED or RPC.

( ((

Tab 2 EP-PS-130-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR (SHIFT MANAGER)

I -I EMERGENCY PLAN SHIFT TECHNICAL OPERATORS COMMUNICATOR ADVISOR (STA)

EP-AD-000-406, Revision 15, Page 1 of 3

( ( (-

Tab 2 EP-PS-1 30-2 TSC ORGANIZATION

  • EMERGENCY DIRECTOR
  • Operations Coordinator
  • Denotes minimum staffing.

Rev. 41, 03/03 Susquehanna Steam Electric Station Units 1 and 2 Emergency Plan TSC ORGANIZATION FIGURE 6 2 EP-AD-000-406, Revision 15, Page 2 of 3

Tab 2 EP-PS-1 30-2 EOF ORGANIZATION ASSISTANT RECOVERY _ RECOVERY MANAGER MANAGER .

ENGINEER. DOSE LIAISON PUBLIC SUPPORT ASSESSMENT SUPPRVISOR INFORMATION SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR MANAGER I -- - - - - - - -

EP-AD-000-406, Revision 15, Page 3 of 3