Davis-Besse Meeting Summary to Discuss the Reactor Pressure Vessel Closure Head Replacement
ML021760534
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/02/2002
From: Pickett D
NRC/NRR/DLPM/LPD3
To:
References
Download: ML021760534 (8)


Text

July 2, 2002 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - MEETING

SUMMARY

OF JUNE 4, 2002, TO DISCUSS THE REACTOR PRESSURE VESSEL CLOSURE HEAD REPLACEMENT On June 4, 2002, Nuclear Regulatory Commission management and staff conducted a public meeting in Rockville, Maryland, with representatives of FirstEnergy Nuclear Operating Company (FENOC). The purpose of the meeting was to discuss FENOCs decision to replace the reactor pressure vessel closure head (RPVCH) at the Davis-Besse Nuclear Power Station (DBNPS). A public notice that the meeting was to be held was issued on May 24, 2002. A telephone conference bridge was established for members of the public who were unable to attend. The meetings participants are included as Enclosure 1 and the licensees handouts are included as Enclosure 2.

The licensee has been pursuing the following three options with regard to the RPVCH:

  • The repair plan option was discussed during the public meeting of April 10, 2002, and formally submitted for staff review on April 25, 2002. The repair plan has subsequently been deferred and the licensees letters dated June 14, 2002, requested that the staff suspend all review activities associated with the repair plan and related requests for relief from the American Society of Mechanical Engineers (ASME) Code.
  • Last fall, the licensee ordered a new RPVCH which is scheduled for delivery in Spring 2004. The licensee investigated the possibility of stepping ahead of other licensee orders for new RPVCHs in order to accelerate delivery. However, the earliest delivery would be Fall 2003 which would not provide a prompt resolution.
  • Purchase of an existing RPVCH was considered from the Midland, Rancho Seco, and Three Mile Island, Unit 2 facilities. The licensee has decided to purchase the RPVCH from the Midland, Unit 2, facility because it is similar in design to DBNPS, is readily available, and is not contaminated.

The licensee described the three-way contract it has signed with Consumers Power, owner of the Midland facility, and Framatome-Advanced Nuclear Power (FRA-ANP). FRA-ANP has purchased the Midland RPVCH as-is from Consumers Power and is reconciling it against the Davis-Besse design requirements. FRA-ANP will compile/validate the ASME Code Data Package for the RPVCH and then sell the RPVCH to FirstEnergy as safety-related equipment.

The following comparisons were made between the RPVCH at Midland and DBNPS:

  • The Midland and DBNPS control rod drive nozzles and J-groove welds are constructed of similar materials. Therefore, the nozzles and J-groove welds will have the same susceptibility for cracking.
  • The alignment of control rods to RPVCH nozzles is consistent with DBNPS. Therefore, the core geometry will remain unchanged.
  • Minor machining of vessel-to-head key-way surfaces will be required to permit alignment between the RPVCH and the vessel.
  • Minor differences exist in the RPVCH O-ring design. A slightly smaller diameter O-ring (0.455 inch versus 0.500 inch) will be installed.

The licensee described the following non-destructive examinations planned for the Midland RPVCH that will supplement the ASME Code Data Package:

  • Visual examinations
  • Radiography of flange-to-dome weld and nozzle-to-flange welds
  • J-groove welds
  • Magnetic particle and ultrasonic examination of flange-to-dome welds
  • PT examination of peripheral CRDM nozzle-to-flange welds, and
  • Eddy current testing of CRDM nozzles The licensee discussed the activities associated with removing the RPVCH from the Midland containment and constructing a temporary access opening in the Davis-Besse containment.

Prior to plant restart, the licensee will bring the plant to normal operating temperature and pressure using reactor coolant pump heat and perform visual inspections for leakage.

Following the technical meeting with the licensee, the staff took questions from members of the public.

/RA/

Douglas V. Pickett, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Projects Management Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. Participants
2. Meeting Slides cc w/encls: See next page
  • The alignment of control rods to RPVCH nozzles is consistent with DBNPS. Therefore, the core geometry will remain unchanged.
  • Minor machining of vessel-to-head key-way surfaces will be required to permit alignment between the RPVCH and the vessel.
  • Minor differences exist in the RPVCH O-ring design. A slightly smaller diameter O-ring (0.455 inch versus 0.500 inch) will be installed.

The licensee described the following non-destructive examinations planned for the Midland RPVCH that will supplement the ASME Code Data Package:

  • Visual examinations
  • Radiography of flange-to-dome weld and nozzle-to-flange welds
  • Liquid-penetrant (PT) examination of the control rod drive mechanism (CRDM) nozzle J-groove welds
  • Magnetic particle and ultrasonic examination of flange-to-dome welds
  • PT examination of peripheral CRDM nozzle-to-flange welds, and
  • Eddy current testing of CRDM nozzles The licensee discussed the activities associated with removing the RPVCH from the Midland containment and constructing a temporary access opening in the Davis-Besse containment.

Prior to plant restart, the licensee will bring the plant to normal operating temperature and pressure using reactor coolant pump heat and perform visual inspections for leakage.

Following the technical meeting with the licensee, the staff took questions from members of the public.

/RA/

Douglas V. Pickett, Project Manager, Section 2 Project Directorate III Division of Licensing Projects Management Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. Participants
2. Meeting Slides cc w/encls: See next page Meeting Slides: ML021560107 Package: ML021760495 Accession Number: ML021760534 OFFICE PM:PDIII-2 LA:PDIII-2 SC:PDIII-2 NAME DPickett THarris AMendiola DATE 07/01/02 07/01/02 07/02/02 OFFICIAL RECORD COPY

Davis-Besse Nuclear Power Station, Unit 1 cc:

Mr. Howard Bergendahl Carol OClaire, Chief, Radiological Branch Vice President-Nuclear, Davis-Besse Ohio Emergency Management Agency FirstEnergy Nuclear Operating Company 2855 West Dublin Granville Road Davis-Besse Nuclear Power Station Columbus, OH 43235-2206 5501 North State Route 2 Oak Harbor, OH 43449-9760 Zack A. Clayton DERR Mary E. OReilly Ohio Environmental Protection Agency FirstEnergy Corporation P.O. Box 1049 76 South Main St. Columbus, OH 43266-0149 Akron, OH 44308 State of Ohio Manager - Regulatory Affairs Public Utilities Commission First Energy Nuclear Operating Company 180 East Broad Street Davis-Besse Nuclear Power Station Columbus, OH 43266-0573 Oak Harbor, OH 43449-9760 Attorney General Director Department of Attorney Ohio Department of Commerce 30 East Broad Street Division of Industrial Compliance Columbus, OH 43216 Bureau of Operations & Maintenance 6606 Tussing Road President, Board of County P.O. Box 4009 Commissioners of Ottawa County Reynoldsburg, OH 43068-9009 Port Clinton, OH 43252 Regional Administrator President, Board of County U.S. Nuclear Regulatory Commission Commissioners of Lucas County 801 Warrenville Road One Government Center, Suite 800 Lisle, IL 60523-4351 Toledo, Ohio 43604-6506 Michael A. Schoppman Framatome ANP 1911 N. Ft. Myer Drive Rosslyn, VA 22209 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Plant Manager, Randel J. Fast FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118

DISTRIBUTION FOR MEETING

SUMMARY

OF JUNE 4, 2002, WITH FIRSTENERGY NUCLEAR OPERATING COMPANY Hard Copy w/encls PD III-2 Reading PUBLIC GGrant, RIII Hard Copy w/Encl 1 OGC ACRS E-mail w/Encl 1 SCollins BSheron JZwolinski TMarsh CCasto WBateman KWichman AHiser SBajwa SCoffin SBloom MMarshall WCullen ALee DThatcher KNaidu AMendiola SSands DPickett THarris SRosenberg MKotzalas HNieh

LIST OF MEETING PARTICIPANTS JUNE 4, 2002 NRC FIRSTENERGY Bill Bateman Bob Schrauder Tony Mendiola Jim Powers Stephanie Coffin Mark McLaughlin Dale Thatcher Pat McCloskey Kamalakar Naidu Dave Lockwood FRAMATOME Mark Carpenter Bill Benhke NRC CONSULTANT Keith Wichman ENCLOSURE 1