ULNRC-04620, February 2002 Monthly Operating Report for Callaway, Unit 1

From kanterella
(Redirected from ML020840368)
Jump to navigation Jump to search
February 2002 Monthly Operating Report for Callaway, Unit 1
ML020840368
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/13/2002
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-04620
Download: ML020840368 (4)


Text

Union Electric PO Box 620 Fulton, MO 65251 CallawayPlant March 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-04620 WAmeren U1E Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY/2002 The enclosed Monthly Operating Report for February/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary of Ameren Corporation

ULNRC-04620 March 13, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

Enclosure ULNRC-04620 March 13, 2002 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: February/2002

1. DESIGN ELECTRICAL RATING (MWe-Net): 1171
2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL 358 1,096 135,059
4. HOURS GENERATOR ON-LINE 314 1,050 133,200
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 334,598 1,181,834 146,339,352 Page 1 of 2

Enclosure ULNRC-04620 March 13, 2002 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT February/2002 TYPE METHOD OF F: FORCED DURATION SHUTTING DOWN CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR ACTIONS/COMMENTS 1 02-01-02 F 358 B 1 Foreign Material inspections

SUMMARY

From February 1 to February 15, the Callaway Plant was in an outage to remove the internal floating cover from the Condensate Storage Tank and to complete inspections of the Auxiliary Feedwater System for foreign material. These activities were necessary due to deterioration of the seal on the floating cover. At 21:45 on February 15, the plant was synchronized to the arid.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)