Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02
ML20092M898
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/28/1995
From: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092M900 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, LIC-95-0181, LIC-95-181, TAC-M69447, NUDOCS 9510040174
Download: ML20092M898 (5)


Text

__

1 Omaha Public Power District P.O. Box 399 Hwy. 75- North of Ft. Calhoun Fort Calhoun. NE 68023-0399 402/636-2000 September 28, 1995 LIC-95-0181 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555

References:

1. Docket No. 50-285
2. NRC Generic Letter (GL) 87-02, Supplement I dated May 22, 1992
3. Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated September 21, 1992 (LIC-92-30lR)
4. Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated February 11, 1993 (LIC-93-0068)
5. Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated September 24, 1993 (LIC-93-0248)

SUBJECT:

Unresolved Safety Ime A-46 Summary Report in Response to Generic l Letter 87-02, Su- ient I that transmits Supplemental Safety l I

Evaluation Report 2 on SQUG Generic Implementation Procedure, Revision 2, as corr _ ted on February 14, 1992 (TAC No. 69447)

Fort Calhoun Station is subject to the implementation provisions outlined in NRC l

Generic Letter (GL) 87-02, " Verification of Seismic Adequacy of Mechanical and i Electrical Equipment in Operating Reactors Unresolved Safety Issue (USI) A-46."

l Supplement 1 to this Generic Letter (Reference 2) asked for a commitment to use j both the Seismic Qualification Utility Group (SQUG) commitments and the implementation guidance provided in the Generic Implementation Procedure, Revision 2 (GIP-2) as supplemented by the Supplemental Safety Evaluation Report

, No. 2 for the resolution of USI A-46. GL 87-02, Supplement I also requested a plant-specific schedule for implementation of the GIP and submission of a report that summarizes the results of the USI A-46 review. I

! l l Omaha Public Power District (OPPD) provided the requested commitment and schedule l in Reference 3; References 4 and 5 clarified this response. Enclosed are the (

Fort Calhoun Station Seismic Evaluation Report, Safe Shutdown Equipment List l (SSEL) Report, and Relay Evaluation Report which summarize the results of the USI i A-46 review. OPPD has implemented the SQUG commitments and the implementation guidance set forth in GIP-2 and SSER No. 2. OPPD intends to use the GIP l

methodology for verifying the seismic adequacy of existing, new, and replacement I

electrical and mechanical equipment.

l l 0400'5 g 05 Sm 9510040174 950928 i

PDR ADOCK 05000285 l p PDR

r 1 .

B. .S. Nuclear Regulatory Commission LIC-95-0181 Page 2 The outliers to the GIP-2 identified during the implementation phase of the resolution were resolved and/or commitments were made for their resolution. The schedules. for completion of the various outstanding outlier resolutions are contained in Enclosure 1. This information is a compilation from the enclosed reports; (Table 8 of the-Seismic Evaluation Report, Section 4.2.2 of the SSEL e Report, and Appendix G of the Relay Evaluation Report). As noted in Reference 2, OPPD will provide a completion letter to -the NRC when all outliers are resolved.

Please contact me if you have any questions.

Sincerely, kT. L. Patterson

. Division Manager Nuclear Operations TLP/tcm Enclosures-c: Winston & Strawn (w/o reports)

L. J. Callan, NRC Regional Administrator, Region IV (w/o reports)

W. C. Walker, NRC Senior Resident Inspector (w/o reports)

S. D. Bloom, NRC Project Manager I

l l

LIC-95-0181 ENCLOSURE 1, PAGE I ,

SEISMIC EVALUATION REPORT r

SUMMARY

AND SCHEDULE FOR OUTLIER RESOLUTION (OUTSTANDING ITEMS EXERPTED FROM TABLE 8) hem '""""#" "

Outlier Description Status / Schedule No Resolution 1 Genene: Os erhead lights are supported by open Close the hools or change the support system appropnately. ECN 94490 hools. MWO 943252 4%

3 Sixteen electrical cabinets are not bolted to adjacent 11olt the cabinets to adiacent cabinets. MR-FC-94-017 R%

cabinets and t.ontain essential relas s MR-FC-94-016 12 %

7 AI-3 cabinet has three missing screw s on the inside Replace screws. MWO 941480 12 %

paneld e 1I IICV-238, AOV: One of the two anchors missing on Replaec the missing anchor. StitTen the frame. MR-FC-94-016 12 %

the accumulator. Also, unistrut frame is ten flexible.

13 IICV-2861 AOV is in Senice lludding, which is rmt Delete function of this vahe by moditication MR-FC-94-022 9%

designed for design basis canhquakes.

I5 MCC-3A2: No bohs in the rear of the caNnet. Proside suflicient rear anchorage. MR-FC-94-017 8%

16 MCC-4Al and MCC-3B1 hase anchors uhich Replace anchors MR-FC-94-017 896 cannot be tightened.

17 MCC-3113 and MCC-4C4 have insuflicient Proside sutTicient anchorage. MR-FC-94-017 8.%

anchorage.

19 VA-3A,3B, fans on vibration isolators. Also, Tie the sibration isolators down Evaluate fan's scismic adequacy . MR-FC-94416 1296 scismic demand eseceds capacitv.

20 FO-2-1 and FO-2-2, Day Tanks: long sight glasses Replace sight glass with a plastic. break-resistant glass, or other tough material. ECN 94-084 6.96 are vulnerable. _.

21 Eight DC starting air receivers and CCW Surge Tank Weld or pretension the straps and weld saddles. MR-FC-94-017 896 AC-2: Straps and saddles not welded or pretenioned.

22 Tank does not fall within the bounding GIP Modify to eliminate requirement for tank WD-21 MR-FC-89-017 12S6 parameters. (Refer to Table 2 for details.)  !

25 Cable and Conduit Raceways in some areas require Perform the required repairs. MR-FC-94-016 1196 minor repairs (Refer to Table 3 for details). MR-FC-94-017 8S6 Note: MR-Modification Request; ECN-Engineering Change Notice; MWO-Maintenance Woik Order ,

i

LIC-95-0181, ENCLOSURE I, PACE 2 -

~ SSEL REPORT

~

SUMMARY

AND SCHEDULE FOR OUTLIER RESOLUTION (FROM SECTION 4.2.2)

EQUIPMENT RESOLUTION SCHEDULE -

  • Raw Water System cannot be presently used to Add hose connection to RW header in Room 81 to MR-FC-94-018 refill the EFWST. See Section 4.2.2 for details. allow refilling of EFWST, 12/96 Note- MR-Modification Request; ECN-Engineering Change Notice, MWO-Maintenance Work Onfer Y

v I

___._-_w,_ <- -- .r-<v w- - - . _ . . _ _ . __m.2____ . __ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ ' -_ c- - v,- er ~-- +* ew 7 ' v4- -

E { L irIt l;* i1I(;[ [ f , :It{i:

E L

U 8 8 8 8 8 8 7 7 7 7 7 7 7 7 7 7 7 7 D 9 S 6 9 S S 9 S 9/ S S S S 9

/

9

/

9

/ S 9 E /

9 9 9

/

9 9 9 9

/

9 9 9 9 9 9 9 9 9 9 9 H

C S _

7 7 7 7 7 7 7 7 7 7 7 4 4 4 4 4 4 4 4 4 4 4 _

3 3 3 3 3 3 3 3 3 3 3 r

- - - - - - - - - - - e 5 5 5 5 5 5 5 5 5 5 5 7 dr _

9 9 9 9 9 9 9 9 9 9 9 4 3 O N N N N N N N N N N N 5 kr C C C C C C C C C C C 9 o E E E E E E E E E E E N W r r r r r r r r r r r C 3 3 3 3 3 3 e e e e e e e e e p

e p

e p E e

c N p p p p p p p p 0 0 0 0 0 0 r n 0- 0- 0- 0- 0- t t t t t t n

t n

t n

t n

t n

t n e a N) O 0- n n n e

n e

n e e e e e e e p n I

e e e OC T 5 9-5 9-5 9-5 9-5 9

5 9- m m m m m m m m m m m t

n tn TIX I

U - e e e e e e e e e e e e ia UD L C C C C C C c c c c c c c c c c c m O F- F- F- F- F- F- a a a a a a a a a a l a e M L N lp lp lp lp l p lp l

p l

p lp lp p c -

S a OE E R R R R R R e e e e e e e e e e e lp O SP R Mr Mr Mr M M M R R R R R R R R R R R e W 3 EP r r r

/ / / /

t

/

t

/

t

/

t

/

t

/

t

/

t

/

t R

E T RA e e e e e p

e p

t s

e t

s e

t e

s e

s s e

s e

s e

s e

s e e s s e t s

M p p p p t t t t t t t e

e G RM t t t t R n n n n n n n n n n n n ic t t t t t t t A O E O n n n n n n o o o o o o o o o o o t P P I

LR e e e e e e i ti i i i i i t

i i t

i i t o o N

t t t t 1, E m m m m m m ta a a ta a a a a a ta a i ta TF e e e e e e c c c c c c c c c c c c e E R UD c c c c c c it i f

if i

f i

f it i f

i f it i f

i f i g a a a a a a i i i i i i il i i i i f n

R N OE lp l

p l

p l

p lp lp l

a la l

a l

a l

a l

a a l

a l

a l

a l

a i

l a a U G RT e e e e e e u u u u u u u u u u u u h S

O I

T OP R R R R R R Q Q Q Q Q Q Q Q Q Q Q Q Cg L A F ER n C U E X n L L e N A U E c

n E

V DS ig 1

8 E EM E n

1 Y HE =

0- A CT I N 5 L S C 9 E D NG E C- R NI N t I

AD O s L I 4 4 4 5 5 5 e YN T 2- 2 2 2 2 2 1 1 1 2 2 2 2 2 2 u q

RA A l l l

l

- l D D D1 DI D D1 D D D D D D e AT C A A A lA A A R S O n MT L o MU O it a

c U(

S i

f id o

M-R M :

t e

o N

I 2 i 2 1 2 3 1 2 3 X X M M P X X M p

M P

- - - - - - 2 P P F I 2 P F Y I l I 2 2 2 2 VI V B B 2 2 V V B B 2 A D D D D D D I

1 S- S- 2 2 4- 1 1 S- S- 2 2 4-L E

A A A A A A 1 4 5 4 4- 8 6- 2 4 5 4- 4- 8 6-I l l 1 l l 4- 4 6 7 D 4- 4- 6 7 R /

7 7

/

7

/ /

7

/

7

/

7 D -

6- 6- l 6- 6- 2 8 8 8 8 8 M 1 I D

2 2 D D D 1 I D D 2 2 D D D D

]