Other: LIC-93-0068, Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-02, LIC-93-0248, Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-46, LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02, LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule, LIC-96-0121, Responds to RAI Re Resolution of USI A-46, LIC-97-0162, Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 971231, ML20056F177, ML20057G224, ML20059H071, ML20133N792
|
MONTHYEARML20128D4231992-11-30030 November 1992 Forwards Safety Evaluation Re Evaluation of 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactor, Uresolved Safety Issue A-46 Project stage: Approval LIC-93-0068, Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-021993-02-11011 February 1993 Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-02 Project stage: Other ML20056F1771993-08-10010 August 1993 Requests That Util Provide Comparison Between Criteria in App F of USAR & Ascm to Show That Ascm Meets Median Centered Definition Project stage: Other LIC-93-0248, Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-461993-09-24024 September 1993 Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-46 Project stage: Other ML20057G2241993-10-18018 October 1993 Informs That NRC Reviewed Comparison Between Criteria in App F of USAR & Alternate Seismic Criteria & Methodology & Concurs W/Util Conclusion Project stage: Other ML20059H0711993-11-0202 November 1993 Informs That Util 920921 Response to Suppl 1 to GL 87-02, Acceptable & Ack Util Confirming That NRC Interpretation Described in Correct in That Util Intends to Use Entire GIP-2,including SQUG Commitments Project stage: Other LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-021995-09-28028 September 1995 Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02 Project stage: Other LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule1996-07-10010 July 1996 Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule Project stage: Other LIC-96-0121, Responds to RAI Re Resolution of USI A-461996-08-23023 August 1996 Responds to RAI Re Resolution of USI A-46 Project stage: Other ML20133N7921997-01-10010 January 1997 Submits Correction of Extension of Commitment for Generic Implementation Procedure (GIP-2) Re Outlier Resolution (Unresolved Safety Issue A-46,TAC M69447) Project stage: Other ML20140D1421997-06-0505 June 1997 Forwards Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Written Response Requested to Be Provided within 30 Days of Receipt of Ltr Project stage: RAI LIC-97-0105, Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 191997-06-20020 June 1997 Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 19 Project stage: Supplement LIC-97-0122, Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also Encl1997-08-0404 August 1997 Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also Encl Project stage: Supplement LIC-97-0162, Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 9712311997-10-0101 October 1997 Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 971231 Project stage: Other ML20236V4821998-07-30030 July 1998 Forwards SER of Util Response to GL 87-02,which Established USI A-46 Program for Fort Calhoun Station,Unit 1.Staff Concludes That USI A-46 Implementation Program Met Purpose & Intent of Criteria in GIP-2 Project stage: Approval 1996-07-10
[Table View] |
Text
_
~
M M."
as as ammmy Omaha Public PowerDistrict 444 South 16th Street Mall Omaha NE68102-2247 January 10, 1997 LIC-97-007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D. C.
20555
References:
1.
Docket No. 50-285 2.
Letter from OPPD (T. L. Patterson) to' NRC (Document Control Desk) dated September 28, 1995 (LIC-95-0181) 3.
Letter from OPPD (T. L. Patterson) to NRC (Document Control Desk) dated August 30, 1996 (LIC-96-0133) 4.
Letter from OPPD (w. G. Gates) to NRC (Document Control Desk) dated December 26. 1996 (LIC-96-0202)
Subject:
Correction of Extension of Commitment for Generic Implementation Procedure (GIP-2) Outlier Resolution (Unresolved Safety Issue A-46, TAC No. 69447)
I In the Reference 4 letter Omaha Public Power District (OPPD) discussed modification MR-FC-94-017 as a GIP-2 outlier resolution and noted plans to complete implementation of this modification no later than the end of the 1998 Refueling Outage. However, the modification identification number given contained a typographical error and should have been MR-FC-89-017. Therefore. the commitment extension in the Reference 4 letter is corrected to: OPPD now plans to complete implementation of modification MR-FC-89-017 no later than the end of the 1998 Refueling Outage.
We regret any inconvenience caused by this error. Please contact me if you have any questions.
Sincerely.
S. K. Gambhir Division Manager Production Engineering TCM/tcm Q