Letter Sequence Other |
---|
|
Results
Other: LIC-93-0068, Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-02, LIC-93-0248, Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-46, LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02, LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule, LIC-96-0121, Responds to RAI Re Resolution of USI A-46, LIC-97-0162, Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 971231, ML20056F177, ML20057G224, ML20059H071, ML20133N792
|
MONTHYEARML20128D4231992-11-30030 November 1992 Forwards Safety Evaluation Re Evaluation of 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactor, Uresolved Safety Issue A-46 Project stage: Approval LIC-93-0068, Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-021993-02-11011 February 1993 Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-02 Project stage: Other ML20056F1771993-08-10010 August 1993 Requests That Util Provide Comparison Between Criteria in App F of USAR & Ascm to Show That Ascm Meets Median Centered Definition Project stage: Other LIC-93-0248, Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-461993-09-24024 September 1993 Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-46 Project stage: Other ML20057G2241993-10-18018 October 1993 Informs That NRC Reviewed Comparison Between Criteria in App F of USAR & Alternate Seismic Criteria & Methodology & Concurs W/Util Conclusion Project stage: Other ML20059H0711993-11-0202 November 1993 Informs That Util 920921 Response to Suppl 1 to GL 87-02, Acceptable & Ack Util Confirming That NRC Interpretation Described in Correct in That Util Intends to Use Entire GIP-2,including SQUG Commitments Project stage: Other LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-021995-09-28028 September 1995 Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02 Project stage: Other LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule1996-07-10010 July 1996 Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule Project stage: Other LIC-96-0121, Responds to RAI Re Resolution of USI A-461996-08-23023 August 1996 Responds to RAI Re Resolution of USI A-46 Project stage: Other ML20133N7921997-01-10010 January 1997 Submits Correction of Extension of Commitment for Generic Implementation Procedure (GIP-2) Re Outlier Resolution (Unresolved Safety Issue A-46,TAC M69447) Project stage: Other ML20140D1421997-06-0505 June 1997 Forwards Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Written Response Requested to Be Provided within 30 Days of Receipt of Ltr Project stage: RAI LIC-97-0105, Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 191997-06-20020 June 1997 Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 19 Project stage: Supplement LIC-97-0122, Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also Encl1997-08-0404 August 1997 Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also Encl Project stage: Supplement LIC-97-0162, Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 9712311997-10-0101 October 1997 Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 971231 Project stage: Other ML20236V4821998-07-30030 July 1998 Forwards SER of Util Response to GL 87-02,which Established USI A-46 Program for Fort Calhoun Station,Unit 1.Staff Concludes That USI A-46 Implementation Program Met Purpose & Intent of Criteria in GIP-2 Project stage: Approval 1996-07-10
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl ML20196F4931999-06-24024 June 1999 Discusses 990617 Public Meeting at Dana College,Blair,Ne Re Overview of Pilot Insp Program ML20196D2321999-06-21021 June 1999 Forwards Corrected Cover Ltr for Insp Rept 50-285/99-04. Original Cover Ltr Incorrectly Stated That Rept Contained Two Noncited Violations,When Rept Actually Documented Only One ML20195J2121999-06-14014 June 1999 Ack Receipt of Ltr Dtd 990316,which Transmitted Rev 16B to Site Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 6 to Training & Qualification Plan for Plant,Under Provisions of 10CFR50.54(p) IR 05000285/19990041999-06-11011 June 1999 Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy ML20195J2481999-06-11011 June 1999 Forwards Insp Rept 50-285/99-04 on 990425-0531.Violations Identified & Being Treated as Noncited ML20195G3141999-06-10010 June 1999 Ack Receipt of & Encl Objectives for Facility Emergency Plan Exercise,Scheduled for 990810 ML20195E8391999-06-0909 June 1999 Ack Receipt of Transmitting Changes to Licensee Emergency Plan,Rev 14 & Emergency Plan Implementing Procedure OSC-1 Under Provisions of 10CFR50,App E,Section IV ML20207G4741999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP-OSC-1, Emergency Classification,Rev 31,under Provisions of 10CFR50, App E,Section V ML20207G4631999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Ep,App B,Rev 4,under Provisions of 10CFR50,App E,Section V.No Violations Identified During Review ML20207G2981999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Radiological Er Plan,Section E,Rev 22,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required Due to Determination That Effectiveness Unchanged ML20207G4661999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP OSC-1, Emergency Classification,Rev 30,under Provisions of 10CFR50, App E,Section V ML20195G3621999-06-0808 June 1999 Ack Receipt of ,Which Transmitted Changes to Fort Calhoun Station Emergency Plan,App A,Rev 15,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required ML20207G3401999-05-27027 May 1999 Informs That NRC Held Planning Meeting on 990511 for Fort Calhoun Station to Identify Insp Activities at Facility for Next 6 to 12 Months.Informs of NRC Planned Insp Activities & Offers Licensee Opportunity to Provide Feedback ML20207A9041999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20206U6331999-05-18018 May 1999 Forwards Insp Rept 50-285/99-03 on 990314-0424.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206L4151999-05-10010 May 1999 Forwards SE of OPPD Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206H4471999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206E7201999-04-28028 April 1999 Responds to Meeting Conducted 990419 in Fort Calhoun,Ne Re Results of PPR Completed 990211.Addl Topics Discussed Included New Assessment Process & Upcoming Actions Planned in Response to Y2K Concerns ML20205Q5671999-04-15015 April 1999 Forwards Amend 190 to License DPR-40 & Safety Evaluation. Amend Revises TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J2751999-04-0202 April 1999 Forwards Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted.During Insp,Licensee Conduct of Activities at Fort Calhoun Station Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20205A7191999-03-19019 March 1999 Informs That on 990211 NRC Staff Completed PPR of Fort Calhoun Station.Review Was Conducted for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20207K6151999-03-11011 March 1999 Forwards Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified ML20207E8691999-03-0303 March 1999 Forwards Correction to Amend 188 to License DPR-40 for Plant,Unit 1.Administrative Error,Three Pages of TSs Contained Errors,An Incorrect Page Number,Missing Parenthesis & Misspelled Words ML20203F2041999-02-11011 February 1999 Informs That During 990208 Telcon Between Mc Ralrick & J Pellet & T Stetka,Arrangements Were Made for Administration of Licensing Examinations at Fort Calhoun Station for Week of 991018 1999-09-07
[Table view] |
Text
- . - - _ . .- .- - .
November 2, 1993
! Docket No. 50-285 Mr. Terry.' L. Patterson ,
Division Manager - Nuclear Operations Omaha Public Power District ;
Fort Calhoun Station FC-2-4 Adm. .
Post Office Box 399 Hwy. 75 - North of Fort Calhoun i Fort Calhoun, Nebraska 68023-0399 l l
Dear Mr. Patterson:
SUBJECT:
EVALUATION OF OMAHA PUBLIC POWER DISTRICT'S CLARIFICATION OF 120-DAY l RESPONSE TO SUPPLEMENT NO. 1 TO GENERIC LETTER 87-02 FOR FORT CALHOUN STATION, UNIT 1 (TAC NO. M69447) i
, On May 27., 1992, the NRC staff issued Supplement No. I to Generic Letter l (GL) 87-02, which transmitted Supplemental Safety Evaluation Report No. 2 ,
(SSER No. 2) on the Seismic Qualification Utility Group's (SQUG's) Generic
, Implementation Procedure, Revision 2 (GIP-2), dated February 14, 1992, for the
! resolution of Unresolved Safety Issue (USI) A-46. By letter dated September 21, 1992, the licensee submitted its 120-day response to the GL supplement for Fort Calhoun Station, Unit 1. By letter dated November 30, 1992, the staff interpreted the licensee's response as a commitment to use the entire GIP-2, including both the SQUG commitments and the SQUG implementation guidance, as supplemented by SSER No. 2.
In its letter dated February 11, 1993, the licensee confirmed that the staff's
! interpretation described in the November 30, 1992, letter is correct in that the licensee intends to use the entire GIP-2,-including the SQUG commitments and implementation guidance. The staff finds the licensee's response acceptable. Additionally, as stated in Section 1.2.3.1 of the SSER No. 2, the staff recognizes that the licensee may revise its licensing basis in accordance with 10 CFR 50.59 to reflect the acceptability of the USI A-46 l
(GIP-2) methodology for verifying the seismic adequacy of electrical and i mechanical equipment covered by GIP-2. If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely, ORIGINAL SIGNED BY:
- Steven Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V l 9311090276 931102 PDR ADOCK 05000285 Office of Nuclear Reactor Regulation P PDR l cc
- See next page '
DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 Reading 'A. B. Beach ;
S. Bloom E. Adensam W. Beckner J. Roe !
t P. Noonan ACRS(10) (P-315) OGC(15B18) M. McBrearty 0FC LA:PD4-J % PM:P/)4-1 D:PD4-1 ,
NAME PNoonab [ .S h pk WBeckner DATE ll /e3 /93 d] J-/93 0 /7493 COPY YES$) kEhNO YESh0) {Q(( (((( yG OFFICIAL RECDR 0 , Document Name: FC69447A.ltr ,
November 2, 1993 Docket no. 50-285 i t
Mr. Terry. L. Patterson c Division Manager - Nuclear Operations -
l Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 l Hwy. 75 - North of Fort Calhoun l Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
EVALUATION OF OMAHA PUBLIC POWER DISTRICT'S CLARIFICATION OF 120-DAY RESPONSE TO SUPPLEMENT NO.1 TO GENERIC LETTER 87-02 FOR FORT :
CALHOUN STATION, UNIT I (TAC NO. M69447) !
On May 22, 1992, the NRC staff issued Supplement No. I to Generic Letter (GL) 87-02, which transmitted Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on the Seismic Qualification Utility Group's (SQUG's) Generic Implementation Procedure, Revision 2 (GIP-2), dated February 14, 1992, for the resolution of Unresolved Safety Issue (USI) A-46. By letter dated September 21, 1992, the licensee submitted its 120-day response to the GL l supplement for Fort Calhoun Station, Unit 1. By letter dated November 30, l 1992, the staff interpreted the licensee's response as a commitment to use the l entire GIP-2, including both the SQUG commitments and the SQUG implementation '
guidance, as supplemented by SSER No. 2.
In its letter dated February 11, 1993, the licensee confirmed that the staff's interpretation described in the November 30, 1992, letter is-correct in that the licensee intends to use the entire GIP-2, ir.cluding the SQUG commitments and implementation guidance. The staff finds the licensee's response acceptable. Additionally, as stated in Section I.2.3.1 of the SSER No. 2, the j staff recognizes that the licensee may revise its licensing basis in i accordance with 10 CFR 50.59 to reflect the acceptability of the USI A-46 (GIP-2) methodology for verifying the seismic adequacy of electrical and mechanical equipment covered by GIP-2. If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely, ORIGINAL SIGNED BY:
Steven Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation -
cc: See next page l DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 Reading A. B. Beach S. Bloom E. Adensam W. Beckner J. Roe i P. Noonan ACRS(10) (P-315) OGC(15B18) M. McBrearty 0FC LA:PD4-19[ PM:PA4-1 D:PD4-1 NAME PNoonan S h pk WBeckner DATE II/,Q/93 d47-/93 0/L/93 COPY YE8750 ) kENN0 YESkd 0FFICIAL RECORD COPY Document Name: FC69447A.ltr ;
- g. .
.) ama ug l
- 1 UNITED STATES
[
,j NUCLEAR REGULATORY COMMISSION l g g WASWNGTON, D.C. 205664001
....+
/ November 2,'1993 Docket No. 50-285 !
Mr. Terry. L. Patterson '
Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
i
SUBJECT:
EVALUATION OF OMAHA PUBLIC POWER DISTRICT'S CLARIFICATION OF 120-DAY RESPONSE TO SUPPLEMENT NO. 1 TO GENERIC LETTER 87-02 FOR FORT CALHOUN STATION, UNIT 1 (TAC NO. M69447)
On May 22, 1992, the NRC staff issued Supplement No.1.to Generic Letter ,
(GL) 87-02, which transmitted Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on the Seismic Qualification Utility Group's (SQUG's) Generic Implementation Procedure, Revision 2 (GIP-2),-dated February 14,.1992, for the resolution of Unresolved Safety Issue (USI) A-46. .By letter dated September 21, 1992, the licensee submitted its 120-day response:to the GL supplement for Fort Calhoun Station, Unit 1. By letter dated November 30, ,
1992, the staff interpreted the licensee's response as'a commitment to use the entire GIP-2, including both the SQUG commitments and the SQUG implementation guidance, as supplemented by SSER No. 2. 1
, In its letter dated February 11, 1993, the licensee confirmed that the staff's interpretation described in the November 30, 1992, letter is correct in that the licensee intends to use the entire GIP-2, including the SQUG commitments and implementation guidance. The staff finds the licensee's response acceptable. Additionally, as stated in Section I.2.3.1 of the SSER No. 2, the staff recognizes that the licensee may revise its licensing basis in accordance with 10 CFR 50.59 to reflect the acceptability of the USI A-46 (GIP-2) methodology for verifying the seismic adequacy of electrical and mechanical equipment covered by GIP-2. If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely,
- 2 Steven Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V l Office of Nuclear Reactor Regulation cc: See next page l
..m ,y y. . , . , , ,.._.._y ..w,..,, ,,-._r,, , . ...,y. . . ,, _ .m., y ,,
- ~ . - - . . . . . .-
I Mr. Terry L. Patterson 3
Omaha Public Power District Fort Calhoun Station, Unit I cc:
Mr. Michael F. McBride, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C. 20009-5728 Mr. Jack Jensen, Chairman Washington County Board i
of Supervisors l
Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations l Combustion Engineering, Inc.
12300 Twinbrook Parkway,. Suite 330 i Rockville, MD 20852 1 l Regional Administrator, Region IV l U.S. Nuclear Regulatory Commission
! 611 Ryan Plaza Drive, Suite 1000 '
Arlington, Texas 76011 4 Harold Borchert, Director Division of Radiological Health Nebraska Department of Health l
301 Centennial Mall, South l Post Office Box 95007 Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 l Fort Calhoun, Nebraska 68023 I
r ? ---
r ._ _ . ~ _ , , . . . ,----_._..,,.._...-,._....r., , ,..y ,,.,y,, y