LD-94-028, Forwards Copies of Amend V to CESSAR - Design Certification. Amend V Included Draft Marked Up Pages & Other Matl Discussed W/Nrc Staff & ACRS During Recent Meetings

From kanterella
Jump to navigation Jump to search
Forwards Copies of Amend V to CESSAR - Design Certification. Amend V Included Draft Marked Up Pages & Other Matl Discussed W/Nrc Staff & ACRS During Recent Meetings
ML20070M580
Person / Time
Site: 05200002
Issue date: 04/29/1994
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070M583 List:
References
LD-94-028, LD-94-28, NUDOCS 9405020194
Download: ML20070M580 (32)


Text

5 S

ABB i 3

i

=

April 29,1994 LD-94-028 j s

i Docket No.52-002 ,

i Document Control Desk ~,

U.S. Nuclear Regulatory Commission E Washington, DC 20555 j

Subject:

Combustion Engineering Standard Safety Analysis S Report - Design Certification, Amendment V

Dear Sirs:

Ei This letter transmits thirty-seven (37) formally printed copies of Amendment V to the _

Combustic.. Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC) 3 and the affidavit, as required by 10 CFR 50.4(b) and 10 CFR 50.30(b). Amendment V includes d revisions previously tra nsmitted as draft marked-up pages of CESSAR-DC and other material  ?

discussed with the NRC staff and the ACRS during recent meetings. The Attachment -

summarizes changs incorporated into Amendment V. g O

If you have my questions, please call me or Mr. Stanley Ritterbusch of my staff at 3 (203) 2d5-5206. "a 3

Very truly yours, y COMBUSTION ENGINEERINO, INC.

E xn

/ ,

i

'=

C. B. Brinkman 4 Director A Nuclear Systems Licensing @

CBB/sp i

Attachment:

As Stated -i i

cc: w/o enclosures: $

T. Wambach (NRC)

P. lang (DOE)

=

j J. Trotter (EPRI) E.

g m 9405020194 940429 4 J PDR ADOCK 05200002 g =

A PDR r 7

ABB Combustion Engineering Nuclear Power -

t g g Cornbuston Engineenng. Inc. P.O Box 500 Telephone (203) 688-1911 L  :

E 1000 Prospect Hdi Rd Fax (203) 285-5203 i Windsor. CT 06095

, s

Docket No.52-002 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of: )

)

Combustion Engineering, Inc. )

)

Standard Plant Design )

APPLICATION FOR REVIEW OF

" COMBUSTION ENGINEERP4G STANDARD SAFETY ANALYSIS REPORT-DESIGN CERTIFICATION" Regis A. Matzie, being duly sworn, states that he is the Vice President, ABB Combustion Engineering Nuclear Systems Engineering, of Combustion Engineering, Inc.; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; and that all statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

COMBUSTION ENGINEERING, INC.

By:

d Regi#A. Matzie '

Vice President ABB Combustion Engineering Nuclear Systems Engineering Subscribed and sworn to befor me this A9 M day of ,1994.

/

^

. 1 )

Notary Publi8 My Commission Expires: 6-31-99

i CESSAR-DC Amendment "V" Overview Page 1 Chanter 1 - Introdur'. ion and General Plant Descrintion Editorial change., were made to Sections 1.1,1.2,1.4,1.6,1.7,1.8 and 1.9. Tables in Sections 1.2,13,1.4,1.6, 1.8,1.9 and 150 were updated. Applicable Generic Letters and NRC Bulletins from 1980 through 1993 were added to Tables 1.8-2 and 1.8-3. Editorial and consistency changes were made to Tables 1.8-5 and 1.8-6.

Tables 1.8-8 and 1.8-9 were updated to reflect the change from Appendix A to Chapter 20 for closure of US1s/GSIs. Editorial changes were made to Table 1.9-1. COL action items corresponding to requirements identified in the Advanced FSER were incorporated into Table 1.10-1. Figures 1.2-1,1.2-24 and 1.2-25 were updated.

Chanter 2 Site Envelone Characteristics Table 2.0-1 was revised in response to an ACRS question.

Editorial changes were made to Section 2.5 and Figure 2.5-1. Appendix 2A was revised for consistency.

Figure 2A-1 was deleted, and nomenclature on Figures 2A-2,4,5,8, and 11 was updated. Appendix 2B was revised for consistency and Figures 2B-5,9,13,17, and 21 - 23 were updated.

Chanter 3 - Desien of Structures. Components. Eauipment and Systems Responses to ACRS questions were incorporated into Sections 3.3,3.4,3.6,3.8 and Appendix 3.8A.

Editorial and consistency changes were made in Sections 33 through 3.11. Tables 3.2-1,3.9-13,3.9-15 and 3.11-2 were updated. Editorial changes were made to Figures 3.7-10 and 3.7-26.

Editorial and consistency changes were made in Appendices 3.6A,3.7B,3.8A,3.8B,3.9A and 3.11A. Figures 3.7C-8 through -13,3.7C-23 through -28, and 3.7D-42 through -47 were updated. Tables 3.8A-3 and 3.8B-1 were revised. Figures 3.8B-3 through -11 were added to Appendix 3.8B. LBB Piping Evaluation Diagrams shown in Figures 3.9A-30 through -36 were updated. An editorial change was made to Figure 3.11A-2.

Chanter 4 - Reactor Consistency and editorial changes were made to Sections 4.2 through 4.5. Consistency changes were made to Tables 4.2-1,43-1 through -4,4.4-1, and 4.4-8. Changes were made to Figures 4.2-9, 4.2-10, 4.2-12, 43-2, 43-25,43-31,43-53,43-58 and 43-63 in response to NRC reviewer comments.

Chanter 5 - Reactor Coolant System and Connected Systems Editorial and consistency changes were made to Sections 5.1 through 5.4, Tables 5.1.1-1 through -3,5.2-2, and 53-7. Table 5.4.7-2 was revised for consistency between SCS and Containment Spray System in resp (mse to NRC reviewer questions. Figures 53-4,5.4.2-5 and 5.4.10-1 were revised. Consistency changes were incorporated into Appendices SD, SE and 5F.

_ Chanter 6 - Encineered Safety Features Sections 6.1 through 63 and 6.5 through 6.7 were updated for consistency and to incorporate editorial changes.

Section 6.1.1 was revised to close out DSER 016.1-4; Section 63.4.1 was revised to close DSER 01633-1; and Section 6.7.1 concerning RDS sizing analysis was clarified to close DSER 01 6.7.2-1. Editorial and consistency changes were made to Tables 6.1-4,6.2.1-1,6.2.4-1,63.21,6333-1, and 6.5-2. Table 6.5-3 was revised for consistency between SCS and Containment Spray Systems per NRC reviewer comments. Section 6.8.5 concerning testing and inspection of the IWSS was added to resolve consistency review comments.

+

CESSAR-DC Amendment "V" Overview Page 2 Appendices 6B and 6C, concerning boron dilution during a small break LOCA, were added. Tables 6B-1, 6C-1,2 and 3; Figures 6B-1 through 3, and Figures 6C-1 through 5 were added.

Chanter 7 - Instrum.ntation and Control Section 7.7 was updated to respond to ACRS concerns regarding fire materials.

Editorial and consistency changes were incorporated into Sections 7.2,73,7.5 and 7.7. Tables 7.5-2 and 7.5-3, and Figure 7.2-10 were updated.

Chanter 8 - Electric Power Sections 8.1 and 83 were revised in response to NRC reviewer comments, and to incorporate editorial changes. Consistency changes were incorporated into Tables 83.1-2,3,4. Table 83.2-4 was updated. New Figure 83-1, Electrical One-line Symbols, was added; Figure 83.1-1 was updated.

Chanter 9 - Auxiliary Systems Sections 9.2 and 9.5 were updated to respond to ACRS questions.

Editorial and consistency changes were implemented in Sections 9.1,9.2,9.4, and 9.5. The fuel handling and storage system in Section 9.1 was updated in response to reviewer comments. Tables 9.2.1-3,9.2.2-2,9.2.2-5, 9.4-1 and 9.4-5 were updated. Section 9.5 was revised for consistency with the USI/GSI #106 [Ch 20]

response. Section 9.53 regarding system lighting and Figure 9.2.10-1 were revised in response to NRC reviewer request.

Chanter 10 - Steam and Power Conversion Section 103 was updated in response to ACRS comments.

Editorial and consistency changes were made to Sections 10.1 through 10.4 and Table 10.2.4-1.

Chanter 11 - Radioactive Waste Manacement Sections 11.1 through 11.4 were updated to incorporate editorial changes and for consistency with ITAAC.

Tables 11.1.13,11.2-2,11.2-6, and 113-4 were revised to reflect doses at the exclusion area boundary or to incorporate editorial changes.

ChaDier 12 - Radiation Protection Sections 123 and 12.4, including Tables 123-5 and 12.4-4 were updated to respond to ACRS mncerns regarding cobalt content in materials.

Sections 12.1 and 123 were revised for consistency with the Advanced FSER.

Chanter 13 Conduct of Onerations An editorial change was made to Section 133.

Chapter 14 - Initial Test Procram Revised Section 14.2 per discussion with reviewers, to address PRA insights and commitments to the NRC, and for 11 ROP confirmatory valve testing. Section 143 was updated to address the role of the initial test program in the Certified Design Material, and to incorporate editorial and consistency changes.

CESSAR-DC Amendment Y Overview Page 3 Chanter 15 - Accident Analyses Table 15A-10 in Appendix 15A was updated.

Chanter 16 - Technical Snecifications No changes were made to this chapter.

Chanter 17 - Ouality Assurance Section 173 was revised to respond to ACRS questions.

Editorial and consistency changes were made to Sections 17.1,17.2 and 173.

Chanter 18 - Human Factors Ennineerine 4 An editorial change was made to Table 185.4-1. Sections 18.6,18.7,18.10 and Table 18.7.1-1 were revised in response to NRC reviewer comments and to incorporate editorial changes.

Chanter 19 - Probabilistic Risk Assessment Editorial and consistency changes were made to Sections 19.2 through 19.9; and Sections 19.11 through 19.16.

Sections 19.8,19.11 and 19.12 were revised per agreement with NRC reviewers to incorporate additional PRA insights. Various tables in Sections 193,19.5 through 19.9,19.11,19.12 and 19.15 were updated. Minor revisions were incorporated into Appendices 19.5B, RSC and 19.6A. Appendix 19.8A was revised per agreement with NRC reviewers to provide additional information in response to RAI #440.170. New Section 19.15.6 was added; the section previous provided as 19.15.6 was renumbered as 19.15.7. Editorial changes were made to Figures 19.63.2-1 & 2, 19.113.1-3, 19.11.4.1 3-1 & 2.

Appendices 19.11G, Equipment Survivability in Severe Accidents, an, 19.11H, Containment Fragility Curve Evaluation, were added. Figures 19.11G-1 and 2 were added. Editorial changes were made to Appendix 19A l

and various tables in Appendix 19A. '

Chanter 20 - Closure of Unresolved and Generic Safety Issues This chapter was completely reset, and replaces the previous Appendix A. Editorial, technical or consistency changes were made to USI/GSI-106, A-31, A-43, and B4)5. Revisions were made to A-44, Station Blackout, and A-13, Snubber Operability Assurance. GSI/TMI Items 24, 70, 87,118,142, B-17, B-36, C-1, I.C.9, I.G.2, II.E.6.1,IIJ3.L nad II.K.1(5,10,13) were added to respond to reviewer requests.

1 i

4 .

SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

Front Matter Listing of Amendments Listing of Amendments Contents of Report Contents of Report CHAPTER 1 TAB 1.0 i

Effective Page Listing, Sheets 1 to 3 Effective Page Listing, Sheets 1 to 3 Table of Contents, vii to ix Table of Contents, vii to ix TAB 1.1 1.1-1 to 1.1-3 1.1-1 to 1.1-3 TAB 1.2 1.2-1,2 1,2-1,2 1.2-19,20 1,2-19,20 Table 1.2-1, Sheets 1,2 Table 1.2-1, Sheets 1,2 Figure 1.2-1 (Foldout) Figure 1.2-1 (Foldout)

Figure 1.2-24 (Foldout) Figure 1.2-24 (Foldout)

Figure 1.2-25 (Foldout) Figure 1.2-25 (Foldout)

TAB 1.3 Table 1.3-1, Sheets 1 to 6 Table 1.3-1, Sheets 1 to 6 i Table 1.3-2 Table 1.3-2, l

TAB 1.4 1.4-1 to 1.4-4 1.4-1 to 1.4-4 Table 1.4-1, Sheets 1,2 Table 1.4-1, Sheets 1,2 TAB 1.6 1.6-1 to 1.6-5 1.6-1 Table 1.6-1, Sheets 1 to 6 after page 1.6-1 709INSTV.wp _ _ - ____ _ _ _ _ _ _ _ _ _

D SYSTEM 80+ CESSAR-DC .

AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB 1.7 1.7-1 1.7-1 TAB 1.8 1.8-1 1.8-1 Table 1.8-1, Sheets 1 to 21 Table 1.8-1, Sheets 1 to 17 Table 1.8-2, Sheets 1 to 22 Table 1.8-2, Sheets 1 to 22 Table 1.8-3, Sheets 1 to 5 Table 1.8-3, Sheets 1 to 5 Table 1.8-4, Sheets 5,6 Table 1.8-4, Sheets 5,6 Table 1.8-6, Sheets 1,2 Table 1.8-6, Sheets 1,2 Table 1.8-8, Sheets 1 to 12 Table 1.8-8, Sheets 1 to 13 Table 1.8-9, Sheets 1 to 6 Table 1.8-9, Sheets 1 to 6 Table 1.8-10, Sheets 1 to 3 Table 1.8-10, Sheets 1 to 3 l I

TAB 1.9 1.9-1 1.9-1 Table 1.9-1 Table 1.9-1 ,

I TAB 1.10 i Table 1.10-1, Sheets 1 to 11 Table 1.10-1, Sheets 1 to 13 CHAPTER 2 TAB 2.0 Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, i to iv Table of Contents, i to iv Table 2.0-1, Sheets 1 to 3 Table 2.0-1, Sheets 1 to 3 TAB 2.5 2.5-3 to 2.5-14 2.5-3 to 2.5-16 Figures 2.5-1, 2.5-2 Figures 2.5-1, 2.5-2 7091NSTV.wr SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB APPENDIX 2A ,

Effective Page Listing Effective Page Listing Table of Contents, i,ii Table of Contents, i,ii 2A-1 2A-1 Figures 2A-1 to 2A-13 Figures 2A-1 to 2A-13 TAB APPENDIX 2B Table of Contents, i to lii Table of Contents, i to iii 2B-1 2B-1 to 2B-3 Figures 2B-5 to 2B-23 Figures 2B-5 to 2B-23 CHAPTER 3 TAB 3.0 Effective Page Listing, Sheets 1 to 7 Effective Page Listing, Sheets 1 to 7 Table of Contents, y to xii- Table of Contents, y to xii xv to xxii xv to xxii l TAB 3.2 1

Table 3.2-1, Sheets 13,14 Table 3.2-1, Sheets 13,14 Sheets 21,22 Sheets 21,22 TAB 3.3 3.3-1,2 3.3-1,2 l

TAB 3.4 I i

3.4-1 to 3.4-4 3.4-1 to 3.4-4 j i

TAB 3.5 l 3.5-1,2 3.5-1,2 l 3.5-7,8 3.5-7,8  !

i I

7091NSTV.wp - _____ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

4 l

l l

SYSTEM 80+ CESSAR-DC '

AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB 3.6 3.6-3,4 3.6-3,4 3.6-11 to 3.6-44 3.6-11 to 3.6-45 TAB APPENDIX 3.6A 3.6A-3,4 3.6A-3,4 TAB 3.7 3.7-1,2 3.7-1,2 3.7-9,10 3.7-9,10 3.7-16a to 3.7-20 3.7-16a to 3.7-20 Figures 3.7-9,10 Figures 3.7-9,10 Figures 3.7-25,26 Figures 3.7-25,26 TAB APPENDIX 3.7B Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, i,ii Table of Contents, i,ii 3.7B-1,2 3.7B-1,2 3.7B-7,8 3.7B-7,8 3.7B-11,12 3.7B-11,12 TAB APPENDIX 3.7C Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Table of Contents, i to iv Table of Contents, i to iv Figures 3.7C-7 to 3.7C-14 Figures 3.7C-7 to 3.7C-14 Figures 3.7C-23 to 3.7C-28 Figures 3.7C-23 to 3.7C-28 TAB APPENDIX 3.7D Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Table of Contents, y, vi Table of Contents, v, vi Figures 3.7D-41 to 3.7D-47 Figures 3.7D-41 to 3.7D-47 l

709INSTV.wp e

i

[ .

! SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS i

i REMOVE ADD PAGE NO. PAGE NO.

TAB 3.8 3.8-7 to 3.8-10 3.8-7 to 3.8-10 4

3.8-15,16 3.8-15,i5 r 3.8-19 to 3.8-24 3.8-19 to 3.8-24 3.8-31 to 3.8-40 3.8-31 to 3.8-40 Table 3.8-3C Table 3.8-3C Table 3.8-5, Sheets 1 to 10 Table 3.8-5 i

TAB APPENDIX 3.8A
Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2

) Cover Page Cover Page Table of Contents, i to xvi Table of Contents, i to xvi 3.8A-1 to 3.8A-56 3.8A-1 to 3.8A-59 Tables 3.8A-3,4 Tables 3.8A-3,4 Anoendix 3.8B Anpendix 3.8B Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, vii,viii Table of Contents, vii,viii 3.8B-1,2 3.8B-1,2 3.8B-5 to 3.8B-10 3.8B-5 to 3.8B-10 3.8B-23 to 3.8B-39 3.8B-23 to 3.8B-39 Table 3.8B-1 Table 3.8B-1 New Figures 3.8B-3 to 3.8B-11, after Figure 3.8B-2, Sheet 3 TAB 3.9 3.9-5 to 3.9-32 3.9-5 to 3.9-32 3.9-37,38 3.9-37,38 3.9-51 to 3.9-52b 3.9-51 to 3.9-52b 3.9-71,72 3.9-71,72 3.9-83 to 3.9-85 3.9-83 to 3.9-85 Table 3.9-13 Table 3.9-13 Table 3.9-15, Sheets 1,2 Table 3.9-15, Sheets 1,2 Sheets 5,6 Sheets 5,6 Sheets 9,10 Sheets 9,10 Sheets 29,30 Sheets 29,30 Sheets 67,68 Sheets 67,68 7091NSTV.wp -- . _ _ _ _ - - _ _ _ _ _ _ _ _ .__-_ _ - __ . _ _ _ _ _ _ _ _

l .

SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB APPENDIX 3.9A Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, iii to viii Table of Contents, iii to viii xi,xii xi,xii 3.9A-11 to 3.9A-14 3.9A-11 to 3.9A-14 3.9A-21 to 3.9A-28 3.9A-21 to 3.9A-28 l 3.9A-39 to 3.9A-40 3.9A-39 to 3.9A-40 Figures 3.9A-30 to 3.9A-36 Figures 3.9A-30 to 3.9A-36 TAB 3.10 3.10-3,4 3.10-3,4 i

TAB 3.11 l

3.11-1 to 3.11-6 3.11-1 to 3.11-6 3.11-9 to 3.11-16 3.11-9 to 3.11-16 Table 3.11-2, Sheets 1,2 Table 3.11-2, Sheets 1,2 l

TAB APPENDIX 3.11A

, Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Table of Contents, iii Table of Contents, iii l 3.11 A-1 3.11A-1 l Figures 3.11A-2,3 Figures 3.11A-2,3 CIIAFTER 4 TAB 4.0 ,

l Effective Page Listing, Sheets 1 to 4 Effective Page Listing, Sheets 1 to 4 Table of Contents, i to vi Table of Contents, i to vi xv to xxii xv to xxii TAB 4.1 l Tables 4.1-1,2 Tables 4.1-1,2 l

l l

1 709INSTV.wp l - , -. --

. SYSTEM 80+ CESSAR-DC ,

AMENDMENT V - PAGE CHANGE INSTRUCTIONS l

l 1

REMOVE '

ADD PAGE NO. PAGE NO.

TAB 4.2 l 4.2-1,2 4.2-1,2 4.2-5,6 4.2-5,6 4.2-9,10 4.2-9,10 4.2-17,18 4.2-17,18 4.2-21 to 4.2-28 4.2-21 to 4.2-28 4.2-31,32 4.2-31,32 4.2-37 to 4.2-54 4.2-37 to 4.2-54 4.2-67 to 4.2-72 4.2-67 to 4.2-72 4.2-77 to 4.2-80 4.2-77 to 4.2-80 4.2-89,90 4.2-89,90 Table 4.2-1, Sheets 1 to 7 Table 4.2-1, Sheets 1 to 7 Figures 4.2-9 to 4.2-12 Figures 4.2-9 to 4.2-12 TAB 4.3 4.3-1 to 4.3-4 4.3-1 to 4.3-4 4.3-9,10 4.3-9,10 4.3-13 to 4.3-16 4.3-13 to 4.3-16 4.3-25,26 4.3-25,26 4.3-31,32 4.3-31,32 ,

4.3-37 to 4.3-42 4.3-37 to 4.3-42  !

Tables 4.3-1 to 4.3-5 Tables 4.3-1 to 4.3-5 Figure 4.3-2, Sheets 1,2 Figure 4.3-2, Sheets 1,2 Figures 4.3-25,26 Figures 4.3-25,26 Figures 4.3-31,32 Figures 4.3-31,32 -

Figures 4.3-53,54 Figures 4.3-53,54 Figures 4.3-57,58 Figures 4.3-57,58 Figure 4.3-63 Figure 4.3-63 TAB 4.4 i 4.4-3 to 4.4-39 4.4-3 to 4.4-39 4 Tables 4.4-1 to 4.4-3 Tables 4.4-1 to 4.4-3 Table 4.4-8 Table 4.4-8 TAB 4.5 4.5-3 to 4.5-12 4.5-3 to 4.5-12 709INSTV.wp SYSTEM 80+ CESSAR-DC .

AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

CHAPTER 5 TAB 5.0 Effective Page Listing, Sheets 1 to 3 Effective Page Listing, Sheets 1 to 3 TAB 5.1 5.1-1,2 5.1-1,2 Tables 5.1.1-1 to 5.1.1-3 Tables 5.1.1-1 to 5.1.1-3 5.1-5 5.1-5 TAB 5.2 5.2-1,la 5.2-1,la 5.2-9,10 5.2-9,10 l 5.2-17 to 5.2-24 5.2-17 to 5.2-24 5.2-27,28 5.2-27,28 Table 5.2-2, Sheets 1 to 5 Table 5.2-2, Sheets 1 to 5 TAB 5.3 5.3-1,2 5.3-1,2 5.3-11,12 5.3-11,12 l Table 5.3-7 Table 5.3-7 Figure 5.3-4 Figure 5.3-4 TAB 5.4 Figure 5.4.2-5 Figure 5.4.2-5 l 5.4-17,18 5.4-17,18 5.4-25,25a 5.4-25,25a 5.4-27 to 28 5.4-27 to 28 Table 5.4.7-2, Sheets 5 to 7 Table 5.4.7-2, Sheets 5 to 7 Figures 5.4.10-1,2 Figures 5.4.10-1,2 l TAB APPENDIX 5D l Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 5D-5,6 5D-5,6 l 709INsTV.wp i .

I l . SYSTEM 80+ CESSAR-DC-l AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB APPENDIX SE Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 <

5E-3,4 5E-3,4 5E-17,18 SE-17,18 5E-19,20 5E-19,20 5E-41,42 5E-41,42 5E-43,44 SE-43,44 5E-41 to SE-44 5E-41 to 5E-44 TAB APPENDIX 5F .

Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 5F-11,12 5F-11,12 l 5F-29,30 5F-29,30 5F-41,42 5F-41,42 l

l CHAFFER 6 l

l TAB 6.0 Effective Page Listing, Sheets 1 to 6 Effective Page Listing, Sheets 1 to 6 Table of Contents, ix,x Table of Contents, ix,x xv,xvi xy,xvi TAB 6.1 l 6.1-3 to 6.1-6 6.1-3 to 6.1-6 Table 6.1-4 Table 6.1-4 TAB 6.2 6.2-7 to 6.2-8 6.2-7,8 6.2-11,12 6.2-11,12 l Table 6.2.1-1, Sheets 1 to 3 Table 6.2.1-1, Sheets 1 to 3 l Table 6.2.1-2 Table 6.2.1-2 6.2-41,42 6.2-41.42 Figure 6.2.3-1 (Foldout) Figure 6.2.3-1 (Foldout) 6.2-53,53a 6.2-53,53a  !

Table 6.2.4-1, Sheets 5 to 8 Table 6.2.4-1, Sheets 5 to 8 Sheets 11 to 14 Sheets 11 to 14 Figure 6.2.4-1, Sheet 6 Figure 6.2.4-1, Sheet 6 l 1

709INSTV.wp I

l I

1 1 SYSTEM 80+ CESSAR-DC. ,

l AMENDMENT V - PAGE CHANGE INSTRUCTIONS 1

i i

REMOVE ADD i PAGE NO. PAGE NO.

! TAB 6.3 6.3-13,14 6.3-13 to 6.3-14b

' 6.3-17,18 - 6.3-17 to 6.3-18b j Table 6.3.2-1, Sheets 1,2 Table 6.3.2-1, Sheets 1,2

6.3-25,26 6.3-25,26
Tables 6.3.3.3-1,2 Tables 6.3.3.3-1,2 6.3-40a to 6.3-47 6.3-41 to 6.3-49 i

TAB 6.5 I 6.5-9,10 6.5-9,10 6.5-15 to 6.5-18 6.5-15 to 6.5-18 j 6.5-23 to 6.5-24. 6.5-23 to 6.5-24

Table 6.5-2 Table 6.5-2 Table 6.5-3, Sheets 5,6 Table 6.5-3, Sheets 5,6 l TAB 6.6 6.6-1 to 6.6-4 6.6-1 to 6.6-4 TAB 6.7

! 6.7-7 to 6.7-10 6.7-7 to 6.7-10 i

l TAB 6.8 l 6.8-9,10 6.8-9,10

TAB APPENDIX 6A Remove Tab Appendix 6A Replace with new TAB: Appendix 6A -

Single Failure Sensitivity Study i

1 l

4 l

1 e

F 709INSTV.wp - , . - . .- - . .. . . .

l l

l .

SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB APPENDIX 6B Remove Tab Appendix 6B Replace with new TAB: Appendix 6B -

Boron Dilution During SBLOCA with Natural Cirtulation Flow Add new Appendix UB, i.e.:

Effective Page Listing Cover Sheet i Table of Contents, i to iii l 6B-1 to 6B-8 I Table'6B-1, Sheets 1,2 Figures 6B-1 to 6B-3 APPENDIX 6_Q APPENDIX 6C Add new TAB: APPENDIX 6C - Boron Dilution During SBLOCA with RCP Restart Add new Appendix 6C, i.e.:

Effective Page Listing, Sheet 1 Cover Sheet 1 Table of Contents, i to iv 6C-1 to 6C-16 Tables 6C-1 to 6C-3 Figures 6C-1 to 6C-5 CHAPTER 7 TAB 7.0 Effective Page Listing, Sheets 1 to 4 Effective Page Listing, Sheets 1 to 4 TAB 7.2 7.2-1 to 7.2-4 7.2-1 to 7.2-4 7.2-11,12 7.2-11,12 7.2-61,62 7.2-61,62 Figures 7.2-9,10 Figures 7.2-9,10 709INSTV.wp -11

SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

TAB 7.3 l 7.3-23,24 7.3-23,24 l

TAB 7.5 l 7.5-7,8 7.5-7,8 l Table 7.5-2, Sheets 1,2 Table 7.5-2, Sheets 1,2 Sheet 5 Sheet 5 Table 7.5-3, Sheets 1,2 Table 7.5-3, Sheets 1,2 TAB 7.7 7.7-25,26 7.7-25,26 7.7-31,32 7.7-31,32 7.7-57 to 60 7.7-57 to 60 7.7-65,66 7.7-65,66 -

CHAPTER 8 TAB 8.0 Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, i to iv Table of Contents, i to iv vii,viii vii,viii TAB 8.1 8.1-1,2 8.1-1,2 8.1-12a to 8.1-13 8.1-13 TAB 8.3 8.3-3b to 8.3-7a 8.3-3b to 8.3-7a 8.3-13 to 8.3-15a 8.3-13 to 8.3-15a 8.3-17,18 8.3-17 to 18 8.3-21,22 8.3-21,22 8.3-33,34 8.3-33 to 34 8.3-38a,38b 8.3-38a,38b 709INSTV.wp s

)

1 SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE . ADD ,

PAGE NO. PAGE NO.

Table 8.3.1-2, Sheets 3 to 14 Table 8.3.1-2, Sheets 3 to 14 Sheet 19 Sheet 19 Table 8.3.1-3, Sheets 3 to 14 Table 8.3.1-3, Sheets 3 to 14 Sheet 19 Sheet 19 Table 8.3.1-4, Sheets 1 to 6 Table 8.3.1-4, Sheets 1 to 6 Add new Figure 8.3-1 (Foldout), after Table 8.3.1-4, Sheet 7 Figure 8.3.1-1 (Foldout) Figure 8.3.1-1 (Foldout)

Add new page 8.3-42a,42b, after page 8.3-42 Table 8.3.2-4, Shects 1,2 Table 8.3.2-4, Sheets 1,2 CHAPTER 9 TAB 9.0 Effective Page Listing, Sheets 1 to 6 Effective Page Listing, Sheets 1 to 6 Table of Contents, xix,xx Table of Contents, xix,xx xxv,xxvi xxv,xxvi TAB 9.1 9.1-3 to 9.1-6 9.1-3 to 9.1-6 9.1-11,12 9.1-11,12 9.1-27 to 9.1-30 9.1-27 to 9.1-30 9.1-37,38 9.1-37,38 9.1-41,42 9.1-41,42 9.1-45,46 9.1-45,46 9.1-53 to 56 9.1-53 to 56 TAB 9.2 9.2-3,4 9.2-3,4 Table 9.2.1-3, Sheets 1,2 Table 9.2.1-3, Sheets 1,2 9.2-21 to 9.2-24 9.2-21 to 9.2-24 9.2-35,36 9.2-35,36 9.2-45,46 9.2-45,46 Table 9.2.2-2, Sheets 1,2 Table 9.2.2-2, Sheets 1,2 Table 9.2.2-5, Sheets 1,2 Table 9.2.2-5, Sheets 1,2  ;

Figure 9.2.10-1 (Foldout) Figure 9.2.10-1 (Foldout)  !

7091NSTV.wp - _

SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

l TAB 9.4 f

9.4-5 to 9.4-8 9.4-5 to 9.4-8 9.4-11 to 9.4-16 9.4-11 to 9.4-16 9.4-23 to 9.4-30 9.4-23 to 9.4-30 Table 9.4-1, Sheets 1 to 18 Table 9.4-1, Sheets 1 to 18 Table 9.4-5, Sheets 1,2 Table 9.4-5, Sheets 1,2 l

TAB 9.5 9.5-3,4 9.5-3 to 9.5-4b 9.5-9,10 9.5-9,10 9.5-21,22 9.5-21,22 9.5-25 to 9.5-30 9.5-25 to 9.5-30 l 9.5-42a to 9.5-42d 9.5-42a to 9.5-42d 9.5-47 to 9.5-50 9.4-47 to 9.5-50 j 9.4-51,51a 9.4-51,51a 9.5-55 to 9.5-58 9.5-55 to 9.5-58 CHAPTER 10 TAB 10.0 Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 TAB 10.1 l

l 10.1-1,2 10.1-1,2 L TAB 10.2 10.2-1,2 10.2-1,2 10.2-5 to 10.2-10 10.2-5 to 10.2-10 l 10.2-13,14 10.2-13,14 i

10.2-15,16 10.2-15,16 Table 10.2.4-1 Table 10.2.4-1 10.2-17,18 10.2-17,18 l

l 7091NSTV.wp ._. - -

1 SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS l

REMOVE ADD PAGE NO. PAGE NO.

TAB 10.3 10.3-1,2 10.3-1,2 10.3-5 to 10.3-8 10.3-5 to 10.3-8 10.3-17,18 10.3-17,18 10.3-23,24 10.3-23,24 TAB 10.4 l 10.4-7,8 10.4-7,8 l 10.4-11 to 10.4-14 10.4-11 to 10.4-14 Table 10.4.9-4, Sheets 3,4 Table 10.4.9-4, Sheets 3,4 l CHAPTER 11 TAB 11.0 l

l Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 i Table of Contents, i to vi Table of Contents, i to vi i TAB 11.1 Table 11.1.1-3,4 Table 11.1.1-3 Table 11.1.1-4 TAB 11.2 11.2-1,2 11.2-1,2 11.2-7 to 11.2-19 11.2-7 to 11.2-22 i Table 11.2-2, Sheets 1,2 Table 11.2-2, Sheets 1,2 Table 11.2-6, Sheets 3,4 Table 11.2-6, Sheets 3,4 TAB 11.3 11.3-1 to 11.3-18 11.3-1 to 11.3-18 Tables 11.3-3,4 Tables 11.3-3,4 TAB 11.4 11.4-1 to 11.4-14 11.4-1 to 11.4-15 I 7091NSTV.wp  !

SYSTEM 80+ CESSAR-DC .

AMENDMENT V - PAGE CHANGE INSTRUCTIONS i REMOVE ADD

PAGE NO. PAGE NO.

2 TAB 11.5 11.5-1 to 11.5-21 11.5-1 to 11.5-23 CHAPTER 12 TAB 12.0 Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents, iii,iv Table of Contents, iii,iv TAB 12.1 12.1-3,4 12.1-3 to 12.1-4b TAB 12.3 12.3-5,6 12.3-5,6 12.3-9,10 12.3-9,10 Table 12.3-5, Sheets 1,2 Table 12.3-5, Sheets 1,2 TAB 12.4 12.4-3,4 12.4-3,4 Tables 12.4-3 to 12.4-5 Tables 12.4-3 to 12.4-5 CHAPTER 13 TAB 13.0 Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 13.3-3,4 13.3-3,4 l

1 I

7091NSTV.wp

~ - . __

~

l

. SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS j REMOVE ADD PAGE NO. PAGE NO.

CHAPIER 14 TAB 14.0 Effective Page Listing, Sheets 1 to 4 Effective Page Listing, Sheets 1 to 4 TAB 14.2 14.2-53,54 14.2-53,54 14.2-85,86 14.2-85,86-14.2-183,184 14.2-183,184 ,

14.2-201,202 14.2-201,202 l

14.2-219,220 14.2-219,220  :

Tables 14.2-2,3 Tables 14.2-2,3 j 14.2-53 to 14.2-60 14.2-53 to 14.2-60 l TAB 14.3 14.3-1,2 14.3-1,2 14.3-5,6 14.3-5 to 14.3-6b 14.3-9 to la 3-14 14.3-9 to 14.3-14 CHAPTER 15 TAB APPENDIX 15A Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Tables 15A-9,10 Tables 15A-9,10 CHAPTER 17 TAB 17.0 Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Table of Contents, i,ii Table of Contents, i,ii 17.1-1 17.1-1 17.2-1 17.2-1 17.3-1 to 17.3-12 17.3-1 to 17.3-16 Table 17.3-4 Table 17.3-4 709INSTV.wp -. .. .-.

di SYSTEM 80+ CESSAR-DC .

AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

CHAPTER 18 TAB 18.0 Effective Page Listing, Sheets 1 to 4 Effective Page Listing, Sheets 1 to 4 Table of Contents, xix,xx Table of Contents, xix,xx 4

TAB 18.5 1

Table 18.5.4-1, Sheets 3,4 Table 18.5.4-1, Sheets 3,4 4

TAB 18.6 4 18.6-15,16 18.6-15,16 TAB 18.7 l

l j 18.7-17 to 18.7-24 18.7-17 to 18.7-24 1 18.7-33,34 18.7-33,34 i 18.7-41,42 18.7-41,42 i i 18.7-49,50 18.7-49,50

{ Table 18.7.1-1, Sheets 1,2 Table 18.7.1-1, Sheets 1,2 Figures 18.7.1-15,16 Figures 18.7.1-15,16 18.7-69 to 18.7-72 18.7-69 to 18.7-72 i 18.7-77,78 18.7-77,78 l 18.7-111 to 18.7-114 18.7-111 to 18.7-114

} 18.7-117,118 18.7-117,118 1

Figures 18.7.3-13,14 Figures 18.7.3-13,14 4 Figures 18.7.3-31,32 Figures 18.7.3-31,32 l Figures 18.7.3-37,38 Figures 18.7.3-37,38

. 18.7-129,130 18.7-129,130

! 18.7-135,136 18.7-135,136 d

l TAB 18.10 -

1 18.10-1,2 18.10-1,2 l

7091NSTV.wp -l8-

o l SYSTEM 80+ CESSAR-DC l AMENDMENT V - PAGE CIIANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

CHAPTER 19 TAB 19.0 l

Effective Page Listing, Sheets 1 to 33 Effective Page Listing, Sheets 1 to 33 l Table of Contents, xv,xvi Table of Contents, xy,xvi xxxv,xxxvi xxxv,xxxvi xlv,xlvi xlv,xlvi TAB 19.2 j 19.2-3,4 19.2-3,4 19.2-7,8 19.2-7,8 19.2-13 to 19.2-20 19.2-13 to 19.2-20 19.2-23 to 19.2-26 19.2-23 to 19.2-26 TAB 19.3 19.3-3 to 19.3-8 19.3-3 to 19.3-8 Table 19.3.2-2, Sheets 3,4 Table 19.3.2-2, Sheets 3,4 Table 19.3.2-8, Sheets 1,2 Table 19.3.2-8, Sheets 1,2 19.3-9 to 19.3-14 19.3-9 to 19.3-14 TAB 19.4 19.4-7,8 19.4-7,8 19.4-17 to 19.4-19.4-20 19.4-17 to 19.4-20 19.4-23 to 19.4-28 19.4-23 to 19.4-28 19.4-33 to 19.4-36 19.4-33 to 19.4-36 19.4-43,43a 19.4-43,43a 19.4-45b to 19.4-50 19.4-45b to 19.4-50b 19.4-53 to 19.4-56 19.4-53 to 19.4-56 19.4-61 to 19.4-64 19.4-61 to 19.4-64 19.4-67 to 19.4-70 19.4-67 to 19.4-70 19.4-73 to 19.4-76 19.4-73 to 19.4-76 19.4-79,80 19.4-79,80 19.4-85 to 19.4-90 19.4-85 to 19.4-90 19.4-97,98 19.4-97,98 19.4-103,104 19.4-103,104 19.4-109 to 19.4-114 19.4-109 to 19.4-114 19.4-119 to 19.4-124 19.4-119 to 191.4-124 7091NSTV.wp -19

I SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CIIANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

19.4-129 to 19.4-134 19.4-129 to 19.4-134 19.4-139 to 19.4-146 19.4-139 to 19.4-136 19.4-153b,154 19.4-153b,154 19.4-157,158 19.4-157,158 19.4-169,170 19.4-169,170 19.4-173,174 19.4-173,174 19.4-179,180 19.4-179,180 19.4-191,192 19.4-191,192 19.4-195 19.4-195 TAB 19.5 -

19.5-1,2 19.5-1,2 19.5-9 to 19.5-12 19.5-9 to 19.5-12 19.5-17,18 19.5-17,18 Table 19.5-3, Sheets 1,2 Table 19.5-3, Sheets 1,2 TAB APPENDIX 19.5B 19.5B-7 to 19.5B-10 19.5B-7 to 19.5B-10 TAB APPENDIX 19.5C i 19.5C-71 to 19.5C-72b 19.5C-71 to 19.5C-72b 1 TAB 19.6 19.6-13,14 19.6-13,14 19.6-15,16 19.6-15,16 19.6-19,20 19.6-19,20 Table 19.6.3.1-1, Sheets 1,2 Table 19.6.3.1-1, Sheets 1,2 19.6-29 to 19.6-34 19.6-29 to 19.6-34 Figures 19.6.3.2-1, Sheet 3, Figure 19.6.3.2-1, Sheets 3,4 19.6.3.2-2, Sheet 4 Figures 19.6.3.2-2, Sheet 3, Figure 19.6.3.2-2, Sheets 3,4 19.6.3.2-1, Sheet 4 19.6-35 to 19.6-38 19.6-35 to 19.6-38 19.6-41 to 19.6-46 19.6-41 to 19.6-46 19.6-69 to 19.6-74 19.6-69 to 19.6-74 '

19.6-93,94 19.6-93,94 Table 19.6.3.10-1, Sheets 1,2 Table 19.6.3.10-1, Sheets 1,2 Table 19.6.3.13-1, Sheets 1 to 16 Table 19.6.3.13-1, Sheets 1 to 16 19.6-121 to 19.6-124 19.6-121 to 19.6-124 7091NSTV.wp  ;

1

. SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

Table 19.6.3.14-2, Sheets 1 to 7 Table 19.6.3.14-2, Sheets 1 to 7 19.6-135,136 19.6-135,136 19.6-139,140 19.6-139,140 Table 19.6.3.16-1, Sheets 1,2 Table 19.6.3.16-1, Sheets 1,2 19.6-157,158 Table 19.6-157,158 Table 19.6.4.1-1, Sheets 1 to 3 Table 19.6.4.1-1, Sheets 1 to 3 19.6-161,162 19.6-161,162 19.6-169,170 19.6-169,170 19.6-183 to 19.6-186 19.6-183 to 19.6-186 TAB APPENDIX 19.6A Effective Page Listing, Sheet 1 Effective Page Listing, Sheet 1 Table 19.6A-1, Sheets 5,6 Table 19.6A-1, Sheets 5,6 TAB 19.7 19.7-1 to 19.7-4 19.7-1 to 19.7-4 19.7-9 to 19.7-12 19.7-9 to 19.7-12 19.7-17 to 19.7-24 19.7-17 to 19.7-24 19.7-25,26 19.7-25,26 19.7-28a,28b 19.7-28a,28b 19.7-31,32 19.7-31,32 19.7-33,34 19.7-33,34 19.7-39,40 19.7-39,40 19.7-43,44 19.7-43,44 Table 19.7.5.1-2 Table 19.7.5.1-2 19.7-61 to 19.7-66 19.7-61 to 19.7-66 Tables 19.7.5.2.6-13,14 Tables 19.7.5.2.6-13,14 19.7-71,72 19.7-71 to 19.7-72 19.7-75,76 19.7-75,76 Table 19.7.5.4-2, Sheets 1,2 Table 19.7.5.4-2, Sheets 1,2 TAB 19.8 19.8-3 to 19.8-4 19.8-3 to 19.8-4 19.8-5 to 19.8-8 19.8-5 to 19.8-8 19.8-9,10 19.8-9,10 19.8-15 to 19.8-20 19.8-15 to 19.8-20 19.8-35,36 19.8-35,36 Tables 19.8.4.3-1,2 Tables 19.8.4.3-1,2 709INSTV.wp L

l SYSTEM 80+ CESSAR-DC .  !

AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

19.8-41,42 19.8-41,42 19.8-42e,42f 19.8-42e,42f 19.8-43,44 19.8-43,44 19.8-45 to 19.8-48 19.8-45 to 19.8-48 19.8-57,58 19.8-57,58 19.8-79,80 19.8-79,80 19.8-81,8'2 19.8-81,82 TAB APPENDIX 19.8A i,ii i,ii 1-1,2 1-1,2 2-1 2-1 2.1-1,2 2.1-1,2 2.2-1,2 2.2-1,2 2.3-1,2 2.3-1,2 2.3-7,8 2.3-7,8 2.5-9,10 2.5-9,10 2.5-13,14 2.5-13,14 2.9-3 to 2.9-5 2.9-3 to 2.9-5 2.12-5,6 2.12-5,6 Last page of Response 440.170 with Five sheets starting with response 440.170 back of page showing Question 440.171 (continued), ending with front of page showing Question 440.171 (no page numbers included)

TAB 19.9 19.9-1,2 19.9-1,2 Tables 19.9.1-1 to 19.9.1-4 Tables 19.9.1-1 to 19.9.1-4 Table 19.9.2.1-1 Table 19.9.2.1-1 Table 19.9.2.3-1 Table 19.9.2.3-1 19.9-8a to 19.9-10 19.9-8a to 19.9-10 Table 19.9.2.4-1 Table 19.9.2.4-1 Table 19.9.2.5-1, Sheets 1,2 Table 19.9.2.5-1, Sheets 1,2 Table 19.9.2.6-1 Table 19.9.2.6-1 19.9-17,18 19.9-17,18 Table 19.9.2.7-1 Table 19.9.2.7-1 19.9-19,20 19.9-19,20 Table 19.9.2.8-1 Table 19.9.2.8-1 Table 19.9.2.9-1 Table 19.9.2.9-1 7091NSTV.wp t ,

I 4

e SYSTEM 80+ CESSAR-DC'

] .

j AMENDMENT V - PAGE CHANGE INSTRUCTIONS REMOVE ADD i PAGE NO. PAGE NO.

I Table 19.9.2.10-1 Table 19.9.2.10-1 j Table 19.9.2.11-1 Table 19.9.2.11-1 19.9-27,28 19.9-27,28 i

! Table 19.9.2.12-1 Table 19.9.2.12  !

. ' Table 19.9.2.13-1, Sheets 1 to 3 Table 19.9.2.13-1, Sheets 1 to 3  !

19.9 33,34 19.9-33,34 i Table 19.9.3.1-1 Table 19.9.3.1-1 l l 19.9-35,35a 19.9-35,35a i

! 19.9-37,38 19.9-37,38 l j 19.9-45,46 19.9-45,46 TAB 19.10 i

I 19.10-1,2 19.10-1,2  !

e 19.10-5 to 19.10-16 19.10-5 to 19.10-16

] TAB 19.11 .!

I l 19.11-1 to 19.11-4 19.11-1 to 19.11-4  :

, 19.11-5 to 19.11-10. 19.11-5 to 19.11-10 l Figure 19.11.3.1-3 Figure 19.11.3.1-3 l

! 19.11-13,14 19.11-13,14 l 19.11-21 to 19.11-24 19.11-21 to 19.11-24 l 19.11-27 to 19.11-34 19.11-27 to 19.11-34

! 19.11-35,36 19.11-35,36 l 19.11-43,44 19.11-43,44 i

! 19.11-45 to 19.11-58 19.11-45 to 19.11-58 i l 19.11-63 to 19.11-66 19.11-63 to 19.11-66 i Table 19.11.4.1.1-1 Table 19.11.4.1.1-1 i Table 19.11.4.1.1-2 Table 19.11.4.1.1-2 l Table 19.11.4.1.1-4 Table 19.11.4.1.1-4 19.11-79 to 19.11-90 19.11-79 to 19.11-90 i Table 19.11.4.1.2-4 Table 19.11.4.1.2-4

19.11-93 to 19.11-110 19.11-93 to 19.11-110

, Table 19.11.4.1.3-6 Table 19.11.4.1.3-6 j Figures 19.11.4.1.3-1,2 Figures 19.11.4.1.3-1,2 i 19.11-111 to 19.11-124 19.11-111 to 19.11-124 i~

Tables 19.11.4.2.1-3,4 Tables 19.11.4.2.1-3,4 19.11-135 to 19.11-138 19.11-135 to 19.11-138

19.11-141 to 19.11-144 19.11-141 to 19.11-144b i 19.11-145 to 19.11-148 19.11-145 to 19.11-148 h

709INSTV.wp i'

- __ _ , ~ , . . .~ .- ,_ _. _ . . _ _ . _ . . , . . . . . . _ _ _ . _ _ . _ , _ . _ _ . - . , . , _ _ . _ . - . . . . . . . . -

{ .

j SYSTEM 80+ CESSAR-DC .

AMENDMENT V - PAGE CIIANGE INSTRUCTIONS l

REMOVE ADD PAGE NO. PAGE NO.

Table 19.11.4.2.4-1 Table 19.11.4.2.4-1 19.11-149 to 19.11-156 19.11-149 to 19.11-156 19.11-163 to 19.11-182r 19.11-163 to 19.11-182v Tables 19.11.4.4-1 to 19.11.4.4-5E Tables 19.11.4.4-1 to 19.11.4.4-5D Table 19.11.4.4-5E Table 19.11.4.4-6 Table 19.11.4.4-6, Sheets 1,2 TAB APPENDIX 19.11F Add new TAB: APPENDIX 19.11G Active Cladding Oxidation, after Figure 19.11F-3 Add new Appendix 19.11G, i.e.:

Effective Page Listing, Sheet 1 Cover Sheet Table of Contents, i to lii l 19.11G-1 to 19.11G-3 l

Table 19.11G-1 Figures 19.11G-1,2 Add new TAB: APPENDIX 19.11H Containment Fragility Curve, after Figure 19.11G-2 Add new Appendix 19.11H, i.e.:

Effective Page Listing, Sheet 1 l Cover Sheet l Table of Contents, i,ii 19.11H-1 to 19.11H-3 l Table 19.11H-1 TAB 19.12 19.12-9 to 19.12-14 19.12-9 to 19.12-14 Table 19.12.1-6, Sheets 1 to 4 Table 19.12.1-6, Sheets 1 to 4 Table 19.12.1-7, Sheets 1 to 3 Table 19.12.1-7, Sheets 1 to 3 19.12-17 to 19.12-24 19.12-17 to 19.12-24 l 19.12-27,28 19.12-27,28 l

19.12-29,30 19.12-29,30 19.12-35,36 19.12-35,36 l 19.12-37b to 19.12-38b 19.12-37b to 19.12-38b 19.12-43 to 19.12-48 19.12-43 to 19.12-48 l 7091NSTV.wp - ._- . . .

Y

. SYSTEM 80+ CESSAR-DC AMENDMENT V - PAGE CIIANGE INSTRUCTIONS REMOVE ADD PAGE NO. PAGE NO.

1 19.12-55 to 19.12-72 19.12-55 to 19.12-72 19.12-73 to 19.12-78 19.12-73 to 19.12-78 19.12-81 to 19.12-92 19.12-81 to 19.12-92 19.12-99 to 19.12-102 19.12-99 to 19.12-102 19.12-103,104 19.12-103,104 19.12-109,110 19.12-109,110 19.12-111 to 19.12-116 19.12-111 to 19.12-116 -

.19.12-121,122 19.12-121,122 l 19.12-125 to 19.12-129 19.12-125 to 19.12-129 l Table 19.12.3-1, Sheets 1,2 Table 19.12.3-1, Sheets 1,2 Figure 19.12.3-1, Sheets 1,2 Figure 19.12.3-1, Sheets 1,2 TAB 19.13 19.13-1,2 19.13-1,2 TAB 19.14 19.14-1 to 19.14-6b 19.14-1 to 19.14-10 ,

Table 19.14.1-1, Sheets 1,2 Table 19.14.1-1, Sheets 1,2 l 19.14-7 to 19.14-12 19.14-11 to 19.14-16 l TAB 19.15 l

I 19.15-1 to 19.15-10 19.15-1 to 19.15-10

! Table 19.15-1, Sheets 1 to 14 Table 19.15-1, Sheets 1 to 18 Table 19.15.1-1 Table 19.15.1-1 19.15-11 to 19.15-46 19.15-11 to 19.15-46 Table 19.15.2-2, Sheets 1 to 3 Table 19.15.2-2, Sheets 1 to 3 - l Table 19.15.2-3, Sheets 1,2 Table 19.15.2-3, Sheets 1,2 19.15-47 to 19.15-60b 19.15-47 to 19.15-60b 19.15-61 to 19.15-68 19.15-61 to 19.15-68 q 19.15-72a,72b 19.15-73,74 -!

19.15-73 19.15-75,76 Add new Table 19.15.6-1, Sheets 1 to 18 -

Add new Table 19.15.6-2, Sheets 1,2 19.15-77 '

l 7091NSTV.wp L___-__---_____ -. . , .. ., - - _.. - .- -.,,. - .-

l

]

l l SYSTEM 80+ CESSAR-DC -

AMENDMENT V - PAGE CIIANGE INSTRUCTIONS  !

4 REMOVE ADD I

PAGE NO. PAGE NO.

i TAB 19.16 19.16-3,4 19.6-3,4 19.16-7,8 19.16-7,8

! 19.16-17,18 19.16-17 to 19.16-19 i TAB APPENDIX 19A Effective Page Listing, Sheets 1,2 Effective Page Listing, Sheets 1,2 Table of Contents,-i,ii Table of Contents, i,ii v,vi v,vi l_ 19A-1 to 19A-27 19A-1 to 19A-27 Tables 19A.2-1 to 19A.5-22 Tables 19A.2-1 to 19A.5-22 4

4 REMOVE TAB A: CLOSURE OF Replace with new TAB: 20.0 Closure of UNRESOLVED AND GENERIC SAFETY Unresolved and Generic Safety Issues

ISSUES Remove Appendix A in its entirety Replace with new Chapter 20, i.e.,

Effective Page Listing, Sheets 1 to 3

]

, Table of Contents i to ix

20.0-1 to 20.2-200 i

e r

N 4

i 3 l 4

709INSTV.wp _ _ _ _ _ _. _. _ _ _ ,- . . . _ - _ _ _