L-2022-109, Inservice Inspection Program - Owners Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
Inservice Inspection Program - Owners Activity Report (OAR-1)
ML22178A112
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/27/2022
From: Strand D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2022-109
Download: ML22178A112 (4)


Text

FPL U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 lnservice Inspection Program Owner's Activity Report (OAR-1)

June 27, 2022 L-2022-109 10 CFR 50.55a Attached find the Owner's Activity Report (Form OAR-1 ), for Turkey Point Unit 4 (PTN4-33), Fifth lnservice Inspection Interval, Third Period, and IWE Third Interval, Second Period. The Form OAR-1, Owner's Activity Report, implements Code Case N-532-5.

Should there be any questions concerning this report, please contact Mrs. Cynthia Cashwell, Regulatory Affairs Manager, at 305-246-1631.

~~ /~r General Manager Regulatory Affairs Florida Power & Light Company Attachment cc:

Regional Administrator, Region 11, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 S.W. 3441" Street Homestead, FL 33035

Report Number: ISI-PTN-4-2022 Plant:

Turkey Point Nuclear Power Plant Unit 4 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: September 7, 1973 Current Inspection Interval: ISi-Fifth and IWE-Third Refueling Outage No.: PTN 4-33 Current Inspection Period: ISi Fifth Interval-Third and IWE Third Interval -Second Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition through the 2008 Addenda and IWE Third lnterval-2007 Edition through the 2008 Addenda Date and Revision of inspection plans: ISi Fifth Interval Effective-January 7, 2020 Rev.2 and IWE-July 15, 2018 Rev.a Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 2007 Edition through 2008 Addenda, Code Cases Used: N-532-5, N-731, N-722-1, N-798 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and {c) the repair/replacement activities and evaluations supporting the completion of PTN4-33 conform to the requirements of Section XI.

!lgmil*r*9'1odbyllilmGuth M *1tc h Guth

!lll:m-llit<l-,Gutii,o-fngin.. ongl't"9t:1lnt,*1rl'itl 1+/-n;hareins.,4~:1l,-rnitc!tguth~t..wm,-:J... 1, 611 7122 Signed ___________

0_,,_.,,_*=_"_*"_"0_--"5_*<<_-..

_-_____ Date ______ _

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the OWner has perfom1ed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

--~"'""""'-

......__ _____ Commlssions _ _.:...;/ lt;;:...1.;...t<{.....__-As:"'"-f-,"'"'b?-+1_:t ____ _

~ignature National Board Number and Endorsement Date

(, f n /,:.ct,?.-

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number E-A Moisture Barrier Degradation AR02421997 and AR02422598 E1.30 Discovery: Several areas were identified damaged on the moisture barrier located on the 14' elevation.

During the repair phase of the moisture barrier, water was observed to be flowing out of the containment moisture barrier and pooling on the 14-foot elevation of the containment building. Chemical analysis confirmed that water in the moisture barrier was borated water. The source of the borated water was either from the refueling cavity or the spent fuel pool (SFP). The water was pumped from the moisture barrier after cavity drained down.

==

Conclusion:==

An engineering analysis requested the entire moisture barrier to be removed, washed, and left removed to allow the joint to dry during the current run cycle. The moisture barrier will be replaced during PTN 4-34. The repair task are included in WO40821680.

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number Replace 2" pipe 2/B Weld Leak section to 90° elbow 12/17/2020 RR40756486-01 due to weld leak 14" Dia. FW Replace 10ft of 14" 2/B Piping dia. piping with one 90 3/31/2022 RR40747277-01 Replacement deg elbow "A" SG Tube 4 Tubes were plugged 1/A Plug and 3 had tube 3/28/2022 RR40754514-01 stabilizers added 1/A "B" SG Tube 1 Tube was plugged 3/28/2022 RR40754685-01 Plug 1/A "C" SG Tube 2 Tubes were plugged 3/28/2022 RR40754713-01 Plug