Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.
ML16204A051
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/20/2016
From: Boles B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-16-220, RIS-16-09
Download: ML16204A051 (3)


Text

FENOC' 5501 North State Route 2 Oak Harbor, Ohio 43449 RrstEnergy Nuclear Operating Company Brian D. Boles 419-321-7676 Vice President, Fax: 419-321-7582 Nuclear July 20, 2016 L-16-220 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2021 for Initial Operator License Examinations and through calendar year 2018 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T.

Hartnett, Superintendent - Nuclear Operations Training at (419) 249-2396.

Sincerely,

~~~

Brian D. Boles vaw

Enclosure:

NRC Form 536 - Operator Licensing Examination Data j

\

cc: Regional Administrator, NRG Region Ill DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRG Region Ill Utility Radiological Safety Board

Enclosure L-16-220 Form NRG- 536

\ Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150--0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.,.t."'A REGu,:

~v ,._,.. information collection is used to plan budgets and resources for operator examinations. Send

~

I!!

,70'9..._

n 0

OPERATOR LICENSING EXAMINATION DATA comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~.,...,

. ~o{' NEOB-10202, (3150-0131), Office of Management and Budget, Washington. DC 20503. If a means used 1o impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Davis-Besse Nuclear Power Station 111 A. PROPOSED EXAMINATION PREPARATION SCHEDULE -

CY 18 CY 19 CY 20 CY 21 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 1 EXAMlNATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 18 CY 19 CY 20 CY 21 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 0 7 7 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 0 5 5 NUMBER OF'SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITE:D 0 0 0 0 PROPOSED DATES PRIMARY DATE 21312020 12/6/2021 ALTERNATE DATE

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH

. CY

- 17 SEPTEMBER MARCH CY

--- 18 SEPTEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRG FORM 536 (05-2016)